SlideShare a Scribd company logo
Arlington County Capital Bikeshare
Building Bikeshare Together: How Arlingtonians Can Participate in the Bikeshare Planning Process
1
Capital Bikeshare is a great way to get
around Arlington. Riders value the ability to
use a bike when they need it while enjoying
a healthy and inexpensive means of
transport.
An important part of making the system
work well for Arlington residents is the
planning and siting of new stations.
Arlington County wants to encourage new
riders by placing stations in locations that
are convenient, visible, and provide quick
access to easy, low-stress bike routes.
Arlington also wants to make sure stations
respect their surroundings, particularly in
parks, residential neighborhoods, and
similar locations.
This brief guide explains how this process
works and how residents and
neighborhoods can play a role in shaping
the network.
Planning for
Bikeshare in
Arlington
2
Much like the ART bus system, Capital
Bikeshare is a public service owned by
Arlington County and partner jurisdictions
and operated under contract by a private
company. The partner jurisdictions include
Washington, D.C.; the City of Alexandria;
and Montgomery County, Maryland.
Decisions about where stations are located
and how stations in Arlington are installed
are made by Arlington County staff and
consultants in partnership with County
residents.
Riders have the choice of several different
membership options, ranging from day
passes to annual memberships. Trips of
fewer than 30 minutes are free. The idea is
to incentivize short trips, as the concept of
bikesharing involves ensuring that bicycles
are widely available when needed.
The system, which began in 2010 with only
14 Arlington stations, has since expanded
to more than 80 stations operating here,
with about 270 more in D.C. and beyond.
Arlington County’s expansion plan calls for
an eventual network of more than 100
stations to reach neighborhoods across the
county.
A quick
primer on
bikeshare in
Arlington
3
Here’s where the planning process begins.
Bikesharing depends on having a closely-
knit network of stations, so building from
the foundation provided by our existing
network is critical. In order to be useful, a
new station needs to be relatively close to
existing (or planned) stations – typically
around 2 to 5 blocks (500' - 1,250') apart.
The network
Bikeshare locations in May 2015. See the full online map.
4
So what
makes a good
location?
Ideal locations are places where many
people live or that are significant
destinations – commercial areas, office
districts, and so on. Having these near the
station is important, because customers
typically access stations on foot, not by
driving. The best locations have a mix of
uses (homes, shops, offices) which
encourages use throughout the day so that
bikes and docks are available.
Another big factor is how comfortable a
location is for biking. Streets with protected
bike lanes or slower traffic are much more
pleasant to ride a bike on, so they make
the best locations. The presence of other
transit options is important as well, as
bikeshare trips are often part of longer trips
involving bus or train. Typically, the busiest
bikeshare stations are at Metrorail stations.
Most of the bikeshare stations so far are in
more urban parts of Arlington. But stations
work in more suburban settings as well.
Even though many residents in these
neighborhoods own their own bikes, that
doesn’t mean they won’t use bikeshare – in
fact, nearly 60 percent of Arlington
bikeshare members own bikes. These
residents value having access to a well-
maintained fleet of bikes available
throughout the region.
Bikeshare can work in urban … and less urban areas.
5
Resident input
Resident input is a big part of the station
siting process. One of the resources the
County uses in determining locations is its
Crowdsourcing Map. This allows residents
to suggest sites and add comments about
why a location would or would not be a
good addition to the system. Many of the
network’s stations began as dots on this
map.
Crowdsourcing Map (www.CaBistations.com)
6
County planners have developed an
implementation plan, also with resident
input, and review the Crowdsourcing Map
to find sites that meet the technical
requirements for a station. Criteria include:
 Enough room for the station and
customers to access bikes (typically at
