SlideShare a Scribd company logo
Summary:
Advanced Notice of Proposed Rulemaking
Released August 2011
By John Beets
Principal GIS Technologist, Willbros Engineering


An Advanced Notice of Proposed Rulemaking (ANPRM) was released by the Pipeline and Hazardous Materials Safety
Administration (PHMSA) in August 2011. High profile incidents, such as the PG&E failure in San Bruno, CA, have
instigated a push by Federal regulatory agencies for additional safety measures for gas transmission pipelines. This
ANPRM is requesting public comment on 14 specific topics in two broad categories. At some point following the review
period, PHMSA will release a Notice of Proposed Rulemaking (NPRM) that will incorporate comments/questions they
receive as a result of this ANPRM. This will allow another round of public comment/questions before a final rule is
released. It is difficult to predict the time frame for release of a final rule – past experience might indicate this could
occur very late in 2012, but more likely sometime in 2013.

The purpose of this document is to provide a brief summary of the content of the ANPRM in order to present a snapshot
of issues that may be under consideration for a revised final rule. An analysis of the information contained in the
ANPRM is not included.

Category 1: Should integrity management requirements be revised and strengthened to bring more pipeline mileage
under integrity management requirements and to better assure safety of pipeline segments in high-consequence
areas (HCAs)?

Topics:
1. Modify HCA definition to expand pipeline mileage in HCAs? This could be done by:
   a. Revising (decreasing) the count for buildings intended for human occupancy
   b. Expanding the definition of identified sites
   c. Making all Class 3 and 4 locations HCA – also increase the width for determining class location on pipelines
      over 24” outside diameter (OD) operating above 1,000 pounds per square inch gauge (psig)
   d. Increasing the HCA buffer beyond that determined by the potential impact radius (PIR)
   e. Considering presence of electric transmission lines or other critical infrastructure within the pipeline
      right-of-way (ROW)
   f. Allowing general public/local communities to provide input into identification of HCAs

2. Strengthen requirements to implement preventative and mitigative measures for pipeline segments in HCAs:
   The current rule requires operators to take additional preventative and mitigative measures in HCAs, but these
   measures are not specified. Risk analysis is to be used to identify additional measures appropriate to the HCA,
   but the current rule does not establish objective criteria or standards on how to determine what measures should
   be taken. PHMSA is considering additional prescriptive requirements to improve selection and implementation
   decisions for preventative and mitigative measures within and, potentially, outside of HCAs.

3. Modification of repair criteria: Changes to repair criteria to provide greater assurance of anomalies/defects being
   repaired before leading to a leak or rupture and whether these criteria need to be expanded to segments outside



Willbros Group, Inc. • 4400 Post Oak Parkway, Suite 1000, Houston, Texas 77027 • 713.403.8000 • www.willbros.com              1
© 2011 Willbros • All Rights Reserved.
Summary: Advanced Notice of Proposed Rulemaking


   of HCAs. This could involve the following:
   a. Revision of the repair criterion to add an additional safety margin
   b. Risk ranking – conditions in HCAs addressed first, followed by non-HCA areas
   c. Adjustment of repair schedules in both HCA and non-HCA areas
   d. Potential standards to account for known accuracy of inline inspection (ILI) tools that are consistent across
      all ILI vendors and operator
   e. Potential methods for validation of tool performance such as validation digs or analysis of as-found versus
      as-predicted defect dimensions
   f. Standards for conducting inline inspections, specific interpretation of personnel qualifications, integration
      of other data sources with ILI

4. Improving requirements for collecting, validating and integrating pipeline data:
   a. Require validation methods be in place, such as pipeline excavations
   b. Require collection of data during pipeline exposure to validate information in the operator’s records
   c. Verify critical pipe data, coating, testing, and operations and maintenance (O&M) records on a periodic basis
      (requirements become more prescriptive)

5. Making requirements related to the nature and application of risk models more prescriptive: PHMSA’s experience
   indicates that majority of operators use relative index-model approaches to risk assessment. PHMSA is not convinced
   as to the robustness of this method. Possible changes discussed:
   a. Strengthen requirements on functions risk models perform
   b. Mandate usage of a specific risk model
   c. Improve existing models to assure usefulness
   d. Push to use more quantitative models is contemplated

