Khalil Al-Alami | 2017-05-23 | Page 2
›Dual Polarization MW.
›XPIC Technology.
›XPD Test and Optimization.
›Interferences and its impact.
›Interference Test for ML-TN MW.
Agenda
Khalil Al-Alami | 2017-05-23 | Page 3
› Is the MW radio link combination where we creates two links
through one path with different polarization and via one dual
polarization antenna at each terminal.
› Here we use such technology to duplicate the capacity. And
in the same time it’s a hardware protection, in case one
polarization has hardware problem one polarization will carry
the traffic but with the half capacity.
› In each radio terminal there will be two MMU’s which supports
XPIC and two similar band and sub-band RAUs.
› The two RAUs at each radio Terminal will be integrated to
one dual polarization antenna via a hardware structure called
“integration kit” or “Assembled OMT”.
Dual pollarization
Khalil Al-Alami | 2017-05-23 | Page 4
›
Mini-link tn instalation
MMU2 K
MMU2 K
RAU
RAU
MMU2 K
MMU2 K
RAU
RAU
f1
f1
f1
V
f1
H
V
H
XPIC
Dual Pol.
XPIC
Dual Pol.
Packet link V
Packet link H
Khalil Al-Alami | 2017-05-23 | Page 5
›
Dual polarization installation
Feed
Integration Kit
Khalil Al-Alami | 2017-05-23 | Page 6
Dual polarization installation
Khalil Al-Alami | 2017-05-23 | Page 7
› For protected (1+1) radio terminals, two MMUs must be
placed in a pair successively, starting with an even Slot.
› Each pair of MMUs placed in adjacent slots (2 and 3, 4 and
5, and so on) is related to the same polarization. The XPIC
cable to be connected between the 2 MMUs which will build
XPIC. Therefore, the front panel XPIC cross-cable connects
modems in alternate slots (2 and 4, 3 and 5, and so on).
Mini-link tn installation
Khalil Al-Alami | 2017-05-23 | Page 8
› It is better to enable the XPIC during Configure Radio
Link.
› When you configure the Modulation capacity for each radio
link of the 2+0 links the value will be half of that in the FSC
then the total capacity of the 2+0 will be as the FSC. For
example the below FSC the Modulation Capacity will be 204
and 46
Mini-link tn Configuration
Khalil Al-Alami | 2017-05-23 | Page 9
› XPIC cable: RJ45-RJ45 screened 100 Ω pair cable
(4x2x0.25) cable with the below Pin layout.
XPIC signal cable
Khalil Al-Alami | 2017-05-23 | Page 10
› It is better to enable the XPIC during Configure Radio Link.
Mini-link tn Configuration
slot 2 config. (Vertical) slot 4 config. (Horizontal)
Khalil Al-Alami | 2017-05-23 | Page 11
› WAN Creation: go RL-IME and select Radio Link Bonding
Mode, and Assigned the 2 Packet Links.
› Note: (For 6P, NPU3D only RL-IME 1/7/100 and RL-IME
1/7/101 can do the bonding configure, 20P NPU1C RL-IME
1/11/100 ~RL-IME 1/11/107 can do the Bonding)
› Right Click RL-IME then Configure :
Mini-link tn Configuration
Khalil Al-Alami | 2017-05-23 | Page 12
Mini-link tn Configuration
Khalil Al-Alami | 2017-05-23 | Page 13
› Turn off the transmitters for H pol and do the Alignment
for V polarization as normal 1+0 until get the max RSL.
› Loosen the 4 screws on the OMT Assembly with the Reflector
Support Bracket. Rotate until the max value is found. The
rotation range is ±5°. Do the same procedures in both Sites.
› Turn the H Pol on and check the RSL at both Pol.
2+0 alignment.
Dual Pol Antenna
RAU
Integration kit
Khalil Al-Alami | 2017-05-23 | Page 14
Cross Polarization Discrimination
Optimization (XPD):
 The Min XPD value for bands (15 – 38 GHz )= 27dB
 1st do the XPD test (see XPD Test Slides), if value is >= 27dB then done,
else you need to do XPD optimization by the below steps:
1. Turn on the Tx on far end of V pol and turn off The Tx of H.
2. Check with a voltmeter at near end on the RAU of H pol and Rotate +/-
until the worst voltage value found. (The rotation is performed to
minimize the leakage between the two polarizations, that is, to
maximize the XPD).
3. Verify the RX Level at near end in H pol and record the value.
4. Verify the RX level at near end in V pol and record the value.
Khalil Al-Alami | 2017-05-23 | Page 15
XPD Optimization :
› A cross polarization discrimination (XPD) of at least 27dB
must be reached. The value is the difference between the
signals measured on the two radios (H & V).
› If the reached value is less than 27 dB, perform steps (1,4)
again.
› If the reached value is less than 27 dB, after repeating steps
(1,4) verify again the hardware installation.
Khalil Al-Alami | 2017-05-23 | Page 16
This screen shots to show how to check the XPD value by
MINI-LINK Craft.
• Vertical & Horizontal TX ON
• Polarization: Vertical
XPD Test screen shots
Khalil Al-Alami | 2017-05-23 | Page 17
XPD Test screen shots
• Polarization: Horizontal
Khalil Al-Alami | 2017-05-23 | Page 18
• Vertical TX ON & Horizontal OFF
• Polarization: Vertical RSL.
• Polarization: Horizontal Off . XPD=27.0dB (different
between Horizontal and Vertical) and its critical.
XPD Test screen shots before XPD alignment
Khalil Al-Alami | 2017-05-23 | Page 19
• Start the Test.
• Vertical TX ON & Horizontal OFF
• Polarization: Vertical RSL.
XPD Test screen shots After XPD alignment
Khalil Al-Alami | 2017-05-23 | Page 20
• Polarization: Horizontal RSL.
• XPD= 33.0dB (different between Horizontal and Vertical).
Which is better than before.
XPD Test screen shots After XPD alignment
Khalil Al-Alami | 2017-05-23 | Page 21
› Interference is one of the challenges which is facing the
MW Radio systems. It can degrade the performance or even
stop the transmission.
› During the alignment when we face difficulty to achieve the
desired RSL, the interference is one of the issues we expect.
› Also during the link life when we get E1 BER or Ethernet PER
we put the interference in our considerations.
› Here we will take the interference test by using our ML Craft:
Access the far-end terminal through ML Craft and switch the
far-end transmitter off. Note: In a 1+1 system both
transmitters must be switched off.
Check RSL level at near end, If the level exceeds -90dBm,
there could be a such interference. Like in the following screen
shots.
Interference Test
Khalil Al-Alami | 2017-05-23 | Page 22
› We off Transmitter power from Far end
at RSL view by tick Transmitter on Ra1 box and save.
Interference Test Scr. shots
Khalil Al-Alami | 2017-05-23 | Page 23
› Check the RSL at near End terminal. In this below screen
Shot means there is an interference.
Interference Test Scr. shots
Khalil Al-Alami | 2017-05-23 | Page 24
› In this screen shot its normal RSL as no signal coming from
The far end terminal.
Interference Test Scr. shots
Khalil Al-Alami | 2017-05-23 | Page 25
› After you finish the test don’t forget to turn the far end
transmitter to restore back the traffic.
Interference Test Scr. shots
Khalil Al-Alami | 2017-05-23 | Page 26
Xpic implementation xpd alignment interference test

