SlideShare a Scribd company logo
Project Management
     Framework
Waleed El-Naggar, MBA, PMP


           Company
           LOGO
Agenda

    1. Introduction to Project Management

    2. Organizational Structures

    3. Project Lifecycle Definition

    4. Project Management Processes

    5. PMP Certificate



5/5/2009            Compiled by: Waleed El-Naggar   2
What Is a Project?

   A temporary endeavor undertaken to create
           a unique product or service

 Temporary endeavor
  • Every project has a definite beginning and a definite end
  • Does not mean short duration
 Undertaken to create a unique product, service or result
  • A product or artifact that is produced, is quantifiable, and can be
    either an end item in itself or a component item
  • A capability to perform a service, such as business functions
    supporting production or distribution
  • A result, such as outcomes or documents

5/5/2009                 Compiled by: Waleed El-Naggar                    3
Project, Portfolio and Program




5/5/2009          Compiled by: Waleed El-Naggar   4
Subproject


 A manageable component of a project

 May be performed by a separate organization

 Could be a project phase

 Subprojects are typically referred to as projects and

  managed as such



5/5/2009           Compiled by: Waleed El-Naggar          5
What Is Project Management?

 Application of knowledge, skills, tools, & techniques to
  project activities to meet project requirements
 Project manager must balance the competing project
  constrains which are:
     • Scope
     • Quality
     • Schedule
     • Budget
     • Resources
     • Risk

5/5/2009             Compiled by: Waleed El-Naggar           6
Project Management vs. Operation

 Operations are an organizational function performing an
  ongoing execution of activities.
 Examples: Production, manufacturing, and accounting
  operations.
 Projects help achieve the organizational goals when they
  are aligned with the organization’s strategy.
 Projects require project management while operations
  require business process management (BPM) or
  operations management.
5/5/2009             Compiled by: Waleed El-Naggar           7
Project Phases & the Project Life Cycle

 A project can be divided up into phases
 The completion of a phase is marked by a deliverable
 Collectively the project phases make up the project life
  cycle
                                                     Intermediate Phase

Cost and
Staffing
 Level                                                                    Final
                                                                          Phase
                   Initial Phase




           Start
                                       Time

5/5/2009                           Compiled by: Waleed El-Naggar                  8
Cost & Staffing levels across the
                   project life cycle




5/5/2009         Compiled by: Waleed El-Naggar   9
Stakeholders Influence

Stakeholders are individuals or organizations that are
actively involved in the project, or whose interests may be
affected as a result of project execution or project
completion
   High            Influence of stakeholders




                   Cost of changes


   Low
           Start                                                     Finish
                                       Project Time
5/5/2009                             Compiled by: Waleed El-Naggar            10
Standard vs. Regulation

 A Standard is :
      A document approved by a recognized body
       providing a set of rules to achieve an optimum
       degree of order in a given context.
      There is no penalty for non-compliance.
 A regulation is:
      A requirement which specifies the characteristics
       of a product/service .
      Compliance is mandatory.

5/5/2009             Compiled by: Waleed El-Naggar         11
Project Stakeholders

  Individuals and organizations who are actively
     involved in the project and whose interests
     may be positively or negatively affected by
            the project success or failure

Key Stakeholders
 Project manager              Manages the project
 Customer                     Uses the product or service
 Performing organization      Enterprise that does the project
  work
 Sponsor                      Provides financial resources

5/5/2009             Compiled by: Waleed El-Naggar                12
Project Stakeholders




5/5/2009     Compiled by: Waleed El-Naggar   13
Project Phases

Divides the project into phases that
 provide better management control and
 the appropriate links to the ongoing
 operations of the organization
Project Governance Across the Life Cycle
Phase-to-Phase Relationship




5/5/2009           Compiled by: Waleed El-Naggar   14
Project Groups & Phases




5/5/2009           Compiled by: Waleed El-Naggar   15
Project Management Skills

   General Management knowledge and skills: Planning,
    organizing, staffing, executing and controlling.
   Interpersonal skills:
     Effective Communication.
     Influencing the organization: “getting things done”
     Leadership: Vision – strategy -Direction.
     Motivating people: Energizing people.
     Negotiation and conflict management.
     Problem solving: Problem definition, alternatives
      identification and decision making.