least 42’ x 10’).
 More than four hours of direct sunlight
daily (stations are solar-powered).
 Adequate sidewalk space. Stations can
be installed on streets or sidewalks. If
placed on a sidewalk, it needs to leave
enough space for pedestrians, or at
least 5’ – and more in busy areas.
Feasibility
assessment
 If a station is on-street, the street needs
to be friendly to people on bikes. It
should have bike lanes or not too much
traffic (typically below 3,000 vehicles
per day. Traffic data is available here).
 Stations need to not block access to
utilities, such as manholes.
 Most stations are on public property,
but the County often works with private
property owners on a voluntary basis.
For these sites, the County reaches a
legal agreement with the owner for
public access of the property.
 Engineering review of the site to ensure
safety and functionality.
7
Interaction with Arlington’s civic
associations is baked into the County’s
planning and siting efforts, and it takes
place early on in the process.
Once a potential location meets the
County’s feasibility standards, planners
reach out to the neighborhood where it is
located to present the location to the civic
association. There, planners talk about how
the system works – because many
residents are still learning about Capital
Bikeshare – and the specific location being
proposed.
Your
neighborhood
These meetings are a two-way street – the
idea is to talk about how the site would
work and also get feedback from the
neighborhood on the site.
Arlington is building a bikeshare network,
and that depends on having stations in
most neighborhoods where density will
support it. But if a specific site doesn’t
work, planners will work with the
neighborhood to find the right spot.
8
Working with civic associations is a core
part of the outreach process. To make
public participation easier for everyone,
planners also bring the information straight
to residents through a station siting
surveys.
The survey is online and is quick and easy
to fill out. It asks for input on sites under
consideration from the neighborhood
residents where the site is being proposed.
Surveys include both an aerial image and a
Neighborhood
surveys
ground-level view showing the footprint of
the proposed site so more residents
receive the same information and chance
to provide input.
9
Once civic associations and residents have
taken a look at the proposed station
location, planners finalize the design. This
involves determining the right size based
on expected demand and precise location.
This includes a look at the need to change
or add signs, street markings, reflective
posts, or to make other adjustments to
make the station easy to use. If the station
is being installed on grass, a concrete pad
is poured first.
Station Design
Examples of completed station plans can be found here.
10
This is the fun part. Once all plans and
approvals are in place, it’s time for
installation. Before installing the station, the
County informs surrounding residents and
businesses about the upcoming
installation. In some cases, parking spaces
or a travel lane may need to be temporarily
blocked to provide space for the work.
The installation process is probably quicker
than you think. For most stations, it only
takes about an hour. The stations are
Installation modular, so they only have to be unloaded,
moved into place and connected.
Once a station is installed, it’s ready for
operation. But that’s not quite the end of
the process.
11
The planning process actually doesn’t stop
with installation. Because Arlington wants
to maximize the value of this public
investment, planners closely track overall
usage and other metrics to get a sense of
how stations are performing and make
adjustments as needed.
If ridership is low, planners study whether
there are any issues that might be
hindering usage. Infrastructure or other
improvements can be made that will make
the station easier to use.
Use Tracking Part of the beauty of bikeshare is that
stations are flexible and can be easily
expanded or contracted if needed. If riders
often find themselves facing a station that
is either empty or full, additional docks can
be added to improve bike and dock
availability.
Continuing to track performance is a big
part of planning for the future.
12
Reach Capital Bikeshare at
info@bikearlington.com for
comments or questions.

