C.V. OF INSTRUMENTATION ERECTION & COMMISSIONING ENGINEER
PROFESSIONAL SNAPSHOT
 11+ years of experience in Process Enhancement, Instrument Installation and Commissioning, Client Servicing.
 Exposure in handling projects for development of new equipment, machinery, etc. including technical calculations,
technology transfer and techno-commercial operations.
 Strong communication and relationship building skills with proficiency in grasping new technical concepts quickly and
utilizing them in an effective manner.
PROFICIENCY MATRIX
 Coordinating activities related to tracking & implementation of project plans within budgets and deadlines.
 Facilitating projects for the set up facilities with accountability for strategic utilization & deployment of available
resources to achieve organizational objectives.
 Identifying cost effective vendors for procurement equipment after determining quality and ensuring adherence to pre-
set standards.
ACHEIVMENT AND HONORS
Participated in hardware contest conducted by ISTE student chapter held at our college.
Participated in National Level Symposium FIESTA held by our College
KNOWLEDGE PURVIEW
 Field Instrument Erection & Commissioning
 Site Management.
 ABB DCS 800xA
 Profibus Communication, Modbus Communication
 UPS and Battery Chargers
 Power Management System
 Fiber optics Communication
 Field Instrument Calibration
 Various Load Center Communications through Fiber Optics.
 Control Valve, ABB Transmitter, Yogokawa Transmitter, Siemens Transmitter.
 CCTV, Fire Alarm system
ORGANISATIONAL EXPERIENCE
KEMCO TECHNOSYS INSTRUMENTAION CO., Doha -Qatar Mar 2014 - Present
ABB, Bangalore - India Dec 2007– Feb 2014
UV Tech, Chennai - India Jun 2004– Nov 2007
KEY DELIVERABLES
Project Management
 Spearheading activities involving working out various requirements & monitoring overall project operations for
ensuring timely completion.
 Managing activities right from the stage of conceptualization stage to execution; including procurement, scheduling,
progress monitoring, vendor co-ordination, site management, man power planning, etc.,
 Coordinating projects for set standards with accountability for strategic utilization & deployment of resources to
achieve organizational goals.
 Highlighting critical areas of progress or delays and ensure actions and pro-active measures are taken to mitigate any
shortcomings.
 Leading, mentoring & monitoring the performance of team members to ensure efficiency in operations.
 Creating and sustaining a dynamic environment that fosters development opportunities and motivates high
performance against team members.
 Preparing and reviewing progress reports on weekly and monthly basis as well as recording and maintaining
documentation as per project requirements.
 Ensuring effective site management and discipline to ensure safe & timely execution of the projects.
Installation, Testing & Commissioning
 Supervise installation, testing and commissioning of equipments for various Instrument projects in Various Plants.
 Study of various Instrumentation (SLD) drawings of the project & suggest for necessary corrections & modifications.
 Arrangement of necessary equipments for the project and getting the equipments calibrated at standard labs.
 Co-ordination with consultants / clients and arranging Site Schedule. Ensure the schedule is followed.
 Carry out pre-commissioning Instrument for the Instrument installations and prepare the reports for the tests carried
out.
 Arrangement for necessary replacements of components / installations if installations do not pass the tests.
PREVIOUS WORK EXPERIENCE
ABB (Mineral/Pulp & Paper/Composite Plant Automation Division), Bangalore - India Dec 2007 – Feb 2014
Engineer – Projects: Worked in the Industrial Automation Division. Involved in Installation, Testing & Commissioning of
Distributed Control System and Erection & Commissioning of Field Instrumentation.
ANNEXURE
Presently involved in Project Engineer for Gulf Chlorine Project as Sub-Contractor to Gulf
Chlorine.
Duration March 14– Present
Client GULF CHLORINE LLC
Role Project Engineer - Instrumentation
Responsibilities: Mainly responsible for Project Coordinator for Instrument Erection & Commissioning.
EPIC for Pulp & Paper Industries in BILT, Ballarpur, MH - India
Duration Feb’ 12 – Feb’ 14
Client BILT, Ballarpur, Maharashtra
Contractor ABB, Bangalore.
Role Instrumentation Dept – Site In charge.
Responsibilities: Mainly responsible for Installation, Testing & Commissioning all field instruments.