5/5/2009               Compiled by: Waleed El-Naggar        16
Project Management Office (PMO)


 An organizational unit to centralize and
  coordinate the management of projects under its
  domain.
 Involved in the selection, management,
  redeployment of shared project personnel.
 Provides dedicated training for project managers.
 Provides enterprise- wide project management
  software.
 Centrally monitors all PMO timelines and budgets.
 Coordinates overall project quality standards.

5/5/2009           Compiled by: Waleed El-Naggar   17
What Is a Deliverable?

A tangible, verifiable product, result or
   capability to perform a service that must be
   produced to complete a process, phase, or
   project.
A deliverable often marks the end of a phase
   of the project
Phase end = Phase exit, stage gates, or kill
   points
5/5/2009            Compiled by: Waleed El-Naggar   18
Organizational Structures


      Functional

      Projectized

      Weak Matrix

      Balanced Matrix

      Strong Matrix

5/5/2009            Compiled by: Waleed El-Naggar   19
Functional Organization


                                                               Project
                                   Chief                     Coordination
                                 Executive




            Functional          Functional               Functional
             Manager             Manager                  Manager



                Staff               Staff                    Staff


                Staff               Staff                    Staff


                Staff               Staff                    Staff




5/5/2009                 Compiled by: Waleed El-Naggar                      20
Projectized Organization

                                Chief
                              Executive




            Project           Project                 Project
            Manager           Manager                 Manager



              Staff               Staff                  Staff


              Staff               Staff                  Staff


              Staff               Staff                  Staff




5/5/2009              Compiled by: Waleed El-Naggar              21
Weak Matrix Organization


                                  Chief
                                Executive




           Functional          Functional               Functional
            Manager             Manager                  Manager



               Staff               Staff                    Staff

                                                                       Project
               Staff               Staff                    Staff    Coordination



               Staff               Staff                    Staff




5/5/2009                Compiled by: Waleed El-Naggar                         22
Balanced Matrix Organization


                                    Chief
                                  Executive




            Functional           Functional               Functional
             Manager              Manager                  Manager



                Staff                Staff                    Staff


                Staff                Staff                    Staff


                Manager              Staff                    Staff




5/5/2009                  Compiled by: Waleed El-Naggar                23
Strong Matrix Organization

                                    Chief
                                  Executive




  Functional         Functional               Functional   Manager of Project
   Manager            Manager                  Manager        Managers



       Staff             Staff                    Staff       Project Manager


       Staff             Staff                    Staff       Project Manager


       Staff             Staff                    Staff       Project Manager




5/5/2009                Compiled by: Waleed El-Naggar                     24
Organizational Structure Influences


           Organization                                         Matrix
                  Type      Functional                                                           Projectized
Project
Characteristics                             Weak Matrix   Balanced Matrix    Strong Matrix

Project Manager's                                                                              High to Almost
                           Little or None     Limited     Low to Moderate   Moderate to High
Authority                                                                                          Total

                                                                                               High to Almost
Resource Availability      Little or None     Limited     Low to Moderate   Moderate to High
                                                                                                   Total

Who controls the project    Functional       Functional
                                                              Mixed         Project Manager    Project Manager
budget                       Manager          Manager


Project Manager's Role       Part-time       Part-time       Full-time          Full-time         Full-time


Project Management
                             Part-time       Part-time       Part-time          Full-time         Full-time
Administrative Staff




5/5/2009                              Compiled by: Waleed El-Naggar                                           25
Advantages/Disadvantages of Organizations

I. Functional Organization

Grouped by areas of specialization/ functions.
Power is with the functional leader.

   Advantages: Access to specialists; members
    reporting to only one supervisor, clearly defined
    career paths

   Disadvantages: less focus on project deliverables,
    no career path on Project Management, PM has
    no authority
5/5/2009              Compiled by: Waleed El-Naggar     26
Advantages/Disadvantages of Organizations

II. Projectized Organization


Organization is by projects. Personnel report to
PM/has total power.

 Advantages: Efficient project organization -
   Loyalty to the project - effective communications.

 Disadvantages: No “home” after the project is
   completed - duplication of facilities.