More Related Content

PDF
Minilink TN Ethernet Config.pdf
PPTX
TRM MINI-LINK TN Presentation By Khalil Al-Alami
PPTX
Routing over ericsson mini link
PPTX
Ericsson TN Cards in Details
PDF
config_mini link
PDF
Ericsson Mini-link 6600 Nodes
PDF
Step by step to install tn6 p
PDF
Ericsson RBS 6000
Minilink TN Ethernet Config.pdf
TRM MINI-LINK TN Presentation By Khalil Al-Alami
Routing over ericsson mini link
Ericsson TN Cards in Details
config_mini link
Ericsson Mini-link 6600 Nodes
Step by step to install tn6 p
Ericsson RBS 6000

What's hot (20)

PPT
Mw training slide
PPT
Basics Of Minilink Microwave Networks
PPT
Handling Common Faults and Alarms for Huawei RTN Microwaves
PDF
519710952-6366-MW-HOP-Installation-Guidelines-Bhartij.pdf
DOC
Mini link tn configuration
PDF
Huawei BTS 3900 Hardware Structure
PPTX
Dcn configuration via cli
PPT
Huawei umts node b configuration principle
PDF
Mobilink 2G3G Swap Guide V1.8 20150406 (1)
PDF
LTE introduction part1
PPT
02 opti x rtn 900 v100r002 configuration guide-20100119-a
PDF
Mini link tn-etsi_technical1
PDF
Ericsson BTS commisioning
PDF
Ericsson RBS 6000 & 3000 & 2000
PPTX
TDM Traffic Migration into IP Backhaul
PPTX
Radio Measurements in LTE
PDF
Microwave Links Correct Installation at Telecom Site
PDF
9500 MPR Microware Packet Radio Description & Application
PPTX
Zxmw nr8250 v1.00 commissioning guide ¸±±¾
Mw training slide
Basics Of Minilink Microwave Networks
Handling Common Faults and Alarms for Huawei RTN Microwaves
519710952-6366-MW-HOP-Installation-Guidelines-Bhartij.pdf
Mini link tn configuration
Huawei BTS 3900 Hardware Structure
Dcn configuration via cli
Huawei umts node b configuration principle
Mobilink 2G3G Swap Guide V1.8 20150406 (1)
LTE introduction part1
02 opti x rtn 900 v100r002 configuration guide-20100119-a
Mini link tn-etsi_technical1
Ericsson BTS commisioning
Ericsson RBS 6000 & 3000 & 2000
TDM Traffic Migration into IP Backhaul
Radio Measurements in LTE
Microwave Links Correct Installation at Telecom Site
9500 MPR Microware Packet Radio Description & Application
Zxmw nr8250 v1.00 commissioning guide ¸±±¾
Ad

Similar to Xpic implementation xpd alignment interference test (20)

DOC
3 g interview question & answer by telsol360
PPT
Industrys Lowest Power Dual-Channel 10-Bit ADCs
PDF
Slides are thereanyrulesofthumb_brener
PDF
Using and OMA to Optimize QAM Optical Transceivers
PDF
Design and Implementation of LNA at 900MHz for GSM applications
PDF
Huawei - Access failures troubleshooting work shop
PDF
accessfailurestroubleshootingworkshop-130723172356-phpapp01.pdf
PDF
MeshDynamics MD4000 Mesh Network Deployment- Best Practices
PPT
Microwave Link Design and its all steps
PPT
RF Transceivers
PDF
Anywave Technical Seminar July 2016 OFDM ISDB-T2
PPTX
Ofdm.pptx
PDF
Design of Low Noise Amplifier for Wimax Application
PPTX
Optical Networking Trends & Evolution
DOC
Umts interview questions and answers
PDF
C011122428
PPTX
Unit 6.pptx
DOC
Umts interview qa
PDF
ECE 626 project report Switched Capacitor
3 g interview question & answer by telsol360
Industrys Lowest Power Dual-Channel 10-Bit ADCs
Slides are thereanyrulesofthumb_brener
Using and OMA to Optimize QAM Optical Transceivers
Design and Implementation of LNA at 900MHz for GSM applications
Huawei - Access failures troubleshooting work shop
accessfailurestroubleshootingworkshop-130723172356-phpapp01.pdf
MeshDynamics MD4000 Mesh Network Deployment- Best Practices
Microwave Link Design and its all steps
RF Transceivers
Anywave Technical Seminar July 2016 OFDM ISDB-T2
Ofdm.pptx
Design of Low Noise Amplifier for Wimax Application
Optical Networking Trends & Evolution
Umts interview questions and answers
C011122428
Unit 6.pptx
Umts interview qa
ECE 626 project report Switched Capacitor
Ad

Recently uploaded (20)

