SlideShare a Scribd company logo
2
Most read
3
Most read
4
Most read
LTE Accessibility
Problem cause &
solution a-z step
Prepared by-
Rajesh Kumar
Definition: Ability of a user to Obtain an E-RAB from the System.
Point:-Accessibility/SSSR is combination of 3 Phase.
1. RRC Phase.
2. S1 Signaling Phase.
3. E-RAB Phase.
Definition based on Counter:-
SSSR=[(PmRrcConnEstabSucc/PmRrcConnEstabAtt)*(Pms1SigConnEstabSucc/
PmS1SigConnEstabAtt)*(PmErabEstabSuccInit/PmErabEstabAttInit)]*100
SSSR Phase based on Counter:-
4. RRC Setup:-Following counter are Responsible-
a> PmRrcConnEstabAtt.
b> PmRrcConnEstabAttReAtt
C> PmRrcConnEstabSucc
Accessibility/SSSR(Session setup success Rate):-
Accessibility/SSSR(Session setup success Rate):-
2.S1-Signalling Setup: Following Counter are Responsible-
a> PmS1SigConnEstabAtt.
b> PmS1SigConnEstabSucc.
3. E-RAB Establishment: Following Counter are Responsible-
A> PmErabEstabAttInit
B> PmErabEstabSuccInit.
C> PmErabEstabAttAdded.
D> PmErabEstabSuccAdded.
Accessibility/SSSR(Session setup success Rate):-
Step for Find out the Problem with Counter:-
1.RRC Failure(PmRrcConnEstabFail):-Following issue need to be verified-
A> pmRrcConnEstabFailLic:The total number of failed RRC Connection Establishments
due to lack of connected users license.
Soln:- Upgrade the LKF(License Key File) by Upgrading Software.Ex- From L12A to L12B
And L13A to L13B.L13B having License of 2000 Connected user per ENB.(License/Software
upgradation activity depends as per Agreement with customer).For this Customer pay to
Ericsson.
Soln:- Offload the Traffic: 1> Shared the Traffic by Changing Azimuth,By Tilt,By
Implementing Hi-Cap Parameter.If still Traffic load is more,planned new site to offload.
B>pmRrcConnEstabFailHighLoad:The total number of failed RRC Connection
Establishments due to high load.
Soln: There are many ways to Offload the Traffic: 1> Shared the Traffic by Changing
Azimuth,By Tilt,By Implementing Hi-Cap Parameter.
Following are the List of Hi-Cap Parameter which can be tune as per N/W requirement.
Accessibility/SSSR(Session setup success Rate):-
MOC Parameter Name Parameter Type Parameter - High Cap Site
System Constant ulInterferenceForgettingFactor (system constant 70) Site Level Parameter 5
System Constant deltaPsdRs2Tx (system constant 872) Site Level Parameter 0
System Constant SpdcchLaGinrMargin (system constant 220) Site Level Parameter 30
System Constant numInitialAccessAndIncomingHo (system constant 556) Site Level Parameter 10
Hidden Parameter tPollRetransmitUl - DataRadioBearer Site Level Parameter 160
Hidden Parameter tPollRetransmitUl - SignallingRadioBearer Site Level Parameter 160
Hidden Parameter tPollRetransmitDl - DataRadioBearer Site Level Parameter 160
Hidden Parameter tPollRetransmitDl - SignallingRadioBearer Site Level Parameter 160
Hidden Parameter dlMaxRetxThreshold - DataRadioBearer Site Level Parameter 8
Hidden Parameter ulMaxRetxThreshold - DataRadioBearer Site Level Parameter 8
EUtranCellFDD noOfPucchCqiUsers Sector Level Parameter 640
EUtranCellFDD noOfPucchSrUsers Sector Level Parameter 590
EUtranCellFDD pdcchCfiMode Sector Level Parameter CF_Static_3 (3)
EUtranCellFDD ulSrsEnable Sector Level Parameter TRUE
UlFss featureStateUlFss Site Level Parameter 1
EUtranCellFDD pZeroNominalPucch Sector Level Parameter -120
EUtranCellFDD pZeroNominalPusch Sector Level Parameter -102
QciProfilePredefined schedulingAlgorithm - default Site Level Parameter RESOURCE_FAIR (0)
