Task Risk Management
A Process for Managing Risks with Task
Analysis at its Heart
Andy Brazier
1. Identify tasks
Possible approaches
Skip the step – people often want to dive straight into
task analysis
Existing procedures – assume they cover all tasks
Structured brainstorming – process drawing
2
Filters
Duty/standby
Pumps
Duty/standby
DP
Alarms
Lo
LoLo
Hi
Trip
Storage
tank
Delivery
tanker
Group exercise
1. Identify tasks
This step is very simple – but encourages a
systematic approach
Uses for task lists
‘Gap analysis’ of procedures, training/competence
systems;
‘On the job’ training programmes;
Workload estimates;
Managing organisational changes.
3
2. Prioritise tasks for analysis
Possible approaches
‘Gut feel,’ experience or ‘normal’ risk assessment
HAZOP, Process Hazard Review (PHR) etc.
Scoring system (see OTO 092 1999 – HSE)
4
Hazardousness of system
Ignition/energy sources
Changing configuration
Error vulnerability
Impact on safety devices
Overall criticality
Low Medium High
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
0-3 4-8 9-15
2. Prioritise tasks for analysis
Benefits of scoring tasks at stage 2
Objective
Demonstration of why tasks were selected for
analysis – safety reports/cases
Highlight ‘anomalies’ without carrying out a detailed
task analysis
5
Microsoft Excel
Worksheet
3. Analyse the most critical tasks
Task analysis is tried and tested – but negative
perceptions
Time and effort
Only doing it to keep the regulator happy
Discoveries from every analysis - if done ‘properly’
6
3. Analyse the most critical tasks
Group exercise – use a data projector
People share experiences and concerns
Accept procedure may not reflect reality
Buy in to new methods
An excellent training exercise for people involved
Human error analysis
Look at the task with ‘new eyes’
Identify where issues have been ‘glossed over’
7
4. Use the findings
‘Engineer out’ error potential
New projects – human factors integration plan
Design reviews and system modifications
Procedures
High criticality – print, follow and sign every time
Medium criticality – reference procedures
Low criticality – generic procedures and guidance
How do you manage the risks the risks of critical
tasks that are performed frequently?
Competence system
How to perform tasks
Understanding the risks
8
4. Use the findings
Continuous review – proactive and reactive
Consider all stages when examining failures
1. Why is a task missing from the list?
2. Why was criticality not assessed correctly?
3. Was the task analysis correct?
4. Were the findings used?
9
Close
Task risk management = a four stage process
1. Develop a task list
2. Prioritise task analysis according to criticality
3. Analyse the most critical tasks
4. Use the findings
10
11

More Related Content

PPT
2014 Hazards - Linking task analysis with other process safety activities
PPTX
2011 SPE - Electronic logging to improve safety
PPT
2005 IBC - Managing risks of control room operations
PPT
2015 Trinity Dublin - Task risk management - hf in process safety
PPT
2006 IChemE Manchester Branch - Human factors & risk management
PPT
2008 Ergonomics Society - Staffing assessments and supervision
PPT
2006 Hazards - Managing change presentation
PPTX
2016 Irish Ergonomics Society - HFE in oil and gas
2014 Hazards - Linking task analysis with other process safety activities
2011 SPE - Electronic logging to improve safety
2005 IBC - Managing risks of control room operations
2015 Trinity Dublin - Task risk management - hf in process safety
2006 IChemE Manchester Branch - Human factors & risk management
2008 Ergonomics Society - Staffing assessments and supervision
2006 Hazards - Managing change presentation
2016 Irish Ergonomics Society - HFE in oil and gas

What's hot (20)