6. Strengthening requirements for applying knowledge gained through the integrity management (IM) program: This
   is related to the current regulation requiring operators to consider other portions of their systems if an assessment
   identifies corrosion requiring repair. Intention is to strengthen requirements related to operator’s use of insights
   gained from implementation of their IM program:
   a. Potential requirements for updating risk models as additional knowledge is gained
   b. Guidelines or requirements related to data integration and/or updating of aerial imagery or patrolling
   c. Specification of a maximum time period for review and validation of risk assessments
   d. Potential data requirements for data integration

7. Strengthening requirements on the selection and use of assessment methods: Currently four methods –
   ILI, pressure test, direct assessment and other technology demonstrated to provide an equivalent understanding
   of pipe condition. Possible changes discussed:
   a. Require ILI wherever possible – include requirements to expand line modifications to accommodate ILI
   b. Restrictions on use of other assessment technologies
   c. Establish standards for conducting ILI assessments – incorporate by reference into regulations


Willbros Group, Inc. • 4400 Post Oak Parkway, Suite 1000, Houston, Texas 77027 • 713.403.8000 • www.willbros.com           2
© 2011 Willbros • All Rights Reserved.
Summary: Advanced Notice of Proposed Rulemaking


   d. Establish standards for conducting Internal Corrosion Direct Assessment (ICDA) and Stress Corrosion Cracking
      Direct Assessment (SCCDA) – incorporate by reference into regulations
   e. Require a onetime pressure test to address manufacturing and construction defects

Category 2: Should non-IM requirements be strengthened or expanded to address other issues associated with
pipeline system integrity?

Topics:
1. Valve spacing and the need for remotely or automatically controlled valves: Current regulation specifies block
   valve spacing by class location on newly built lines. Remotely operating and/or automatic valves are not currently
   required. Potential changes:
   a. Change spacing requirements for new lines
   b. Explicitly require new valves in the event of class change to meet spacing requirements
   c. Explicitly require new valves under other (non-class change) conditions
   d. Require remotely controlled sectionalizing block valves
   e. Require prescriptive design criteria for operator evaluation of additional valves, remote closure and/or
      valve automation

2. Corrosion control: Requirements related to external, internal and atmospheric corrosion:
   a. Require post-construction surveys for coating damage or to determine Cathodic Protection (CP) adequacy
   b. Require periodic interference current surveys (such as Close Interval Survey – CIS)
   c. Add additional measures to prevent internal corrosion (such as ILI runs or accumulated liquids sampling)
   d. Include practices or standards addressing prevention, detection, assessment and remediation of SCC – requiring
      additional surveys or shorter internal surveys based on pipeline operating temperatures and coating types
   e. Prescribe CIS external corrosion control survey timing intervals for both HCAs and non-HCAs that are used
      to determine CP effectiveness
   f. Provide specific HCA and non-HCA corrosion control measures with clearly defined conditions and appropriate
      mitigation efforts
   g. Perform a critical analysis of all factors influencing SCC to determine if a credible threat exists for each
      pipeline segment
   h. Require SCC integrity assessment in segments where a credible threat has been identified
   i. Require a periodic analysis of operator corrosion management programs, integrating all relevant data
   j. Require operators to periodically submit corrosion management performance metric data

3. Pipe manufactured using longitudinal weld seams: This is meant to address longitudinal seam weld issues with
   pipe manufactured primarily before 1970 and pressure test grandfathering for lines built prior to 1971 (allowing
   operations at a maximum allowable operating pressure (MAOP) based on the highest 5-year operating pressure
   prior to July 1, 1970 in lieu of a pressure test):
   a. Require all pipelines that have not been pressure tested at or above 1.1 times MAOP or class location test criteria
      to be pressure tested in accordance with present regulation



Willbros Group, Inc. • 4400 Post Oak Parkway, Suite 1000, Houston, Texas 77027 • 713.403.8000 • www.willbros.com            3
© 2011 Willbros • All Rights Reserved.
Summary: Advanced Notice of Proposed Rulemaking


   b. Alternatively, require specific types of pipe with an operating history that demonstrates systemic integrity issues
      to be pressure tested in accordance with present regulation, e.g., low-frequency electric resistance welded
      (LF-ERW), direct current electric resistance welded (DC-ERW), lap-welded, electric flash welded (EFW), furnace
      butt welded, submerged arc welded or other longitudinal seams
   c. Define alternative minimum test pressures
   d. Provide additional pressure test requirements to all pipelines, or only pipelines in HCAs, or only pipelines in
      Class 2, 3, or 4 areas
   e. Specify other technologies that may reliably find and remediate seam integrity issues