QciProfilePredefined schedulingAlgorithm - qci 1 Site Level Parameter RESOURCE_FAIR (0)
QciProfilePredefined schedulingAlgorithm - qci 2 Site Level Parameter RESOURCE_FAIR (0)
QciProfilePredefined schedulingAlgorithm - qci 3 Site Level Parameter RESOURCE_FAIR (0)
QciProfilePredefined schedulingAlgorithm - qci 4 Site Level Parameter RESOURCE_FAIR (0)
QciProfilePredefined schedulingAlgorithm - qci 5 Site Level Parameter RESOURCE_FAIR (0)
QciProfilePredefined
schedulingAlgorithm - qci 6
Site Level Parameter RESOURCE_FAIR (0)
QciProfilePredefined schedulingAlgorithm - qci 7 Site Level Parameter RESOURCE_FAIR (0)
QciProfilePredefined schedulingAlgorithm - qci 8 Site Level Parameter RESOURCE_FAIR (0)
QciProfilePredefined schedulingAlgorithm - qci 9 Site Level Parameter RESOURCE_FAIR (0)
Accessibility/SSSR(Session setup success Rate):-
C> pmRrcConnEstabFailOverload:The total number of failed RRC
Connection Establishments due to overload.
Soln: Same as Above.
d>> pmRrcConnEstabFailActiveUserLicenseExceeded:The number
of failed RRC establishments due to more active users than what license
allows.
Soln:1. Check Active user per cell through counter PmActiveUserDlSum,
PmActiveUserUlsum.
2. Try to Offload traffic if possible by changing Azimuth,Tilt or Loading Hi-
Cap Parameter. Earlier we have discussed abt Hi-Cap.
3.Also check distance of UE from ENB,if connected from far
distance,Can change parameter RxlevAccmin to Protect access.
Accessibility/SSSR(Session setup success Rate):-
.e> pmRrcConnEstabFailFailureInRadioProcedure:The number of
failed RRC establishments due to failed radio procedure.
f> pmRrcConnEstabFailBearerAdmissionRej:The total number of
failed establishment of RRC Connection due to the fact that all the UE's
bearers are rejected during bearer admission.
Soln: Implement hi-Cap Parameter to allow more user.Also PDCCH
Adm control Th can be changed.Befor change Check PDCCH CCE
Utilization by Counter- PmPdcchCceUtil
g> pmRrcConnReestFailLicMtReest:The number of RRC Connection
Reestablishments attempts that failed due to feature "Multi-Target RRC
Connection Reestablishment" not being OPERABLE
Soln: Not included in any predefined scanner.So U have to activate
Scanner.
Accessibility/SSSR(Session setup success Rate):-
h>pmRrcConnEstabFailLackOfResources:The number of failed RRC
establishments due to lack of resources
Soln: check the Utilization of Cell and try to Offload by Implementing Hi-
Cap Parameter,Shift traffic on some less utilized cell.
i> pmRrcConnEstabFailUnspecified:The number of failed RRC
establishments due to unspecified cause.
Apart from that Please check Coverage issue,UL Interference issue,Alarm
issue,H/W issue(Re-set first) if required replace RRU.
Accessibility/SSSR(Session setup success Rate):-
2. S1-signalling Failure(PmS1SigConnEstabFail):-There is no any
Specific Secondary counter I have found.But Following could be the
reason :
a> TN(Transport issue): Need to check Fiber issue from IPBH Team.
b> TAC Wrong Configure: Configure Correct TAC as Per Design.
c> LAC-TAC mapping: Validate the LAC-TAC mapping is correct as per
Design.
d> Message mismatch: The message flow b/w UE to MME is found any
Mismatch,will laid S1-Signalling Failure.
Accessibility/SSSR(Session setup success Rate):-
3. E-RAB Failure(PmErabEstabFailInit)-
a> pmErabEstabFailGbrDlEnb(The total number of failed E-RAB setup attempts
due to downlink GBR overload for resources common to the eNodeB).