PPTX
2012 Young Generation Network - Human performance problems
PPT
2012 IEHF North West branch - Task risk management
PPT
2007 North Wales OHS - Human factors overview
PPT
2008 epsc - accident avoidance
PPT
2008 Hazards - Shift handover
PPT
2010 IBC - Managing risks of control room operations
PPT
2007 Ergonomics society - What works in industry
PPTX
Management of control room alarms
PPTX
2012 Young Generation Network - Task analysis
PPTX
Root Cause Analysis - methods and best practice
PPTX
Safety webinar with mark friend
PPTX
Accident investigation full version
PPT
Role Of Safety In Ops Ex
PPT
Using Safety to Drive Lean Implementation
PPTX
Effective Shift Handover
PPTX
99771535 conducting-a-job-hazard-analysis
DOC
JOB SAFETY ANALYSIS
PDF
Incident investigation s4 form
PPTX
Tips and Tricks to a Proper Accident Investigation
2012 Young Generation Network - Human performance problems
2012 IEHF North West branch - Task risk management
2007 North Wales OHS - Human factors overview
2008 epsc - accident avoidance
2008 Hazards - Shift handover
2010 IBC - Managing risks of control room operations
2007 Ergonomics society - What works in industry
Management of control room alarms
2012 Young Generation Network - Task analysis
Root Cause Analysis - methods and best practice
Safety webinar with mark friend
Accident investigation full version
Role Of Safety In Ops Ex
Using Safety to Drive Lean Implementation
Effective Shift Handover
99771535 conducting-a-job-hazard-analysis
JOB SAFETY ANALYSIS
Incident investigation s4 form
Tips and Tricks to a Proper Accident Investigation
Ad

Similar to 2012 IEHF - Task risk management (20)

PDF
Risk management plan loren schwappach
PPT
Practical Application Of System Safety For Performance Improvement
PDF
Task Risk Assessment .pdf
PPT
Presentation on QRM
PPT
Risk Management and training dipu.ppt
PPT
Rtb wkplace health, safety & risk 2010 v f 01 12-10
PDF
2016-05-30 risk driven design
PDF
Quality risk management
PPTX
NEBOSH HSE Process Safety Managment Element 2.pptx
PDF
Risk Analysis PowerPoint Presentation Slides
DOCX
M.E-ISE-2022-24-SM-Introduction to Safety Management.docx
PDF
Overview Of Job Hazard Analysis for South Carolina Hospitality Industry
PDF
Five Steps For Improving Municipal Government Work Processes
PPTX
Hazards and risk management
PPTX
Quality Risk Management - FMEA
PPTX
project defence 2016
PPTX
Risk management
PDF
Project Controls Expo, 18th Nov 2014 - "Schedule Risk Analysis for Complex Pr...
PPTX
SAD13 - Risk Analysis
PDF
Introduction to Risk Management ISO31000:2009
Risk management plan loren schwappach
Practical Application Of System Safety For Performance Improvement
Task Risk Assessment .pdf
Presentation on QRM
Risk Management and training dipu.ppt
Rtb wkplace health, safety & risk 2010 v f 01 12-10
2016-05-30 risk driven design
Quality risk management
NEBOSH HSE Process Safety Managment Element 2.pptx
Risk Analysis PowerPoint Presentation Slides
M.E-ISE-2022-24-SM-Introduction to Safety Management.docx
Overview Of Job Hazard Analysis for South Carolina Hospitality Industry
Five Steps For Improving Municipal Government Work Processes
Hazards and risk management
Quality Risk Management - FMEA
project defence 2016
Risk management
Project Controls Expo, 18th Nov 2014 - "Schedule Risk Analysis for Complex Pr...
SAD13 - Risk Analysis
Introduction to Risk Management ISO31000:2009
Ad

More from Andy Brazier (8)

PPTX
Human Factors Engineering (HFE) at the early phoases of a project
PPTX
Interlocked isolation valves - less is more
PDF
Blackcircles online tyre supplier - Website induced error
PPTX
2010 Ysgol Aberconwy Secondary School - Ergonomics for gcse
PPT
2010 Ergonomics Society - Actions in a coach fire
PPT
2002 ibc - Assessing the safety of staffing arrangements
PPT
2004 ibc - The role of control room operators
PPT
2005 Energy Institute - Staffing arrangements for automated plant
Human Factors Engineering (HFE) at the early phoases of a project
Interlocked isolation valves - less is more
Blackcircles online tyre supplier - Website induced error
2010 Ysgol Aberconwy Secondary School - Ergonomics for gcse
2010 Ergonomics Society - Actions in a coach fire
2002 ibc - Assessing the safety of staffing arrangements
2004 ibc - The role of control room operators
2005 Energy Institute - Staffing arrangements for automated plant

