SlideShare a Scribd company logo
The
Petroleum
Programme
ENGLISH
FOR THE OIL INDUSTRY
Presented & Preparator by : M . Jalalvand
B.Sc. Petroleum Production Engineering
Member of Society of Petroleum Engineer (SPE)
Member of Iranian Petroleum Institute (IPI)
Member of BPJ
Unit 1
The Rig
Section A
Reading comprehension:
• Oil is contained in rocks under the ground and in
rocks under the sea. To find it, oilmen have to drill
boreholes. The equipment for drilling these holes is the
drilling rig.
• Most rigs work on the rotary system. A bit rotates at the
end of a pipe. As the bit rotates, it cuts and crushes the
rock at the Bottom of the hole. The cuttings are carried
to the surface by a special fluid. This fluid is called
‘mud’. Mud is a mixture of clay, water and chemicals.
Rotary Drilling Rig
• Look at the diagram of the rotary rig. Notice the string.
This is made up of ‘joint’ or ‘single’. Each joint or single
is a hallow section of pipe (30 ft). The string is made up
of a number of these singles, all joined together.
• The bit is connected to the bottom of the string. At the
top of the string there is a special pipe called the ‘Kelly.
The Kelly isn’t round, but hexagonal. It fits into a
hexagonal hole in the rotary table.
• The rotary table turns the Kelly, the Kelly turns the
string and the string turns the rotary bit.
• Mud is not only used for
carrying the cuttings up to the
surface. It is also used for
keeping the bit cool.
• The mud is pumped down
through the annulus. The mud
engineer or ‘mud man ‘is in
charge of the mud.
• For example, he tells the floor
men how to mix the mud at the
mud tanks.
• It is often necessary to pull the string out of the hole.
• There are different reasons for this. Perhaps, for example
the drill bit is dull.
• If the bit is dull, it must be changed. To do this, the
driller and the floor man must trip the pipe.
They must pull the string out
(a),
change the bit (b),
and then run the string back
into the Hole (c).
Tripping the pipe is also called
making a round trip.
Round trips are expensive.
Oilman makes them only if
they must.
a b
c
Special Words & Expression 1
• Boreholes In the petroleum industry , the words ‘borehole’ ,’hole’ ,’well’ and ‘oil well’ usually mean
the same thing .
• Rotary turning like a wheel.
• Rotates turns around and around like a wheel.
• Crushes breaks up into small pieces, using great power.
• Cutting the pieces of rock drilled by the bit.
• Fluid anything that flows. Liquids, gases and melted substances are all fluids.
• Clay an earthy material, plastic when it is wet.
• The most common clay in drilling fluid is Bentonite. Bentonite consists of calcium (ca),
magnesium (Mg), and aluminum (Al).
• Hollow having an empty space on the inside.
• Drill pipe is hollow, so that mud can pass through it.
• Hexagonal having six angles and six sides.
• Floor men workers on a rig .floor man are also called ‘roughnecks’. A mud man or driller
can tell a floor man what to do.
• Dull not sharp; worn out; gone. If the bit is gone, it must be changed.
• Driller the person in charge of the drilling.
• Floor men workers on a rig .floor man are also called ‘roughnecks’. A mud man or driller
can tell a floor man what to do
• Dull not sharp; worn out; gone. If the bit is gone, it must be changed.
• Driller the person in charge of the drilling.
Cross section
Cross section
A hexagon
1)Mud Tank
‫حفاري‬ ‫گل‬ ‫مخزن‬
‫حفاري‬ ‫گل‬ ‫سازي‬ ‫ذخيره‬ ‫جهت‬ ‫كه‬ ‫حمل‬ ‫قابل‬ ‫فلزي‬ ‫مخازن‬
‫حفاري‬ ‫گل‬ ‫جهت‬ ‫چاله‬ ‫حفر‬ ‫امكان‬ ‫كه‬ ‫مكانهايي‬ ‫در‬
‫گردد‬ ‫مي‬ ‫استفاده‬ ‫مقدورنباشد‬.