Soln: Parameter which is Responsible:dlNonGbrRatio, dlTransNwBandwidth
b> pmErabEstabFailGbrUlEnb(The total number of failed E-RAB setup attempts
due to uplink GBR overload for resources common to the eNodeB).
Soln: Parameter Which is Responsible :ulNonGbrRatio, ,ulTransNwBandwidth
c>pmErabEstabFailAddedLic(The total number of failed establishment of added
E-RABs due to license rejects (Multiple Radio Bearer per user or RLC UM). Added
E-RABs are all E-RABs present in S1 message E-RAB Setup Request).
d>pmErabEstabFailInitLic(The total number of failed establishment of initial E-
RABs due to license rejects (Multiple Radio Bearer per user or RLC UM). Initial E-
RABs are all E-RABs present in the S1 message Initial Context Setup Request).
Accessibility/SSSR(Session setup success Rate):-
Apart from that Following Could be checked:
1> Security update Fail.
2> Vendor specific issue.
3> TN(Transport issue).
Note: Some case study based Problem & Solution.
1. RRC Degradation due to RRC Reject.
Parameter: no of Pucch CQI user-160
no of Pucch Sr user-160
Here RRC Conn max user is>160
Hence due to CQI resource Congestion RRC Conn was rejected.
2. SSSR degrade due to Low S1 Succ rate: Sometimes it has been Observed that S1 Succ
rate degraded due to Software upgradation.Cell KPI
Improved after DUL Restart.
Accessibility/SSSR(Session setup success Rate):-
3. SSSR Degraded due to H/W issue: Once RRU was replace SSSR
improved.
Accessibility can also be improved by tunning these parameter.
Change dlMaxRetxTh &ULMaxRetxTh of SRB-1(1,2,4,8,16,32)
Note: Any Suggestion/Feedback will be Highly Appreciable to Improve This
Presentation.
THANK YOU

More Related Content