5/5/2009              Compiled by: Waleed El-Naggar   27
Advantages/Disadvantages of Organizations

III. Matrix Organization
Power varies between Project & Functional managers
according to its type (strong, balanced or weak)
 Advantages:
          Maximum utilization of scarce resources
          Efficient horizontal and vertical dissemination of
           information
          Retention of home after project closure.
 Disadvantages:
          Different priorities between PM & FM (Conflicts)
          Dual reporting
          Complex to monitor and control
          Duplication of effort

5/5/2009                      Compiled by: Waleed El-Naggar     28
Balance of Power in an Organization




                                     Project Influence in Decision Making




       Functional Influence in Decision Making




  Pure             Weak              Balanced               Strong         Pure
Functional         Matrix             Matrix                Matrix      Projectized




5/5/2009                    Compiled by: Waleed El-Naggar                      29
Quiz

What type of organization is BEST for
managing complex projects involving cross
disciplinary efforts?
     A. Projectized
     B. Functional
     C. Line
     D. Matrix
                  The answer is: D
5/5/2009             Compiled by: Waleed El-Naggar   30
Types of Life Cycles

 Product Life Cycle
           A Project is undertaken to present only one aspect
           of the Product life cycle.
          The product life cycle may be composed of several
           projects.
 Project Management Life Cycle vs. Project Life
  Cycle:
          Project life cycle is customizable for each project;
           example; e.g. Plan – design – implement – test: in
           IT projects.
          Each step of the Project Life Cycle may contain the
           whole project management life cycle.
5/5/2009                  Compiled by: Waleed El-Naggar       31
Project Management Process Groups
                            Monitoring &
                            Controlling Processes

                               Planning
                               Processes




           Initiating
                                                        Closing
           Processes
                                                        Processes




                                 Executing
                                 Processes



5/5/2009                Compiled by: Waleed El-Naggar               32
Project Management Process Groups

 Initiating Process Group
          Defines and authorizes the project or a project phase
 Planning Process Group
          Defines and refines objectives, and plans the course of action
           required to attain the objectives and scope that the project was
           undertaken to address
 Executing Process Group
          Integrates people and other resources to carry out the project
           management plan for the project
 Monitoring and Controlling Process Group
          Regularly measures and monitors progress to identify variances
           from the project management plan so that corrective action can
           be taken when necessary to meet project objectives
 Closing Process Group
          Formalizes acceptance of the product, services or result and
           brings the project or a project phase to an orderly end

5/5/2009                      Compiled by: Waleed El-Naggar                   33
Project Process Group Overlaps




5/5/2009           Compiled by: Waleed El-Naggar   34
Project
  Management
  Process Groups
  and Knowledge
  Areas Mapping



5/5/2009       Compiled by: Waleed El-Naggar   35
Quiz

The project life cycle is comprised of which
of the following?
     A. Phases
     B. Milestones
     C. Estimates
     D. Activities
                  The answer is: A

5/5/2009             Compiled by: Waleed El-Naggar   36
Quiz

Of the following, which is the logical order of the project
management processes?
   A. Initiating, planning, controlling, executing, closing
   B. Planning, initiating, controlling, executing, closing
   C. Initiating, planning, executing, controlling, closing
   D. Planning, initiating, executing, closing


                   The answer is: C

5/5/2009              Compiled by: Waleed El-Naggar       37
Project Management Institute

Founded in 1969, the Project Management
 Institute (PMI) has grown to be the organization
 of choice for project management professionals
 world wide.
200,000 members representing 125 countries
Establishes project management standards,
 provide seminars, educational programs and
 professional certification.
http://www.pmi.org
5/5/2009           Compiled by: Waleed El-Naggar    38
Project Management Professional (PMP)

 The PMP certification is the most widely recognized and
   respected certification in the field of project
   management. The purpose and goal of this certification
   program is the development, maintenance, evaluation,
   promotion, and administration of a rigorous,
   examination-based, professional certification program of
   the highest caliber.
 Worldwide there are over 50,000 PMPs who provide
   project management services in 26 countries.