4. Establishing requirements applicable to underground gas storage: PHMSA may develop standards covering
   underground gas storage facilities. This could include:
   a. Safety standards for casing, tubing, isolation packer and wellbore communication and wellhead equipment
   b. Standards for monitoring of external/internal corrosion
   c. Standards for welding, pressure testing and design safety factors of casing and tubing
   d. Emergency shutdowns for wellhead valves
   e. Integrity and O&M intervals for key safety and CP systems
   f. Standards for emergency shutdowns, emergency shutdown stations, gas monitors, local emergency response
      communications, public communications and O&M procedures

5. Management of change: PHMSA pipeline safety regulations do not now address management process subjects
   such as management of change. PHMSA is considering adding requirements in this area to provide a greater degree
   of control over this element of pipeline risk:
   a. Development of standards governing the management of change process including requirements for IM proce-
      dures, O&M manuals, facility drawings, emergency response plans and procedures and documents required
      to be maintained for the life of the pipeline
   b. Consider incorporating like standards from other industries

6. Quality Management Systems (QMS): Quality management includes the activities and processes that an organization
   uses to achieve quality. These include formulating policy, setting objectives, planning, quality control, quality
   assurance, performance monitoring and quality improvement. PHMSA’s pipeline safety regulations do not now
   address process management issues such as QMS. PHMSA may institute formal requirements for QMS into the
   regulation. They are asking the industry for information on existing quality assurance standards and practices currently
   in use that might be adopted. Should QMS be applied to all or some pipelines and does it apply to the complete
   lifecycle? Do operators commonly require their contractors to maintain and use formal QMS?

7. Exemption of facilities installed prior to the regulations: This is to address the MAOP exemption for pre-1970 pipelines
   that operate above 72% specified minimum yield strength (SMYS) and also includes use of materials manufactured
   prior to 1970. The changes could include requirements for periodic pressure tests, in-line inspections, coating
   examination, CP surveys and expanded requirements on interference currents and depth of cover maintenance for
   these lines. This could be for all pipelines or targeted to those with a vintage history of systemic integrity issues
   in areas such as longitudinal weld seams or steel quality.



Willbros Group, Inc. • 4400 Post Oak Parkway, Suite 1000, Houston, Texas 77027 • 713.403.8000 • www.willbros.com              4
© 2011 Willbros • All Rights Reserved.
Summary: Advanced Notice of Proposed Rulemaking


8. Modifying the regulation of gas gathering lines: Recent developments in the field of gas exploration and production,
   such as shale gas, indicate that the existing framework for regulating gas gathering lines may no longer be appropri-
   ate. Gathering lines are being constructed to transport shale gas that range from 12 to 36 inches in diameter with
   an MAOP of 1,480 psig, far exceeding the historical operating parameters of such lines. Moreover, enforcement of
   the current requirements has been hampered by the conflicting and ambiguous language of American Petroleum
   Institute Recommended Practice 80 (API RP 80), a complex standard that can produce multiple classifications for
   the same pipeline system. Gathering regulation may be modified as follows:
   a. Require submission of annual incident and safety-related conditions reports
   b. Include a new definition for gathering in the regulation
   c. Establish new, risk-based safety requirements for large diameter, high pressure gathering lines in rural locations
   d. Consider short sections of pipeline downstream of processing, compression and similar equipment to be
      a continuation of gathering
   e. Adopt specific requirements for pipelines associated with landfill gas systems (due to increased concentrations
      of hydrogen sulfide and/or carbon dioxide)
   f. Enhance requirements for internal corrosion control
   g. Apply gas integrity management requirements to all onshore gas gathering




Willbros Group, Inc. • 4400 Post Oak Parkway, Suite 1000, Houston, Texas 77027 • 713.403.8000 • www.willbros.com           5
© 2011 Willbros • All Rights Reserved.

More Related Content

PDF
PHMSA Draft Regulations to Regulate Local Gathering Pipelines for Gas & Oil
PDF
Babst Calland Bulletin on Proposed PHMSA Change in Pipeline Regulations for N...
PDF
Assay Improvement for Protein Therapeutics at Clinical Development Stage
PDF
21 cfr part 11 hplc
PDF
Download-manuals-water quality-wq-manuals-gwvolume6designmanualwaterqualitys...
PDF
An Enterprise Approach to Engine Test Analysis: Requirements for Implementation
 
