innovation through design
gas processing | water treatment | solids management | carbon capture | field services | spares
INTRODUCTION TO
PROCESS GROUP
Who we are & how we work
Resources & facilities
Technology solutions
Clients
Major projects
Fabrication partners (e.g. South Korea)
Process Group | Overview
~130 employees | US$75M revenue
United Arab Emirates
Abu Dhabi, 2005
Singapore
2007
Australia
Melbourne: Head Office, 1978
Overview | Who we are
Overview | Who we are
Established 1978, Melbourne Head office (Design / Project Mgt. / Fab.)
Abu Dhabi est. 2005 (Design / Project Management / Fabrication)
Singapore est. 2008 (Design / Project Management / External Fab)
130 employees globally, revenue US$75mill
ISO 9001, OHSAS 18001, U-stamp (Abu Dhabi)
Overview | Resources & Facilities (Australia)
Melbourne Head Office
1,200 sqm
Workshop 4 Hobbs Crt
1,250 sqm
Workshop 5 Hobbs Crt
2,250 sqm
Office
1,000 sqm
Outside storage and construction
~20,000 sqm
Factory
2 x 2,100 sqm
Overview | Resources & Facilities (Abu Dhabi)
Overview | Resources & Facilities (Singapore)
298 Tiong Bahru Road,
Central Plaza,
Singapore, 168730
Capabilities
Office Size ~2000 FT 2
Project Management / Execution
Sales
Drafting
Document Control
QA
Singapore Team:
1 General Manager
1 Sales Manager
1 Eng Manager
6 Project Engineers
2 Drafting
1 Document Control
Overview | Resources & Facilities (Fabrication)
Abu Dhabi
Singapore
Melbourne
ShenZhen
Ulsan
Batam Island
Lahore
Gas Sweetening (Amine / Membrane)
Gas Dehydration (TEG / Molecular Sieve / Membrane)
Glycol Regeneration (MEG / DEG / TEG)
Dew Point Control (Refrigeration / JT / Silica Gel)
Fuel & Seal Gas Conditioning
Produced Water Treatment (Deoiler Hydrocyclones, IGF, NSF, CPI)
Sand Handling Systems (Wellhead & Process Desander Cyclones, Sand
Flushing)
Mercury and H2S Removal
Mini LPG Plants
Condensate Stabilization
Desalters / Dehydrators
Heater Treaters
Overview | Technology Solutions
Deoiler
Cyclones
Ocean /
onshore
Discharge
Desander
Cyclones
Nut Shell
FiltrationGas Flotation
WATER TREATMENT
SOLIDS
TREATMENT
Discharge
Gas
Oil
Water
Reinjection underground
PRIMARY
SEPARATION
Gas
Sweetening
Mercury & H2S
removal
Compression
Gas
Dehydration
& DPCU
Gas
Oil
Water
Solids
GAS PROCESSING
Pipeline
OIL TREATMENT
Pipeline
Fuel Gas
Conditioning
Well Head
Desander
Crude Oil
Dehydrator
Crude Oil
Desalter
Overview | Clients
Major Project | Gas Dehydration (TEG)
