SlideShare a Scribd company logo
2
Most read
Counter Name Sub Counter Name Counter explanation Cause & Solution
C310080064
Number of failed RRC
connection preparation,Due To
Rl setup FAIL
Rl setup FAIL
1. CE shortage;need CE
expansion
2. Check alarm for more
information
C310080065
Number of failed RRC
connection preparation, Due
To Rl setup expiry.
Due To Rl setup expiry Transmission problem
C310080067
Number of failed RRC
connection preparation, Due
To Codes
CODE Shortage
Code shortage, need traffic
balance, add new cell, second
carrier
C310080068
Number of failed RRC
connection preparation, Due
To DL POWER Shortage
DL POWER Shortage
Power shortage, need traffic
balance, add new cell, second
carrier
C310080069
Number of failed RRC
connection preparation, Due
To UL Interfere
UL Interference
Check the reason for RTWP
increase, follow the
interference shooting
document
C310080070
Number of failed RRC
connection preparation, Due
To UL CE Shortage
UL CE
CE shortage;need CE
expansion
C310080071
Number of failed RRC
connection preparation, Due
To DL CE Shortage
DL CE
CE shortage;need CE
expansion
C310080072
Number of failed RRC
connection preparation, Due
To RNC Internal Reasons
/ / RL setup fail, Due to RNC
1. RCB OVERLOAD
2. DSP on RUB not config IP
address
C310080077
Number of failed RRC
connection preparation,Due To
Iub RlSetup TbFail
Iub Transmission Fail Transmission problem
C310080078
Number of failed RRC
connection preparation,Due To
Iub RlSetup TbCacFail
Iub Transmission access Fail Transmission problem
C310080079
Number of failed RRC
connection preparation,Due To
Iub UP Fail
IUB Use Plane Fail Transmission problem
C310086446
Number of failed RRC
connection preparation,Due To
CN
C310086447
Number of failed RRC
connection preparation, Due
To CN Overload
CN OVERLOAD CN OVERLOAD
C310080167
Number of failed RRC
connection access, due to
Radio Interface Synch.
/ /
Have Sent RRC Connection
Setup,
But do not received RRC
Connection Setup Complete or
Radio Link Restore
CAUSE:
DSP Failed
Other hardware problem
RRC lodebalance strategy
Timer for RL restore is to short
SOLUTION: change hardware
to check if it is the problem
1. change the site CMP
2. change resource shelf
priority
if it worked, need upgrade or
repalce
Radio interface failure has
been attributed to some
hardware failures(in sympathy
with traffic as what happened
at site selbone Park (BPC),
Nguboyenja (RRU))
C310080063
Number of failed RRC
connection preparation, NodeB
C310080066
Number of failed RRC
connection preparation, Due
To Admission Control
C310080076
Number of failed RRC
connection preparation, Due
To Trans
C310080168
Number of failed RRC
connection access, due to
timeout of Uu interface
/ /
Have sent RRC Connection
Setup, but do not receiced
RRC Connection Setup
Complete, but received Radio
Link Restore
N/A
Meanwhile, UU interface may
require some downtilt
adjustments and that is what I
will be doing for those cells
with more than 100 RRC setup
blocked due to UU interfac
C310080169
Number of failed RRC
connection access, due to
RNC Inner Reasons
/ /
Have sent RRC Connection
Setup,but do not received RRC
Connection Setup Complete,
because of RNC
N/A

More Related Content

PDF
LTE KPI and PI Formula_NOKIA.pdf
PPT
08. DRIVE TEST Analysis
PPSX
3G drive test procedure (SSV) by Md Joynal Abaden
PPTX
Dt parameters
PDF
LTE KPI
PPTX
Huawei 3 g_capacity_optimization
PDF
Events in tems products
PPT
Drive test final
LTE KPI and PI Formula_NOKIA.pdf
08. DRIVE TEST Analysis
3G drive test procedure (SSV) by Md Joynal Abaden
Dt parameters
LTE KPI
Huawei 3 g_capacity_optimization
Events in tems products
Drive test final

What's hot (20)

PPT
How to perform trouble shooting based on counters
PPTX
NSA Mobility Managment.pptx
PDF
toaz.info-zte-fdd-lte-radio-network-optimization-guideline-v14-1-pr_2dc3a4737...
PPTX
3 g drive test
DOC
Factors affecting lte throughput and calculation methodology
PDF
2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...
PPTX
Sharing session huawei network optimization january 2015 ver3
DOCX
Lte coverage optimization analysis
DOCX
Lte drive test parameters
PPTX
LTE Optimization-KPIs.pptx
PDF
zte umts-cs-call-drop-analysis-guide-zte
PDF
Features and Parameters Slides.pdf
PDF
Lte1841
PDF
LTE Air Interface
PPT
Rf optimization
PDF
46679007 define-rx-path-imbalance
PPT
Layer 3 messages (2G)
PDF
Lte principle
DOC
Top 10 3 G Radio Optimisation Actions
PPT
2 g vs-3g drive
How to perform trouble shooting based on counters
NSA Mobility Managment.pptx
toaz.info-zte-fdd-lte-radio-network-optimization-guideline-v14-1-pr_2dc3a4737...
3 g drive test
Factors affecting lte throughput and calculation methodology
2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...
Sharing session huawei network optimization january 2015 ver3
Lte coverage optimization analysis
Lte drive test parameters
LTE Optimization-KPIs.pptx
zte umts-cs-call-drop-analysis-guide-zte
Features and Parameters Slides.pdf
Lte1841
LTE Air Interface
Rf optimization
46679007 define-rx-path-imbalance
Layer 3 messages (2G)
Lte principle
Top 10 3 G Radio Optimisation Actions
2 g vs-3g drive
Ad