Recently uploaded (20)

PPTX
Artificial Intelligence
PPTX
Current and future trends in Computer Vision.pptx
PDF
Exploratory_Data_Analysis_Fundamentals.pdf
PDF
keyrequirementskkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk
PPTX
introduction to high performance computing
PDF
null (2) bgfbg bfgb bfgb fbfg bfbgf b.pdf
PDF
Artificial Superintelligence (ASI) Alliance Vision Paper.pdf
PPTX
Fundamentals of safety and accident prevention -final (1).pptx
PPTX
Nature of X-rays, X- Ray Equipment, Fluoroscopy
PDF
UNIT no 1 INTRODUCTION TO DBMS NOTES.pdf
PPT
INTRODUCTION -Data Warehousing and Mining-M.Tech- VTU.ppt
PDF
BIO-INSPIRED ARCHITECTURE FOR PARSIMONIOUS CONVERSATIONAL INTELLIGENCE : THE ...
PPTX
Fundamentals of Mechanical Engineering.pptx
PPT
Introduction, IoT Design Methodology, Case Study on IoT System for Weather Mo...
PDF
Analyzing Impact of Pakistan Economic Corridor on Import and Export in Pakist...
PDF
SMART SIGNAL TIMING FOR URBAN INTERSECTIONS USING REAL-TIME VEHICLE DETECTI...
PDF
The CXO Playbook 2025 – Future-Ready Strategies for C-Suite Leaders Cerebrai...
PDF
Unit I ESSENTIAL OF DIGITAL MARKETING.pdf
PDF
A SYSTEMATIC REVIEW OF APPLICATIONS IN FRAUD DETECTION
PDF
COURSE DESCRIPTOR OF SURVEYING R24 SYLLABUS
Artificial Intelligence
Current and future trends in Computer Vision.pptx
Exploratory_Data_Analysis_Fundamentals.pdf
keyrequirementskkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk
introduction to high performance computing
null (2) bgfbg bfgb bfgb fbfg bfbgf b.pdf
Artificial Superintelligence (ASI) Alliance Vision Paper.pdf
Fundamentals of safety and accident prevention -final (1).pptx
Nature of X-rays, X- Ray Equipment, Fluoroscopy
UNIT no 1 INTRODUCTION TO DBMS NOTES.pdf
INTRODUCTION -Data Warehousing and Mining-M.Tech- VTU.ppt
BIO-INSPIRED ARCHITECTURE FOR PARSIMONIOUS CONVERSATIONAL INTELLIGENCE : THE ...
Fundamentals of Mechanical Engineering.pptx
Introduction, IoT Design Methodology, Case Study on IoT System for Weather Mo...
Analyzing Impact of Pakistan Economic Corridor on Import and Export in Pakist...
SMART SIGNAL TIMING FOR URBAN INTERSECTIONS USING REAL-TIME VEHICLE DETECTI...
The CXO Playbook 2025 – Future-Ready Strategies for C-Suite Leaders Cerebrai...
Unit I ESSENTIAL OF DIGITAL MARKETING.pdf
A SYSTEMATIC REVIEW OF APPLICATIONS IN FRAUD DETECTION
COURSE DESCRIPTOR OF SURVEYING R24 SYLLABUS