PDF
July 2025 - Top 10 Read Articles in International Journal of Software Enginee...
PDF
The CXO Playbook 2025 – Future-Ready Strategies for C-Suite Leaders Cerebrai...
PPTX
Sustainable Sites - Green Building Construction
PPTX
Lecture Notes Electrical Wiring System Components
PPTX
Geodesy 1.pptx...............................................
PDF
Embodied AI: Ushering in the Next Era of Intelligent Systems
PDF
Evaluating the Democratization of the Turkish Armed Forces from a Normative P...
PDF
Mohammad Mahdi Farshadian CV - Prospective PhD Student 2026
PDF
Model Code of Practice - Construction Work - 21102022 .pdf
PDF
R24 SURVEYING LAB MANUAL for civil enggi
PPT
Mechanical Engineering MATERIALS Selection
PPTX
Construction Project Organization Group 2.pptx
PPTX
MET 305 2019 SCHEME MODULE 2 COMPLETE.pptx
PPTX
Internet of Things (IOT) - A guide to understanding
PPTX
MCN 401 KTU-2019-PPE KITS-MODULE 2.pptx
PPTX
M Tech Sem 1 Civil Engineering Environmental Sciences.pptx
PPTX
CH1 Production IntroductoryConcepts.pptx
PPTX
OOP with Java - Java Introduction (Basics)
PPTX
Infosys Presentation by1.Riyan Bagwan 2.Samadhan Naiknavare 3.Gaurav Shinde 4...
PDF
keyrequirementskkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk
July 2025 - Top 10 Read Articles in International Journal of Software Enginee...
The CXO Playbook 2025 – Future-Ready Strategies for C-Suite Leaders Cerebrai...
Sustainable Sites - Green Building Construction
Lecture Notes Electrical Wiring System Components
Geodesy 1.pptx...............................................
Embodied AI: Ushering in the Next Era of Intelligent Systems
Evaluating the Democratization of the Turkish Armed Forces from a Normative P...
Mohammad Mahdi Farshadian CV - Prospective PhD Student 2026
Model Code of Practice - Construction Work - 21102022 .pdf
R24 SURVEYING LAB MANUAL for civil enggi
Mechanical Engineering MATERIALS Selection
Construction Project Organization Group 2.pptx
MET 305 2019 SCHEME MODULE 2 COMPLETE.pptx
Internet of Things (IOT) - A guide to understanding
MCN 401 KTU-2019-PPE KITS-MODULE 2.pptx
M Tech Sem 1 Civil Engineering Environmental Sciences.pptx
CH1 Production IntroductoryConcepts.pptx
OOP with Java - Java Introduction (Basics)
Infosys Presentation by1.Riyan Bagwan 2.Samadhan Naiknavare 3.Gaurav Shinde 4...
keyrequirementskkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk

