ISN
DRAGLINE
•   Walking draglines are for many years the most
    popular machine for opencast mining due to their
    flexibility, utility and availability.
•   their low operating costs for waste mining
•   Draglines are deployed wherever there is scope for
    side casting Overburden above coal seam into the
    de-coaled area.
•   It is very cost effective technology- cost of OB
    removal is cheaper than shovel dumper technology.
•   There are two draglines working at RGOC-I and RG
    OC-III with bucket size of 24 Cum and 30.6 Cum
    respectively.
•   Both these draglines are performing very well.
•   The bucket is maneuvered by means of a number of
    ropes and chains.


                            ISN
DRAGLINE
The dragline is a typical combined cyclic excavator and
   material carrier since it both excavates material and
   dumps it without the use of trucks or conveyor
   belts. The dragline sits above the waste or
   overburden block, usually 50m or so wide, on the
   highwall side and excavates the material in front of
   itself, to dump it on the low-wall or spoil side of the
   strip to uncover the coal seam below it.




                             ISN
OPERATION OF DRAGLINE
In a typical cycle of excavation, the bucket is positioned
above the material to be excavated.
The bucket is then lowered and the dragrope is then drawn so
that the bucket is dragged along the surface of the material.
The bucket is then lifted by using the hoist rope.
A swing operation is then performed to move the bucket to
the place where the material is to be dumped.
The dragrope is then released causing the bucket to tilt and
empty. This is called a dump operation.
It is a independent machine unlike a shovel.
A 30 cum Dragline can handle 40 Lakh cum of OB per annum.
The dragline works on the immediate OB bench above coal
and the benches from the surface to the Dragline are normally
handled by Shovel & Dumper combination. Hence adequate
capacity of Shovel & Dumper ISN capacity should be provided to
prevent idling of the Dragline.
OPERATION OF DRAGLINE
The Dragline has a long boom with a bucket capacity ranging
from 15 to 50 cum.
It can swing in 360 degrees, after dragging the loose material
below its level.
It swings normally between 90 to 120 degrees and side cast
the material in to the de-coaled area.
The nomenclature of the Dragline usually called as 24/99
which means 24 cum of bucket capacity and 96 m is the boom
length.
The same Dragline can have about 32 cum of bucket capacity
if the boom length of 71 m. normally
the Draglines is electrically driven with 6.6 KV power with 2
main motors of 1750 HP each. These motors inturn drive the
Generators and the Generators drive DC motors
Normally there are 7 DC motors for different operations like
                              ISN
marching, dragging, hoisting, swinging etc.,
DRAGLINE BUCKET




       ISN
LINE DIAGRAM OF DRAGLINE




             ISN
LINE DIAGRAM OF DRAGLINE




             ISN
APPLICATION OF DRAGLINE
1.   Gradients flatter than 1 in 6 (if gradient is more the
     dumped OB will slide towards the coal face and
     particularly in rainy season the extraction of coal
     become dangerous)
2.   Seams should be free of faults & other geological
     disturbances
3.   Deposits with Larger Strike length (>2 km) so that
     frequent shifting of the Dragline from one end to
     another can be reduced.
4.   Present cost of the Dragline is above 100 Cr and the
     life of the Dragline is 1.50 Lakh hours hence, the
     property should be large enough ensuring the life of
     about 25 yr or more.
5.   A hilly property is not suitable
                              ISN
6.   Property should have atleast 15 years life
DRAGLINE – Methods of Working
– Simple casing method with or without
  rehandling.
– Extended bench method.
– Horse shoe /Spoil Bank/Across Pit
  method.
– Continuous bench two pass method.
– Tandem dragline working i.e., two
  draglines working together, one dealing
  with part of the material dumped by the
  other.
                    ISN
Simple Casting
This is simple method of Dragline working. In this method the Dragline is sited
on immediate OB bench above Coal and removes the OB and dumps it in the
de-coaled area of previous cut.
The width of the cut normally less than 40 m so that re-handling of the OB will
be negligible. The method is extremely suitable for singly thin seam mining.