2)Shale Shakers
‫تكاننده‬
‫كه‬ ‫است‬ ‫پيوسته‬ ‫خطي‬ ‫لرزشي‬ ‫حركت‬ ‫داراييك‬ ‫تكاننده‬‫براي‬
‫گيرد‬ ‫مي‬ ‫قرار‬ ‫استفاده‬ ‫مورد‬ ‫گل‬ ‫از‬ ‫جامد‬ ‫ذرات‬ ‫جداسازي‬.
3)Suction line
‫مكش‬ ‫خط‬
‫قسمت‬ ‫به‬ ‫و‬ ‫كرده‬ ‫خارج‬ ‫مخزن‬ ‫از‬ ‫را‬ ‫محصول‬ ‫يك‬ ‫كه‬ ‫خطي‬
‫ش‬ ‫مي‬ ‫ناميده‬ ‫پركننده‬ ‫خط‬ ‫همچنين‬ ،‫فرستد‬ ‫مي‬ ‫پمپ‬ ‫مكش‬‫ود‬.
4)Mud Pump
‫گل‬ ‫پمپ‬
‫حف‬ ‫گل‬ ‫گردش‬ ‫براي‬ ‫كه‬ ‫بزرگي‬ ‫برگشتي‬ ‫و‬ ‫رفت‬ ‫پمپ‬‫بر‬ ‫اري‬
‫شود‬ ‫مي‬ ‫استفاده‬ ‫حفاري‬ ‫دكل‬ ‫روي‬.
• 7) Draw work
‫دكل‬ ‫آالت‬ ‫ماشين‬
، ‫برق‬ ‫تامين‬ ، ‫كالچها‬ ، ‫محور‬ ، ‫كابل‬ ، ‫باالبر‬ ‫محور‬ ‫براي‬ ‫جمعي‬ ‫نام‬
‫شود‬ ‫مي‬ ‫استفاده‬ ‫حفاري‬ ‫دكل‬ ‫در‬ ‫كه‬ ‫االت‬ ‫ماسين‬ ‫ساير‬ ‫و‬ ‫ترمزها‬.
• 8) Stand Pipe
‫ايستا‬ ‫لوله‬
‫باال‬ ‫حفاري‬ ‫تيرك‬ ‫يا‬ ‫حفاري‬ ‫دكل‬ ‫كناره‬ ‫درامتداد‬ ‫كه‬ ‫عمودي‬ ‫لوله‬ ‫يك‬‫مي‬
‫و‬ ‫ميكند‬ ‫متصل‬ ‫چرخشي‬ ‫خرطومي‬ ‫به‬ ‫را‬ ‫لجن‬ ‫پمپ‬ ‫خروجي‬ ‫خط‬ ‫و‬ ‫رود‬
‫شود‬ ‫مي‬ ‫پمپ‬ ‫گودال‬ ‫داخل‬ ‫به‬ ‫لجن‬ ‫آن‬ ‫ازدرون‬.
• 9) Kelly hose/Rotary hose
‫حفاري‬ ‫گل‬ ‫خرطومي‬ ‫شيلنگ‬
‫ت‬ ‫طريق‬ ‫از‬ ‫كه‬ ‫حفاري‬ ‫سيال‬ ‫كه‬ ‫دوراني‬ ‫حفاري‬ ‫دكل‬ ‫روي‬ ‫شيلنگي‬‫لمبه‬
‫چندپر‬ ‫هاي‬ ‫لوله‬ ‫و‬ ‫هرزگرد‬ ‫سمت‬ ‫به‬ ‫ايستاده‬ ‫هاي‬ ‫لوله‬ ‫و‬ ‫حفاري‬ ‫گل‬‫مي‬
‫كند‬ ‫مي‬ ‫هدايت‬ ‫را‬ ‫روند‬.
• 10) Gooseneck
‫زانويي‬
9
7
• 11) Travelling block
‫متحرک‬ ‫بلوک‬
‫پيچ‬ ‫آن‬ ‫به‬ ‫حفاری‬ ‫کابل‬ ‫که‬ ‫ها‬ ‫قرقره‬ ‫چرخ‬ ‫و‬ ‫ها‬ ‫قرقره‬ ‫از‬ ‫آرايش‬ ‫يک‬‫يده‬
‫شود‬ ‫می‬.