Similar to RRC-fail-counter-analysis (20)

PDF
287995345-Huawei-WCDMA-Radio-Parameters-Optimization-Cases.pdf
PPTX
NSN NOKIA 3G KPI for Network planning and optimization
PDF
pdfcoffee.com_3g-4g-troubleshooting-huawei-pdf-free.pdf
DOC
Discuss with martin_evdo
PPT
dokumen.tips_nokia-gsm-optimization.ppt
PDF
99189325 7745-alarm-troubleshoot
PDF
accessfailurestroubleshootingworkshop-130723172356-phpapp01.pdf
PDF
Huawei - Access failures troubleshooting work shop
PPT
3900458 LTE Accessibilty case study.ppt
PDF
Qualcomm lte-performance-challenges-09-01-2011
PPTX
03 FO_NAST3100 _C01_1 LTE Access Success Rate Optimization Analysis(PPT+NOTES...
PPT
Nokia kpi and_core_optimization
PPTX
28. de Funcionalidad - DCCC.pptx
PDF
300 135-q&a-demo-exam area
PPT
kpianalysis-110830052500-phpapp02.ppt
PPT
Kpi analysis
PPT
Nokia gsm-kpi-analysis-based-on-daily-monitoring-basis-presentation
PPT
dokumen.tips_nokia-gsm-kpi-analysis-based-on-daily-monitoring-basis-presentat...
PPT
Nokia_GSM_KPI_ANALYSIS_Based_on_Daily_Mo.ppt
PPT
Kpi analysis
287995345-Huawei-WCDMA-Radio-Parameters-Optimization-Cases.pdf
NSN NOKIA 3G KPI for Network planning and optimization
pdfcoffee.com_3g-4g-troubleshooting-huawei-pdf-free.pdf
Discuss with martin_evdo
dokumen.tips_nokia-gsm-optimization.ppt
99189325 7745-alarm-troubleshoot
accessfailurestroubleshootingworkshop-130723172356-phpapp01.pdf
Huawei - Access failures troubleshooting work shop
3900458 LTE Accessibilty case study.ppt
Qualcomm lte-performance-challenges-09-01-2011
03 FO_NAST3100 _C01_1 LTE Access Success Rate Optimization Analysis(PPT+NOTES...
Nokia kpi and_core_optimization
28. de Funcionalidad - DCCC.pptx
300 135-q&a-demo-exam area
kpianalysis-110830052500-phpapp02.ppt
Kpi analysis
Nokia gsm-kpi-analysis-based-on-daily-monitoring-basis-presentation
dokumen.tips_nokia-gsm-kpi-analysis-based-on-daily-monitoring-basis-presentat...
Nokia_GSM_KPI_ANALYSIS_Based_on_Daily_Mo.ppt
Kpi analysis
Ad

More from Emerson Eduardo Rodrigues Von Staffen (8)

PDF
Optimisation project overview
PDF
Initial tuning umts (2)
PDF
Gi oss offering top cell_partnership (1)
PDF
Devops continuousintegration and deployment onaws puttingmoneybackintoyourmis...
PDF
ZTE-umts-congestion-control-feature-guide-v8-5-2011312
PDF
wcdma-paging-problem-analysis
Optimisation project overview
Initial tuning umts (2)
Gi oss offering top cell_partnership (1)
Devops continuousintegration and deployment onaws puttingmoneybackintoyourmis...
ZTE-umts-congestion-control-feature-guide-v8-5-2011312
wcdma-paging-problem-analysis

Recently uploaded (20)