Client
Project Platong Gas II Development
Location Thailand
Delivery 2011
Plant details
Gas flowrate: 2 x 250 MMSCFD
Lean TEG Circulation Rate: 80 USGPM
Lean TEG Concentration: 99.8 wt%
Outlet Water Content: 2.5 lb/MMSCF
Major Project | Gas Dehydration (TEG)
Client
Project GLNG Upstream Project
Location Queensland
Delivery 2012 to 2013
Plant details
Gas flowrate: 60 MMSCFD
Seven (7) Gas Dehydration Packages
Long term Service Agreement
Major Project | Gas Dehydration (TEG)
Client
Project PNG LNG Associated Gas
Location Papa New Guinea
Delivery 2011
Plant details
Gas flowrate: 3 x 100 MMSCFD
Lean TEG Circulation Rate: 46 USGPM
Lean TEG Concentration: 99.89 wt%
Outlet Water Content: 5 lb/MMSCF
Major Project | Amine Package
Client
Project Zamzama Phase II Project
Location Pakistan
Delivery 2007
Plant details
Gas flowrate: 161 MMSCFD
Amine Circulation Rate: 720 USGPM
Inlet CO2 Content: 3.49% v/v
Outlet CO2 Content: 0.01% v/v
Major Project | Solids Handling & PWTP
Client : PDO
Project : Musallim Phase I & II
Location : Oman
Delivery 2007 to 2008
Plant details
Water Throughput : 3 x 20,000 m3/day
Oil & solids discharge limit : < 40 ppm
Oil & solids actual discharge : < 15 ppm
External Fabricator Partner (South Korea)
Factory
Area(m2) Capacity /
Year
Main Production Remarks
Total Shop
Factory #1 59,500 26,500 20,000 ton
• Pressure Vessel
• Column & Reactor
• Converter, Steam Drum
• Refinery & Petrochemical Plant
Equipment
• Nuclear Power Equipment, BOPs
Factory
Area(m2) Capacity /
Year
Main Production Remarks
Total Shop
Factory #2 171,500 15,500 70,000 ton
• Semi-Rig & Offshore Floater
Mega Block
• Offshore Structure
• Module Construction
• Jetty
• Paint Shop
• Moving
Shelters
External Fabricator Partner (South Korea)
Column & Tower
- Project Name: Yansab Olefins Project
- Site: Saudi Arabia
- Client : SABIC
- Weight/Q’ty: 2,450ton/ 3 set
- Size: 51t x 7,100(w) x 88,300(L) + 4,900
- Material/ Weight: A537-2+S5/ 1,380ton
- Delivery: March, 2007
Topside Module
- Project Name: Pazflor FPSO
- Site: Nigeria
- Client: DSME/ TOTAL
- Weight/Q’ty: 3,400ton/ 4 units
- Size: 29.7m(w) x 28.6m(L) x 19.2m(H)
- Delivery: March, 2010
Module
- Project Name: Kearl Initial
Development Project
- Site: Canada
- Client: AMEC/ ExxonMobil
- Weight/Q’ty: 20,000ton/ 187 units
- Size: 7.3m(w) x 7.8m(H) x 36.0m(L)
- Delivery: August, 2011
Load-out Capacity
External Fabricator Partner (South Korea)

