Page 1 of 6
CURRICULUM VITAE
MOHAMED MOHAMED IBRAHIM MADY
PERSONAL DETAILS
GSM: +201065805647
Telephone: +20402672631
Email: moh_madi89@yahoo.com
Address: Qotour –Gharbeya- Egypt
Nationality: Egyptian
Marital status: Married
JOB TITLE :- Electrical & Instrumentation Engineer
CAREER OBJECTIVE
Seeking a challenging and interesting job in Electrical & Instrumentation QC,
construction and pre commissioning in power plants, oil/gas or petrochemical where
my talent, skills, experience, and stamina can be utilized and to allow me the
opportunity for continue growth.
EDUCATION
Aug.2009: BSc. Of Electrical Power Engineering –Tanta University.
MEMBERSHIP OF PROFESSIONAL ORGANIZATION
Egyptian Syndicate Professional Engineers.
EXPERIENCE
ELECTRICAL & INSTRUMENTATION CONSTRUCTION RESPONSIBILTIES:-
Total Experience 7 Years 9 Projects. (Refinery Project, BOP, Ethylene, 2 Units
Ansaldo Gas Turbines, GIS substation and Steam Turbine), I am Ready to work
inside & outside my country.
Responsible for field construction operations and coordination of works
associated with the Electrical & instrumentation scope on site and other discipline
works as may be assigned.
Provide input to quantity tracking application and report weekly installed
quantities to Project Controls.
Ensures that local and national safety and environmental codes, requirements
and standards are being complied with within assigned area of responsibility to
Page 2 of 6
ensures the Zero Accident Philosophy is incorporated into every aspect of
construction operations. Actively participates in scheduled safety meetings.
Ensures the most current design document is used to complete the work and that
all design changes are approved prior to implementation.
Ensure contractors and subcontractors have developed work packs in conjunction
with Field Engineering.
Implements and supports the Contractor daily interaction in Pre-Start, Safety
Inspections, Behavior Based Safety (BBS) and weekly toolbox forums.
Supervision the electrical & instrumentation erection activities for gas turbine
(Generator & turbine works, auxiliary skids and air intake)
Installation Supervision for fire detection system as heat detectors, fire detectors
UV/IR, manual call Station, Beacon/strobe light, gas detectors, linear HD,HSSD
CO2 andFM200 system.
Installation Supervision for PAGA, CCTV, Radio, TELE, Access and LAN systems.
Supervision the electrical & instrumentation erection activities for BOP ( Main
steam system ,Feed water system, Closed cooling, services water , lube oil ,
control oil , firefighting , water treatment )
Supervision the electrical & instrumentation erection for Equipment's (pumps,
heat Exchangers, compressors, Heaters )
Supervision the electrical & instrumentation erection for Hydrogen Generation
Building.
Calibration, Installation and testing Supervision for all Detectors, Transmitters,
Control Switch’s, Control Valves and Gauges used in process measurements.
Installation Supervision for impulse tubing for all instruments, sampling system
and air lines.
Supervision of hydro & Pneumatic pressure tests for tubing.
Installation & Testing Supervision for Power transformer, NER, Bus duct, GCB,
(metal clad& GIS) switch gear, MCC, Load center, lighting, UPS system
(Batteries, Charger, Inverter and distribution panels), Cable trays, Conduits,
Inst. Racks, Stanchions & supports mounted, JB’s, DCS, ESD cabinets ,.. etc.
Installation & Testing Supervision Steam Tracing works.
Supervision for electrical & Instrumentation Cables laying, connections,
Continuity, Insulation resistance, Hipot and loop check.
Create confined space, cold & hot work permit for activity work.
Verify manpower daily reports & evaluation for activity, attendance, progress &
quality of work.
ELECTRICAL & INSTRUMENTATION QC RESPONSIBILTIES:-
Conduct inspection for all abovementioned activities in ELECTRICAL
&INSTRUMENTATION CONSTRUCTION RESPONSIBILTIES.
Conduct inspection of raw materials, bought out items and review of Material
Test Certificates (MTC) and the specification requirements.
Page 3 of 6
Verify all the received equipment’s and materials to be as the approved
drawings and data sheets (MRR).
Checking delivered materials/ equipment, ensuring all materials is furnished as
required by plant design and in accordance with specification.
Interface and coordinate with clients for QC matters and coordinate with third
party inspection agencies for all related inspection activities.
Prepare Quality Control procedures/work instruction, Method of Statement,
ITP (Inspection Test Plans) according to project/ client requirements and
follow-up for its approval and monitor the implementation.