• Hook
‫قالب‬
• 12) Drilling line
‫حفاري‬ ‫كابل‬
• 13) Crown block
‫تاج‬ ‫بلوک‬
• 14) Derrick
‫دكل‬(‫حفاري‬ ‫سكوي‬)
• 15) Monkey board
‫زياد‬ ‫ارتفاع‬ ‫در‬ ‫كاري‬ ‫پالتفرم‬
‫حفاري‬ ‫دكل‬ ‫كارگران‬ ‫به‬ ‫مربوط‬ ‫كاري‬ ‫سكوي‬
• 16) Drill Pipe
‫حفاري‬ ‫لوله‬
11
16
13
• Drill collar
‫مته‬ ‫طوق‬(‫وزني‬ ‫لوله‬)
• 17) Pipe Rack
‫لوله‬ ‫جاي‬
• 18) Swivel
‫گردان‬ ‫مفصل‬
‫کاربردها‬. :‫حفاری‬ ‫ساقه‬ ‫وزن‬ ‫تحمل‬,‫چرخش‬ ‫و‬ ‫دوران‬ ‫امکان‬ ‫ايجاد‬
‫حفاری‬ ‫ساقه‬
• 20) Rotary table/Drilling table
‫حفاري‬ ‫ميز‬/‫دوار‬ ‫صفحه‬
18
20
17
• Rotary
‫دورانی‬ ‫چرخشی‬
‫يک‬ ‫حول‬ ‫دورانی‬ ‫حرکت‬ ‫دورانی‬ ‫حرکت‬ ‫با‬ ‫آن‬ ‫در‬ ‫که‬ ‫است‬ ‫حفاری‬ ‫متد‬
‫کند‬ ‫می‬ ‫خرد‬ ‫را‬ ‫ها‬ ‫سنگ‬ ‫محور‬.
• 23) Blowout Preventer (BOP)
‫فوران‬ ‫از‬ ‫كننده‬ ‫ممانعت‬
• 25) Drill string
‫حفاري‬ ‫لوله‬ ‫رشته‬
‫سرمت‬ ‫آنها‬ ‫انتهاي‬ ‫در‬ ‫كه‬ ‫باشد‬ ‫مي‬ ‫يكديگر‬ ‫به‬ ‫متصل‬ ‫هاي‬ ‫لوله‬ ‫شامل‬‫ه‬
‫است‬ ‫گرفته‬ ‫قرار‬.
• 26) Drill bit
‫مته‬ ‫سر‬
• Drilling mud
‫حفاري‬ ‫گل‬
‫كند‬ ‫مي‬ ‫گردش‬ ‫چاه‬ ‫داخل‬ ‫كه‬ ‫ديگر‬ ‫افزودني‬ ‫مواد‬ ‫و‬ ‫آب‬ ‫از‬ ‫مخلوطي‬.
‫حفاري‬ ‫هاي‬ ‫خرده‬ ‫انتقال‬ ، ‫مته‬ ‫سر‬ ‫سازي‬ ‫خنك‬ ‫مخلوط‬ ‫اين‬ ‫وظيفه‬
‫و‬ ‫چاه‬ ‫ديواره‬ ‫ريزش‬ ‫از‬ ‫جلوگيري‬ ، ‫ها‬ ‫صخره‬ ‫و‬ ‫ها‬ ‫سنگ‬ ‫از‬ ‫شده‬
‫باشد‬ ‫مي‬ ‫هيدروكربوني‬ ‫مواد‬ ‫فوران‬ ‫كردن‬ ‫دفع‬.
• Mud pit
‫گل‬ ‫گودال‬
‫حين‬ ‫در‬ ‫ها‬ ‫سيال‬ ‫موقت‬ ‫ذخيره‬ ‫براي‬ ‫زمين‬ ‫سطح‬ ‫در‬ ‫كه‬ ‫اي‬ ‫چاله‬
‫است‬ ‫شده‬ ‫كنده‬ ‫حفاري‬ ‫عمليات‬.