5/5/2009                  Compiled by: Waleed El-Naggar     39
Certification Test Eligibility Requirements


               Category 1                                      Category 2
• Baccalaureate/equivalent degree             • High School diploma/equivalent degree

• Minimum of 4,500 hours of project           • Minimum of 7,500 hours of project
  management experience within the five         management experience within the five
  process groups (Initiation, Planning,         process groups (Initiation, Planning,
  Execution, Control, Closing)                  Execution, Control, Closing)

• 3 years of project management               • 5 years of project management
  experience within the last 6 years (36        experience within the last 8 years (60
  months of non-overlapping months of           months of non-overlapping months of
  PM experience).                               PM experience).

• 35 contact hours of project management      • 35 contact hours of project management
  education.                                    education.



5/5/2009                       Compiled by: Waleed El-Naggar                             40
After Passing Examination

Each PMP must satisfy the PMI Continuing
Certification Requirements Program (formerly
called Professional Development Program) in
order to maintain the PMP certification.
          Attain no less than 60 Professional
           Development Units (PDUs) within a three-year
           cycle.
          Agree to continue to adhere to PMI’s
           Professional Code of Conduct.
5/5/2009                Compiled by: Waleed El-Naggar   41
PMP Areas

           Scope Management                             14%
           Time Management                               7%
           Cost Management                               7%
           Quality Management                            8%
           Procurement Management                        7%
           Risk Management                               7%
           HR Management                                12%
           Communications Management                    12%
           Integration Management                       12%
           Professional Responsibility                  14%


5/5/2009                Compiled by: Waleed El-Naggar         42
PMP Resources


Project Management Body of Knowledge
   (PMBOK) Guide, 4th Edition

PMP Exam Prep, 5th Edition by Rita Mulcahy

Project Management Professional Study
   Guide, 5th Edition, Kim Heldman



5/5/2009          Compiled by: Waleed El-Naggar   43
Thank You



5/5/2009    Compiled by: Waleed El-Naggar   44

More Related Content

PPT
06. Project Management Process Groups
PPTX
Project Cost Management - PMBOK6
PDF
PMP Lecture 1: Introduction to Project Management
PPTX
Project management process and Project Management Knowledge areas
PPS
An Introduction To Project Management
PPTX
Project Management Best Practices - Tips and Techniques
PDF
Project Quality Management - PMBOK
PDF
Project Management Concepts
06. Project Management Process Groups
Project Cost Management - PMBOK6
PMP Lecture 1: Introduction to Project Management
Project management process and Project Management Knowledge areas
An Introduction To Project Management
Project Management Best Practices - Tips and Techniques
Project Quality Management - PMBOK
Project Management Concepts

What's hot (20)

PPTX
Project management life cycle
PPTX
Project Scope Management - PMBOK6
PPTX
project management concepts
PPT
Project Scope Management -
PDF
Introduction to Project Management
PDF
PMP PMbok 5th CH1 - CH2
PDF
Project Management Professional (PMP)
PDF
Introduction to Project Management.pdf
PDF
Project Management Concepts (from PMBOK 5th Ed)
PPTX
PMI Project Management Principles
PPTX
Project Quality Management - PMBOK6
PPTX
Project scope management 1
PPTX
Project Management - PMI Approach
PPT
Project management tools and techniques
PDF
PMP Lecture 4: Project Integration Management
PPTX
Projrct Monitoring & Controling
PPTX
Project Management Framework
PPT
Project Management
PDF
Fundamentals of project management
Project management life cycle
Project Scope Management - PMBOK6
project management concepts
Project Scope Management -
Introduction to Project Management
PMP PMbok 5th CH1 - CH2
Project Management Professional (PMP)
Introduction to Project Management.pdf
Project Management Concepts (from PMBOK 5th Ed)
PMI Project Management Principles
Project Quality Management - PMBOK6
Project scope management 1
Project Management - PMI Approach
Project management tools and techniques
PMP Lecture 4: Project Integration Management
Projrct Monitoring & Controling
Project Management Framework
Project Management
Fundamentals of project management
Ad

Viewers also liked (20)