Plan and supervise Subcontractor inspection activities and reviews of Sub-
Contractor QC performance.
Supervise subcontractor staff for reporting, recording and inspection activities.
Preparation of final QC dossier for handing over to the client and maintain
proper filling system (as per organization procedure) with full traceability for
retrieving the document (TOAC,CCC).
Have a proactive approach in problem solving.
Plan, technical supports & arrangement documents drawings, materials, and
tools for construction work of electrical & instrumentation activities.
Supervise the installation work on daily basis to confirm that the installation
works is matching with the project schedule and the safety rules.
Coordination & technical support with another construction departments.
Attending daily/weekly meeting with the client and contractors regarding to
work progress.
Co-ordinate with the engineering regarding to the missing and/or new
required wiring modification.
Support the Commissioning & Startup Team working.
Trouble Shooting Fixing during the Commissioning and Startup work period
Follow up & Close NCR, OR and punch list items.
Tracking all activates, process and non-process systems and subsystems
through ICON and UNICCS systems.
Projects Experience Names
Form Dec 2015 till now Electrical & Instrumentation QC Engineer
Company GS Engineering & Construction Corporation, SEOUL, KOREA
Project ERC Refinery Project; Mostorod, Arab Republic of Egypt
Consultant Worley Parsons
Client Egyptian Refining Company (TAKRIR) S.A.E.
Contractor GS Engineering & Construction Corporation, SEOUL, KOREA
Form Sept 2015 till Dec 2015 Instrumentation QC Engineer
Page 4 of 6
Company JV (TOYO & ENPPI).
Project ETHYDCO ETHYLENE PROJECT-Ameriya-ALEX-Egypt
Client ETHYDCO
Contractor JV (TOYO & ENPPI).
Form May 2015 till Sept 2015 Electrical & Instrumentation Engineer
Company PSP ELSWEDEY
Project Mahmoudia 320MW Simple cycle GAS TURBINE fast track PPT -Egypt.
Owner Cairo Electricity Production Company (CEPC)
Contractor PSP ELSWEDEY
Form OCT 2014 till May 2015 Instrumentation QC Engineer
Company PETROJET (Petroleum Projects and Technical Construction Co.)
Project ETHYDCO ETHYLENE PROJECT-Ameriya-ALEX-Egypt
Client ETHYDCO
Contractor JV (TOYO & ENPPI).
From FEB 2014 till OCT 2014 Site Electrical & Instrumentation
Engineer
Company DOOSAN Heavy Industries, Seoul, Korea
Project El Ain EL Sokhna Supercritical Thermal Power Plant 2*650 MW
Contract CP-105
Owner Cairo Electricity Production Company (CEPC)
Consultant Power Generation Engineering and service Company (PGESCO)
Contractor DOOSAN Heavy Industries, Seoul, Korea
From June 2012 till Jan 2014 Site Electrical & Instrumentation
Engineer
Company YOUNGJIN, Korea
Project El Ain EL Sokhna Supercritical Thermal Power Plant 2*650 MW.
Contract CP-105
Owner Cairo Electricity Production Company (CEPC)
Consultant Power Generation Engineering and service Company (PGESCO)
Contractor DOOSAN Heavy Industries, Seoul, Korea
Page 5 of 6
From Feb 2012 till June 2012 Site Electrical & Instrumentation
Engineer
Company Electro thrawat
Project El Ain EL Sokhna Supercritical Thermal Power Plant 2*650 MW.
Contract CP-117
Owner Cairo Electricity Production Company (CEPC)
Consultant Power Generation Engineering and service Company (PGESCO)
Contractor Electro thrawat
From Jan 2012 till Feb 2012 Site Electrical Engineer
Company PSP ELSWEDEY
Project El Ezz El Dekhela steel company GIS Substation-ALEX-Egypt
Owner El Ezz El Dekhela steel company
Consultant Toshiba-China
Contractor PSP ELSWEDEY
From May 2010 till Jan 2012 Site Electrical Engineer
Company Electro thrawat
Project Abo Qir Thermal Power Plant 2*650 MW.
Contract CP-117
Owner Cairo Electricity Production Company (CEPC)
Consultant Power Generation Engineering and service Company (PGESCO)
Contractor Electro thrawat
From Aug. 2009 till April 2010 Maintenance Engineer
Company Techno Power
LANGUAGE SKILLS
English: Very good writing and speaking.
Arabic is the native language.
COMPUTER SKILLS
Very good at using Microsoft Office (Word, Excel, PowerPoint, Outlook) and
familiar with the Web using.