                                      ISN
ISN
ISN
ISN
Simple Casting




      ISN
BALANCING DIAGRAM




        ISN
ISN
ISN
BALANCING DIAGRAM OF
    WEST SECTION




         ISN
ISN
Extended Bench Method
• As the name is suggested, the Dragline bench is
  extended by dumping a part of OB by dragline into de-
  coal area and the space is levelled by dozing and the
  same Dragline can be sited in 2nd position on the
  dumped and dozzed OB.
• This enables the distance between 1st and 2nd position to
  be more when compared with simple casting method.
• The increasing distance increases the capability of the
  Dragline to dump OB further away in de-coaled area, so
  that sliding of OB on to the coal bench is to be minimized.
• A Dragline has to do more re handling now. This method
  is suitable for exposing relatively thicker seams.

                            ISN
ISN
ISN
ISN
ISN
Extended Bench Method




S.No      D/L      Excavating       Cut         Area m2    Dump
        Position                                 (solid)
 1        P-1        1st Dig    D’A’B’CFF’RST   480+19     YRQOU
                                                   2

                                 ISN
Extended Bench Method with cast Blast




                 ISN
Spoil Bank Method
• The method is adapted when there are 2 seams
  and having parting between 10 to 12 m.
• In the first position, the Dragline exposes the top
  seam by side casting the OB above the top
  seam.
• The side casting material is dozed and leveled.
• After extraction of the top seam the parting OB is
  loosened by blasting and the Dragline is placed
  on the already side casted leveled material and
  the remaining parting OB of above bottom seam
  is removed by the dragline and side casted
  exposing the bottom seam.
                         ISN
Spoil Bank Method




       ISN
ISN
Spoil Bank Method




  D/L      Operational   Excavation       Cut         Area m2     Dump
Position    position                                   (solid)
26M/81     Main Bench     1st Dig      ABCDEFGH       280+904     MPQRIS
  R        Position                                                 ’SU
           (MBP)
           Spoil Bench    1st Dig         IJKL          332
           Position
           (SBP)
                         Rehandle       ISN
                                      QPIS’ST+VV’N   513+17+152   MNOVW
                                            N’                    W’X’XY
Continuous Bench Two pass Method




               ISN
Tandem Working of Draglines
• In this method 2 Draglines are put into in
  tandem operation one above the other
  with a minimum horizontal distance of 100
  m between them. This method is adopted
  where the coal seam thickness is more
  than 30 m and to handle the OB bench of
  60 m above the coal seam.


                     ISN
Tandem Working of Draglines




   Dragline      Cut        Dump      Area m2
                                       (solid)      D/L 10/70 is
    10/70       ABCD         abcd      285.0
                                                 150-200m ahead of
    20/90       CDEF        kmnofci    570.0
                (Dig)
                                                     D/L 20/90
              Ijkl (R.H.)               9.6
              Ebf (R.H.)    ISN         1.0
Variables with Draglines

•Swing and boom angle of a dragline.
•Increase or decrease of bucket size (within
limits) with consequent decrease or increase of
boom length.
•Cut width and height of dragline bench.
•Method of use of dragline/draglines.
•More than one position of a dragline.
•Adopting cast-blasting to the desired extent.

                       ISN
Technical specifications of Dragline
             (24 x 96)
   - Boom length             : 74 - 95 m
   - Boom angle              : 30°- 38°
   - Bucket Capacity (nominal): 26 - 34 cu m
   - Dump height             : 38 - 40 m
   - Digging depth           : 44.3 - 53.4 m
   - Operating radius        : 64.6 - 88.2 m
   - Walking speed           : 0.24 kmph
   - Bearing Pressure        : 0.95 kg/cm2



                        ISN
SPECIFICATIONS OF OC-I DRAGLINE

    MAKE                        Ranson & Rapier
    Bucket Capacity             M3           24
    Annual capacity             mm3        3.31
    Boom Length                 Mtrs       95.6
    Operating Radius            Mtrs         88
    Dumping Height              Mtrs       39.6
    Base Dia                    Mtrs         16
    Shoe Length                 Mtrs         17
    Shoe Width                  Mtrs        2.8
    Movement of Machine         Mtrs        2.2
    Weight of Machine           Tonnes    2000
    Total H.P                   H.P.      3500
                          ISN
ISN