PDF
Project Organization and Structure
PDF
PMP.Essentials.150121
PPSX
PDF
Crc20 in jamaica
PPSX
PPSX
Arrow computation
PDF
PMP Application - Step by Step
PDF
Pmp in summary
PDF
Fluxo de Processos de Gerenciamento de Programas em Português - 3ª Edição - V...
PPT
Session 3 gdas pmp study group presentation
PPT
Session 8 gdas pmp study group presentation
PPT
Session 10 gdas pmp study group presentation
PPT
Session 4 gdas pmp study group presentation
PPT
Session 2 gdas pmp study group presentation
PPT
Session 7 gdas pmp study group presentation
PPT
Session 6 gdas pmp study group presentation
PPT
Session 5 gdas pmp study group presentation
PDF
Fluxo de Processos de Gerenciamento de Programas em Português - 3ª Edição
Project Organization and Structure
PMP.Essentials.150121
Crc20 in jamaica
Arrow computation
PMP Application - Step by Step
Pmp in summary
Fluxo de Processos de Gerenciamento de Programas em Português - 3ª Edição - V...
Session 3 gdas pmp study group presentation
Session 8 gdas pmp study group presentation
Session 10 gdas pmp study group presentation
Session 4 gdas pmp study group presentation
Session 2 gdas pmp study group presentation
Session 7 gdas pmp study group presentation
Session 6 gdas pmp study group presentation
Session 5 gdas pmp study group presentation
Fluxo de Processos de Gerenciamento de Programas em Português - 3ª Edição
Ad

Similar to 01 project management framework (20)

PPTX
Project Management Overview
PDF
Project Planning and Management
PPTX
Introduction project managemen
PPTX
Chapter 2 Project Organization and life cycle.pptx
PPT
1 project management framework
PDF
PMI-PMP6 Lecture 02: Project Management Framework_v1.0
PDF
Project Management,Org Influence,and Project Life Cycle Management (4).pdf
PPT
PM-1 Overview.ppt
PPTX
Pmp basics you need to know
PPTX
Standard org chart & role descriptions
PDF
Online PMP Exam Certification Training - 35 Hours
PPT
CH 3- The Human Side of Project Management.ppt
PPTX
1. into. to project and project management (1)
PDF
Project Management Tools & Techniques by Susan W. Carey
DOCX
Various National Agencies Directly Involved in the Issuance of Public Fiscal
PPTX
Introduction to Project Management - PMP Workgroup
PDF
PDF
0. project management framework (fundamentals)
PDF
Pm deep dive the framework
PPT
project management concepts
Project Management Overview
Project Planning and Management
Introduction project managemen
Chapter 2 Project Organization and life cycle.pptx
1 project management framework
PMI-PMP6 Lecture 02: Project Management Framework_v1.0
Project Management,Org Influence,and Project Life Cycle Management (4).pdf
PM-1 Overview.ppt
Pmp basics you need to know
Standard org chart & role descriptions
Online PMP Exam Certification Training - 35 Hours
CH 3- The Human Side of Project Management.ppt
1. into. to project and project management (1)
Project Management Tools & Techniques by Susan W. Carey
Various National Agencies Directly Involved in the Issuance of Public Fiscal
Introduction to Project Management - PMP Workgroup
0. project management framework (fundamentals)
Pm deep dive the framework
project management concepts

More from Tu Nguyen, PMP®,PMI-RMP® (17)

PPSX
PPSX
PPSX
Time cost-trade-off
PPSX
Time cost-control
PPSX
PDF
Ch 6 construction progress control
PDF
Ch 4 cash flow and investment appraisal
PDF
Ch 3 contract strategy
PDF
Ch 2 planning and scheduling
PDF
Ch 1 organization of construction projects
PDF
Ch 5 estimating and tendering
Time cost-trade-off
Time cost-control
Ch 6 construction progress control
Ch 4 cash flow and investment appraisal
Ch 3 contract strategy
Ch 2 planning and scheduling
Ch 1 organization of construction projects
Ch 5 estimating and tendering