2012 IEHF - Task risk management

  • 1. Tel: (+44) 01492 879813 Mob: (+44) 07984 284642 andy@abrisk.co.uk www.abrisk.co.uk 1 Task Risk Management A Process for Managing Risks with Task Analysis at its Heart Andy Brazier
  • 2. 1. Identify tasks Possible approaches Skip the step – people often want to dive straight into task analysis Existing procedures – assume they cover all tasks Structured brainstorming – process drawing 2 Filters Duty/standby Pumps Duty/standby DP Alarms Lo LoLo Hi Trip Storage tank Delivery tanker Group exercise
  • 3. 1. Identify tasks This step is very simple – but encourages a systematic approach Uses for task lists ‘Gap analysis’ of procedures, training/competence systems; ‘On the job’ training programmes; Workload estimates; Managing organisational changes. 3
  • 4. 2. Prioritise tasks for analysis Possible approaches ‘Gut feel,’ experience or ‘normal’ risk assessment HAZOP, Process Hazard Review (PHR) etc. Scoring system (see OTO 092 1999 – HSE) 4 Hazardousness of system Ignition/energy sources Changing configuration Error vulnerability Impact on safety devices Overall criticality Low Medium High 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 0-3 4-8 9-15
  • 5. 2. Prioritise tasks for analysis Benefits of scoring tasks at stage 2 Objective Demonstration of why tasks were selected for analysis – safety reports/cases Highlight ‘anomalies’ without carrying out a detailed task analysis 5 Microsoft Excel Worksheet
  • 6. 3. Analyse the most critical tasks Task analysis is tried and tested – but negative perceptions Time and effort Only doing it to keep the regulator happy Discoveries from every analysis - if done ‘properly’ 6
  • 7. 3. Analyse the most critical tasks Group exercise – use a data projector People share experiences and concerns Accept procedure may not reflect reality Buy in to new methods An excellent training exercise for people involved Human error analysis Look at the task with ‘new eyes’ Identify where issues have been ‘glossed over’ 7
  • 8. 4. Use the findings ‘Engineer out’ error potential New projects – human factors integration plan Design reviews and system modifications Procedures High criticality – print, follow and sign every time Medium criticality – reference procedures Low criticality – generic procedures and guidance How do you manage the risks the risks of critical tasks that are performed frequently? Competence system How to perform tasks Understanding the risks 8
  • 9. 4. Use the findings Continuous review – proactive and reactive Consider all stages when examining failures 1. Why is a task missing from the list? 2. Why was criticality not assessed correctly? 3. Was the task analysis correct? 4. Were the findings used? 9
  • 10. Close Task risk management = a four stage process 1. Develop a task list 2. Prioritise task analysis according to criticality 3. Analyse the most critical tasks 4. Use the findings 10
  • 11. 11