PDF
White Paper Available from the PPIM Conference: Pipeline Regulation and Dire...
PDF
AN OVERVIEW OF PHARMACEUTICAL PROCESS VALIDATION AND PROCESS CONTROL VARIABLE...
PHMSA Draft Regulations to Regulate Local Gathering Pipelines for Gas & Oil
Babst Calland Bulletin on Proposed PHMSA Change in Pipeline Regulations for N...
Assay Improvement for Protein Therapeutics at Clinical Development Stage
21 cfr part 11 hplc
Download-manuals-water quality-wq-manuals-gwvolume6designmanualwaterqualitys...
An Enterprise Approach to Engine Test Analysis: Requirements for Implementation
 
White Paper Available from the PPIM Conference: Pipeline Regulation and Dire...
AN OVERVIEW OF PHARMACEUTICAL PROCESS VALIDATION AND PROCESS CONTROL VARIABLE...

What's hot (17)

DOC
WestmorelandThomas-2
PDF
Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartvii
PDF
PII Paper for PetroMin Gas Pipeline Conference
DOC
R_ActCH03_ARQD_12Mar2015
PDF
Richard Nussbaum, PE, RG, MDNR, Hazardous Waste Program Permits Section Updat...
PPTX
Aged aircraft maintenance.
PDF
VFD_QAM_1-_AAR_M-1003_Rev_B_-_04_AUG_2014
PDF
Download-manuals-water quality-technicalpapers-wq-monitoringsystemforprotect...
PPTX
PPT
Csa2010 cmv drivers
PPT
MDE's Stormwater Permitting Requirements
PDF
Slides from 2003 structures conference
PDF
Data Collection on the ProteinSimple Maurice: Driving Compliance with the Emp...
PPT
MDE Stormwater Permitting Requirements
PDF
Concepts for Proposed General Permit for Well Pads and Proposed GP-5 Modifica...
PPT
MAINTENANCE MANAGEMENT
PDF
Download-manuals-surface water-manual-sw-volume6designmanualwqsampling
WestmorelandThomas-2
Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartvii
PII Paper for PetroMin Gas Pipeline Conference
R_ActCH03_ARQD_12Mar2015
Richard Nussbaum, PE, RG, MDNR, Hazardous Waste Program Permits Section Updat...
Aged aircraft maintenance.
VFD_QAM_1-_AAR_M-1003_Rev_B_-_04_AUG_2014
Download-manuals-water quality-technicalpapers-wq-monitoringsystemforprotect...
Csa2010 cmv drivers
MDE's Stormwater Permitting Requirements
Slides from 2003 structures conference
Data Collection on the ProteinSimple Maurice: Driving Compliance with the Emp...
MDE Stormwater Permitting Requirements
Concepts for Proposed General Permit for Well Pads and Proposed GP-5 Modifica...
MAINTENANCE MANAGEMENT
Download-manuals-surface water-manual-sw-volume6designmanualwqsampling
Ad

Viewers also liked (8)

PPT
Bienaventuranzas de la amistad
PPTX
Regional members selling membership
PPTX
PPT
Paul bamonte
PDF
Posicionament natural-muntanyola
PPT
2012 FEPA Presentation: Paul Smith
PPT
Story Time 2
PDF
Presentació microsoft
Bienaventuranzas de la amistad
Regional members selling membership
Paul bamonte
Posicionament natural-muntanyola
2012 FEPA Presentation: Paul Smith
Story Time 2
Presentació microsoft
Ad

Similar to Willbros - Summary: Advanced Notice of Proposed Rulemaking (20)