 Study of Instrumentation cable tray route drawings of the project & suggest for necessary corrections &
modifications.
 Arrangement of necessary equipments for the project and getting the equipments calibrated at standard labs.
 Co-ordination with consultants / clients and arranging Site Testing Schedule. Ensure the schedule is followed.
 Carry out pre-commissioning tests for the Instrument installations and prepare the reports for the tests carried out.
 Preparation of Instrument List, Instrument Loop Wiring Diagram, Instrument & JB Location, JB wiring Diagram, Cable
schedule.
 In charge of Supervising the Erection and commissioning activities at project site. To Coordinate with Client kick off
meeting, Monthly Progress review meeting, close out report hand over as built documents / drawings, survey changes /
spares etc.
 Supervision of Installation of field instruments, main and secondary cable tray, cables lying and cable termination of
instruments.
 Responsible for reviewing construction drawings such as location drawing, wiring layouts, hook-up connection, P&ID’s typical
installation details, loop diagram, logic diagram, datasheets, etc.
 Organizing and Executing Preventing Maintaining Job.
 Fiber optic communication, Profibus communication, Modbus Communication.
 Establishing communication between MCC and DCS through profibus and troubleshooting.
 Planning, Coordinating, scoping, estimation, tracking, inspection & implementation of project plans within budget and
deadline.
 Involved in cable engineering work, preparation of cable schedule & termination schedule.
 Allocation of controller cards.
 Establishment of optical links between different Load centers.
 I/O Testing, ABB V/F drives Field Instruments (PCS, BDS, ZSS, RTD, Thermocouple, Level Transmitter, Level Switch, SMART
Pressure and Temperature Transmitter, Pressure Switch, Belt Weigh Feeder, solid flow meter) Installation, Commissioning,
and Testing.
 Involved in maintenance and working of I/O panel (ABB), weigh feeder’s (Tran weigh), 2x20 KVA UPS panel (DB power),
Motor control centre (SIEMENS).
EPIC of ACC Cement Plant in Chandrapur, Maharashtra, India.
Duration Mar’11– Dec’11
Client ACC Limited – Holcim Group, India
Contractor ABB
Role Instrumentation Erection & Commissioning Engineer
Responsibilities Mainly responsible for Installation, Testing & commissioning all field instruments.
 Managing project schedules, budgets and permits for operations.
 Supervision & Progress Monitoring of activities carried out at Site.
 Co-ordination with other departments, outside agencies, contractors, consultants & clients for smooth execution of
project.
 Attend weekly meetings with Senior Management to discuss Site problems.
 Preparing and reviewing progress reports on weekly and monthly basis as well as recording and maintaining
documentation as per project requirements.
 Ensure effective site management and discipline to ensure safe & timely execution of the projects.
 Review Consultant’s design & specifications.
 Assisting Engineers in compiling Material Submittals, liaise with Suppliers to ensure compliance with Specifications &
Drawings
 Inspection of all materials and works carried out ensuring operational status as per Consultant’s Requirements &
Specifications.
 Preparation of Instrument List, Instrument Loop Wiring Diagram, Instrument & JB Location, JB wiring Diagram, Cable
Schedule.
 In charge of Supervising the Erection and commissioning activities at project site. To Coordinate with Client kick off meeting,
Monthly Progress review meeting, close out report hand over as built documents / drawings, survey changes / spares etc.
 Supervision of Installation of field instruments, main and secondary cable tray, cables lying and cable termination of
instruments.
 Responsible for reviewing construction drawings such as location drawing, wiring layouts, hook-up connection, P&ID’s typical
installation details, loop diagram, logic diagram, datasheets, etc.
 Organizing and Executing Preventing Maintaining Job.
 Fiber optic communication, Profibus communication, Modbus Communication.
 Establishing communication between MCC and DCS through profibus and troubleshooting.
 Planning, Coordinating, scoping, estimation, tracking, inspection & implementation of project plans within budget and
deadline.
 Involved in cable engineering work, preparation of cable schedule & termination schedule.
 Allocation of controller cards.
 Establishment of optical links between different Load centers.