More Related Content

PPTX
Ferrous Metals
PPTX
Dragline ppt
PPTX
DRAG-LINE CONSTRUCTION EQUIPMENT
PDF
Differnt technologies in oc mines
PPTX
Surface mining
PPT
Concept of oc mine planning & design(final)
PPTX
Lec-9 Building BYE-Laws SPP.pptx
PPTX
Types of classifiers
Ferrous Metals
Dragline ppt
DRAG-LINE CONSTRUCTION EQUIPMENT
Differnt technologies in oc mines
Surface mining
Concept of oc mine planning & design(final)
Lec-9 Building BYE-Laws SPP.pptx
Types of classifiers

What's hot (20)

PDF
Subsidence in coal mines
PPTX
Bucket wheel excavator ppt
PPTX
Mine waste dump
PPTX
Shuttle car
PPTX
Bord and pillar working with LHD/SDL
PDF
Mine Opening and Development
PPT
Inundation
DOC
Prediction of Surface Subsidence and Its Monitoring
PPTX
Jack hammer drill
PPTX
Different Raising Techniques in mining
PPTX
Drilling equipments
PDF
Surface miner
PPT
Subsidence
PDF
Oc mechanical excavation
PPTX
Shaft sinking.
PPTX
depllaring in coal mines
PPTX
Stoping and methods of Stoping.
PDF
Mine transportation system
DOCX
Mining Machinery Learning Material for DEegree and Diploma
DOCX
Mining Machinery Learning Material
Subsidence in coal mines
Bucket wheel excavator ppt
Mine waste dump
Shuttle car
Bord and pillar working with LHD/SDL
Mine Opening and Development
Inundation
Prediction of Surface Subsidence and Its Monitoring
Jack hammer drill
Different Raising Techniques in mining
Drilling equipments
Surface miner
Subsidence
Oc mechanical excavation
Shaft sinking.
depllaring in coal mines
Stoping and methods of Stoping.
Mine transportation system
Mining Machinery Learning Material for DEegree and Diploma
Mining Machinery Learning Material
Ad

Viewers also liked (11)

PPT
Working with Dragline
DOC
Drilling in mining
PDF
M.tech seminar
PPT
Projet urbain sur Bardo Constantine
PPTX
Atelier projet urbain
PDF
Catalogue de dimensionnement des chaussees neuves (fascicule1)
PDF
Thesis_3_10
PDF
Design optimization of excavator bucket using Finite Element Method
PDF
Prestress loss due to friction & anchorage take up
PDF
Basics of drilling 1
Working with Dragline
Drilling in mining
M.tech seminar
Projet urbain sur Bardo Constantine
Atelier projet urbain
Catalogue de dimensionnement des chaussees neuves (fascicule1)
Thesis_3_10
Design optimization of excavator bucket using Finite Element Method
Prestress loss due to friction & anchorage take up
Basics of drilling 1
Ad

Similar to Working of dragline (20)

PPTX
Mine 417 Research-WPS Office.pptx
PDF
PDF document lecture 3.pdf
PPTX
Sublevel Stoping method in metal mines .pptx
PPTX
Design of earth dam at gorukallu
PPT
Chp in presentation
PPT
CHP Equipment's & Interlocks Complete PPT
PPTX
Troughed Belt Conveyor & Flat Belt Conveyor
PPTX
Ripper production
PPTX
Thin seam mining
PDF
Miningmethods 1228473621975095-9
PDF
Mining Methods
PDF
Modelling Granular and Fluid Flows in Equipment Design
PDF
Ch2 before
PPTX
Unit 1.pptx
PPT
Dragline exclavator
PPTX
Drag line excavator
PPTX
conveying of solid in pfpp chem engg.pptx
PPT
Advanced Automation and Technology in Coal Handling Plants
PPT
Sizing
Mine 417 Research-WPS Office.pptx
PDF document lecture 3.pdf
Sublevel Stoping method in metal mines .pptx
Design of earth dam at gorukallu
Chp in presentation
CHP Equipment's & Interlocks Complete PPT
Troughed Belt Conveyor & Flat Belt Conveyor
Ripper production
Thin seam mining
Miningmethods 1228473621975095-9
Mining Methods
Modelling Granular and Fluid Flows in Equipment Design
Ch2 before
Unit 1.pptx
Dragline exclavator
Drag line excavator
conveying of solid in pfpp chem engg.pptx
Advanced Automation and Technology in Coal Handling Plants
Sizing