PDF
PHMSA: Safety of Gas Transmission & Gathering Pipelines Summary
DOCX
Natural Gas Storage Sample Memo
PDF
kor-me12 ASMEE Setting Standardization.pdf
PDF
ISO 14067
PDF
2-offshore-standards-update-sims-j-robert.pdf
PPT
2013-QSM-Training Presentation Quality Systems.ppt
PDF
Structural R.
PPT
Ipea api579
PPTX
gap analysis for infrastructure development
PDF
ACI 214R-11 Guide To Evaluation Of Strength Test Results Of Concrete
PDF
ACI_214R_11_Guide_to_Evaluation_of_Stren.pdf
PPTX
07_Biofuels_Mngt_of_Change.pptx
PDF
no yio iop khtfdsjh bh jklo ok lpoih jhb
PDF
Presentation 3 - Irish Water standards.pdf
PDF
Corrosion control
PPTX
Presentaion: Updates to Good Manufacturing Practices
PPTX
PHMSA Final Rule (part 1) for Gas Transmission Pipelines
PDF
software Paper published.pdf
PDF
ASME-BTH-standards-committee.pdf
PPTX
Presentation Slides: PHMSA Final Rule (Part 1) for Gas Transmission Pipelines
PHMSA: Safety of Gas Transmission & Gathering Pipelines Summary
Natural Gas Storage Sample Memo
kor-me12 ASMEE Setting Standardization.pdf
ISO 14067
2-offshore-standards-update-sims-j-robert.pdf
2013-QSM-Training Presentation Quality Systems.ppt
Structural R.
Ipea api579
gap analysis for infrastructure development
ACI 214R-11 Guide To Evaluation Of Strength Test Results Of Concrete
ACI_214R_11_Guide_to_Evaluation_of_Stren.pdf
07_Biofuels_Mngt_of_Change.pptx
no yio iop khtfdsjh bh jklo ok lpoih jhb
Presentation 3 - Irish Water standards.pdf
Corrosion control
Presentaion: Updates to Good Manufacturing Practices
PHMSA Final Rule (part 1) for Gas Transmission Pipelines
software Paper published.pdf
ASME-BTH-standards-committee.pdf
Presentation Slides: PHMSA Final Rule (Part 1) for Gas Transmission Pipelines

More from Willbros Group, Inc. (13)

PDF
Talisman Safety Program
PDF
Rebuilding the World's Pipeline Infrastructure
PPT
Up in the Clouds: Cloud Computing and GIS
PDF
Willbros Group at D.A. Davidson's 11th Annual Engineering & Construction Con...
PDF
Willbros - Credit Suisse Engineering & Construction Conference
PDF
Willbros Canada Brochure
PDF
Willbros - Capital One Southcoast, Inc Energy Conference Presentation
PDF
Willbros - Jefferies & Co. Global Energy Conference
PPTX
Willbros GITA Presentation on GIS-Based Risk Assessment
PDF
Willbros - D.A. Davidson Conference Presentation
PDF
Willbros 2010 Annual Report
PDF
Willbros HSE&S 2010-2011 Annual Report
PDF
Willbros - 2011 Credit Suisse Presentation
Talisman Safety Program
Rebuilding the World's Pipeline Infrastructure
Up in the Clouds: Cloud Computing and GIS
Willbros Group at D.A. Davidson's 11th Annual Engineering & Construction Con...
Willbros - Credit Suisse Engineering & Construction Conference
Willbros Canada Brochure
Willbros - Capital One Southcoast, Inc Energy Conference Presentation
Willbros - Jefferies & Co. Global Energy Conference
Willbros GITA Presentation on GIS-Based Risk Assessment
Willbros - D.A. Davidson Conference Presentation
Willbros 2010 Annual Report
Willbros HSE&S 2010-2011 Annual Report
Willbros - 2011 Credit Suisse Presentation

Recently uploaded (20)

PDF
NISM Series V-A MFD Workbook v December 2024.khhhjtgvwevoypdnew one must use ...
PPTX
Belch_12e_PPT_Ch18_Accessible_university.pptx
PDF
Solara Labs: Empowering Health through Innovative Nutraceutical Solutions
PDF
Hindu Circuler Economy - Model (Concept)
PPTX
DMT - Profile Brief About Business .pptx
PDF
Power and position in leadershipDOC-20250808-WA0011..pdf
PDF
Cours de Système d'information about ERP.pdf
PDF
Solaris Resources Presentation - Corporate August 2025.pdf
PDF
Outsourced Audit & Assurance in USA Why Globus Finanza is Your Trusted Choice
PDF
Keppel_Proposed Divestment of M1 Limited
PPTX
2025 Product Deck V1.0.pptxCATALOGTCLCIA
PDF
pdfcoffee.com-opt-b1plus-sb-answers.pdfvi
PPTX
Board-Reporting-Package-by-Umbrex-5-23-23.pptx
PPTX
Sales & Distribution Management , LOGISTICS, Distribution, Sales Managers
PDF
Module 2 - Modern Supervison Challenges - Student Resource.pdf
PDF
Tata consultancy services case study shri Sharda college, basrur
PDF
Stem Cell Market Report | Trends, Growth & Forecast 2025-2034
PDF
Ôn tập tiếng anh trong kinh doanh nâng cao
PDF
BsN 7th Sem Course GridNNNNNNNN CCN.pdf
PDF
IFRS Notes in your pocket for study all the time
NISM Series V-A MFD Workbook v December 2024.khhhjtgvwevoypdnew one must use ...
Belch_12e_PPT_Ch18_Accessible_university.pptx
Solara Labs: Empowering Health through Innovative Nutraceutical Solutions
Hindu Circuler Economy - Model (Concept)
DMT - Profile Brief About Business .pptx
Power and position in leadershipDOC-20250808-WA0011..pdf
Cours de Système d'information about ERP.pdf
Solaris Resources Presentation - Corporate August 2025.pdf
Outsourced Audit & Assurance in USA Why Globus Finanza is Your Trusted Choice
Keppel_Proposed Divestment of M1 Limited
2025 Product Deck V1.0.pptxCATALOGTCLCIA
pdfcoffee.com-opt-b1plus-sb-answers.pdfvi
Board-Reporting-Package-by-Umbrex-5-23-23.pptx
Sales & Distribution Management , LOGISTICS, Distribution, Sales Managers
Module 2 - Modern Supervison Challenges - Student Resource.pdf
Tata consultancy services case study shri Sharda college, basrur
Stem Cell Market Report | Trends, Growth & Forecast 2025-2034
Ôn tập tiếng anh trong kinh doanh nâng cao
BsN 7th Sem Course GridNNNNNNNN CCN.pdf
IFRS Notes in your pocket for study all the time

