The idea of Benchmarking process:
to compare the activity of one
company with activities of the best of
other companies.
Within the UK industry BenchmarkingBenchmarking
has been identified as:has been identified as:
a powerful tool for assistinga powerful tool for assisting
managers to improve efficiency withinmanagers to improve efficiency within
the industry.the industry.
BENCHMARKING AND
PRODUCTIVITY
Organisation specific benchmarks are developed
during:
 the benchmarking process;
 the analysis phase.
 Benchmarking has proved to be a flexible toolBenchmarking has proved to be a flexible tool
used to support other strategies.used to support other strategies.
 It looks at the organisation’s strength and
weaknesses to compare with other
organisations.
 It change strategies at the right time to become
more competitive in global market.
BENCHMARKING AND
PRODUCTIVITY
IMPROVING BUSINESS RESULT
THROUGH
BENCHMARKING
The term benchmarking includes aThe term benchmarking includes a
number of different activities builtnumber of different activities built
around a single, simple and powerfularound a single, simple and powerful
idea.idea.
benchmarking is a continuing
process;
opens the organisation to new and
radical ideas;
BENCHMARKING AND
PRODUCTIVITY
A major project management
benchmarking company in the
United States and in Europe
concluded that at least 10
billion ponds was wasted due
to items such as:
BENCHMARKING AND
PRODUCTIVITY
BENCHMARKING AND
PRODUCTIVITY
BENCHMARKING AND
PRODUCTIVITY
BENCHMARKING AND
PRODUCTIVITY
BENCHMARKING AND
PRODUCTIVITY
BENCHMARKING AND
PRODUCTIVITY
Competitive benchmarking
is the benchmarking applied
to one’s performance
against competitors;
measures of project
excellence and
effectiveness.
BENCHMARKING AND
PRODUCTIVITY
 Manufacturing sectors have
been relatively quick to respond
to changes within the business
environment.
 An example of this is the
relatively rapid and flexible
response to the global economy.
BENCHMARKING AND
PRODUCTIVITY
Companies needs to develop a
culture of ‘lean construction’
through continuous
improvement.
The objective of this approach
is to increase the performance,
and at the same time reduce
BENCHMARKING AND
PRODUCTIVITY
Steps to take in Benchmarking can
be
Described as:
 ConsiderActivities with low Key
Performance Indicators( KPIs);
 Considera process model first;
 Considerwhat to benchmarkfrom the
process model first, second, and so on;
 Define the measures;
 Develop data collection methodology;
 Collect data;
BENCHMARKING AND
PRODUCTIVITY
 Identify deficiencies in the use of best
practices and project management
performance.
 Identify reasons fordeficiencies (root
causes).
 Develop an action plan (select best
practices to reduce shortfall).
 Integrate best practices into the
project delivery process.
 Adopt benchmarking as part of a
continuous improvement program.
 Monitorprogress
BENCHMARKING AND
PRODUCTIVITY
 Monitorfactors such as:
 cost
 time
 waste
 safety
 client satisfaction
 and also many othercritical
BENCHMARKING AND
PRODUCTIVITY
BENCHMARKING AND
PRODUCTIVITY
BENCHMARKING AND
PRODUCTIVITY
Step 1-pull information from bill of quantity
Step 2-carry out calculations-use
COST CONTROL-AOA
BENCHMARKING AND
PRODUCTIVITY
 ACTIVITIES 1-2, 2-3, 3-4, 1-12, 1-9, ….
To measure Items such as:
 Time (increase/decrease)
 Cost (increase/decrease)
 Labour (increase/decrease)
 Material (Material waste-
increase/decrease)
 Machinery (efficiency
increase/decrease).
BENCHMARKING AND
PRODUCTIVITY
 Compare Actual completion time for
Activities 1-2, 2-3,..aganist allocated
time for Activities 1-2, 2-3,
 Compare Actual completion cost for
Activities 1-2, 2-3,..aganist allocated
cost for Activities 1-2, 2-3,
 Compare Actual waste allowed(%)
for Activities 1-2, 2-3,..against
allowed waste (%) for Activities 1-2,
2-3,
BENCHMARKING AND
PRODUCTIVITY
BENCHMARKING AND
PRODUCTIVITY
 COST OF MATERIALS
31.14
5% WASTE ALLOWED
6.50% WASTE
EXPERIENCED
31.14(6.50-
5)=31.14X1.50=£46.71
46.71X156=7286.76
THE ESTIMATED
COST FOR THIS
ITEM=
7286.76-46.71=7240.05
Total MD
=Cost
of
material
Waste Waste
Quanti
ty
(TQ)
Deliver
ed to
site
(Estima
te)
(Actual
)
(Act-) % %
156 31.14 5% 6.50%
264 18.88 5% 6.50%
282 8 5% 7.00%
708 1.71 5% 6.50%