 I/O Testing, ABB V/F drives Field Instruments (PCS, BDS, ZSS, RTD, Thermocouple, Level Transmitter, Level Switch, SMART
Pressure and Temperature Transmitter, Pressure Switch, Belt Weigh Feeder, solid flow meter) Installation, Commissioning,
and Testing.
 Involved in maintenance and working of I/O panel (ABB), weigh feeder’s (Tran weigh), 2x20 KVA UPS panel (DB power),
Motor control centre (SIEMENS).
 CCTV Commissioning. PA system, Opacity monitor, Girth gear lubrication panel (Lincoln Helios), shell scanner
(Thermotecnix), ABB transmitters (profibus, 4-20mA), Cooler hydraulic system (Polybius).
 Metso Control Valve, Mass flow meter calibration.
 Power Management System (PMS) communication between Different Load centers.
Managing activities pertaining to change orders and contract changes & finalization of requirements, estimates for
smooth execution of projects
EPIC of Prism Cement Plant in Satna, Madhya Pradesh, India.
Duration Mar’10 – Mar’11
Client Prism Cement, India
Contractor ABB
Role Instrumentation Erection & Commissioning Engineer.
Responsibilities Similar to above project.
EPIC of Grasim Cement Plant in Kotputli, Rajasthan, India.
Duration Nov’09 – Mar’10
Client Grasim Cement – Birla Group, India
Contractor ABB
Role Instrumentation Erection & Commissioning Engineer.
Responsibilities Similar to above project
EPIC of ETA – Star Cement LLC, Ras Al Khaima, UAE.
Duration Mar’09 – Oct’09
Client ETA – Star Cement LLC, ETA Group, UAE
Contractor ABB, India
Role Instrumentation Erection & Commissioning Engineer.
Responsibilities Similar to above project
EPIC of Ultra Tech – Ginigera Graining Unit, Karnataka, India.
Duration Aug’08 – Mar’09
Client Ultra Tech – Birla Group, India
Contractor ABB, India
Role Instrumentation Erection & Commissioning Engineer.
Responsibilities Similar to above project
EPIC of Ultra Tech – Ginigera Graining Unit, Karnataka, India.
Duration Dec’07 – Aug’08
Client Ultra Tech – Birla Group, India
Contractor ABB, India
Role Instrumentation Erection & Commissioning Engineer.
Responsibilities Similar to above project.
PLANT : PETROCHEMICAL PLANT
Project : Ethylene Storage Terminal and Marine Facility at Karaikal.
Concern : Ultra Violet Technical Services.
Duration : June 2004 to Nov 2007
Designation : Site Engineer.
Responsibilities
 Managing project schedules, budgets and permits for operations.
 Supervision & Progress Monitoring of activities carried out at Site.
 Co-ordination with other departments, outside agencies, contractors, consultants & clients for smooth execution of
project.
 Attend weekly meetings with Senior Management to discuss Site problems.
 Preparing and reviewing progress reports on weekly and monthly basis as well as recording and maintaining
documentation as per project requirements.
 Time Management, Cable tray work, cable pulling work, job allocation to labors.
 Loop Checking with panels.
 Material Reconciliation report submission to Customers.
CAREER MILESTONES
 Quality check as per drawings and as per site conditions.
 Execution of job as per site requirement.
 Planning and purchasing of material in lots as per site requirement to reduce cost.
 Co ordinate with customer and get site clearance to avoid loss of time and manpower
 Erection billing and Reconciliation for all materials.
ACADEMIC CREDENTIALS
B.E in Electronics and Instrumentation. Oct 2000 – Apr 2004
Monomania Sunderanar University, TN, INDIA 64.21%
Higher Secondary School Education June1999 – April 2000
NLC Boys Higher Secondary School, Neyveli. TN 60.8%
Secondary School Education June 1997 – April 1998
NLC Boys Higher Secondary School, Neyveli. TN 73%
PERSONAL DETAILS
Date of Birth : 25/12/1982
Language Known : Tamil, English & Hindi
Passport Detail : F3928365 (Valid up to 08/07/2015)
I hereby declare that the information furnished above is true to the best my knowledge.