Willbros - Summary: Advanced Notice of Proposed Rulemaking

  • 1. Summary: Advanced Notice of Proposed Rulemaking Released August 2011 By John Beets Principal GIS Technologist, Willbros Engineering An Advanced Notice of Proposed Rulemaking (ANPRM) was released by the Pipeline and Hazardous Materials Safety Administration (PHMSA) in August 2011. High profile incidents, such as the PG&E failure in San Bruno, CA, have instigated a push by Federal regulatory agencies for additional safety measures for gas transmission pipelines. This ANPRM is requesting public comment on 14 specific topics in two broad categories. At some point following the review period, PHMSA will release a Notice of Proposed Rulemaking (NPRM) that will incorporate comments/questions they receive as a result of this ANPRM. This will allow another round of public comment/questions before a final rule is released. It is difficult to predict the time frame for release of a final rule – past experience might indicate this could occur very late in 2012, but more likely sometime in 2013. The purpose of this document is to provide a brief summary of the content of the ANPRM in order to present a snapshot of issues that may be under consideration for a revised final rule. An analysis of the information contained in the ANPRM is not included. Category 1: Should integrity management requirements be revised and strengthened to bring more pipeline mileage under integrity management requirements and to better assure safety of pipeline segments in high-consequence areas (HCAs)? Topics: 1. Modify HCA definition to expand pipeline mileage in HCAs? This could be done by: a. Revising (decreasing) the count for buildings intended for human occupancy b. Expanding the definition of identified sites c. Making all Class 3 and 4 locations HCA – also increase the width for determining class location on pipelines over 24” outside diameter (OD) operating above 1,000 pounds per square inch gauge (psig) d. Increasing the HCA buffer beyond that determined by the potential impact radius (PIR) e. Considering presence of electric transmission lines or other critical infrastructure within the pipeline right-of-way (ROW) f. Allowing general public/local communities to provide input into identification of HCAs 2. Strengthen requirements to implement preventative and mitigative measures for pipeline segments in HCAs: The current rule requires operators to take additional preventative and mitigative measures in HCAs, but these measures are not specified. Risk analysis is to be used to identify additional measures appropriate to the HCA, but the current rule does not establish objective criteria or standards on how to determine what measures should be taken. PHMSA is considering additional prescriptive requirements to improve selection and implementation decisions for preventative and mitigative measures within and, potentially, outside of HCAs. 3. Modification of repair criteria: Changes to repair criteria to provide greater assurance of anomalies/defects being repaired before leading to a leak or rupture and whether these criteria need to be expanded to segments outside Willbros Group, Inc. • 4400 Post Oak Parkway, Suite 1000, Houston, Texas 77027 • 713.403.8000 • www.willbros.com 1 © 2011 Willbros • All Rights Reserved.
  • 2. Summary: Advanced Notice of Proposed Rulemaking of HCAs. This could involve the following: a. Revision of the repair criterion to add an additional safety margin b. Risk ranking – conditions in HCAs addressed first, followed by non-HCA areas c. Adjustment of repair schedules in both HCA and non-HCA areas d. Potential standards to account for known accuracy of inline inspection (ILI) tools that are consistent across all ILI vendors and operator e. Potential methods for validation of tool performance such as validation digs or analysis of as-found versus as-predicted defect dimensions f. Standards for conducting inline inspections, specific interpretation of personnel qualifications, integration of other data sources with ILI 4. Improving requirements for collecting, validating and integrating pipeline data: a. Require validation methods be in place, such as pipeline excavations b. Require collection of data during pipeline exposure to validate information in the operator’s records c. Verify critical pipe data, coating, testing, and operations and maintenance (O&M) records on a periodic basis (requirements become more prescriptive) 5. Making requirements related to the nature and application of risk models more prescriptive: PHMSA’s experience indicates that majority of operators use relative index-model approaches to risk assessment. PHMSA is not convinced as to the robustness of this method. Possible changes discussed: a. Strengthen requirements on functions risk models perform b. Mandate usage of a specific risk model c. Improve existing models to