• Mud Return Line
‫لجن‬ ‫برگشت‬ ‫خط‬(‫الي‬ ‫و‬ ‫گل‬)
‫و‬ ‫چاه‬ ‫سوراخ‬ ‫در‬ ‫سطحي‬ ‫اتصاالت‬ ‫مابين‬ ‫كه‬ ‫لوله‬ ‫يا‬ ‫آبشخور‬ ‫يك‬
‫لجن‬ ‫آن‬ ‫ميان‬ ‫از‬ ‫و‬ ‫گردد‬ ‫مي‬ ‫مستقر‬ ‫زا‬ ‫نفت‬ ‫هاي‬ ‫سنگ‬ ‫لرزاننده‬
‫ميشود‬ ‫بازگردانده‬ ‫سطح‬ ‫به‬ ‫سوراخ‬ ‫داخل‬ ‫از‬ ‫حفاري‬ ‫از‬ ‫حاصل‬.
26

More Related Content

PPTX
Drilling
PDF
Drilling equipments_Advanced Construction Technology (Semester-6), Civil Engi...
PPTX
Rock Drilling and Types of Rock Drilling
PPT
Introduction to Drilling Engineering
PPSX
BHA components and performances
 
PPTX
Core recovery
PPTX
Jack hammer drill
Drilling
Drilling equipments_Advanced Construction Technology (Semester-6), Civil Engi...
Rock Drilling and Types of Rock Drilling
Introduction to Drilling Engineering
BHA components and performances
 
Core recovery
Jack hammer drill

What's hot (19)

PPT
Block 20 Types of Rollers 13
PPTX
Drilling abc
PDF
Basics of drilling 2
PPTX
Drilling and core logging
PDF
Vibrators_Advanced Construction Technology (Semester-6), Civil Engineering
PDF
Drilling and producing the well 3
PDF
Machineries and Maintenance Question Patterns for Mining students
PPTX
Drilling methods
PPTX
Drilling
PDF
Drilling methods
PPTX
Rollers
PDF
Basics of drilling 1
PPTX
Advanced Construction Equipments :Methods of field compaction
PDF
Underground Mining System Question Pattern and Answer
DOC
Drilling in mining
PPTX
Fundamentals of Petroleum Engineering Module 4
PPTX
Roller compaction machines
PPT
Drilling mining
PPT
rig types and its components
Block 20 Types of Rollers 13
Drilling abc
Basics of drilling 2
Drilling and core logging
Vibrators_Advanced Construction Technology (Semester-6), Civil Engineering
Drilling and producing the well 3
Machineries and Maintenance Question Patterns for Mining students
Drilling methods
Drilling
Drilling methods
Rollers
Basics of drilling 1
Advanced Construction Equipments :Methods of field compaction
Underground Mining System Question Pattern and Answer
Drilling in mining
Fundamentals of Petroleum Engineering Module 4
Roller compaction machines
Drilling mining
rig types and its components
Ad

Similar to petroleum programe (ENGLISH FOR THE OIL INDUSTRY) (20)

PDF
01_Rig Components & Personel.pdf
DOC
Basics for oil riggers
PPTX
oil & gas drilling preliminaries
PPTX
OilAndGas basics in petroleum industry and Intha impact
PDF
Drilling Rig Components ( Illustrated Glossary )
PPTX
DRILLING PRESENTATION and their major types
PDF
1. sequance of well drilling and completion part 1
PDF
Horizontal directional drilling
PPTX
Chapter 1 Basic of well drilling process.pptx
PPTX
Operation and Well Setting GTI SEG-SUSC 08-10-2016
PPTX
constructionequipments
PDF
Sequence of well drilling part 1
PPTX
Basic of well drilling process
PPTX
Drilling Operations of Ground Water Wells Up-Geologist Team Zagazig Univ 06-0...
PDF
Oil Drilling
PDF
Drilling rig components ( illustrated glossary )
PPT
176589.pptx.ppt
PDF
PE 305 Drilling Engineering 1 Ch-3= 1-2.pdf
PDF
Wel Planing
DOC
OIL EXPLORATION | Offshore Drilling Operation| Deilling Rig operation | Types
01_Rig Components & Personel.pdf
Basics for oil riggers
oil & gas drilling preliminaries
OilAndGas basics in petroleum industry and Intha impact
Drilling Rig Components ( Illustrated Glossary )
DRILLING PRESENTATION and their major types
1. sequance of well drilling and completion part 1
Horizontal directional drilling
Chapter 1 Basic of well drilling process.pptx
Operation and Well Setting GTI SEG-SUSC 08-10-2016
constructionequipments
Sequence of well drilling part 1
Basic of well drilling process
Drilling Operations of Ground Water Wells Up-Geologist Team Zagazig Univ 06-0...