DATE: YOURS TRULY,
PLACE: (BHARATH. V)
NLC Boys Higher Secondary School, Neyveli. TN 60.8%
Secondary School Education June 1997 – April 1998
NLC Boys Higher Secondary School, Neyveli. TN 73%
PERSONAL DETAILS
Date of Birth : 25/12/1982
Language Known : Tamil, English & Hindi
Passport Detail : F3928365 (Valid up to 08/07/2015)
I hereby declare that the information furnished above is true to the best my knowledge.
DATE: YOURS TRULY,
PLACE: (BHARATH. V)

More Related Content

DOCX
JakeA_resume Oct14
DOC
Sr.Mech.Design Engr. 30.03.15
PDF
Pugazhenthi Mathuramuthu CV
PDF
Samir Patil 16 YRs EXP
PDF
KINGSLY M PIPING-PROJECT CV ABD
PDF
Jaime_Navarro_Resume
DOC
Planning Engineer _CV
DOC
Jaime_Navarro_Resume
JakeA_resume Oct14
Sr.Mech.Design Engr. 30.03.15
Pugazhenthi Mathuramuthu CV
Samir Patil 16 YRs EXP
KINGSLY M PIPING-PROJECT CV ABD
Jaime_Navarro_Resume
Planning Engineer _CV
Jaime_Navarro_Resume

What's hot (19)

DOCX
Cv s.sankarasubramanian - senior planning engineer
DOCX
fac mgt 2016
DOCX
Aftab resume
DOCX
Srinivaskumar_cv_16
DOC
Dale Buzzelli Resume
PDF
Shrikant Kathale-Design Engineer CV (8 Years Exp.)
DOCX
Project Engineer 3
DOC
Mailhot Resume_2016
PDF
CV_Amit Ghule
DOCX
Tony resume 30 jan16
PDF
Bill resume
PDF
CV - Kelum Hemka Siriwardhena
PDF
CV-Sidharth Sunny- Project Engineer
DOC
Mahmood Ibrahim Mansoor - Resume - Final 2
DOCX
Ketan's resume
DOCX
SNeshevich_2016
DOC
joseph_resume UPDATED 08192015
PDF
Resume - MOSTAFA SAYED (C.V)
Cv s.sankarasubramanian - senior planning engineer
fac mgt 2016
Aftab resume
Srinivaskumar_cv_16
Dale Buzzelli Resume
Shrikant Kathale-Design Engineer CV (8 Years Exp.)
Project Engineer 3
Mailhot Resume_2016
CV_Amit Ghule
Tony resume 30 jan16
Bill resume
CV - Kelum Hemka Siriwardhena
CV-Sidharth Sunny- Project Engineer
Mahmood Ibrahim Mansoor - Resume - Final 2
Ketan's resume
SNeshevich_2016
joseph_resume UPDATED 08192015
Resume - MOSTAFA SAYED (C.V)
Ad

Similar to 11 year Exp in Instrumentation Field. (20)

PDF
DOC
vijins new-11-2016
DOC
Selvakumar Resume
PDF
DIPESH KUMAR
PDF
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071
DOC
Resume raj bharath be
DOC
Sourav chakraborty
DOC
Instrumentation Engineer Resume
DOCX
roshan-CV1
DOC
Sr Lead Engineer - Instrumentation & control
DOCX
M.Nouman Aramco Format CV
PDF
Ahmed Fahmy_CV
PDF
Electrical Engineer cv.PDF
PDF
DOC
Ayush_IE
DOC
Rameshrajagopal (1)
PDF
Mohamed Mady C
DOCX
Instrumentation Design Engineer
vijins new-11-2016
Selvakumar Resume
DIPESH KUMAR
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071
Resume raj bharath be
Sourav chakraborty
Instrumentation Engineer Resume
roshan-CV1
Sr Lead Engineer - Instrumentation & control
M.Nouman Aramco Format CV
Ahmed Fahmy_CV
Electrical Engineer cv.PDF
Ayush_IE
Rameshrajagopal (1)
Mohamed Mady C
Instrumentation Design Engineer
Ad

11 year Exp in Instrumentation Field.