assure usefulness d. Push to use more quantitative models is contemplated 6. Strengthening requirements for applying knowledge gained through the integrity management (IM) program: This is related to the current regulation requiring operators to consider other portions of their systems if an assessment identifies corrosion requiring repair. Intention is to strengthen requirements related to operator’s use of insights gained from implementation of their IM program: a. Potential requirements for updating risk models as additional knowledge is gained b. Guidelines or requirements related to data integration and/or updating of aerial imagery or patrolling c. Specification of a maximum time period for review and validation of risk assessments d. Potential data requirements for data integration 7. Strengthening requirements on the selection and use of assessment methods: Currently four methods – ILI, pressure test, direct assessment and other technology demonstrated to provide an equivalent understanding of pipe condition. Possible changes discussed: a. Require ILI wherever possible – include requirements to expand line modifications to accommodate ILI b. Restrictions on use of other assessment technologies c. Establish standards for conducting ILI assessments – incorporate by reference into regulations Willbros Group, Inc. • 4400 Post Oak Parkway, Suite 1000, Houston, Texas 77027 • 713.403.8000 • www.willbros.com 2 © 2011 Willbros • All Rights Reserved.
  • 3. Summary: Advanced Notice of Proposed Rulemaking d. Establish standards for conducting Internal Corrosion Direct Assessment (ICDA) and Stress Corrosion Cracking Direct Assessment (SCCDA) – incorporate by reference into regulations e. Require a onetime pressure test to address manufacturing and construction defects Category 2: Should non-IM requirements be strengthened or expanded to address other issues associated with pipeline system integrity? Topics: 1. Valve spacing and the need for remotely or automatically controlled valves: Current regulation specifies block valve spacing by class location on newly built lines. Remotely operating and/or automatic valves are not currently required. Potential changes: a. Change spacing requirements for new lines b. Explicitly require new valves in the event of class change to meet spacing requirements c. Explicitly require new valves under other (non-class change) conditions d. Require remotely controlled sectionalizing block valves e. Require prescriptive design criteria for operator evaluation of additional valves, remote closure and/or valve automation 2. Corrosion control: Requirements related to external, internal and atmospheric corrosion: a. Require post-construction surveys for coating damage or to determine Cathodic Protection (CP) adequacy b. Require periodic interference current surveys (such as Close Interval Survey – CIS) c. Add additional measures to prevent internal corrosion (such as ILI runs or accumulated liquids sampling) d. Include practices or standards addressing prevention, detection, assessment and remediation of SCC – requiring additional surveys or shorter internal surveys based on pipeline operating temperatures and coating types e. Prescribe CIS external corrosion control survey timing intervals for both HCAs and non-HCAs that are used to determine CP effectiveness f. Provide specific HCA and non-HCA corrosion control measures with clearly defined conditions and appropriate mitigation efforts g. Perform a critical analysis of all factors influencing SCC to determine if a credible threat exists for each pipeline segment h. Require SCC integrity assessment in segments where a credible threat has been identified i. Require a periodic analysis of operator corrosion management programs, integrating all relevant data j. Require operators to periodically submit corrosion management performance metric data 3. Pipe manufactured using longitudinal weld seams: This is meant to address longitudinal seam weld issues with pipe manufactured primarily before 1970 and pressure test grandfathering for lines built prior to 1971 (allowing operations at a maximum allowable operating pressure (MAOP) based on the highest 5-year operating pressure prior to July 1, 1970 in lieu of a pressure test): a. Require all pipelines that have not been pressure tested at or above 1.1 times MAOP or class location test criteria to be pressure tested in accordance with present regulation Willbros Group, Inc. • 4400 Post Oak Parkway, Suite 1000, Houston, Texas 77027 • 713.403.8000 • www.willbros.com 3 © 2011 Willbros • All Rights Reserved.