PPTX
LTE KPI Optimization - A to Z Abiola.pptx
PDF
ltekpioptimization-atozabiola-230817212814-48b65a9a.pdf
PPT
3374547 LTE Retainability .ppt
PPTX
LTE Optimization-KPIs.pptx
PDF
LTE_KPI-Retainability (1).pdf
PPTX
03 FO_NAST3100 _C01_1 LTE Access Success Rate Optimization Analysis(PPT+NOTES...
PPTX
685201759-LTE-KPIs- troubleshooting.pptx
PPTX
Commisioning.pptx
LTE KPI Optimization - A to Z Abiola.pptx
ltekpioptimization-atozabiola-230817212814-48b65a9a.pdf
3374547 LTE Retainability .ppt
LTE Optimization-KPIs.pptx
LTE_KPI-Retainability (1).pdf
03 FO_NAST3100 _C01_1 LTE Access Success Rate Optimization Analysis(PPT+NOTES...
685201759-LTE-KPIs- troubleshooting.pptx
Commisioning.pptx

Similar to 3900458 LTE Accessibilty case study.ppt (20)

PDF
Chap 4. call processing and handover.eng
PDF
Call processing and handover.eng
PDF
LTE Call Processing and Handover
PDF
1.training lte ran kpi & counters rjil
PDF
3g umts-originating-call
PDF
3g umts-originating-call
PDF
3g umts-originating-call
PDF
3 g call flow
PDF
3g umts-originating-call
PDF
NSA Call Flow with detailed steps for easy understanding
DOCX
Operator E CA(Carrier Aggregation) Feature Test Guide.docx
PPTX
Transceiver System requirement specifications for 20 km range UAV video datalink
PDF
3g umts-originating-call Call Flow
PDF
05 _ LTE NOKIA RAB and NAS Counters.pdf
PPT
Pms System Training
PDF
Drive Test and Optimization Tutorial - I.pdf
PDF
Key Factors that affect 5G Throughput, Possible Causes and Ways to optimize.pdf
PPTX
KPIs - 5G N66 deployment in western canada.pptx
DOCX
Practice exam #2
PDF
Umts call-flow-scenarios overview
Chap 4. call processing and handover.eng
Call processing and handover.eng
LTE Call Processing and Handover
1.training lte ran kpi & counters rjil
3g umts-originating-call
3g umts-originating-call
3g umts-originating-call
3 g call flow
3g umts-originating-call
NSA Call Flow with detailed steps for easy understanding
Operator E CA(Carrier Aggregation) Feature Test Guide.docx
Transceiver System requirement specifications for 20 km range UAV video datalink
3g umts-originating-call Call Flow
05 _ LTE NOKIA RAB and NAS Counters.pdf
Pms System Training
Drive Test and Optimization Tutorial - I.pdf
Key Factors that affect 5G Throughput, Possible Causes and Ways to optimize.pdf
KPIs - 5G N66 deployment in western canada.pptx
Practice exam #2
Umts call-flow-scenarios overview
Ad

More from wafawafa52 (20)

PPTX
496479546-Drop-Counter- Tree(1).pptx
PPTX
421275892-3G-Retainability-SSP-Final-v1-0(1).pptx
PPT
360762795-If-Load-Sharing-in-Multi-carrier-Network.ppt
PPTX
CDC-F-solution-on-1830PSS-MAR2015-ED6-5B2-5D(2).pptx
PPTX
372988826-Cell-Dependency-in-Ericsson-scripting(2).pptx
PPT
rbs-6201-2g-commisioning1-151219095532.ppt
PPT
dugintegration-240811195422-dfdcf3a6.ppt
PPTX
512606295-Ericsson-vs-Huawei-SIB-and-Parameter-Comparison1.pptx
PPTX
372988826-Cell-Dependency-in-Ericsson-scripting(1).pptx
PPTX
436934181-Coriant-MTera-Presentation(1).pptx
PPT
361300678-HW-Differences-Between-Apg40-Apg43.ppt
PPTX
384754914- LTE Timers .pptx
PPT
4759182 Availlabilty .ppt
PPTX
730003648-Baseband-G3-1-HW-Presentation-CBC-Copy(2).pptx
PPTX
501411220-Moshell-commands-and-read-through(2).pptx
PPT
EnodeB_Moshell_important_commands .ppt
PDF
Useful Moshell commands .pdf
PDF
OSS - RC - Operation - Training 1 - 1.pdf
PDF
Configuracao - Alarmes - Baseband .pdf
PDF
APG43_Linux_Introduction_and_commands.pdf
496479546-Drop-Counter- Tree(1).pptx
421275892-3G-Retainability-SSP-Final-v1-0(1).pptx
360762795-If-Load-Sharing-in-Multi-carrier-Network.ppt
CDC-F-solution-on-1830PSS-MAR2015-ED6-5B2-5D(2).pptx
372988826-Cell-Dependency-in-Ericsson-scripting(2).pptx
rbs-6201-2g-commisioning1-151219095532.ppt