01 project management framework

  • 1. Project Management Framework Waleed El-Naggar, MBA, PMP Company LOGO
  • 2. Agenda 1. Introduction to Project Management 2. Organizational Structures 3. Project Lifecycle Definition 4. Project Management Processes 5. PMP Certificate 5/5/2009 Compiled by: Waleed El-Naggar 2
  • 3. What Is a Project? A temporary endeavor undertaken to create a unique product or service  Temporary endeavor • Every project has a definite beginning and a definite end • Does not mean short duration  Undertaken to create a unique product, service or result • A product or artifact that is produced, is quantifiable, and can be either an end item in itself or a component item • A capability to perform a service, such as business functions supporting production or distribution • A result, such as outcomes or documents 5/5/2009 Compiled by: Waleed El-Naggar 3
  • 4. Project, Portfolio and Program 5/5/2009 Compiled by: Waleed El-Naggar 4
  • 5. Subproject  A manageable component of a project  May be performed by a separate organization  Could be a project phase  Subprojects are typically referred to as projects and managed as such 5/5/2009 Compiled by: Waleed El-Naggar 5
  • 6. What Is Project Management?  Application of knowledge, skills, tools, & techniques to project activities to meet project requirements  Project manager must balance the competing project constrains which are: • Scope • Quality • Schedule • Budget • Resources • Risk 5/5/2009 Compiled by: Waleed El-Naggar 6
  • 7. Project Management vs. Operation  Operations are an organizational function performing an ongoing execution of activities.  Examples: Production, manufacturing, and accounting operations.  Projects help achieve the organizational goals when they are aligned with the organization’s strategy.  Projects require project management while operations require business process management (BPM) or operations management. 5/5/2009 Compiled by: Waleed El-Naggar 7
  • 8. Project Phases & the Project Life Cycle  A project can be divided up into phases  The completion of a phase is marked by a deliverable  Collectively the project phases make up the project life cycle Intermediate Phase Cost and Staffing Level Final Phase Initial Phase Start Time 5/5/2009 Compiled by: Waleed El-Naggar 8
  • 9. Cost & Staffing levels across the project life cycle 5/5/2009 Compiled by: Waleed El-Naggar 9
  • 10. Stakeholders Influence Stakeholders are individuals or organizations that are actively involved in the project, or whose interests may be affected as a result of project execution or project completion High Influence of stakeholders Cost of changes Low Start Finish Project Time 5/5/2009 Compiled by: Waleed El-Naggar 10
  • 11. Standard vs. Regulation  A Standard is :  A document approved by a recognized body providing a set of rules to achieve an optimum degree of order in a given context.  There is no penalty for non-compliance.  A regulation is:  A requirement which specifies the characteristics of a product/service .  Compliance is mandatory. 5/5/2009 Compiled by: Waleed El-Naggar 11
  • 12. Project Stakeholders Individuals and organizations who are actively involved in the project and whose interests may be positively or negatively affected by the project success or failure Key Stakeholders  Project manager Manages the project  Customer Uses the product or service  Performing organization Enterprise that does the project work  Sponsor Provides financial resources 5/5/2009 Compiled by: Waleed El-Naggar 12
  • 13. Project Stakeholders 5/5/2009 Compiled by: Waleed El-Naggar 13
  • 14. Project Phases Divides the project into phases that provide better management control and the appropriate links to the ongoing operations of the organization Project Governance Across the Life Cycle Phase-to-Phase Relationship 5/5/2009 Compiled by: Waleed El-Naggar 14
  • 15. Project Groups & Phases 5/5/2009 Compiled by: Waleed El-Naggar 15
  • 16. Project Management Skills  General Management knowledge and skills: Planning, organizing, staffing, executing and controlling.  Interpersonal skills:  Effective Communication.  Influencing the organization: “getting things done”  Leadership: Vision – strategy -Direction.  Motivating people: Energizing people.  Negotiation and conflict management.  Problem solving: Problem definition, alternatives identification and decision making. 5/5/2009 Compiled by: Waleed El-Naggar 16