  • 4. Summary: Advanced Notice of Proposed Rulemaking b. Alternatively, require specific types of pipe with an operating history that demonstrates systemic integrity issues to be pressure tested in accordance with present regulation, e.g., low-frequency electric resistance welded (LF-ERW), direct current electric resistance welded (DC-ERW), lap-welded, electric flash welded (EFW), furnace butt welded, submerged arc welded or other longitudinal seams c. Define alternative minimum test pressures d. Provide additional pressure test requirements to all pipelines, or only pipelines in HCAs, or only pipelines in Class 2, 3, or 4 areas e. Specify other technologies that may reliably find and remediate seam integrity issues 4. Establishing requirements applicable to underground gas storage: PHMSA may develop standards covering underground gas storage facilities. This could include: a. Safety standards for casing, tubing, isolation packer and wellbore communication and wellhead equipment b. Standards for monitoring of external/internal corrosion c. Standards for welding, pressure testing and design safety factors of casing and tubing d. Emergency shutdowns for wellhead valves e. Integrity and O&M intervals for key safety and CP systems f. Standards for emergency shutdowns, emergency shutdown stations, gas monitors, local emergency response communications, public communications and O&M procedures 5. Management of change: PHMSA pipeline safety regulations do not now address management process subjects such as management of change. PHMSA is considering adding requirements in this area to provide a greater degree of control over this element of pipeline risk: a. Development of standards governing the management of change process including requirements for IM proce- dures, O&M manuals, facility drawings, emergency response plans and procedures and documents required to be maintained for the life of the pipeline b. Consider incorporating like standards from other industries 6. Quality Management Systems (QMS): Quality management includes the activities and processes that an organization uses to achieve quality. These include formulating policy, setting objectives, planning, quality control, quality assurance, performance monitoring and quality improvement. PHMSA’s pipeline safety regulations do not now address process management issues such as QMS. PHMSA may institute formal requirements for QMS into the regulation. They are asking the industry for information on existing quality assurance standards and practices currently in use that might be adopted. Should QMS be applied to all or some pipelines and does it apply to the complete lifecycle? Do operators commonly require their contractors to maintain and use formal QMS? 7. Exemption of facilities installed prior to the regulations: This is to address the MAOP exemption for pre-1970 pipelines that operate above 72% specified minimum yield strength (SMYS) and also includes use of materials manufactured prior to 1970. The changes could include requirements for periodic pressure tests, in-line inspections, coating examination, CP surveys and expanded requirements on interference currents and depth of cover maintenance for these lines. This could be for all pipelines or targeted to those with a vintage history of systemic integrity issues in areas such as longitudinal weld seams or steel quality. Willbros Group, Inc. • 4400 Post Oak Parkway, Suite 1000, Houston, Texas 77027 • 713.403.8000 • www.willbros.com 4 © 2011 Willbros • All Rights Reserved.
  • 5. Summary: Advanced Notice of Proposed Rulemaking 8. Modifying the regulation of gas gathering lines: Recent developments in the field of gas exploration and production, such as shale gas, indicate that the existing framework for regulating gas gathering lines may no longer be appropri- ate. Gathering lines are being constructed to transport shale gas that range from 12 to 36 inches in diameter with an MAOP of 1,480 psig, far exceeding the historical operating parameters of such lines. Moreover, enforcement of the current requirements has been hampered by the conflicting and ambiguous language of American Petroleum Institute Recommended Practice 80 (API RP 80), a complex standard that can produce multiple classifications for the same pipeline system. Gathering regulation may be modified as follows: a. Require submission of annual incident and safety-related conditions reports b. Include a new definition for gathering in the regulation c. Establish new, risk-based safety requirements for large diameter, high pressure gathering lines in rural locations d. Consider short sections of pipeline downstream of processing, compression and similar equipment to be a continuation of gathering e. Adopt specific requirements for pipelines associated with landfill gas systems (due to increased concentrations of hydrogen sulfide and/or carbon dioxide) f. Enhance requirements for internal corrosion control g. Apply gas integrity management requirements to all onshore gas gathering Willbros Group, Inc. • 4400 Post Oak Parkway, Suite 1000, Houston, Texas 77027 • 713.403.8000 • www.willbros.com 5 © 2011 Willbros • All Rights Reserved.