Xpic implementation xpd alignment interference test

  • 2. Khalil Al-Alami | 2017-05-23 | Page 2 ›Dual Polarization MW. ›XPIC Technology. ›XPD Test and Optimization. ›Interferences and its impact. ›Interference Test for ML-TN MW. Agenda
  • 3. Khalil Al-Alami | 2017-05-23 | Page 3 › Is the MW radio link combination where we creates two links through one path with different polarization and via one dual polarization antenna at each terminal. › Here we use such technology to duplicate the capacity. And in the same time it’s a hardware protection, in case one polarization has hardware problem one polarization will carry the traffic but with the half capacity. › In each radio terminal there will be two MMU’s which supports XPIC and two similar band and sub-band RAUs. › The two RAUs at each radio Terminal will be integrated to one dual polarization antenna via a hardware structure called “integration kit” or “Assembled OMT”. Dual pollarization
  • 4. Khalil Al-Alami | 2017-05-23 | Page 4 › Mini-link tn instalation MMU2 K MMU2 K RAU RAU MMU2 K MMU2 K RAU RAU f1 f1 f1 V f1 H V H XPIC Dual Pol. XPIC Dual Pol. Packet link V Packet link H
  • 5. Khalil Al-Alami | 2017-05-23 | Page 5 › Dual polarization installation Feed Integration Kit
  • 6. Khalil Al-Alami | 2017-05-23 | Page 6 Dual polarization installation
  • 7. Khalil Al-Alami | 2017-05-23 | Page 7 › For protected (1+1) radio terminals, two MMUs must be placed in a pair successively, starting with an even Slot. › Each pair of MMUs placed in adjacent slots (2 and 3, 4 and 5, and so on) is related to the same polarization. The XPIC cable to be connected between the 2 MMUs which will build XPIC. Therefore, the front panel XPIC cross-cable connects modems in alternate slots (2 and 4, 3 and 5, and so on). Mini-link tn installation
  • 8. Khalil Al-Alami | 2017-05-23 | Page 8 › It is better to enable the XPIC during Configure Radio Link. › When you configure the Modulation capacity for each radio link of the 2+0 links the value will be half of that in the FSC then the total capacity of the 2+0 will be as the FSC. For example the below FSC the Modulation Capacity will be 204 and 46 Mini-link tn Configuration
  • 9. Khalil Al-Alami | 2017-05-23 | Page 9 › XPIC cable: RJ45-RJ45 screened 100 Ω pair cable (4x2x0.25) cable with the below Pin layout. XPIC signal cable
  • 10. Khalil Al-Alami | 2017-05-23 | Page 10 › It is better to enable the XPIC during Configure Radio Link. Mini-link tn Configuration slot 2 config. (Vertical) slot 4 config. (Horizontal)
  • 11. Khalil Al-Alami | 2017-05-23 | Page 11 › WAN Creation: go RL-IME and select Radio Link Bonding Mode, and Assigned the 2 Packet Links. › Note: (For 6P, NPU3D only RL-IME 1/7/100 and RL-IME 1/7/101 can do the bonding configure, 20P NPU1C RL-IME 1/11/100 ~RL-IME 1/11/107 can do the Bonding) › Right Click RL-IME then Configure : Mini-link tn Configuration
  • 12. Khalil Al-Alami | 2017-05-23 | Page 12 Mini-link tn Configuration
  • 13. Khalil Al-Alami | 2017-05-23 | Page 13 › Turn off the transmitters for H pol and do the Alignment for V polarization as normal 1+0 until get the max RSL. › Loosen the 4 screws on the OMT Assembly with the Reflector Support Bracket. Rotate until the max value is found. The rotation range is ±5°. Do the same procedures in both Sites. › Turn the H Pol on and check the RSL at both Pol. 2+0 alignment. Dual Pol Antenna RAU Integration kit