More Related Content

PDF
TransitCenter's "Limits of TDM Definitions and Potential for Greater Impact"
PPTX
Central West Focus Area Update for EDPP
PPT
Webinar: Some Observations on BRT in North America… and Elsewhere
PPTX
Possible impacts of ICT based demand-responsive public transportation schemes...
PPTX
Rural and Small Urban Mobility Innovations: Microtransit
PPT
CycleStreets quickfire presentation to OSM State of the Map 2009
PPT
Public Transit 101 - Making Transit the Better Way
PDF
U.S. 33 Smart Mobility Corridor
TransitCenter's "Limits of TDM Definitions and Potential for Greater Impact"
Central West Focus Area Update for EDPP
Webinar: Some Observations on BRT in North America… and Elsewhere
Possible impacts of ICT based demand-responsive public transportation schemes...
Rural and Small Urban Mobility Innovations: Microtransit
CycleStreets quickfire presentation to OSM State of the Map 2009
Public Transit 101 - Making Transit the Better Way
U.S. 33 Smart Mobility Corridor

What's hot (20)

PDF
Pedestrian Safety in North Texas
PDF
Need, mobility poverty, and environmental justice
PPSX
Cost Cutting through Information Systems: Using Google Transit as a Model
PPTX
Lessons Learned in Transit Efficiencies, Revenue Generation, and Cost Reductions
PPTX
Forget last mile travel - a new modality rising!
PPTX
How to Design an On-Demand Transit Service
PDF
Catalyzing the New Mobility in Cities
PPTX
Using Swarm Intelligence to Prepare for the Next Carmageddon
PPT
SAFETEA-LU Reauthorization Context & Issues
PPT
MTA Bus Customer Information Systems
DOCX
Feasibility of Straddling Bus – Smart Transportation Technology for a city of...
PDF
2002-Youve-Got-Connections
PDF
03-Event Notification in VANET with Traffic Congestion Detection and Congesti...
PPTX
General Plan 2040 - Tempe, Arizona
PPT
Smart Commute Initiative: Implementing a Regional Workplace-based TDM Program...
PDF
San Jose Transit first policy nomination
PPT
Transit and Pedestrian Safety - 2014 Public Transportation & Universities Con...
PPT
Movement for Liveable London Street Talks - Richard Bourn and Richard Hebditc...
PDF
City of Salina Brochure - Traffic Signal Systems
Pedestrian Safety in North Texas
Need, mobility poverty, and environmental justice
Cost Cutting through Information Systems: Using Google Transit as a Model
Lessons Learned in Transit Efficiencies, Revenue Generation, and Cost Reductions
Forget last mile travel - a new modality rising!
How to Design an On-Demand Transit Service
Catalyzing the New Mobility in Cities
Using Swarm Intelligence to Prepare for the Next Carmageddon
SAFETEA-LU Reauthorization Context & Issues
MTA Bus Customer Information Systems
Feasibility of Straddling Bus – Smart Transportation Technology for a city of...
2002-Youve-Got-Connections
03-Event Notification in VANET with Traffic Congestion Detection and Congesti...
General Plan 2040 - Tempe, Arizona
Smart Commute Initiative: Implementing a Regional Workplace-based TDM Program...
San Jose Transit first policy nomination
Transit and Pedestrian Safety - 2014 Public Transportation & Universities Con...
Movement for Liveable London Street Talks - Richard Bourn and Richard Hebditc...
City of Salina Brochure - Traffic Signal Systems
Ad

Viewers also liked (9)

PPTX
Communicating Transportation Options
PPT
Arlington County Transportation Funding 101
PDF
Fort Myer-Henderson Hall Transportation Survey
PPTX
All good things
PDF
Smart Fares: What if we sold transit fares like cell phone minutes?
PPT
Vanpool Research Part 2 - by Lori Diggins - LDA Consulting
PPT
Blogging the Greater Greater Washington Way
PPT
Vanpool Insurance Needs - by Diane Utz - GW RideConnect
PDF
Infrastructure Market 2009
Communicating Transportation Options
Arlington County Transportation Funding 101
Fort Myer-Henderson Hall Transportation Survey
All good things
Smart Fares: What if we sold transit fares like cell phone minutes?
Vanpool Research Part 2 - by Lori Diggins - LDA Consulting
Blogging the Greater Greater Washington Way
Vanpool Insurance Needs - by Diane Utz - GW RideConnect
Infrastructure Market 2009
Ad

Similar to Building bikeshare together (20)

PDF
A STUDY ON PROVISION OF PARK AND RIDE FACILITY FOR SMART CITY BELAGAVI
PDF
Bike sharing published papers
PDF
IRJET- I-Parker-A New Smart Car Parking System
PDF
Bike Parking Guide_Final 2015
PDF
Roadspace Allocation for Better Streets
PDF
Maximizing Biking and Walking Access to Transit
DOCX
ieee paper on bike sharing android application
PDF
VTA Transit Passenger Improvement Plan
PDF
First last mile
PDF
Inspire Transport Planning
PDF
2013-03-15_BalanceMHub&Parking_final
PPTX
16 projects
PDF
IRJET- Smart Parking System using Internet of Things Technology
PPT
Topic 3- Feasibility analysis of a start-up
PDF
Corona-NTMP_Final
PPTX
Ppp for public bicycle sharing and parking management in kharghar navi mumbai...
PDF
Developing a Regional Bike Sharing Program
PDF
Bicycle sharing planning guide - Ilya Movshovich approved
PDF
Itdp bike share_planning_guide
PPTX
On-Street Parking Management Tysons and Reston Grid Streets
A STUDY ON PROVISION OF PARK AND RIDE FACILITY FOR SMART CITY BELAGAVI
Bike sharing published papers
IRJET- I-Parker-A New Smart Car Parking System
Bike Parking Guide_Final 2015
Roadspace Allocation for Better Streets
Maximizing Biking and Walking Access to Transit
ieee paper on bike sharing android application
VTA Transit Passenger Improvement Plan
First last mile
Inspire Transport Planning
2013-03-15_BalanceMHub&Parking_final
16 projects
IRJET- Smart Parking System using Internet of Things Technology
Topic 3- Feasibility analysis of a start-up
Corona-NTMP_Final
Ppp for public bicycle sharing and parking management in kharghar navi mumbai...
Developing a Regional Bike Sharing Program
Bicycle sharing planning guide - Ilya Movshovich approved
Itdp bike share_planning_guide
On-Street Parking Management Tysons and Reston Grid Streets