More from SATYANARAYANA I (12)

PDF
Chap9 anrep1314
PDF
Semimechanization sdls&lh ds
PDF
Basics of drilling 4
PDF
Basics of drilling 3
PDF
Basics of drilling 2
PDF
Basics of drilling 5
PDF
Working of icc bwe-rock breaker
PDF
Scraper ripper-grader-dozer
PDF
Design of openpit mining
PDF
Basics of openpit mining
PDF
Highwall mining
PDF
Extraction of developed pillars
Chap9 anrep1314
Semimechanization sdls&lh ds
Basics of drilling 4
Basics of drilling 3
Basics of drilling 2
Basics of drilling 5
Working of icc bwe-rock breaker
Scraper ripper-grader-dozer
Design of openpit mining
Basics of openpit mining
Highwall mining
Extraction of developed pillars

Recently uploaded (20)

PPTX
KOM of Painting work and Equipment Insulation REV00 update 25-dec.pptx
PDF
Spectral efficient network and resource selection model in 5G networks
PDF
Approach and Philosophy of On baking technology
PDF
Unlocking AI with Model Context Protocol (MCP)
PPTX
VMware vSphere Foundation How to Sell Presentation-Ver1.4-2-14-2024.pptx
PDF
Advanced methodologies resolving dimensionality complications for autism neur...
PPTX
Big Data Technologies - Introduction.pptx
PDF
Review of recent advances in non-invasive hemoglobin estimation
PDF
Optimiser vos workloads AI/ML sur Amazon EC2 et AWS Graviton
PDF
KodekX | Application Modernization Development
DOCX
The AUB Centre for AI in Media Proposal.docx
PPTX
Programs and apps: productivity, graphics, security and other tools
PDF
Electronic commerce courselecture one. Pdf
PDF
Dropbox Q2 2025 Financial Results & Investor Presentation
PDF
Network Security Unit 5.pdf for BCA BBA.
PDF
Architecting across the Boundaries of two Complex Domains - Healthcare & Tech...
PDF
Agricultural_Statistics_at_a_Glance_2022_0.pdf
PPT
Teaching material agriculture food technology
PDF
Encapsulation theory and applications.pdf
PPTX
ACSFv1EN-58255 AWS Academy Cloud Security Foundations.pptx
KOM of Painting work and Equipment Insulation REV00 update 25-dec.pptx
Spectral efficient network and resource selection model in 5G networks
Approach and Philosophy of On baking technology
Unlocking AI with Model Context Protocol (MCP)
VMware vSphere Foundation How to Sell Presentation-Ver1.4-2-14-2024.pptx
Advanced methodologies resolving dimensionality complications for autism neur...
Big Data Technologies - Introduction.pptx
Review of recent advances in non-invasive hemoglobin estimation
Optimiser vos workloads AI/ML sur Amazon EC2 et AWS Graviton
KodekX | Application Modernization Development
The AUB Centre for AI in Media Proposal.docx
Programs and apps: productivity, graphics, security and other tools
Electronic commerce courselecture one. Pdf
Dropbox Q2 2025 Financial Results & Investor Presentation
Network Security Unit 5.pdf for BCA BBA.
Architecting across the Boundaries of two Complex Domains - Healthcare & Tech...
Agricultural_Statistics_at_a_Glance_2022_0.pdf
Teaching material agriculture food technology
Encapsulation theory and applications.pdf
ACSFv1EN-58255 AWS Academy Cloud Security Foundations.pptx