dugintegration-240811195422-dfdcf3a6.ppt
512606295-Ericsson-vs-Huawei-SIB-and-Parameter-Comparison1.pptx
372988826-Cell-Dependency-in-Ericsson-scripting(1).pptx
436934181-Coriant-MTera-Presentation(1).pptx
361300678-HW-Differences-Between-Apg40-Apg43.ppt
384754914- LTE Timers .pptx
4759182 Availlabilty .ppt
730003648-Baseband-G3-1-HW-Presentation-CBC-Copy(2).pptx
501411220-Moshell-commands-and-read-through(2).pptx
EnodeB_Moshell_important_commands .ppt
Useful Moshell commands .pdf
OSS - RC - Operation - Training 1 - 1.pdf
Configuracao - Alarmes - Baseband .pdf
APG43_Linux_Introduction_and_commands.pdf
Ad

Recently uploaded (20)

PPTX
CYBER-CRIMES AND SECURITY A guide to understanding
PPTX
UNIT-1 - COAL BASED THERMAL POWER PLANTS
PPTX
web development for engineering and engineering
PDF
Digital Logic Computer Design lecture notes
PPTX
OOP with Java - Java Introduction (Basics)
PPTX
Lecture Notes Electrical Wiring System Components
PDF
keyrequirementskkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk
PPTX
MCN 401 KTU-2019-PPE KITS-MODULE 2.pptx
PPT
Mechanical Engineering MATERIALS Selection
PDF
PRIZ Academy - 9 Windows Thinking Where to Invest Today to Win Tomorrow.pdf
PPTX
Construction Project Organization Group 2.pptx
PPTX
Foundation to blockchain - A guide to Blockchain Tech
PDF
BMEC211 - INTRODUCTION TO MECHATRONICS-1.pdf
PPTX
additive manufacturing of ss316l using mig welding
PPTX
CARTOGRAPHY AND GEOINFORMATION VISUALIZATION chapter1 NPTE (2).pptx
PPTX
UNIT 4 Total Quality Management .pptx
PPTX
Lesson 3_Tessellation.pptx finite Mathematics
PPTX
Welding lecture in detail for understanding
PDF
composite construction of structures.pdf
PDF
PPT on Performance Review to get promotions
CYBER-CRIMES AND SECURITY A guide to understanding
UNIT-1 - COAL BASED THERMAL POWER PLANTS
web development for engineering and engineering
Digital Logic Computer Design lecture notes
OOP with Java - Java Introduction (Basics)
Lecture Notes Electrical Wiring System Components
keyrequirementskkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk
MCN 401 KTU-2019-PPE KITS-MODULE 2.pptx
Mechanical Engineering MATERIALS Selection
PRIZ Academy - 9 Windows Thinking Where to Invest Today to Win Tomorrow.pdf
Construction Project Organization Group 2.pptx
Foundation to blockchain - A guide to Blockchain Tech
BMEC211 - INTRODUCTION TO MECHATRONICS-1.pdf
additive manufacturing of ss316l using mig welding
CARTOGRAPHY AND GEOINFORMATION VISUALIZATION chapter1 NPTE (2).pptx
UNIT 4 Total Quality Management .pptx
Lesson 3_Tessellation.pptx finite Mathematics
Welding lecture in detail for understanding
composite construction of structures.pdf
PPT on Performance Review to get promotions

3900458 LTE Accessibilty case study.ppt

  • 1. LTE Accessibility Problem cause & solution a-z step Prepared by- Rajesh Kumar
  • 2. Definition: Ability of a user to Obtain an E-RAB from the System. Point:-Accessibility/SSSR is combination of 3 Phase. 1. RRC Phase. 2. S1 Signaling Phase. 3. E-RAB Phase. Definition based on Counter:- SSSR=[(PmRrcConnEstabSucc/PmRrcConnEstabAtt)*(Pms1SigConnEstabSucc/ PmS1SigConnEstabAtt)*(PmErabEstabSuccInit/PmErabEstabAttInit)]*100 SSSR Phase based on Counter:- 4. RRC Setup:-Following counter are Responsible- a> PmRrcConnEstabAtt. b> PmRrcConnEstabAttReAtt C> PmRrcConnEstabSucc Accessibility/SSSR(Session setup success Rate):-
  • 3. Accessibility/SSSR(Session setup success Rate):- 2.S1-Signalling Setup: Following Counter are Responsible- a> PmS1SigConnEstabAtt. b> PmS1SigConnEstabSucc. 3. E-RAB Establishment: Following Counter are Responsible- A> PmErabEstabAttInit B> PmErabEstabSuccInit. C> PmErabEstabAttAdded. D> PmErabEstabSuccAdded.