More Related Content

PDF
AZMET-Newsletter 2016-17
PDF
AZMET-Newsletter 2016 (English)
PPTX
SELA Region Q4-2013 Thru-tubing Recompletion and Thru-tubing Workover
PPTX
CNJ Career Path
PDF
Nebot Fluid Science Dynamics Tianjin
PPTX
BDC VUB # 150 TTRC modified oct 26_KDK
PDF
Marchiori jobs list_r2
PDF
1 palmer international consulting_presentation_artc_singapore_2014 (10)
AZMET-Newsletter 2016-17
AZMET-Newsletter 2016 (English)
SELA Region Q4-2013 Thru-tubing Recompletion and Thru-tubing Workover
CNJ Career Path
Nebot Fluid Science Dynamics Tianjin
BDC VUB # 150 TTRC modified oct 26_KDK
Marchiori jobs list_r2
1 palmer international consulting_presentation_artc_singapore_2014 (10)

What's hot (20)

PPTX
Nippon Dragon Resources Inc. Hard rock revolution has arrived!
PDF
Palmer international consulting_presentation_ertc_brussels_2014 (5)
PDF
CoreMet_Company Presentation_04
PPTX
PROJECT MANAGEMENT PLAN OF WHITE PORTLAND CEMENT PLANT PROJECT
PPTX
Recovered Carbon Black: Now a Commercial Scale Product for the Tyre Industry
PPT
The Gas Recovery Systems - Sphere Decontamination Presentation
PDF
PYReco present at Cologne Expo Cologne 14 16th Feb 2012 = Final
PPTX
KSB Energy Saving_FPG (Send out)
DOCX
Halil Özkan 125680 Civil Engineering
PDF
Perth metro
PDF
Winner novel agglomeration process for ferroalloy fines
PDF
09.02.2012 Modern coking coal technology, Peter Long
DOC
Job description
PDF
Shawn Witt Portfolio
PPTX
Environmental Regulation & Managing Waste Tyres
PDF
Enhancing Refinery Profitability
DOCX
Projects - senior machinery engineer
PPTX
Fjords processing corporate presentation
PDF
Doing more with less - Duncan Whitfield, Smart desalination
PPTX
Wellstream Processing sales presentation
Nippon Dragon Resources Inc. Hard rock revolution has arrived!
Palmer international consulting_presentation_ertc_brussels_2014 (5)
CoreMet_Company Presentation_04
PROJECT MANAGEMENT PLAN OF WHITE PORTLAND CEMENT PLANT PROJECT
Recovered Carbon Black: Now a Commercial Scale Product for the Tyre Industry
The Gas Recovery Systems - Sphere Decontamination Presentation
PYReco present at Cologne Expo Cologne 14 16th Feb 2012 = Final
KSB Energy Saving_FPG (Send out)
Halil Özkan 125680 Civil Engineering
Perth metro
Winner novel agglomeration process for ferroalloy fines
09.02.2012 Modern coking coal technology, Peter Long
Job description
Shawn Witt Portfolio
Environmental Regulation & Managing Waste Tyres
Enhancing Refinery Profitability
Projects - senior machinery engineer
Fjords processing corporate presentation
Doing more with less - Duncan Whitfield, Smart desalination
Wellstream Processing sales presentation
Ad

Similar to Introducing Process Group (20)

PDF
PQ_SEC _2014
PDF
ilshinautoclave company profile
PDF
Amal modular yard rev03 20150921 -pdf
DOC
Noble_Esemitodje_Resume_February_2017
DOC
remesh new
DOCX
SENTHIL PANDIAN CV
PPTX
TAB presentation for promotion the product
PDF
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
PDF
A1 Company Profile Secure Supplies 1.pdf
DOC
AJITHKUMAR -Lead Production Operator
PPT
Presentation P&P Dept edited (1).ppt
PDF
Ammonia Based Desulferization.pdf
PDF
Carbon Capture from the Cement Industry, Oscar Graff (Aker Solutions) UK/Norw...
PPTX
Zac india presentation acretech
PDF
ACARP wall -flow DFP project - Coplin
PPTX
PPTX
MR. Akhlaq Mohsin.pptx
PDF
ADDRESSING THE CHALLENGES OF RECYCLING IN THE EU THROUGH INNOVATIVE APPROACHES
PDF
Vedam Design: Dredging Solutions
PPS
Expansion of-water-treatment-plant
PQ_SEC _2014
ilshinautoclave company profile
Amal modular yard rev03 20150921 -pdf
Noble_Esemitodje_Resume_February_2017
remesh new
SENTHIL PANDIAN CV
TAB presentation for promotion the product
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
A1 Company Profile Secure Supplies 1.pdf
AJITHKUMAR -Lead Production Operator
Presentation P&P Dept edited (1).ppt
Ammonia Based Desulferization.pdf
Carbon Capture from the Cement Industry, Oscar Graff (Aker Solutions) UK/Norw...
Zac india presentation acretech
ACARP wall -flow DFP project - Coplin
MR. Akhlaq Mohsin.pptx
ADDRESSING THE CHALLENGES OF RECYCLING IN THE EU THROUGH INNOVATIVE APPROACHES
Vedam Design: Dredging Solutions
Expansion of-water-treatment-plant
Ad

Recently uploaded (20)