Good at using AutoCAD Program ( 2D &3D)
Page 6 of 6
HIGHLIGHTS OF QUALIFICATIONS AND SKILLS
Open-minded, ambitious, hard worker and optimistic.
Knowledge of supervisory functions relating to field activities.
Self-motivated, dependable and goal oriented
Skill in oral and written communications.
Commitment to the Project’s ethical standards.
Commitment to the Project’s quality standards.
Have the ability to work individually and as a co-operative team member.
Have the ability to work on plans, deadlines, targets and quotas.
Excellent communication skills and very good presentation skills.
&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&
REFERENCES FURNISHED UPON REQUEST
Finally,hoping that my C.V meets your requirements and acceptance with promise of
progress.

More Related Content

DOC
Deepak Resume
PDF
THOWFIC AHAMED CV
DOC
Merrit CV
DOCX
Cv electrical
DOCX
Harish_QA_QC_Engineer_resume
DOCX
CV Muhammed Salahuddeen, Fire Protection Engineer
DOCX
RA CV Current
DOC
Mushtaq Electrical_ENGINEER 2016
Deepak Resume
THOWFIC AHAMED CV
Merrit CV
Cv electrical
Harish_QA_QC_Engineer_resume
CV Muhammed Salahuddeen, Fire Protection Engineer
RA CV Current
Mushtaq Electrical_ENGINEER 2016

What's hot (18)

DOCX
Resume of Kaptan Singh new
PDF
MEP engineer CV
DOCX
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
DOCX
Kareem cv updated
DOC
SAGAR RESUME
DOCX
FILTHER RIEOALEX
DOCX
HVAC Engineer Resume
PDF
Sameh Hassan Aly Detailed CV2
DOCX
Brad_Bridgers-_I&E1
DOC
Electrical QA QC Engineer
DOC
DOC
Mohamed_Quandeel_Quandeel
DOC
Resume - Electrical Engineer (MEP) 9+ Years Exp
DOC
MEP ENGINEER CV HABEEB OMER
PDF
Senior MEP Engineer_Hossam Abdel Fattah TAG ELDIN
DOCX
DOC
MOHAN M&E SUPERVISOR CV
DOCX
syed Raza _CV
Resume of Kaptan Singh new
MEP engineer CV
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
Kareem cv updated
SAGAR RESUME
FILTHER RIEOALEX
HVAC Engineer Resume
Sameh Hassan Aly Detailed CV2
Brad_Bridgers-_I&E1
Electrical QA QC Engineer
Mohamed_Quandeel_Quandeel
Resume - Electrical Engineer (MEP) 9+ Years Exp
MEP ENGINEER CV HABEEB OMER
Senior MEP Engineer_Hossam Abdel Fattah TAG ELDIN
MOHAN M&E SUPERVISOR CV
syed Raza _CV
Ad

Similar to Mohamed Mady C (20)

DOCX
roshan-CV1
DOCX
mubashir Electrical engineer
DOC
resume_milind___3_
PDF
Eng.M.Sallam
PDF
MANSOOR_ALI_CV -QA QC
DOC
shahbaz alam
DOCX
Jigar naik cv(e & i) engineer
PDF
MostafaFahimHamdy25.7.2016
DOCX
Mn cv (777)
DOCX
M.A.Zakout Resume_11_5_2015
DOC
Electrical Inspector CV
PDF
Electrical Engineer cv.PDF
DOCX
CV Mahboob Updated 24.10.15
DOC
Jamal_Ashraf -1 oil@gas
PDF
khaled.elhag CV
DOCX
Tamil E&I Compex inspector
DOC
CV Electrical QA QC Engineer
roshan-CV1
mubashir Electrical engineer
resume_milind___3_
Eng.M.Sallam
MANSOOR_ALI_CV -QA QC
shahbaz alam
Jigar naik cv(e & i) engineer
MostafaFahimHamdy25.7.2016
Mn cv (777)
M.A.Zakout Resume_11_5_2015
Electrical Inspector CV
Electrical Engineer cv.PDF
CV Mahboob Updated 24.10.15
Jamal_Ashraf -1 oil@gas
khaled.elhag CV
Tamil E&I Compex inspector
CV Electrical QA QC Engineer
Ad

Mohamed Mady C