More from Mobility Lab (20)

PDF
Arlington, Virginia's Transportation Future
PDF
Creating Better Places with Transportation Demand Management (TDM)
DOCX
Building a Standard for Open Bikeshare Data
PPTX
Which Attributes Make a Community Successful?
PDF
Capital Bikeshare’s First Mile:Last-Mile Ridership
PPTX
Integrating Community Development and Transportation Strategies
PPTX
2012 Arlington Business Leaders Study
PPT
WeGoMil Real Time Ridesharing at BRAC
PPTX
Dominion Power Emergency Preparedness
PPTX
ITS for Transit (Federal Transit Administration)
PPT
VDOT Winter Weather Preparations
PPTX
LEED/Transportation Symposium - Justin Schor
PPTX
Commuter Direct
PPSX
ACCS 2011 WalkArlington highlights
PPTX
Jennings monday - act canada making a difference
PPSX
2011 ACCS BikeArlington Study Highlights
PPT
BRAC in MD - by Jean Friedberg - MD BRAC
PPT
BRAC in VA - by Peggy Tadej - VA BRAC
PPT
Database/Website Existing Database and Future Possibilities - Formulation: Pa...
PPT
Existing Vanpool Universe - by Holly Morello - Potomac and Rappahannock Trans...
Arlington, Virginia's Transportation Future
Creating Better Places with Transportation Demand Management (TDM)
Building a Standard for Open Bikeshare Data
Which Attributes Make a Community Successful?
Capital Bikeshare’s First Mile:Last-Mile Ridership
Integrating Community Development and Transportation Strategies
2012 Arlington Business Leaders Study
WeGoMil Real Time Ridesharing at BRAC
Dominion Power Emergency Preparedness
ITS for Transit (Federal Transit Administration)
VDOT Winter Weather Preparations
LEED/Transportation Symposium - Justin Schor
Commuter Direct
ACCS 2011 WalkArlington highlights
Jennings monday - act canada making a difference
2011 ACCS BikeArlington Study Highlights
BRAC in MD - by Jean Friedberg - MD BRAC
BRAC in VA - by Peggy Tadej - VA BRAC
Database/Website Existing Database and Future Possibilities - Formulation: Pa...
Existing Vanpool Universe - by Holly Morello - Potomac and Rappahannock Trans...

Recently uploaded (20)