Oil Drilling
Drilling rig components ( illustrated glossary )
176589.pptx.ppt
PE 305 Drilling Engineering 1 Ch-3= 1-2.pdf
Wel Planing
OIL EXPLORATION | Offshore Drilling Operation| Deilling Rig operation | Types
Ad

Recently uploaded (20)

PDF
Trump Administration's workforce development strategy
PPTX
Final Presentation General Medicine 03-08-2024.pptx
DOC
Soft-furnishing-By-Architect-A.F.M.Mohiuddin-Akhand.doc
PPTX
1st Inaugural Professorial Lecture held on 19th February 2020 (Governance and...
PPTX
UV-Visible spectroscopy..pptx UV-Visible Spectroscopy – Electronic Transition...
PPTX
school management -TNTEU- B.Ed., Semester II Unit 1.pptx
PDF
grade 11-chemistry_fetena_net_5883.pdf teacher guide for all student
PPTX
History, Philosophy and sociology of education (1).pptx
PDF
RTP_AR_KS1_Tutor's Guide_English [FOR REPRODUCTION].pdf
PPTX
Radiologic_Anatomy_of_the_Brachial_plexus [final].pptx
PDF
Computing-Curriculum for Schools in Ghana
PDF
Module 4: Burden of Disease Tutorial Slides S2 2025
PPTX
Final Presentation General Medicine 03-08-2024.pptx
PDF
OBE - B.A.(HON'S) IN INTERIOR ARCHITECTURE -Ar.MOHIUDDIN.pdf
PPTX
Cell Types and Its function , kingdom of life
PDF
GENETICS IN BIOLOGY IN SECONDARY LEVEL FORM 3
PDF
ChatGPT for Dummies - Pam Baker Ccesa007.pdf
PDF
Updated Idioms and Phrasal Verbs in English subject
PDF
Practical Manual AGRO-233 Principles and Practices of Natural Farming
PDF
Yogi Goddess Pres Conference Studio Updates
Trump Administration's workforce development strategy
Final Presentation General Medicine 03-08-2024.pptx
Soft-furnishing-By-Architect-A.F.M.Mohiuddin-Akhand.doc
1st Inaugural Professorial Lecture held on 19th February 2020 (Governance and...
UV-Visible spectroscopy..pptx UV-Visible Spectroscopy – Electronic Transition...
school management -TNTEU- B.Ed., Semester II Unit 1.pptx
grade 11-chemistry_fetena_net_5883.pdf teacher guide for all student
History, Philosophy and sociology of education (1).pptx
RTP_AR_KS1_Tutor's Guide_English [FOR REPRODUCTION].pdf
Radiologic_Anatomy_of_the_Brachial_plexus [final].pptx
Computing-Curriculum for Schools in Ghana
Module 4: Burden of Disease Tutorial Slides S2 2025
Final Presentation General Medicine 03-08-2024.pptx
OBE - B.A.(HON'S) IN INTERIOR ARCHITECTURE -Ar.MOHIUDDIN.pdf
Cell Types and Its function , kingdom of life
GENETICS IN BIOLOGY IN SECONDARY LEVEL FORM 3
ChatGPT for Dummies - Pam Baker Ccesa007.pdf
Updated Idioms and Phrasal Verbs in English subject
Practical Manual AGRO-233 Principles and Practices of Natural Farming
Yogi Goddess Pres Conference Studio Updates

petroleum programe (ENGLISH FOR THE OIL INDUSTRY)

  • 1. The Petroleum Programme ENGLISH FOR THE OIL INDUSTRY Presented & Preparator by : M . Jalalvand B.Sc. Petroleum Production Engineering Member of Society of Petroleum Engineer (SPE) Member of Iranian Petroleum Institute (IPI) Member of BPJ
  • 3. Section A Reading comprehension: • Oil is contained in rocks under the ground and in rocks under the sea. To find it, oilmen have to drill boreholes. The equipment for drilling these holes is the drilling rig. • Most rigs work on the rotary system. A bit rotates at the end of a pipe. As the bit rotates, it cuts and crushes the rock at the Bottom of the hole. The cuttings are carried to the surface by a special fluid. This fluid is called ‘mud’. Mud is a mixture of clay, water and chemicals.