  • 1. BHARATH.V bharathshabi@gmail.com C.9 UNITED INDIA COMPLEX, SIR AUROBINDO STREET, BLOCK-19, NEYVELI – 607803. TN, INDIA. MOBILE NO: +91-9841913267 Qatar: 00974-30362814 shabi_sss@yahoo.co.in C.V. OF INSTRUMENTATION ERECTION & COMMISSIONING ENGINEER PROFESSIONAL SNAPSHOT  11+ years of experience in Process Enhancement, Instrument Installation and Commissioning, Client Servicing.  Exposure in handling projects for development of new equipment, machinery, etc. including technical calculations, technology transfer and techno-commercial operations.  Strong communication and relationship building skills with proficiency in grasping new technical concepts quickly and utilizing them in an effective manner. PROFICIENCY MATRIX  Coordinating activities related to tracking & implementation of project plans within budgets and deadlines.  Facilitating projects for the set up facilities with accountability for strategic utilization & deployment of available resources to achieve organizational objectives.  Identifying cost effective vendors for procurement equipment after determining quality and ensuring adherence to pre- set standards. ACHEIVMENT AND HONORS Participated in hardware contest conducted by ISTE student chapter held at our college. Participated in National Level Symposium FIESTA held by our College KNOWLEDGE PURVIEW  Field Instrument Erection & Commissioning  Site Management.  ABB DCS 800xA  Profibus Communication, Modbus Communication  UPS and Battery Chargers  Power Management System  Fiber optics Communication  Field Instrument Calibration  Various Load Center Communications through Fiber Optics.  Control Valve, ABB Transmitter, Yogokawa Transmitter, Siemens Transmitter.
  • 2.  CCTV, Fire Alarm system ORGANISATIONAL EXPERIENCE KEMCO TECHNOSYS INSTRUMENTAION CO., Doha -Qatar Mar 2014 - Present ABB, Bangalore - India Dec 2007– Feb 2014 UV Tech, Chennai - India Jun 2004– Nov 2007 KEY DELIVERABLES Project Management  Spearheading activities involving working out various requirements & monitoring overall project operations for ensuring timely completion.  Managing activities right from the stage of conceptualization stage to execution; including procurement, scheduling, progress monitoring, vendor co-ordination, site management, man power planning, etc.,  Coordinating projects for set standards with accountability for strategic utilization & deployment of resources to achieve organizational goals.  Highlighting critical areas of progress or delays and ensure actions and pro-active measures are taken to mitigate any shortcomings.  Leading, mentoring & monitoring the performance of team members to ensure efficiency in operations.  Creating and sustaining a dynamic environment that fosters development opportunities and motivates high performance against team members.  Preparing and reviewing progress reports on weekly and monthly basis as well as recording and maintaining documentation as per project requirements.  Ensuring effective site management and discipline to ensure safe & timely execution of the projects. Installation, Testing & Commissioning  Supervise installation, testing and commissioning of equipments for various Instrument projects in Various Plants.  Study of various Instrumentation (SLD) drawings of the project & suggest for necessary corrections & modifications.  Arrangement of necessary equipments for the project and getting the equipments calibrated at standard labs.  Co-ordination with consultants / clients and arranging Site Schedule. Ensure the schedule is followed.  Carry out pre-commissioning Instrument for the Instrument installations and prepare the reports for the tests carried out.  Arrangement for necessary replacements of components / installations if installations do not pass the tests. PREVIOUS WORK EXPERIENCE ABB (Mineral/Pulp & Paper/Composite Plant Automation Division), Bangalore - India Dec 2007 – Feb 2014 Engineer – Projects: Worked in the Industrial Automation Division. Involved in Installation, Testing & Commissioning of Distributed Control System and Erection & Commissioning of Field Instrumentation. ANNEXURE Presently involved in Project Engineer for Gulf Chlorine Project as Sub-Contractor to Gulf Chlorine. Duration March 14– Present Client GULF CHLORINE LLC Role Project Engineer - Instrumentation Responsibilities: Mainly responsible for Project Coordinator for Instrument Erection & Commissioning. EPIC for Pulp & Paper Industries in BILT, Ballarpur, MH - India Duration Feb’ 12 – Feb’ 14 Client BILT, Ballarpur, Maharashtra Contractor ABB, Bangalore. Role Instrumentation Dept – Site In charge. Responsibilities: Mainly responsible for Installation, Testing & Commissioning all field instruments.  Study of Instrumentation cable tray route drawings of the project & suggest for necessary corrections & modifications.  Arrangement of necessary equipments for the project and getting the equipments calibrated at standard labs.  Co-ordination with consultants / clients and arranging Site Testing Schedule. Ensure the schedule is followed.  Carry out pre-commissioning tests for the Instrument installations and prepare the reports for the tests carried out.