  • 1. Page 1 of 6 CURRICULUM VITAE MOHAMED MOHAMED IBRAHIM MADY PERSONAL DETAILS GSM: +201065805647 Telephone: +20402672631 Email: moh_madi89@yahoo.com Address: Qotour –Gharbeya- Egypt Nationality: Egyptian Marital status: Married JOB TITLE :- Electrical & Instrumentation Engineer CAREER OBJECTIVE Seeking a challenging and interesting job in Electrical & Instrumentation QC, construction and pre commissioning in power plants, oil/gas or petrochemical where my talent, skills, experience, and stamina can be utilized and to allow me the opportunity for continue growth. EDUCATION Aug.2009: BSc. Of Electrical Power Engineering –Tanta University. MEMBERSHIP OF PROFESSIONAL ORGANIZATION Egyptian Syndicate Professional Engineers. EXPERIENCE ELECTRICAL & INSTRUMENTATION CONSTRUCTION RESPONSIBILTIES:- Total Experience 7 Years 9 Projects. (Refinery Project, BOP, Ethylene, 2 Units Ansaldo Gas Turbines, GIS substation and Steam Turbine), I am Ready to work inside & outside my country. Responsible for field construction operations and coordination of works associated with the Electrical & instrumentation scope on site and other discipline works as may be assigned. Provide input to quantity tracking application and report weekly installed quantities to Project Controls. Ensures that local and national safety and environmental codes, requirements and standards are being complied with within assigned area of responsibility to
  • 2. Page 2 of 6 ensures the Zero Accident Philosophy is incorporated into every aspect of construction operations. Actively participates in scheduled safety meetings. Ensures the most current design document is used to complete the work and that all design changes are approved prior to implementation. Ensure contractors and subcontractors have developed work packs in conjunction with Field Engineering. Implements and supports the Contractor daily interaction in Pre-Start, Safety Inspections, Behavior Based Safety (BBS) and weekly toolbox forums. Supervision the electrical & instrumentation erection activities for gas turbine (Generator & turbine works, auxiliary skids and air intake) Installation Supervision for fire detection system as heat detectors, fire detectors UV/IR, manual call Station, Beacon/strobe light, gas detectors, linear HD,HSSD CO2 andFM200 system. Installation Supervision for PAGA, CCTV, Radio, TELE, Access and LAN systems. Supervision the electrical & instrumentation erection activities for BOP ( Main steam system ,Feed water system, Closed cooling, services water , lube oil , control oil , firefighting , water treatment ) Supervision the electrical & instrumentation erection for Equipment's (pumps, heat Exchangers, compressors, Heaters ) Supervision the electrical & instrumentation erection for Hydrogen Generation Building. Calibration, Installation and testing Supervision for all Detectors, Transmitters, Control Switch’s, Control Valves and Gauges used in process measurements. Installation Supervision for impulse tubing for all instruments, sampling system and air lines. Supervision of hydro & Pneumatic pressure tests for tubing. Installation & Testing Supervision for Power transformer, NER, Bus duct, GCB, (metal clad& GIS) switch gear, MCC, Load center, lighting, UPS system (Batteries, Charger, Inverter and distribution panels), Cable trays, Conduits, Inst. Racks, Stanchions & supports mounted, JB’s, DCS, ESD cabinets ,.. etc. Installation & Testing Supervision Steam Tracing works. Supervision for electrical & Instrumentation Cables laying, connections, Continuity, Insulation resistance, Hipot and loop check. Create confined space, cold & hot work permit for activity work. Verify manpower daily reports & evaluation for activity, attendance, progress & quality of work. ELECTRICAL & INSTRUMENTATION QC RESPONSIBILTIES:- Conduct inspection for all abovementioned activities in ELECTRICAL &INSTRUMENTATION CONSTRUCTION RESPONSIBILTIES. Conduct inspection of raw materials, bought out items and review of Material Test Certificates (MTC) and the specification requirements.