More Related Content

DOCX
Qm0026 quality concepts, tasks and development methods
PDF
TQM Tutorials - DESIGN FOR QUALITY
PPT
PPT
Product design concept
PPTX
PPTX
Six sigma method of quality control
DOCX
Om0013 advanced production and operations management
DOC
Chetan
Qm0026 quality concepts, tasks and development methods
TQM Tutorials - DESIGN FOR QUALITY
Product design concept
Six sigma method of quality control
Om0013 advanced production and operations management
Chetan

What's hot (20)

PPTX
Study on quality control & quality management systems
PDF
Factors influencing Process Design and Process Analysis
PDF
TQM Tutorials - Partnerships and Resources
DOCX
Qm0026 quality concepts, tasks and development methods
PPT
Product Design
PDF
Operational turnaround at auto components manufacturer
PPT
benchmarking ppt.pptx
PPT
Product design and development ch4
PPT
Benchmarking (1)
PDF
Basics of Product and Process Design Management
PPT
PRODUCTION CYCLE
PPTX
Chpter 2 manufacturing environment
PPT
Product design
DOCX
business process reingeenering
PPT
O ps management lecture 3 design goods & services
PPTX
New Product Design & Devolopment
PDF
Manufacturing Strategy and its impact on Product and Process Design
PDF
Manufacturing Strategy by Hayes
PPTX
Benchmarking
PPTX
Marketing and Strategic Planning
Study on quality control & quality management systems
Factors influencing Process Design and Process Analysis
TQM Tutorials - Partnerships and Resources
Qm0026 quality concepts, tasks and development methods
Product Design
Operational turnaround at auto components manufacturer
benchmarking ppt.pptx
Product design and development ch4
Benchmarking (1)
Basics of Product and Process Design Management
PRODUCTION CYCLE
Chpter 2 manufacturing environment
Product design
business process reingeenering
O ps management lecture 3 design goods & services
New Product Design & Devolopment
Manufacturing Strategy and its impact on Product and Process Design
Manufacturing Strategy by Hayes
Benchmarking
Marketing and Strategic Planning
Ad

Viewers also liked (16)

PPS
La Escalera
PPT
خـورشـيـد در قرآن کريم
PPT
051 the numerical combination-the holy qur' an-gods word
PPT
мульт.неделя отчет шевчук 2015
PPTX
بررسی زیارت اربعین امام حسین علیه السلام
PPT
072 the structural differences
PPT
در زمین لنگرها(از كوه ها) افكند
PPTX
اعجاز قرآن
PPTX
Dulcibella Legacy-G6 uni
PPT
ابـر ــ بـاران ــ تگـرگ آب
DOCX
Trabajo de ensayo
PPT
اشاره قرآن به فروپاشی ستاره گان و اجرام آسمانی معلق در فضا
PDF
Bushidō Consulting _ Presentation _ June 2016
PPT
024 the force of gravity and orbital movements
PPTX
028 the gravitational lens effect
PDF
Asthma Questioinnaire
La Escalera
خـورشـيـد در قرآن کريم
051 the numerical combination-the holy qur' an-gods word
мульт.неделя отчет шевчук 2015
بررسی زیارت اربعین امام حسین علیه السلام
072 the structural differences
در زمین لنگرها(از كوه ها) افكند
اعجاز قرآن
Dulcibella Legacy-G6 uni
ابـر ــ بـاران ــ تگـرگ آب
Trabajo de ensayo
اشاره قرآن به فروپاشی ستاره گان و اجرام آسمانی معلق در فضا
Bushidō Consulting _ Presentation _ June 2016
024 the force of gravity and orbital movements
028 the gravitational lens effect
Asthma Questioinnaire
Ad

Similar to 004 benchmarking and productivity (20)

PPT
Benchmarking and productivity
PPT
Construction Productivity
PPT
004 benchmarking and productivity
PPT
Construction productivity
PPTX
Lecture 3 benchmarking in quality system
PPT
Benchmarking.ppt
PDF
benchmarking-12517018313111-phpapp01.pdf
PDF
benchmarking-12517018313111-phpapp01.pdf
PPT
Benchmarking dean ems septmeber 9, 2010
PPT
PPT
Benchmarking for hrd professionals
PDF
A Review on Benchmarking Automation in Construction Industry
PPTX
Benchmarking
PPTX
Benchmarking22222222222222222222222222222222222.pptx
PPTX
Benchmarking**********************************************
PPTX
Benchmarking
PPTX
BUSINESSBUSINESSBUSINESSBusiness Process.pptx
PPT
Benchmarking
PPT
TQM proper on training and development.ppt
PPTX
Benchmarking
Benchmarking and productivity
Construction Productivity
004 benchmarking and productivity
Construction productivity
Lecture 3 benchmarking in quality system
Benchmarking.ppt
benchmarking-12517018313111-phpapp01.pdf
benchmarking-12517018313111-phpapp01.pdf
Benchmarking dean ems septmeber 9, 2010
Benchmarking for hrd professionals
A Review on Benchmarking Automation in Construction Industry
Benchmarking
Benchmarking22222222222222222222222222222222222.pptx
Benchmarking**********************************************
Benchmarking
BUSINESSBUSINESSBUSINESSBusiness Process.pptx
Benchmarking
TQM proper on training and development.ppt
Benchmarking