  • 3.  Preparation of Instrument List, Instrument Loop Wiring Diagram, Instrument & JB Location, JB wiring Diagram, Cable schedule.  In charge of Supervising the Erection and commissioning activities at project site. To Coordinate with Client kick off meeting, Monthly Progress review meeting, close out report hand over as built documents / drawings, survey changes / spares etc.  Supervision of Installation of field instruments, main and secondary cable tray, cables lying and cable termination of instruments.  Responsible for reviewing construction drawings such as location drawing, wiring layouts, hook-up connection, P&ID’s typical installation details, loop diagram, logic diagram, datasheets, etc.  Organizing and Executing Preventing Maintaining Job.  Fiber optic communication, Profibus communication, Modbus Communication.  Establishing communication between MCC and DCS through profibus and troubleshooting.  Planning, Coordinating, scoping, estimation, tracking, inspection & implementation of project plans within budget and deadline.  Involved in cable engineering work, preparation of cable schedule & termination schedule.  Allocation of controller cards.  Establishment of optical links between different Load centers.  I/O Testing, ABB V/F drives Field Instruments (PCS, BDS, ZSS, RTD, Thermocouple, Level Transmitter, Level Switch, SMART Pressure and Temperature Transmitter, Pressure Switch, Belt Weigh Feeder, solid flow meter) Installation, Commissioning, and Testing.  Involved in maintenance and working of I/O panel (ABB), weigh feeder’s (Tran weigh), 2x20 KVA UPS panel (DB power), Motor control centre (SIEMENS). EPIC of ACC Cement Plant in Chandrapur, Maharashtra, India. Duration Mar’11– Dec’11 Client ACC Limited – Holcim Group, India Contractor ABB Role Instrumentation Erection & Commissioning Engineer Responsibilities Mainly responsible for Installation, Testing & commissioning all field instruments.  Managing project schedules, budgets and permits for operations.  Supervision & Progress Monitoring of activities carried out at Site.  Co-ordination with other departments, outside agencies, contractors, consultants & clients for smooth execution of project.  Attend weekly meetings with Senior Management to discuss Site problems.  Preparing and reviewing progress reports on weekly and monthly basis as well as recording and maintaining documentation as per project requirements.  Ensure effective site management and discipline to ensure safe & timely execution of the projects.  Review Consultant’s design & specifications.  Assisting Engineers in compiling Material Submittals, liaise with Suppliers to ensure compliance with Specifications & Drawings  Inspection of all materials and works carried out ensuring operational status as per Consultant’s Requirements & Specifications.  Preparation of Instrument List, Instrument Loop Wiring Diagram, Instrument & JB Location, JB wiring Diagram, Cable Schedule.  In charge of Supervising the Erection and commissioning activities at project site. To Coordinate with Client kick off meeting, Monthly Progress review meeting, close out report hand over as built documents / drawings, survey changes / spares etc.  Supervision of Installation of field instruments, main and secondary cable tray, cables lying and cable termination of instruments.  Responsible for reviewing construction drawings such as location drawing, wiring layouts, hook-up connection, P&ID’s typical installation details, loop diagram, logic diagram, datasheets, etc.  Organizing and Executing Preventing Maintaining Job.  Fiber optic communication, Profibus communication, Modbus Communication.  Establishing communication between MCC and DCS through profibus and troubleshooting.  Planning, Coordinating, scoping, estimation, tracking, inspection & implementation of project plans within budget and deadline.  Involved in cable engineering work, preparation of cable schedule & termination schedule.  Allocation of controller cards.  Establishment of optical links between different Load centers.  I/O Testing, ABB V/F drives Field Instruments (PCS, BDS, ZSS, RTD, Thermocouple, Level Transmitter, Level Switch, SMART Pressure and Temperature Transmitter, Pressure Switch, Belt Weigh Feeder, solid flow meter) Installation, Commissioning, and Testing.  Involved in maintenance and working of I/O panel (ABB), weigh feeder’s (Tran weigh), 2x20 KVA UPS panel (DB power), Motor control centre (SIEMENS).