  • 4. Accessibility/SSSR(Session setup success Rate):- Step for Find out the Problem with Counter:- 1.RRC Failure(PmRrcConnEstabFail):-Following issue need to be verified- A> pmRrcConnEstabFailLic:The total number of failed RRC Connection Establishments due to lack of connected users license. Soln:- Upgrade the LKF(License Key File) by Upgrading Software.Ex- From L12A to L12B And L13A to L13B.L13B having License of 2000 Connected user per ENB.(License/Software upgradation activity depends as per Agreement with customer).For this Customer pay to Ericsson. Soln:- Offload the Traffic: 1> Shared the Traffic by Changing Azimuth,By Tilt,By Implementing Hi-Cap Parameter.If still Traffic load is more,planned new site to offload. B>pmRrcConnEstabFailHighLoad:The total number of failed RRC Connection Establishments due to high load. Soln: There are many ways to Offload the Traffic: 1> Shared the Traffic by Changing Azimuth,By Tilt,By Implementing Hi-Cap Parameter. Following are the List of Hi-Cap Parameter which can be tune as per N/W requirement.
  • 5. Accessibility/SSSR(Session setup success Rate):- MOC Parameter Name Parameter Type Parameter - High Cap Site System Constant ulInterferenceForgettingFactor (system constant 70) Site Level Parameter 5 System Constant deltaPsdRs2Tx (system constant 872) Site Level Parameter 0 System Constant SpdcchLaGinrMargin (system constant 220) Site Level Parameter 30 System Constant numInitialAccessAndIncomingHo (system constant 556) Site Level Parameter 10 Hidden Parameter tPollRetransmitUl - DataRadioBearer Site Level Parameter 160 Hidden Parameter tPollRetransmitUl - SignallingRadioBearer Site Level Parameter 160 Hidden Parameter tPollRetransmitDl - DataRadioBearer Site Level Parameter 160 Hidden Parameter tPollRetransmitDl - SignallingRadioBearer Site Level Parameter 160 Hidden Parameter dlMaxRetxThreshold - DataRadioBearer Site Level Parameter 8 Hidden Parameter ulMaxRetxThreshold - DataRadioBearer Site Level Parameter 8 EUtranCellFDD noOfPucchCqiUsers Sector Level Parameter 640 EUtranCellFDD noOfPucchSrUsers Sector Level Parameter 590 EUtranCellFDD pdcchCfiMode Sector Level Parameter CF_Static_3 (3) EUtranCellFDD ulSrsEnable Sector Level Parameter TRUE UlFss featureStateUlFss Site Level Parameter 1 EUtranCellFDD pZeroNominalPucch Sector Level Parameter -120 EUtranCellFDD pZeroNominalPusch Sector Level Parameter -102 QciProfilePredefined schedulingAlgorithm - default Site Level Parameter RESOURCE_FAIR (0) QciProfilePredefined schedulingAlgorithm - qci 1 Site Level Parameter RESOURCE_FAIR (0) QciProfilePredefined schedulingAlgorithm - qci 2 Site Level Parameter RESOURCE_FAIR (0) QciProfilePredefined schedulingAlgorithm - qci 3 Site Level Parameter RESOURCE_FAIR (0) QciProfilePredefined schedulingAlgorithm - qci 4 Site Level Parameter RESOURCE_FAIR (0) QciProfilePredefined schedulingAlgorithm - qci 5 Site Level Parameter RESOURCE_FAIR (0) QciProfilePredefined schedulingAlgorithm - qci 6 Site Level Parameter RESOURCE_FAIR (0) QciProfilePredefined schedulingAlgorithm - qci 7 Site Level Parameter RESOURCE_FAIR (0) QciProfilePredefined schedulingAlgorithm - qci 8 Site Level Parameter RESOURCE_FAIR (0) QciProfilePredefined schedulingAlgorithm - qci 9 Site Level Parameter RESOURCE_FAIR (0)
  • 6. Accessibility/SSSR(Session setup success Rate):- C> pmRrcConnEstabFailOverload:The total number of failed RRC Connection Establishments due to overload. Soln: Same as Above. d>> pmRrcConnEstabFailActiveUserLicenseExceeded:The number of failed RRC establishments due to more active users than what license allows. Soln:1. Check Active user per cell through counter PmActiveUserDlSum, PmActiveUserUlsum. 2. Try to Offload traffic if possible by changing Azimuth,Tilt or Loading Hi- Cap Parameter. Earlier we have discussed abt Hi-Cap. 3.Also check distance of UE from ENB,if connected from far distance,Can change parameter RxlevAccmin to Protect access.