  • 3. Page 3 of 6 Verify all the received equipment’s and materials to be as the approved drawings and data sheets (MRR). Checking delivered materials/ equipment, ensuring all materials is furnished as required by plant design and in accordance with specification. Interface and coordinate with clients for QC matters and coordinate with third party inspection agencies for all related inspection activities. Prepare Quality Control procedures/work instruction, Method of Statement, ITP (Inspection Test Plans) according to project/ client requirements and follow-up for its approval and monitor the implementation. Plan and supervise Subcontractor inspection activities and reviews of Sub- Contractor QC performance. Supervise subcontractor staff for reporting, recording and inspection activities. Preparation of final QC dossier for handing over to the client and maintain proper filling system (as per organization procedure) with full traceability for retrieving the document (TOAC,CCC). Have a proactive approach in problem solving. Plan, technical supports & arrangement documents drawings, materials, and tools for construction work of electrical & instrumentation activities. Supervise the installation work on daily basis to confirm that the installation works is matching with the project schedule and the safety rules. Coordination & technical support with another construction departments. Attending daily/weekly meeting with the client and contractors regarding to work progress. Co-ordinate with the engineering regarding to the missing and/or new required wiring modification. Support the Commissioning & Startup Team working. Trouble Shooting Fixing during the Commissioning and Startup work period Follow up & Close NCR, OR and punch list items. Tracking all activates, process and non-process systems and subsystems through ICON and UNICCS systems. Projects Experience Names Form Dec 2015 till now Electrical & Instrumentation QC Engineer Company GS Engineering & Construction Corporation, SEOUL, KOREA Project ERC Refinery Project; Mostorod, Arab Republic of Egypt Consultant Worley Parsons Client Egyptian Refining Company (TAKRIR) S.A.E. Contractor GS Engineering & Construction Corporation, SEOUL, KOREA Form Sept 2015 till Dec 2015 Instrumentation QC Engineer
  • 4. Page 4 of 6 Company JV (TOYO & ENPPI). Project ETHYDCO ETHYLENE PROJECT-Ameriya-ALEX-Egypt Client ETHYDCO Contractor JV (TOYO & ENPPI). Form May 2015 till Sept 2015 Electrical & Instrumentation Engineer Company PSP ELSWEDEY Project Mahmoudia 320MW Simple cycle GAS TURBINE fast track PPT -Egypt. Owner Cairo Electricity Production Company (CEPC) Contractor PSP ELSWEDEY Form OCT 2014 till May 2015 Instrumentation QC Engineer Company PETROJET (Petroleum Projects and Technical Construction Co.) Project ETHYDCO ETHYLENE PROJECT-Ameriya-ALEX-Egypt Client ETHYDCO Contractor JV (TOYO & ENPPI). From FEB 2014 till OCT 2014 Site Electrical & Instrumentation Engineer Company DOOSAN Heavy Industries, Seoul, Korea Project El Ain EL Sokhna Supercritical Thermal Power Plant 2*650 MW Contract CP-105 Owner Cairo Electricity Production Company (CEPC) Consultant Power Generation Engineering and service Company (PGESCO) Contractor DOOSAN Heavy Industries, Seoul, Korea From June 2012 till Jan 2014 Site Electrical & Instrumentation Engineer Company YOUNGJIN, Korea Project El Ain EL Sokhna Supercritical Thermal Power Plant 2*650 MW. Contract CP-105 Owner Cairo Electricity Production Company (CEPC) Consultant Power Generation Engineering and service Company (PGESCO) Contractor DOOSAN Heavy Industries, Seoul, Korea
  • 5. Page 5 of 6 From Feb 2012 till June 2012 Site Electrical & Instrumentation Engineer Company Electro thrawat Project El Ain EL Sokhna Supercritical Thermal Power Plant 2*650 MW. Contract CP-117 Owner Cairo Electricity Production Company (CEPC) Consultant Power Generation Engineering and service Company (PGESCO) Contractor Electro thrawat From Jan 2012 till Feb 2012 Site Electrical Engineer Company PSP ELSWEDEY Project El Ezz El Dekhela steel company GIS Substation-ALEX-Egypt Owner El Ezz El Dekhela steel company Consultant Toshiba-China Contractor PSP ELSWEDEY From May 2010 till Jan 2012 Site Electrical Engineer Company Electro thrawat Project Abo Qir Thermal Power Plant 2*650 MW. Contract CP-117 Owner Cairo Electricity Production Company (CEPC) Consultant Power Generation Engineering and service Company (PGESCO) Contractor Electro thrawat From Aug. 2009 till April 2010 Maintenance Engineer Company Techno Power LANGUAGE SKILLS English: Very good writing and speaking. Arabic is the native language. COMPUTER SKILLS Very good at using Microsoft Office (Word, Excel, PowerPoint, Outlook) and familiar with the Web using. Good at using AutoCAD Program ( 2D &3D)
  • 6. Page 6 of 6 HIGHLIGHTS OF QUALIFICATIONS AND SKILLS Open-minded, ambitious, hard worker and optimistic. Knowledge of supervisory functions relating to field activities. Self-motivated, dependable and goal oriented Skill in oral and written communications. Commitment to the Project’s ethical standards. Commitment to the Project’s quality standards. Have the ability to work individually and as a co-operative team member. Have the ability to work on plans, deadlines, targets and quotas. Excellent communication skills and very good presentation skills. &&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&& REFERENCES FURNISHED UPON REQUEST Finally,hoping that my C.V meets your requirements and acceptance with promise of progress.