PDF
Getting started with AI Agents and Multi-Agent Systems
PPT
What is a Computer? Input Devices /output devices
PPTX
Group 1 Presentation -Planning and Decision Making .pptx
PDF
Transform Your ITIL® 4 & ITSM Strategy with AI in 2025.pdf
PDF
Architecture types and enterprise applications.pdf
PDF
From MVP to Full-Scale Product A Startup’s Software Journey.pdf
PDF
Assigned Numbers - 2025 - Bluetooth® Document
PDF
August Patch Tuesday
PDF
Getting Started with Data Integration: FME Form 101
PDF
ENT215_Completing-a-large-scale-migration-and-modernization-with-AWS.pdf
PDF
DASA ADMISSION 2024_FirstRound_FirstRank_LastRank.pdf
PPTX
O2C Customer Invoices to Receipt V15A.pptx
PDF
WOOl fibre morphology and structure.pdf for textiles
PDF
Hybrid model detection and classification of lung cancer
PDF
Video forgery: An extensive analysis of inter-and intra-frame manipulation al...
PDF
NewMind AI Weekly Chronicles – August ’25 Week III
PDF
Univ-Connecticut-ChatGPT-Presentaion.pdf
PDF
Five Habits of High-Impact Board Members
PPTX
MicrosoftCybserSecurityReferenceArchitecture-April-2025.pptx
PDF
Unlock new opportunities with location data.pdf
Getting started with AI Agents and Multi-Agent Systems
What is a Computer? Input Devices /output devices
Group 1 Presentation -Planning and Decision Making .pptx
Transform Your ITIL® 4 & ITSM Strategy with AI in 2025.pdf
Architecture types and enterprise applications.pdf
From MVP to Full-Scale Product A Startup’s Software Journey.pdf
Assigned Numbers - 2025 - Bluetooth® Document
August Patch Tuesday
Getting Started with Data Integration: FME Form 101
ENT215_Completing-a-large-scale-migration-and-modernization-with-AWS.pdf
DASA ADMISSION 2024_FirstRound_FirstRank_LastRank.pdf
O2C Customer Invoices to Receipt V15A.pptx
WOOl fibre morphology and structure.pdf for textiles
Hybrid model detection and classification of lung cancer
Video forgery: An extensive analysis of inter-and intra-frame manipulation al...
NewMind AI Weekly Chronicles – August ’25 Week III
Univ-Connecticut-ChatGPT-Presentaion.pdf
Five Habits of High-Impact Board Members
MicrosoftCybserSecurityReferenceArchitecture-April-2025.pptx
Unlock new opportunities with location data.pdf