  • 5. • Look at the diagram of the rotary rig. Notice the string. This is made up of ‘joint’ or ‘single’. Each joint or single is a hallow section of pipe (30 ft). The string is made up of a number of these singles, all joined together. • The bit is connected to the bottom of the string. At the top of the string there is a special pipe called the ‘Kelly. The Kelly isn’t round, but hexagonal. It fits into a hexagonal hole in the rotary table. • The rotary table turns the Kelly, the Kelly turns the string and the string turns the rotary bit.
  • 6. • Mud is not only used for carrying the cuttings up to the surface. It is also used for keeping the bit cool. • The mud is pumped down through the annulus. The mud engineer or ‘mud man ‘is in charge of the mud. • For example, he tells the floor men how to mix the mud at the mud tanks.
  • 7. • It is often necessary to pull the string out of the hole. • There are different reasons for this. Perhaps, for example the drill bit is dull. • If the bit is dull, it must be changed. To do this, the driller and the floor man must trip the pipe.
  • 8. They must pull the string out (a), change the bit (b), and then run the string back into the Hole (c). Tripping the pipe is also called making a round trip. Round trips are expensive. Oilman makes them only if they must. a b c
  • 9. Special Words & Expression 1 • Boreholes In the petroleum industry , the words ‘borehole’ ,’hole’ ,’well’ and ‘oil well’ usually mean the same thing . • Rotary turning like a wheel. • Rotates turns around and around like a wheel. • Crushes breaks up into small pieces, using great power. • Cutting the pieces of rock drilled by the bit. • Fluid anything that flows. Liquids, gases and melted substances are all fluids. • Clay an earthy material, plastic when it is wet. • The most common clay in drilling fluid is Bentonite. Bentonite consists of calcium (ca), magnesium (Mg), and aluminum (Al). • Hollow having an empty space on the inside. • Drill pipe is hollow, so that mud can pass through it.
  • 10. • Hexagonal having six angles and six sides. • Floor men workers on a rig .floor man are also called ‘roughnecks’. A mud man or driller can tell a floor man what to do. • Dull not sharp; worn out; gone. If the bit is gone, it must be changed. • Driller the person in charge of the drilling. • Floor men workers on a rig .floor man are also called ‘roughnecks’. A mud man or driller can tell a floor man what to do • Dull not sharp; worn out; gone. If the bit is gone, it must be changed. • Driller the person in charge of the drilling. Cross section Cross section A hexagon
  • 11. 1)Mud Tank ‫حفاري‬ ‫گل‬ ‫مخزن‬ ‫حفاري‬ ‫گل‬ ‫سازي‬ ‫ذخيره‬ ‫جهت‬ ‫كه‬ ‫حمل‬ ‫قابل‬ ‫فلزي‬ ‫مخازن‬ ‫حفاري‬ ‫گل‬ ‫جهت‬ ‫چاله‬ ‫حفر‬ ‫امكان‬ ‫كه‬ ‫مكانهايي‬ ‫در‬ ‫گردد‬ ‫مي‬ ‫استفاده‬ ‫مقدورنباشد‬. 2)Shale Shakers ‫تكاننده‬ ‫كه‬ ‫است‬ ‫پيوسته‬ ‫خطي‬ ‫لرزشي‬ ‫حركت‬ ‫داراييك‬ ‫تكاننده‬‫براي‬ ‫گيرد‬ ‫مي‬ ‫قرار‬ ‫استفاده‬ ‫مورد‬ ‫گل‬ ‫از‬ ‫جامد‬ ‫ذرات‬ ‫جداسازي‬. 3)Suction line ‫مكش‬ ‫خط‬ ‫قسمت‬ ‫به‬ ‫و‬ ‫كرده‬ ‫خارج‬ ‫مخزن‬ ‫از‬ ‫را‬ ‫محصول‬ ‫يك‬ ‫كه‬ ‫خطي‬ ‫ش‬ ‫مي‬ ‫ناميده‬ ‫پركننده‬ ‫خط‬ ‫همچنين‬ ،‫فرستد‬ ‫مي‬ ‫پمپ‬ ‫مكش‬‫ود‬. 4)Mud Pump ‫گل‬ ‫پمپ‬ ‫حف‬ ‫گل‬ ‫گردش‬ ‫براي‬ ‫كه‬ ‫بزرگي‬ ‫برگشتي‬ ‫و‬ ‫رفت‬ ‫پمپ‬‫بر‬ ‫اري‬ ‫شود‬ ‫مي‬ ‫استفاده‬ ‫حفاري‬ ‫دكل‬ ‫روي‬.