  • 7. Accessibility/SSSR(Session setup success Rate):- .e> pmRrcConnEstabFailFailureInRadioProcedure:The number of failed RRC establishments due to failed radio procedure. f> pmRrcConnEstabFailBearerAdmissionRej:The total number of failed establishment of RRC Connection due to the fact that all the UE's bearers are rejected during bearer admission. Soln: Implement hi-Cap Parameter to allow more user.Also PDCCH Adm control Th can be changed.Befor change Check PDCCH CCE Utilization by Counter- PmPdcchCceUtil g> pmRrcConnReestFailLicMtReest:The number of RRC Connection Reestablishments attempts that failed due to feature "Multi-Target RRC Connection Reestablishment" not being OPERABLE Soln: Not included in any predefined scanner.So U have to activate Scanner.
  • 8. Accessibility/SSSR(Session setup success Rate):- h>pmRrcConnEstabFailLackOfResources:The number of failed RRC establishments due to lack of resources Soln: check the Utilization of Cell and try to Offload by Implementing Hi- Cap Parameter,Shift traffic on some less utilized cell. i> pmRrcConnEstabFailUnspecified:The number of failed RRC establishments due to unspecified cause. Apart from that Please check Coverage issue,UL Interference issue,Alarm issue,H/W issue(Re-set first) if required replace RRU.
  • 9. Accessibility/SSSR(Session setup success Rate):- 2. S1-signalling Failure(PmS1SigConnEstabFail):-There is no any Specific Secondary counter I have found.But Following could be the reason : a> TN(Transport issue): Need to check Fiber issue from IPBH Team. b> TAC Wrong Configure: Configure Correct TAC as Per Design. c> LAC-TAC mapping: Validate the LAC-TAC mapping is correct as per Design. d> Message mismatch: The message flow b/w UE to MME is found any Mismatch,will laid S1-Signalling Failure.
  • 10. Accessibility/SSSR(Session setup success Rate):- 3. E-RAB Failure(PmErabEstabFailInit)- a> pmErabEstabFailGbrDlEnb(The total number of failed E-RAB setup attempts due to downlink GBR overload for resources common to the eNodeB). Soln: Parameter which is Responsible:dlNonGbrRatio, dlTransNwBandwidth b> pmErabEstabFailGbrUlEnb(The total number of failed E-RAB setup attempts due to uplink GBR overload for resources common to the eNodeB). Soln: Parameter Which is Responsible :ulNonGbrRatio, ,ulTransNwBandwidth c>pmErabEstabFailAddedLic(The total number of failed establishment of added E-RABs due to license rejects (Multiple Radio Bearer per user or RLC UM). Added E-RABs are all E-RABs present in S1 message E-RAB Setup Request). d>pmErabEstabFailInitLic(The total number of failed establishment of initial E- RABs due to license rejects (Multiple Radio Bearer per user or RLC UM). Initial E- RABs are all E-RABs present in the S1 message Initial Context Setup Request).
  • 11. Accessibility/SSSR(Session setup success Rate):- Apart from that Following Could be checked: 1> Security update Fail. 2> Vendor specific issue. 3> TN(Transport issue). Note: Some case study based Problem & Solution. 1. RRC Degradation due to RRC Reject. Parameter: no of Pucch CQI user-160 no of Pucch Sr user-160 Here RRC Conn max user is>160 Hence due to CQI resource Congestion RRC Conn was rejected. 2. SSSR degrade due to Low S1 Succ rate: Sometimes it has been Observed that S1 Succ rate degraded due to Software upgradation.Cell KPI Improved after DUL Restart.
  • 12. Accessibility/SSSR(Session setup success Rate):- 3. SSSR Degraded due to H/W issue: Once RRU was replace SSSR improved. Accessibility can also be improved by tunning these parameter. Change dlMaxRetxTh &ULMaxRetxTh of SRB-1(1,2,4,8,16,32) Note: Any Suggestion/Feedback will be Highly Appreciable to Improve This Presentation.