Introducing Process Group

  • 1. innovation through design gas processing | water treatment | solids management | carbon capture | field services | spares INTRODUCTION TO PROCESS GROUP
  • 2. Who we are & how we work Resources & facilities Technology solutions Clients Major projects Fabrication partners (e.g. South Korea) Process Group | Overview
  • 3. ~130 employees | US$75M revenue United Arab Emirates Abu Dhabi, 2005 Singapore 2007 Australia Melbourne: Head Office, 1978 Overview | Who we are
  • 4. Overview | Who we are Established 1978, Melbourne Head office (Design / Project Mgt. / Fab.) Abu Dhabi est. 2005 (Design / Project Management / Fabrication) Singapore est. 2008 (Design / Project Management / External Fab) 130 employees globally, revenue US$75mill ISO 9001, OHSAS 18001, U-stamp (Abu Dhabi)
  • 5. Overview | Resources & Facilities (Australia) Melbourne Head Office 1,200 sqm Workshop 4 Hobbs Crt 1,250 sqm Workshop 5 Hobbs Crt 2,250 sqm
  • 6. Office 1,000 sqm Outside storage and construction ~20,000 sqm Factory 2 x 2,100 sqm Overview | Resources & Facilities (Abu Dhabi)
  • 7. Overview | Resources & Facilities (Singapore) 298 Tiong Bahru Road, Central Plaza, Singapore, 168730 Capabilities Office Size ~2000 FT 2 Project Management / Execution Sales Drafting Document Control QA Singapore Team: 1 General Manager 1 Sales Manager 1 Eng Manager 6 Project Engineers 2 Drafting 1 Document Control
  • 8. Overview | Resources & Facilities (Fabrication) Abu Dhabi Singapore Melbourne ShenZhen Ulsan Batam Island Lahore
  • 9. Gas Sweetening (Amine / Membrane) Gas Dehydration (TEG / Molecular Sieve / Membrane) Glycol Regeneration (MEG / DEG / TEG) Dew Point Control (Refrigeration / JT / Silica Gel) Fuel & Seal Gas Conditioning Produced Water Treatment (Deoiler Hydrocyclones, IGF, NSF, CPI) Sand Handling Systems (Wellhead & Process Desander Cyclones, Sand Flushing) Mercury and H2S Removal Mini LPG Plants Condensate Stabilization Desalters / Dehydrators Heater Treaters Overview | Technology Solutions
  • 10. Deoiler Cyclones Ocean / onshore Discharge Desander Cyclones Nut Shell FiltrationGas Flotation WATER TREATMENT SOLIDS TREATMENT Discharge Gas Oil Water Reinjection underground PRIMARY SEPARATION Gas Sweetening Mercury & H2S removal Compression Gas Dehydration & DPCU Gas Oil Water Solids GAS PROCESSING Pipeline OIL TREATMENT Pipeline Fuel Gas Conditioning Well Head Desander Crude Oil Dehydrator Crude Oil Desalter
  • 12. Major Project | Gas Dehydration (TEG) Client Project Platong Gas II Development Location Thailand Delivery 2011 Plant details Gas flowrate: 2 x 250 MMSCFD Lean TEG Circulation Rate: 80 USGPM Lean TEG Concentration: 99.8 wt% Outlet Water Content: 2.5 lb/MMSCF
  • 13. Major Project | Gas Dehydration (TEG) Client Project GLNG Upstream Project Location Queensland Delivery 2012 to 2013 Plant details Gas flowrate: 60 MMSCFD Seven (7) Gas Dehydration Packages Long term Service Agreement
  • 14. Major Project | Gas Dehydration (TEG) Client Project PNG LNG Associated Gas Location Papa New Guinea Delivery 2011 Plant details Gas flowrate: 3 x 100 MMSCFD Lean TEG Circulation Rate: 46 USGPM Lean TEG Concentration: 99.89 wt% Outlet Water Content: 5 lb/MMSCF
  • 15. Major Project | Amine Package Client Project Zamzama Phase II Project Location Pakistan Delivery 2007 Plant details Gas flowrate: 161 MMSCFD Amine Circulation Rate: 720 USGPM Inlet CO2 Content: 3.49% v/v Outlet CO2 Content: 0.01% v/v
  • 16. Major Project | Solids Handling & PWTP Client : PDO Project : Musallim Phase I & II Location : Oman Delivery 2007 to 2008 Plant details Water Throughput : 3 x 20,000 m3/day Oil & solids discharge limit : < 40 ppm Oil & solids actual discharge : < 15 ppm
  • 17. External Fabricator Partner (South Korea) Factory Area(m2) Capacity / Year Main Production Remarks Total Shop Factory #1 59,500 26,500 20,000 ton • Pressure Vessel • Column & Reactor • Converter, Steam Drum • Refinery & Petrochemical Plant Equipment • Nuclear Power Equipment, BOPs
  • 18. Factory Area(m2) Capacity / Year Main Production Remarks Total Shop Factory #2 171,500 15,500 70,000 ton • Semi-Rig & Offshore Floater Mega Block • Offshore Structure • Module Construction • Jetty • Paint Shop • Moving Shelters External Fabricator Partner (South Korea)
  • 19. Column & Tower - Project Name: Yansab Olefins Project - Site: Saudi Arabia - Client : SABIC - Weight/Q’ty: 2,450ton/ 3 set - Size: 51t x 7,100(w) x 88,300(L) + 4,900 - Material/ Weight: A537-2+S5/ 1,380ton - Delivery: March, 2007 Topside Module - Project Name: Pazflor FPSO - Site: Nigeria - Client: DSME/ TOTAL - Weight/Q’ty: 3,400ton/ 4 units - Size: 29.7m(w) x 28.6m(L) x 19.2m(H) - Delivery: March, 2010 Module - Project Name: Kearl Initial Development Project - Site: Canada - Client: AMEC/ ExxonMobil - Weight/Q’ty: 20,000ton/ 187 units - Size: 7.3m(w) x 7.8m(H) x 36.0m(L) - Delivery: August, 2011 Load-out Capacity External Fabricator Partner (South Korea)