PDF
Integrating Fractal Dimension and Time Series Analysis for Optimized Hyperspe...
PDF
A SYSTEMATIC REVIEW OF APPLICATIONS IN FRAUD DETECTION
PDF
keyrequirementskkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk
PDF
BIO-INSPIRED ARCHITECTURE FOR PARSIMONIOUS CONVERSATIONAL INTELLIGENCE : THE ...
PPT
Occupational Health and Safety Management System
PPTX
Artificial Intelligence
PPTX
introduction to high performance computing
PPTX
UNIT 4 Total Quality Management .pptx
PDF
Exploratory_Data_Analysis_Fundamentals.pdf
PDF
Enhancing Cyber Defense Against Zero-Day Attacks using Ensemble Neural Networks
PDF
Mitigating Risks through Effective Management for Enhancing Organizational Pe...
PDF
The CXO Playbook 2025 – Future-Ready Strategies for C-Suite Leaders Cerebrai...
PPTX
Information Storage and Retrieval Techniques Unit III
PDF
PREDICTION OF DIABETES FROM ELECTRONIC HEALTH RECORDS
PDF
BIO-INSPIRED HORMONAL MODULATION AND ADAPTIVE ORCHESTRATION IN S-AI-GPT
PDF
Analyzing Impact of Pakistan Economic Corridor on Import and Export in Pakist...
PPTX
CURRICULAM DESIGN engineering FOR CSE 2025.pptx
PDF
Categorization of Factors Affecting Classification Algorithms Selection
PDF
Soil Improvement Techniques Note - Rabbi
PDF
UNIT no 1 INTRODUCTION TO DBMS NOTES.pdf
Integrating Fractal Dimension and Time Series Analysis for Optimized Hyperspe...
A SYSTEMATIC REVIEW OF APPLICATIONS IN FRAUD DETECTION
keyrequirementskkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk
BIO-INSPIRED ARCHITECTURE FOR PARSIMONIOUS CONVERSATIONAL INTELLIGENCE : THE ...
Occupational Health and Safety Management System
Artificial Intelligence
introduction to high performance computing
UNIT 4 Total Quality Management .pptx
Exploratory_Data_Analysis_Fundamentals.pdf
Enhancing Cyber Defense Against Zero-Day Attacks using Ensemble Neural Networks
Mitigating Risks through Effective Management for Enhancing Organizational Pe...
The CXO Playbook 2025 – Future-Ready Strategies for C-Suite Leaders Cerebrai...
Information Storage and Retrieval Techniques Unit III
PREDICTION OF DIABETES FROM ELECTRONIC HEALTH RECORDS
BIO-INSPIRED HORMONAL MODULATION AND ADAPTIVE ORCHESTRATION IN S-AI-GPT
Analyzing Impact of Pakistan Economic Corridor on Import and Export in Pakist...
CURRICULAM DESIGN engineering FOR CSE 2025.pptx
Categorization of Factors Affecting Classification Algorithms Selection
Soil Improvement Techniques Note - Rabbi
UNIT no 1 INTRODUCTION TO DBMS NOTES.pdf

RRC-fail-counter-analysis

  • 1. Counter Name Sub Counter Name Counter explanation Cause & Solution C310080064 Number of failed RRC connection preparation,Due To Rl setup FAIL Rl setup FAIL 1. CE shortage;need CE expansion 2. Check alarm for more information C310080065 Number of failed RRC connection preparation, Due To Rl setup expiry. Due To Rl setup expiry Transmission problem C310080067 Number of failed RRC connection preparation, Due To Codes CODE Shortage Code shortage, need traffic balance, add new cell, second carrier C310080068 Number of failed RRC connection preparation, Due To DL POWER Shortage DL POWER Shortage Power shortage, need traffic balance, add new cell, second carrier C310080069 Number of failed RRC connection preparation, Due To UL Interfere UL Interference Check the reason for RTWP increase, follow the interference shooting document C310080070 Number of failed RRC connection preparation, Due To UL CE Shortage UL CE CE shortage;need CE expansion C310080071 Number of failed RRC connection preparation, Due To DL CE Shortage DL CE CE shortage;need CE expansion C310080072 Number of failed RRC connection preparation, Due To RNC Internal Reasons / / RL setup fail, Due to RNC 1. RCB OVERLOAD 2. DSP on RUB not config IP address C310080077 Number of failed RRC connection preparation,Due To Iub RlSetup TbFail Iub Transmission Fail Transmission problem C310080078 Number of failed RRC connection preparation,Due To Iub RlSetup TbCacFail Iub Transmission access Fail Transmission problem C310080079 Number of failed RRC connection preparation,Due To Iub UP Fail IUB Use Plane Fail Transmission problem C310086446 Number of failed RRC connection preparation,Due To CN C310086447 Number of failed RRC connection preparation, Due To CN Overload CN OVERLOAD CN OVERLOAD C310080167 Number of failed RRC connection access, due to Radio Interface Synch. / / Have Sent RRC Connection Setup, But do not received RRC Connection Setup Complete or Radio Link Restore CAUSE: DSP Failed Other hardware problem RRC lodebalance strategy Timer for RL restore is to short SOLUTION: change hardware to check if it is the problem 1. change the site CMP 2. change resource shelf priority if it worked, need upgrade or repalce Radio interface failure has been attributed to some hardware failures(in sympathy with traffic as what happened at site selbone Park (BPC), Nguboyenja (RRU)) C310080063 Number of failed RRC connection preparation, NodeB C310080066 Number of failed RRC connection preparation, Due To Admission Control C310080076 Number of failed RRC connection preparation, Due To Trans
  • 2. C310080168 Number of failed RRC connection access, due to timeout of Uu interface / / Have sent RRC Connection Setup, but do not receiced RRC Connection Setup Complete, but received Radio Link Restore N/A Meanwhile, UU interface may require some downtilt adjustments and that is what I will be doing for those cells with more than 100 RRC setup blocked due to UU interfac C310080169 Number of failed RRC connection access, due to RNC Inner Reasons / / Have sent RRC Connection Setup,but do not received RRC Connection Setup Complete, because of RNC N/A