  • 12. • 7) Draw work ‫دكل‬ ‫آالت‬ ‫ماشين‬ ، ‫برق‬ ‫تامين‬ ، ‫كالچها‬ ، ‫محور‬ ، ‫كابل‬ ، ‫باالبر‬ ‫محور‬ ‫براي‬ ‫جمعي‬ ‫نام‬ ‫شود‬ ‫مي‬ ‫استفاده‬ ‫حفاري‬ ‫دكل‬ ‫در‬ ‫كه‬ ‫االت‬ ‫ماسين‬ ‫ساير‬ ‫و‬ ‫ترمزها‬. • 8) Stand Pipe ‫ايستا‬ ‫لوله‬ ‫باال‬ ‫حفاري‬ ‫تيرك‬ ‫يا‬ ‫حفاري‬ ‫دكل‬ ‫كناره‬ ‫درامتداد‬ ‫كه‬ ‫عمودي‬ ‫لوله‬ ‫يك‬‫مي‬ ‫و‬ ‫ميكند‬ ‫متصل‬ ‫چرخشي‬ ‫خرطومي‬ ‫به‬ ‫را‬ ‫لجن‬ ‫پمپ‬ ‫خروجي‬ ‫خط‬ ‫و‬ ‫رود‬ ‫شود‬ ‫مي‬ ‫پمپ‬ ‫گودال‬ ‫داخل‬ ‫به‬ ‫لجن‬ ‫آن‬ ‫ازدرون‬. • 9) Kelly hose/Rotary hose ‫حفاري‬ ‫گل‬ ‫خرطومي‬ ‫شيلنگ‬ ‫ت‬ ‫طريق‬ ‫از‬ ‫كه‬ ‫حفاري‬ ‫سيال‬ ‫كه‬ ‫دوراني‬ ‫حفاري‬ ‫دكل‬ ‫روي‬ ‫شيلنگي‬‫لمبه‬ ‫چندپر‬ ‫هاي‬ ‫لوله‬ ‫و‬ ‫هرزگرد‬ ‫سمت‬ ‫به‬ ‫ايستاده‬ ‫هاي‬ ‫لوله‬ ‫و‬ ‫حفاري‬ ‫گل‬‫مي‬ ‫كند‬ ‫مي‬ ‫هدايت‬ ‫را‬ ‫روند‬. • 10) Gooseneck ‫زانويي‬ 9 7
  • 13. • 11) Travelling block ‫متحرک‬ ‫بلوک‬ ‫پيچ‬ ‫آن‬ ‫به‬ ‫حفاری‬ ‫کابل‬ ‫که‬ ‫ها‬ ‫قرقره‬ ‫چرخ‬ ‫و‬ ‫ها‬ ‫قرقره‬ ‫از‬ ‫آرايش‬ ‫يک‬‫يده‬ ‫شود‬ ‫می‬. • Hook ‫قالب‬ • 12) Drilling line ‫حفاري‬ ‫كابل‬ • 13) Crown block ‫تاج‬ ‫بلوک‬ • 14) Derrick ‫دكل‬(‫حفاري‬ ‫سكوي‬) • 15) Monkey board ‫زياد‬ ‫ارتفاع‬ ‫در‬ ‫كاري‬ ‫پالتفرم‬ ‫حفاري‬ ‫دكل‬ ‫كارگران‬ ‫به‬ ‫مربوط‬ ‫كاري‬ ‫سكوي‬ • 16) Drill Pipe ‫حفاري‬ ‫لوله‬ 11 16 13