  • 14. Khalil Al-Alami | 2017-05-23 | Page 14 Cross Polarization Discrimination Optimization (XPD):  The Min XPD value for bands (15 – 38 GHz )= 27dB  1st do the XPD test (see XPD Test Slides), if value is >= 27dB then done, else you need to do XPD optimization by the below steps: 1. Turn on the Tx on far end of V pol and turn off The Tx of H. 2. Check with a voltmeter at near end on the RAU of H pol and Rotate +/- until the worst voltage value found. (The rotation is performed to minimize the leakage between the two polarizations, that is, to maximize the XPD). 3. Verify the RX Level at near end in H pol and record the value. 4. Verify the RX level at near end in V pol and record the value.
  • 15. Khalil Al-Alami | 2017-05-23 | Page 15 XPD Optimization : › A cross polarization discrimination (XPD) of at least 27dB must be reached. The value is the difference between the signals measured on the two radios (H & V). › If the reached value is less than 27 dB, perform steps (1,4) again. › If the reached value is less than 27 dB, after repeating steps (1,4) verify again the hardware installation.
  • 16. Khalil Al-Alami | 2017-05-23 | Page 16 This screen shots to show how to check the XPD value by MINI-LINK Craft. • Vertical & Horizontal TX ON • Polarization: Vertical XPD Test screen shots
  • 17. Khalil Al-Alami | 2017-05-23 | Page 17 XPD Test screen shots • Polarization: Horizontal
  • 18. Khalil Al-Alami | 2017-05-23 | Page 18 • Vertical TX ON & Horizontal OFF • Polarization: Vertical RSL. • Polarization: Horizontal Off . XPD=27.0dB (different between Horizontal and Vertical) and its critical. XPD Test screen shots before XPD alignment
  • 19. Khalil Al-Alami | 2017-05-23 | Page 19 • Start the Test. • Vertical TX ON & Horizontal OFF • Polarization: Vertical RSL. XPD Test screen shots After XPD alignment
  • 20. Khalil Al-Alami | 2017-05-23 | Page 20 • Polarization: Horizontal RSL. • XPD= 33.0dB (different between Horizontal and Vertical). Which is better than before. XPD Test screen shots After XPD alignment
  • 21. Khalil Al-Alami | 2017-05-23 | Page 21 › Interference is one of the challenges which is facing the MW Radio systems. It can degrade the performance or even stop the transmission. › During the alignment when we face difficulty to achieve the desired RSL, the interference is one of the issues we expect. › Also during the link life when we get E1 BER or Ethernet PER we put the interference in our considerations. › Here we will take the interference test by using our ML Craft: Access the far-end terminal through ML Craft and switch the far-end transmitter off. Note: In a 1+1 system both transmitters must be switched off. Check RSL level at near end, If the level exceeds -90dBm, there could be a such interference. Like in the following screen shots. Interference Test
  • 22. Khalil Al-Alami | 2017-05-23 | Page 22 › We off Transmitter power from Far end at RSL view by tick Transmitter on Ra1 box and save. Interference Test Scr. shots
  • 23. Khalil Al-Alami | 2017-05-23 | Page 23 › Check the RSL at near End terminal. In this below screen Shot means there is an interference. Interference Test Scr. shots
  • 24. Khalil Al-Alami | 2017-05-23 | Page 24 › In this screen shot its normal RSL as no signal coming from The far end terminal. Interference Test Scr. shots
  • 25. Khalil Al-Alami | 2017-05-23 | Page 25 › After you finish the test don’t forget to turn the far end transmitter to restore back the traffic. Interference Test Scr. shots
  • 26. Khalil Al-Alami | 2017-05-23 | Page 26