Working of dragline

  • 1. WORKING OF DRAGLINE I. Satyanarayana, M.Tech,MBA,MCA Dy. Manager, Project Planning, SCCL, isnindian@gmail.com, visit at www.slideshare.net/isnindian ISN
  • 2. ISN
  • 3. DRAGLINE • Walking draglines are for many years the most popular machine for opencast mining due to their flexibility, utility and availability. • their low operating costs for waste mining • Draglines are deployed wherever there is scope for side casting Overburden above coal seam into the de-coaled area. • It is very cost effective technology- cost of OB removal is cheaper than shovel dumper technology. • There are two draglines working at RGOC-I and RG OC-III with bucket size of 24 Cum and 30.6 Cum respectively. • Both these draglines are performing very well. • The bucket is maneuvered by means of a number of ropes and chains. ISN
  • 4. DRAGLINE The dragline is a typical combined cyclic excavator and material carrier since it both excavates material and dumps it without the use of trucks or conveyor belts. The dragline sits above the waste or overburden block, usually 50m or so wide, on the highwall side and excavates the material in front of itself, to dump it on the low-wall or spoil side of the strip to uncover the coal seam below it. ISN
  • 5. OPERATION OF DRAGLINE In a typical cycle of excavation, the bucket is positioned above the material to be excavated. The bucket is then lowered and the dragrope is then drawn so that the bucket is dragged along the surface of the material. The bucket is then lifted by using the hoist rope. A swing operation is then performed to move the bucket to the place where the material is to be dumped. The dragrope is then released causing the bucket to tilt and empty. This is called a dump operation. It is a independent machine unlike a shovel. A 30 cum Dragline can handle 40 Lakh cum of OB per annum. The dragline works on the immediate OB bench above coal and the benches from the surface to the Dragline are normally handled by Shovel & Dumper combination. Hence adequate capacity of Shovel & Dumper ISN capacity should be provided to prevent idling of the Dragline.
  • 6. OPERATION OF DRAGLINE The Dragline has a long boom with a bucket capacity ranging from 15 to 50 cum. It can swing in 360 degrees, after dragging the loose material below its level. It swings normally between 90 to 120 degrees and side cast the material in to the de-coaled area. The nomenclature of the Dragline usually called as 24/99 which means 24 cum of bucket capacity and 96 m is the boom length. The same Dragline can have about 32 cum of bucket capacity if the boom length of 71 m. normally the Draglines is electrically driven with 6.6 KV power with 2 main motors of 1750 HP each. These motors inturn drive the Generators and the Generators drive DC motors Normally there are 7 DC motors for different operations like ISN marching, dragging, hoisting, swinging etc.,
  • 8. LINE DIAGRAM OF DRAGLINE ISN
  • 9. LINE DIAGRAM OF DRAGLINE ISN
  • 10. APPLICATION OF DRAGLINE 1. Gradients flatter than 1 in 6 (if gradient is more the dumped OB will slide towards the coal face and particularly in rainy season the extraction of coal become dangerous) 2. Seams should be free of faults & other geological disturbances 3. Deposits with Larger Strike length (>2 km) so that frequent shifting of the Dragline from one end to another can be reduced. 4. Present cost of the Dragline is above 100 Cr and the life of the Dragline is 1.50 Lakh hours hence, the property should be large enough ensuring the life of about 25 yr or more. 5. A hilly property is not suitable ISN 6. Property should have atleast 15 years life
  • 11. DRAGLINE – Methods of Working – Simple casing method with or without rehandling. – Extended bench method. – Horse shoe /Spoil Bank/Across Pit method. – Continuous bench two pass method. – Tandem dragline working i.e., two draglines working together, one dealing with part of the material dumped by the other. ISN