  • 17. Project Management Office (PMO)  An organizational unit to centralize and coordinate the management of projects under its domain.  Involved in the selection, management, redeployment of shared project personnel.  Provides dedicated training for project managers.  Provides enterprise- wide project management software.  Centrally monitors all PMO timelines and budgets.  Coordinates overall project quality standards. 5/5/2009 Compiled by: Waleed El-Naggar 17
  • 18. What Is a Deliverable? A tangible, verifiable product, result or capability to perform a service that must be produced to complete a process, phase, or project. A deliverable often marks the end of a phase of the project Phase end = Phase exit, stage gates, or kill points 5/5/2009 Compiled by: Waleed El-Naggar 18
  • 19. Organizational Structures Functional Projectized Weak Matrix Balanced Matrix Strong Matrix 5/5/2009 Compiled by: Waleed El-Naggar 19
  • 20. Functional Organization Project Chief Coordination Executive Functional Functional Functional Manager Manager Manager Staff Staff Staff Staff Staff Staff Staff Staff Staff 5/5/2009 Compiled by: Waleed El-Naggar 20
  • 21. Projectized Organization Chief Executive Project Project Project Manager Manager Manager Staff Staff Staff Staff Staff Staff Staff Staff Staff 5/5/2009 Compiled by: Waleed El-Naggar 21
  • 22. Weak Matrix Organization Chief Executive Functional Functional Functional Manager Manager Manager Staff Staff Staff Project Staff Staff Staff Coordination Staff Staff Staff 5/5/2009 Compiled by: Waleed El-Naggar 22
  • 23. Balanced Matrix Organization Chief Executive Functional Functional Functional Manager Manager Manager Staff Staff Staff Staff Staff Staff Manager Staff Staff 5/5/2009 Compiled by: Waleed El-Naggar 23
  • 24. Strong Matrix Organization Chief Executive Functional Functional Functional Manager of Project Manager Manager Manager Managers Staff Staff Staff Project Manager Staff Staff Staff Project Manager Staff Staff Staff Project Manager 5/5/2009 Compiled by: Waleed El-Naggar 24
  • 25. Organizational Structure Influences Organization Matrix Type Functional Projectized Project Characteristics Weak Matrix Balanced Matrix Strong Matrix Project Manager's High to Almost Little or None Limited Low to Moderate Moderate to High Authority Total High to Almost Resource Availability Little or None Limited Low to Moderate Moderate to High Total Who controls the project Functional Functional Mixed Project Manager Project Manager budget Manager Manager Project Manager's Role Part-time Part-time Full-time Full-time Full-time Project Management Part-time Part-time Part-time Full-time Full-time Administrative Staff 5/5/2009 Compiled by: Waleed El-Naggar 25
  • 26. Advantages/Disadvantages of Organizations I. Functional Organization Grouped by areas of specialization/ functions. Power is with the functional leader.  Advantages: Access to specialists; members reporting to only one supervisor, clearly defined career paths  Disadvantages: less focus on project deliverables, no career path on Project Management, PM has no authority 5/5/2009 Compiled by: Waleed El-Naggar 26
  • 27. Advantages/Disadvantages of Organizations II. Projectized Organization Organization is by projects. Personnel report to PM/has total power.  Advantages: Efficient project organization - Loyalty to the project - effective communications.  Disadvantages: No “home” after the project is completed - duplication of facilities. 5/5/2009 Compiled by: Waleed El-Naggar 27
  • 28. Advantages/Disadvantages of Organizations III. Matrix Organization Power varies between Project & Functional managers according to its type (strong, balanced or weak)  Advantages:  Maximum utilization of scarce resources  Efficient horizontal and vertical dissemination of information  Retention of home after project closure.  Disadvantages:  Different priorities between PM & FM (Conflicts)  Dual reporting  Complex to monitor and control  Duplication of effort 5/5/2009 Compiled by: Waleed El-Naggar 28
  • 29. Balance of Power in an Organization Project Influence in Decision Making Functional Influence in Decision Making Pure Weak Balanced Strong Pure Functional Matrix Matrix Matrix Projectized 5/5/2009 Compiled by: Waleed El-Naggar 29
  • 30. Quiz What type of organization is BEST for managing complex projects involving cross disciplinary efforts? A. Projectized B. Functional C. Line D. Matrix The answer is: D 5/5/2009 Compiled by: Waleed El-Naggar 30
  • 31. Types of Life Cycles  Product Life Cycle  A Project is undertaken to present only one aspect of the Product life cycle.  The product life cycle may be composed of several projects.  Project Management Life Cycle vs. Project Life Cycle:  Project life cycle is customizable for each project; example; e.g. Plan – design – implement – test: in IT projects.  Each step of the Project Life Cycle may contain the whole project management life cycle. 5/5/2009 Compiled by: Waleed El-Naggar 31