  • 14. • Drill collar ‫مته‬ ‫طوق‬(‫وزني‬ ‫لوله‬) • 17) Pipe Rack ‫لوله‬ ‫جاي‬ • 18) Swivel ‫گردان‬ ‫مفصل‬ ‫کاربردها‬. :‫حفاری‬ ‫ساقه‬ ‫وزن‬ ‫تحمل‬,‫چرخش‬ ‫و‬ ‫دوران‬ ‫امکان‬ ‫ايجاد‬ ‫حفاری‬ ‫ساقه‬ • 20) Rotary table/Drilling table ‫حفاري‬ ‫ميز‬/‫دوار‬ ‫صفحه‬ 18 20 17
  • 15. • Rotary ‫دورانی‬ ‫چرخشی‬ ‫يک‬ ‫حول‬ ‫دورانی‬ ‫حرکت‬ ‫دورانی‬ ‫حرکت‬ ‫با‬ ‫آن‬ ‫در‬ ‫که‬ ‫است‬ ‫حفاری‬ ‫متد‬ ‫کند‬ ‫می‬ ‫خرد‬ ‫را‬ ‫ها‬ ‫سنگ‬ ‫محور‬. • 23) Blowout Preventer (BOP) ‫فوران‬ ‫از‬ ‫كننده‬ ‫ممانعت‬ • 25) Drill string ‫حفاري‬ ‫لوله‬ ‫رشته‬ ‫سرمت‬ ‫آنها‬ ‫انتهاي‬ ‫در‬ ‫كه‬ ‫باشد‬ ‫مي‬ ‫يكديگر‬ ‫به‬ ‫متصل‬ ‫هاي‬ ‫لوله‬ ‫شامل‬‫ه‬ ‫است‬ ‫گرفته‬ ‫قرار‬.
  • 16. • 26) Drill bit ‫مته‬ ‫سر‬ • Drilling mud ‫حفاري‬ ‫گل‬ ‫كند‬ ‫مي‬ ‫گردش‬ ‫چاه‬ ‫داخل‬ ‫كه‬ ‫ديگر‬ ‫افزودني‬ ‫مواد‬ ‫و‬ ‫آب‬ ‫از‬ ‫مخلوطي‬. ‫حفاري‬ ‫هاي‬ ‫خرده‬ ‫انتقال‬ ، ‫مته‬ ‫سر‬ ‫سازي‬ ‫خنك‬ ‫مخلوط‬ ‫اين‬ ‫وظيفه‬ ‫و‬ ‫چاه‬ ‫ديواره‬ ‫ريزش‬ ‫از‬ ‫جلوگيري‬ ، ‫ها‬ ‫صخره‬ ‫و‬ ‫ها‬ ‫سنگ‬ ‫از‬ ‫شده‬ ‫باشد‬ ‫مي‬ ‫هيدروكربوني‬ ‫مواد‬ ‫فوران‬ ‫كردن‬ ‫دفع‬. • Mud pit ‫گل‬ ‫گودال‬ ‫حين‬ ‫در‬ ‫ها‬ ‫سيال‬ ‫موقت‬ ‫ذخيره‬ ‫براي‬ ‫زمين‬ ‫سطح‬ ‫در‬ ‫كه‬ ‫اي‬ ‫چاله‬ ‫است‬ ‫شده‬ ‫كنده‬ ‫حفاري‬ ‫عمليات‬. • Mud Return Line ‫لجن‬ ‫برگشت‬ ‫خط‬(‫الي‬ ‫و‬ ‫گل‬) ‫و‬ ‫چاه‬ ‫سوراخ‬ ‫در‬ ‫سطحي‬ ‫اتصاالت‬ ‫مابين‬ ‫كه‬ ‫لوله‬ ‫يا‬ ‫آبشخور‬ ‫يك‬ ‫لجن‬ ‫آن‬ ‫ميان‬ ‫از‬ ‫و‬ ‫گردد‬ ‫مي‬ ‫مستقر‬ ‫زا‬ ‫نفت‬ ‫هاي‬ ‫سنگ‬ ‫لرزاننده‬ ‫ميشود‬ ‫بازگردانده‬ ‫سطح‬ ‫به‬ ‫سوراخ‬ ‫داخل‬ ‫از‬ ‫حفاري‬ ‫از‬ ‫حاصل‬. 26