PPTX
SOMANJAN PRAMANIK_3500032 2042.pptx
PDF
Item # 3 - 934 Patterson Final Review.pdf
DOCX
EAPP.docxdffgythjyuikuuiluikluikiukuuuuuu
PPTX
Presentatio koos kokos koko ossssn5.pptx
PDF
PPT Item # 4 - 328 Albany St compt. review
PDF
Item # 5 - 5307 Broadway St final review
PPT
The Central Civil Services (Leave Travel Concession) Rules, 1988, govern the ...
PDF
Items # 6&7 - 900 Cambridge Oval Right-of-Way
PDF
About Karen Miner-Romanoff - Academic & nonprofit consultant
PPTX
Developing_An_Advocacy_Agenda_by_Kevin_Karuga.pptx
PDF
PPT Item #s 2&3 - 934 Patterson SUP & Final Review
PDF
ESG Alignment in Action - The Abhay Bhutada Foundation
PPTX
DFARS Part 252 - Clauses - Defense Regulations
PPTX
SUKANYA SAMRIDDHI YOJANA RESEARCH REPORT AIMS OBJECTIVES ITS PROVISION AND IM...
PPTX
Chapter 1: Philippines constitution laws
PDF
PPT Item # 2 -- Announcements Powerpoint
PPTX
Quiz - Saturday.pptxaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
PPTX
Weekly Report 17-10-2024_cybersecutity.pptx
PDF
4_Key Concepts Structure and Governance plus UN.pdf okay
PPTX
Introduction_to_the_Study_of_Globalization.pptx
SOMANJAN PRAMANIK_3500032 2042.pptx
Item # 3 - 934 Patterson Final Review.pdf
EAPP.docxdffgythjyuikuuiluikluikiukuuuuuu
Presentatio koos kokos koko ossssn5.pptx
PPT Item # 4 - 328 Albany St compt. review
Item # 5 - 5307 Broadway St final review
The Central Civil Services (Leave Travel Concession) Rules, 1988, govern the ...
Items # 6&7 - 900 Cambridge Oval Right-of-Way
About Karen Miner-Romanoff - Academic & nonprofit consultant
Developing_An_Advocacy_Agenda_by_Kevin_Karuga.pptx
PPT Item #s 2&3 - 934 Patterson SUP & Final Review
ESG Alignment in Action - The Abhay Bhutada Foundation
DFARS Part 252 - Clauses - Defense Regulations
SUKANYA SAMRIDDHI YOJANA RESEARCH REPORT AIMS OBJECTIVES ITS PROVISION AND IM...
Chapter 1: Philippines constitution laws
PPT Item # 2 -- Announcements Powerpoint
Quiz - Saturday.pptxaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
Weekly Report 17-10-2024_cybersecutity.pptx
4_Key Concepts Structure and Governance plus UN.pdf okay
Introduction_to_the_Study_of_Globalization.pptx