More from Dr Fereidoun Dejahang (20)

DOCX
27 j20 my news punch -dr f dejahang 27-01-2020
DOCX
28 dej my news punch rev 28-12-2019
DOCX
16 fd my news punch rev 16-12-2019
PPT
029 fast-tracking projects
PPT
028 fast-tracking projects & cost overrun
PPT
027 fast-tracked projects-materials
PPT
026 fast react-productivity improvement
PPT
025 enterprise resources management
PPT
022 b construction productivity-write
PPT
022 a construction productivity (2)
PPT
021 construction productivity (1)
PPTX
019 competencies-managers
PPT
018 company productivity
PPT
017 communication
PPT
016 communication in construction sector
PPTX
015 changes-process model
PPTX
014 changes-cost overrun measurement
PPTX
013 changes in construction projects
PPT
012 bussiness planning process
PPT
011 business performance management
27 j20 my news punch -dr f dejahang 27-01-2020
28 dej my news punch rev 28-12-2019
16 fd my news punch rev 16-12-2019
029 fast-tracking projects
028 fast-tracking projects & cost overrun
027 fast-tracked projects-materials
026 fast react-productivity improvement
025 enterprise resources management
022 b construction productivity-write
022 a construction productivity (2)
021 construction productivity (1)
019 competencies-managers
018 company productivity
017 communication
016 communication in construction sector
015 changes-process model
014 changes-cost overrun measurement
013 changes in construction projects
012 bussiness planning process
011 business performance management

Recently uploaded (20)

PDF
Accra-Kumasi Expressway - Prefeasibility Report Volume 1 of 7.11.2018.pdf
PPTX
Building constraction Conveyance of water.pptx
PDF
Exploratory_Data_Analysis_Fundamentals.pdf
PDF
Applications of Equal_Area_Criterion.pdf
PPTX
tack Data Structure with Array and Linked List Implementation, Push and Pop O...
PDF
null (2) bgfbg bfgb bfgb fbfg bfbgf b.pdf
PDF
Unit1 - AIML Chapter 1 concept and ethics
PPTX
Graph Data Structures with Types, Traversals, Connectivity, and Real-Life App...
PPTX
Feature types and data preprocessing steps
PDF
Artificial Superintelligence (ASI) Alliance Vision Paper.pdf
PDF
Design Guidelines and solutions for Plastics parts
PPTX
Sorting and Hashing in Data Structures with Algorithms, Techniques, Implement...
PPTX
Chemical Technological Processes, Feasibility Study and Chemical Process Indu...
PPTX
Measurement Uncertainty and Measurement System analysis
PDF
distributed database system" (DDBS) is often used to refer to both the distri...
PDF
Abrasive, erosive and cavitation wear.pdf
PDF
Implantable Drug Delivery System_NDDS_BPHARMACY__SEM VII_PCI .pdf
PPTX
Chapter 2 -Technology and Enginerring Materials + Composites.pptx
PPT
Chapter 1 - Introduction to Manufacturing Technology_2.ppt
PPTX
Petroleum Refining & Petrochemicals.pptx
Accra-Kumasi Expressway - Prefeasibility Report Volume 1 of 7.11.2018.pdf
Building constraction Conveyance of water.pptx
Exploratory_Data_Analysis_Fundamentals.pdf
Applications of Equal_Area_Criterion.pdf
tack Data Structure with Array and Linked List Implementation, Push and Pop O...
null (2) bgfbg bfgb bfgb fbfg bfbgf b.pdf
Unit1 - AIML Chapter 1 concept and ethics
Graph Data Structures with Types, Traversals, Connectivity, and Real-Life App...
Feature types and data preprocessing steps
Artificial Superintelligence (ASI) Alliance Vision Paper.pdf
Design Guidelines and solutions for Plastics parts
Sorting and Hashing in Data Structures with Algorithms, Techniques, Implement...
Chemical Technological Processes, Feasibility Study and Chemical Process Indu...
Measurement Uncertainty and Measurement System analysis
distributed database system" (DDBS) is often used to refer to both the distri...
Abrasive, erosive and cavitation wear.pdf
Implantable Drug Delivery System_NDDS_BPHARMACY__SEM VII_PCI .pdf
Chapter 2 -Technology and Enginerring Materials + Composites.pptx
Chapter 1 - Introduction to Manufacturing Technology_2.ppt
Petroleum Refining & Petrochemicals.pptx

004 benchmarking and productivity