  • 32. Project Management Process Groups Monitoring & Controlling Processes Planning Processes Initiating Closing Processes Processes Executing Processes 5/5/2009 Compiled by: Waleed El-Naggar 32
  • 33. Project Management Process Groups  Initiating Process Group  Defines and authorizes the project or a project phase  Planning Process Group  Defines and refines objectives, and plans the course of action required to attain the objectives and scope that the project was undertaken to address  Executing Process Group  Integrates people and other resources to carry out the project management plan for the project  Monitoring and Controlling Process Group  Regularly measures and monitors progress to identify variances from the project management plan so that corrective action can be taken when necessary to meet project objectives  Closing Process Group  Formalizes acceptance of the product, services or result and brings the project or a project phase to an orderly end 5/5/2009 Compiled by: Waleed El-Naggar 33
  • 34. Project Process Group Overlaps 5/5/2009 Compiled by: Waleed El-Naggar 34
  • 35. Project Management Process Groups and Knowledge Areas Mapping 5/5/2009 Compiled by: Waleed El-Naggar 35
  • 36. Quiz The project life cycle is comprised of which of the following? A. Phases B. Milestones C. Estimates D. Activities The answer is: A 5/5/2009 Compiled by: Waleed El-Naggar 36
  • 37. Quiz Of the following, which is the logical order of the project management processes? A. Initiating, planning, controlling, executing, closing B. Planning, initiating, controlling, executing, closing C. Initiating, planning, executing, controlling, closing D. Planning, initiating, executing, closing The answer is: C 5/5/2009 Compiled by: Waleed El-Naggar 37
  • 38. Project Management Institute Founded in 1969, the Project Management Institute (PMI) has grown to be the organization of choice for project management professionals world wide. 200,000 members representing 125 countries Establishes project management standards, provide seminars, educational programs and professional certification. http://www.pmi.org 5/5/2009 Compiled by: Waleed El-Naggar 38
  • 39. Project Management Professional (PMP)  The PMP certification is the most widely recognized and respected certification in the field of project management. The purpose and goal of this certification program is the development, maintenance, evaluation, promotion, and administration of a rigorous, examination-based, professional certification program of the highest caliber.  Worldwide there are over 50,000 PMPs who provide project management services in 26 countries. 5/5/2009 Compiled by: Waleed El-Naggar 39
  • 40. Certification Test Eligibility Requirements Category 1 Category 2 • Baccalaureate/equivalent degree • High School diploma/equivalent degree • Minimum of 4,500 hours of project • Minimum of 7,500 hours of project management experience within the five management experience within the five process groups (Initiation, Planning, process groups (Initiation, Planning, Execution, Control, Closing) Execution, Control, Closing) • 3 years of project management • 5 years of project management experience within the last 6 years (36 experience within the last 8 years (60 months of non-overlapping months of months of non-overlapping months of PM experience). PM experience). • 35 contact hours of project management • 35 contact hours of project management education. education. 5/5/2009 Compiled by: Waleed El-Naggar 40
  • 41. After Passing Examination Each PMP must satisfy the PMI Continuing Certification Requirements Program (formerly called Professional Development Program) in order to maintain the PMP certification.  Attain no less than 60 Professional Development Units (PDUs) within a three-year cycle.  Agree to continue to adhere to PMI’s Professional Code of Conduct. 5/5/2009 Compiled by: Waleed El-Naggar 41
  • 42. PMP Areas Scope Management 14% Time Management 7% Cost Management 7% Quality Management 8% Procurement Management 7% Risk Management 7% HR Management 12% Communications Management 12% Integration Management 12% Professional Responsibility 14% 5/5/2009 Compiled by: Waleed El-Naggar 42
  • 43. PMP Resources Project Management Body of Knowledge (PMBOK) Guide, 4th Edition PMP Exam Prep, 5th Edition by Rita Mulcahy Project Management Professional Study Guide, 5th Edition, Kim Heldman 5/5/2009 Compiled by: Waleed El-Naggar 43
  • 44. Thank You 5/5/2009 Compiled by: Waleed El-Naggar 44