Building bikeshare together

  • 1. Arlington County Capital Bikeshare Building Bikeshare Together: How Arlingtonians Can Participate in the Bikeshare Planning Process
  • 2. 1 Capital Bikeshare is a great way to get around Arlington. Riders value the ability to use a bike when they need it while enjoying a healthy and inexpensive means of transport. An important part of making the system work well for Arlington residents is the planning and siting of new stations. Arlington County wants to encourage new riders by placing stations in locations that are convenient, visible, and provide quick access to easy, low-stress bike routes. Arlington also wants to make sure stations respect their surroundings, particularly in parks, residential neighborhoods, and similar locations. This brief guide explains how this process works and how residents and neighborhoods can play a role in shaping the network. Planning for Bikeshare in Arlington
  • 3. 2 Much like the ART bus system, Capital Bikeshare is a public service owned by Arlington County and partner jurisdictions and operated under contract by a private company. The partner jurisdictions include Washington, D.C.; the City of Alexandria; and Montgomery County, Maryland. Decisions about where stations are located and how stations in Arlington are installed are made by Arlington County staff and consultants in partnership with County residents. Riders have the choice of several different membership options, ranging from day passes to annual memberships. Trips of fewer than 30 minutes are free. The idea is to incentivize short trips, as the concept of bikesharing involves ensuring that bicycles are widely available when needed. The system, which began in 2010 with only 14 Arlington stations, has since expanded to more than 80 stations operating here, with about 270 more in D.C. and beyond. Arlington County’s expansion plan calls for an eventual network of more than 100 stations to reach neighborhoods across the county. A quick primer on bikeshare in Arlington
  • 4. 3 Here’s where the planning process begins. Bikesharing depends on having a closely- knit network of stations, so building from the foundation provided by our existing network is critical. In order to be useful, a new station needs to be relatively close to existing (or planned) stations – typically around 2 to 5 blocks (500' - 1,250') apart. The network Bikeshare locations in May 2015. See the full online map.
  • 5. 4 So what makes a good location? Ideal locations are places where many people live or that are significant destinations – commercial areas, office districts, and so on. Having these near the station is important, because customers typically access stations on foot, not by driving. The best locations have a mix of uses (homes, shops, offices) which encourages use throughout the day so that bikes and docks are available. Another big factor is how comfortable a location is for biking. Streets with protected bike lanes or slower traffic are much more pleasant to ride a bike on, so they make the best locations. The presence of other transit options is important as well, as bikeshare trips are often part of longer trips involving bus or train. Typically, the busiest bikeshare stations are at Metrorail stations. Most of the bikeshare stations so far are in more urban parts of Arlington. But stations work in more suburban settings as well. Even though many residents in these neighborhoods own their own bikes, that doesn’t mean they won’t use bikeshare – in fact, nearly 60 percent of Arlington bikeshare members own bikes. These residents value having access to a well- maintained fleet of bikes available throughout the region. Bikeshare can work in urban … and less urban areas.
  • 6. 5 Resident input Resident input is a big part of the station siting process. One of the resources the County uses in determining locations is its Crowdsourcing Map. This allows residents to suggest sites and add comments about why a location would or would not be a good addition to the system. Many of the network’s stations began as dots on this map. Crowdsourcing Map (www.CaBistations.com)
  • 7. 6 County planners have developed an implementation plan, also with resident input, and review the Crowdsourcing Map to find sites that meet the technical requirements for a station. Criteria include:  Enough room for the station and customers to access bikes (typically at least 42’ x 10’).  More than four hours of direct sunlight daily (stations are solar-powered).  Adequate sidewalk space. Stations can be installed on streets or sidewalks. If placed on a sidewalk, it needs to leave enough space for pedestrians, or at least 5’ – and more in busy areas. Feasibility assessment  If a station is on-street, the street needs to be friendly to people on bikes. It should have bike lanes or not too much traffic (typically below 3,000 vehicles per day. Traffic data is available here).  Stations need to not block access to utilities, such as manholes.  Most stations are on public property, but the County often works with private property owners on a voluntary basis. For these sites, the County reaches a legal agreement with the owner for public access of the property.  Engineering review of the site to ensure safety and functionality.
  • 8. 7 Interaction with Arlington’s civic associations is baked into the County’s planning and siting efforts, and it takes place early on in the process. Once a potential location meets the County’s feasibility standards, planners reach out to the neighborhood where it is located to present the location to the civic association. There, planners talk about how the system works – because many residents are still learning about Capital Bikeshare – and the specific location being proposed. Your neighborhood These meetings are a two-way street – the idea is to talk about how the site would work and also get feedback from the neighborhood on the site. Arlington is building a bikeshare network, and that depends on having stations in most neighborhoods where density will support it. But if a specific site doesn’t work, planners will work with the neighborhood to find the right spot.
  • 9. 8 Working with civic associations is a core part of the outreach process. To make public participation easier for everyone, planners also bring the information straight to residents through a station siting surveys. The survey is online and is quick and easy to fill out. It asks for input on sites under consideration from the neighborhood residents where the site is being proposed. Surveys include both an aerial image and a Neighborhood surveys ground-level view showing the footprint of the proposed site so more residents receive the same information and chance to provide input.
  • 10. 9 Once civic associations and residents have taken a look at the proposed station location, planners finalize the design. This involves determining the right size based on expected demand and precise location. This includes a look at the need to change or add signs, street markings, reflective posts, or to make other adjustments to make the station easy to use. If the station is being installed on grass, a concrete pad is poured first. Station Design Examples of completed station plans can be found here.
  • 11. 10 This is the fun part. Once all plans and approvals are in place, it’s time for installation. Before installing the station, the County informs surrounding residents and businesses about the upcoming installation. In some cases, parking spaces or a travel lane may need to be temporarily blocked to provide space for the work. The installation process is probably quicker than you think. For most stations, it only takes about an hour. The stations are Installation modular, so they only have to be unloaded, moved into place and connected. Once a station is installed, it’s ready for operation. But that’s not quite the end of the process.
  • 12. 11 The planning process actually doesn’t stop with installation. Because Arlington wants to maximize the value of this public investment, planners closely track overall usage and other metrics to get a sense of how stations are performing and make adjustments as needed. If ridership is low, planners study whether there are any issues that might be hindering usage. Infrastructure or other improvements can be made that will make the station easier to use. Use Tracking Part of the beauty of bikeshare is that stations are flexible and can be easily expanded or contracted if needed. If riders often find themselves facing a station that is either empty or full, additional docks can be added to improve bike and dock availability. Continuing to track performance is a big part of planning for the future.
  • 13. 12 Reach Capital Bikeshare at info@bikearlington.com for comments or questions.