  • 4.  CCTV Commissioning. PA system, Opacity monitor, Girth gear lubrication panel (Lincoln Helios), shell scanner (Thermotecnix), ABB transmitters (profibus, 4-20mA), Cooler hydraulic system (Polybius).  Metso Control Valve, Mass flow meter calibration.  Power Management System (PMS) communication between Different Load centers. Managing activities pertaining to change orders and contract changes & finalization of requirements, estimates for smooth execution of projects EPIC of Prism Cement Plant in Satna, Madhya Pradesh, India. Duration Mar’10 – Mar’11 Client Prism Cement, India Contractor ABB Role Instrumentation Erection & Commissioning Engineer. Responsibilities Similar to above project. EPIC of Grasim Cement Plant in Kotputli, Rajasthan, India. Duration Nov’09 – Mar’10 Client Grasim Cement – Birla Group, India Contractor ABB Role Instrumentation Erection & Commissioning Engineer. Responsibilities Similar to above project EPIC of ETA – Star Cement LLC, Ras Al Khaima, UAE. Duration Mar’09 – Oct’09 Client ETA – Star Cement LLC, ETA Group, UAE Contractor ABB, India Role Instrumentation Erection & Commissioning Engineer. Responsibilities Similar to above project EPIC of Ultra Tech – Ginigera Graining Unit, Karnataka, India. Duration Aug’08 – Mar’09 Client Ultra Tech – Birla Group, India Contractor ABB, India Role Instrumentation Erection & Commissioning Engineer. Responsibilities Similar to above project EPIC of Ultra Tech – Ginigera Graining Unit, Karnataka, India. Duration Dec’07 – Aug’08 Client Ultra Tech – Birla Group, India Contractor ABB, India Role Instrumentation Erection & Commissioning Engineer. Responsibilities Similar to above project. PLANT : PETROCHEMICAL PLANT Project : Ethylene Storage Terminal and Marine Facility at Karaikal. Concern : Ultra Violet Technical Services. Duration : June 2004 to Nov 2007 Designation : Site Engineer. Responsibilities  Managing project schedules, budgets and permits for operations.  Supervision & Progress Monitoring of activities carried out at Site.  Co-ordination with other departments, outside agencies, contractors, consultants & clients for smooth execution of project.  Attend weekly meetings with Senior Management to discuss Site problems.  Preparing and reviewing progress reports on weekly and monthly basis as well as recording and maintaining documentation as per project requirements.  Time Management, Cable tray work, cable pulling work, job allocation to labors.  Loop Checking with panels.  Material Reconciliation report submission to Customers. CAREER MILESTONES  Quality check as per drawings and as per site conditions.  Execution of job as per site requirement.  Planning and purchasing of material in lots as per site requirement to reduce cost.  Co ordinate with customer and get site clearance to avoid loss of time and manpower  Erection billing and Reconciliation for all materials. ACADEMIC CREDENTIALS B.E in Electronics and Instrumentation. Oct 2000 – Apr 2004 Monomania Sunderanar University, TN, INDIA 64.21% Higher Secondary School Education June1999 – April 2000
  • 5. NLC Boys Higher Secondary School, Neyveli. TN 60.8% Secondary School Education June 1997 – April 1998 NLC Boys Higher Secondary School, Neyveli. TN 73% PERSONAL DETAILS Date of Birth : 25/12/1982 Language Known : Tamil, English & Hindi Passport Detail : F3928365 (Valid up to 08/07/2015) I hereby declare that the information furnished above is true to the best my knowledge. DATE: YOURS TRULY, PLACE: (BHARATH. V)
  • 6. NLC Boys Higher Secondary School, Neyveli. TN 60.8% Secondary School Education June 1997 – April 1998 NLC Boys Higher Secondary School, Neyveli. TN 73% PERSONAL DETAILS Date of Birth : 25/12/1982 Language Known : Tamil, English & Hindi Passport Detail : F3928365 (Valid up to 08/07/2015) I hereby declare that the information furnished above is true to the best my knowledge. DATE: YOURS TRULY, PLACE: (BHARATH. V)