  • 12. Simple Casting This is simple method of Dragline working. In this method the Dragline is sited on immediate OB bench above Coal and removes the OB and dumps it in the de-coaled area of previous cut. The width of the cut normally less than 40 m so that re-handling of the OB will be negligible. The method is extremely suitable for singly thin seam mining. ISN
  • 13. ISN
  • 14. ISN
  • 15. ISN
  • 18. ISN
  • 19. ISN
  • 20. BALANCING DIAGRAM OF WEST SECTION ISN
  • 21. ISN
  • 22. Extended Bench Method • As the name is suggested, the Dragline bench is extended by dumping a part of OB by dragline into de- coal area and the space is levelled by dozing and the same Dragline can be sited in 2nd position on the dumped and dozzed OB. • This enables the distance between 1st and 2nd position to be more when compared with simple casting method. • The increasing distance increases the capability of the Dragline to dump OB further away in de-coaled area, so that sliding of OB on to the coal bench is to be minimized. • A Dragline has to do more re handling now. This method is suitable for exposing relatively thicker seams. ISN
  • 23. ISN
  • 24. ISN
  • 25. ISN
  • 26. ISN
  • 27. Extended Bench Method S.No D/L Excavating Cut Area m2 Dump Position (solid) 1 P-1 1st Dig D’A’B’CFF’RST 480+19 YRQOU 2 ISN
  • 28. Extended Bench Method with cast Blast ISN
  • 29. Spoil Bank Method • The method is adapted when there are 2 seams and having parting between 10 to 12 m. • In the first position, the Dragline exposes the top seam by side casting the OB above the top seam. • The side casting material is dozed and leveled. • After extraction of the top seam the parting OB is loosened by blasting and the Dragline is placed on the already side casted leveled material and the remaining parting OB of above bottom seam is removed by the dragline and side casted exposing the bottom seam. ISN
  • 31. ISN
  • 32. Spoil Bank Method D/L Operational Excavation Cut Area m2 Dump Position position (solid) 26M/81 Main Bench 1st Dig ABCDEFGH 280+904 MPQRIS R Position ’SU (MBP) Spoil Bench 1st Dig IJKL 332 Position (SBP) Rehandle ISN QPIS’ST+VV’N 513+17+152 MNOVW N’ W’X’XY
  • 33. Continuous Bench Two pass Method ISN
  • 34. Tandem Working of Draglines • In this method 2 Draglines are put into in tandem operation one above the other with a minimum horizontal distance of 100 m between them. This method is adopted where the coal seam thickness is more than 30 m and to handle the OB bench of 60 m above the coal seam. ISN
  • 35. Tandem Working of Draglines Dragline Cut Dump Area m2 (solid) D/L 10/70 is 10/70 ABCD abcd 285.0 150-200m ahead of 20/90 CDEF kmnofci 570.0 (Dig) D/L 20/90 Ijkl (R.H.) 9.6 Ebf (R.H.) ISN 1.0
  • 36. Variables with Draglines •Swing and boom angle of a dragline. •Increase or decrease of bucket size (within limits) with consequent decrease or increase of boom length. •Cut width and height of dragline bench. •Method of use of dragline/draglines. •More than one position of a dragline. •Adopting cast-blasting to the desired extent. ISN
  • 37. Technical specifications of Dragline (24 x 96) - Boom length : 74 - 95 m - Boom angle : 30°- 38° - Bucket Capacity (nominal): 26 - 34 cu m - Dump height : 38 - 40 m - Digging depth : 44.3 - 53.4 m - Operating radius : 64.6 - 88.2 m - Walking speed : 0.24 kmph - Bearing Pressure : 0.95 kg/cm2 ISN
  • 38. SPECIFICATIONS OF OC-I DRAGLINE MAKE Ranson & Rapier Bucket Capacity M3 24 Annual capacity mm3 3.31 Boom Length Mtrs 95.6 Operating Radius Mtrs 88 Dumping Height Mtrs 39.6 Base Dia Mtrs 16 Shoe Length Mtrs 17 Shoe Width Mtrs 2.8 Movement of Machine Mtrs 2.2 Weight of Machine Tonnes 2000 Total H.P H.P. 3500 ISN