Editor's Notes

  • #2: The purpose of my presentation is to propose a new term Task Risk Management that refers to a four stage process that puts task analysis into a context that I believe will help organisations get the most benefit from looking at what people do and considering the potential for human error. There is not necessarily anything new in each of the four stages but I believe that we should follow each stage every time we get engaged in task analysis; and that each stage has very real benefits in its own right.
  • #3: I suggest the first of the four stages of task risk management is to generate a comprehensive list of tasks for the system where we wish to apply task analysis. My experience is that this is rarely done because people want to dive straight into analysing specific tasks. When I do get people to accept that the starting point for our analysis should be a list of tasks they often want to simply use the list of existing procedures. However, my experience is that most organisations have not developed procedures in a very systematic fashion, and more often than not is that procedures do not exists for tasks that should be our highest priority for task analysis. I have found that a structured brain-storm is usually the best, asking people to work systematically through their system to identify tasks. A drawing can be particularly useful. For example, working left to right on this drawing I can see that operationally we need to receive material from a tanker, manage stock levels in the tank, changeover filters when the online one gets blocked and changeover pumps if the online fails. Also, I know we will need some system start-up and shutdown procedures. From a maintenance perspective I can see that we need to change or clean filter elements, repair the pump, calibrate instruments and test trip functions.
  • #4: This step is very simple, and perhaps that is why people will often want to skip it. But by starting at this point people start to think more systematically, and are less inclined to pluck tasks from thin air for analysis. Also, the lists are very useful in their own right. They can be used for gap analyses. At one of my clients we used a macro to convert the lists into training packages that grouped tasks into modules that were printed out as a workbook that was given to trainees. Also, it is very useful to know what tasks people are doing when looking at this like workload or when managing change.
  • #5: Step 2 of the process is to review the list and prioritise the tasks that should be analysed first. These should be the tasks where there is interaction with major hazards and where there is potential for human failure. In other words, where are we going to get the most benefit from carrying out task analysis. I find that peoples gut feel for which tasks are most critical is fairly unreliable. They usually choose tasks that they are familiar with, and often reassure themselves that there is not an issue with certain tasks because they have a procedure. My experience also is that both standard health and safety risk assessments and process safety analyses such as HAZOP are rarely much use, largely because the approaches taken to human factors are unsystematic. I have had most success with a simple scoring system. The basis for this was presented in an HSE report in 1999. I have adapted it through experience, but the basic principle is that each task is scored between 0 and 3 against five criteria. Add up the scores for a total. The ones with the highest score are the most critical and hence the highest priority for task analysis.
  • #6: Having used this method a lot over the last few years I am fully confident that, whilst it is relatively quick and easy to do, the output is very useful. It ensures a degree of objectivity and is particularly useful for demonstrating that you understand human factors risks, which you can refer to in a safety report or case if you are a COMAH site, offshore establishment etc. An additional benefit of the scoring system is that it can highlight anomalies in the way you manage human factors risks without going through the time and effort of carrying out a full task analysis. For example one of the scores asks about the vulnerability to error. If you score highly on that criteria it is suggesting that constant vigilance is required. Given that we know humans are not great at vigilance this score can prompt you to consider whether the current task method is safe or whether arrangements need to be changed. Another score is about overriding safety devices. Again, if you score this high it prompts you to consider whether it is appropriate that a task requires safety devices to be overridden.
  • #7: Step 3 is analysing the tasks that had the highest score in step 2. I’m not planning to talk much about this today because I think it is very much a standard technique for anyone working in human factors. But I would point out that a lot of people have a negative perception because they can see how long it takes per task and think they have to analyse every task. That is why the first 2 steps in the process are so important. Also, it doesn’t help that a lot of people only engage with task analysis because someone says they have to. My experience is that every time we have done a task analysis properly we have learnt something.
  • #8: Properly means involving the right people, putting procedures aside, keeping to a good structure and carrying out a human error analysis. This last bit can be a bit of a drag, but it is very interesting how often new issues come to light when you look back at the analysis you have just completed. Recently we analysed how to test a trip function. We had accepted that overrides would be required, but when we looked at the potential errors we realised there was a significant vulnerability. As a result we concluded that a completely different method was required.
  • #9: The fourth stage is probably the most important, and it is to actual do something with the findings. Unfortunately it is often be overlooked. I suspect because a lot of people have got involve because they have been told they have to do it. We should always be asking ourselves how risks can be engineered out. This is relatively straightforward when we are involved in the design stage for new projects, although task analysis often carried out too late to make fundamental changes. This is a factor where the 4 step process can help because you can develop task lists and criticality ranking very early on, and so ensure that human factors issues are integrated into the project plan. One outcome is invariably the development of new or improved procedures. The detailed task analysis can give us the steps to include in the procedure, but the criticality rating also gives us a guide to what type of procedure should be provided and how it should be used in practice. This requires a buy in to the idea that the same does not fit all for procedures and it is unreasonable to expect people to follow procedures for every task. Equally, for most companies the idea that a procedure must printed, followed and signed every time certain tasks are performed is a new one, which takes some time to accept. Although I stand by the basic guidance based on criticality, I have come across quite a number of situations where people are performing some of the most critical tasks on a very regular basis. People are often tempted to try and re-score the task, but I think this is not acceptable. The correct approach is to engineer the task so that its hazard or vulnerability to error is reduced. But this is not always possible. I would suggest the solution requires a much better understanding of competence. But if we have completed our task analyses correctly a lot of the information needed to define competence requirements has already been recorded.
  • #10: Another aspect of using the output is making sure the process remain live. That means revisiting all 4 steps. For example, if there is an issue with a task there should be a number of question you ask. Was the task on the list and if not why. What criticality was it assigned and does the incident suggest this was incorrect? Was the task analysis correct and if not why? And were the findings implemented effectively.
  • #11: So to close I will just summarise the four steps of the process. Identify tasks associated with the system. Consider operations, maintenance and dealing with situations that arise Rank tasks on the list into priorities, with the highest being the ones where we are more likely to learn the most from carrying out task analysis. We should not be analysing easy tasks Analyse the tasks, but make sure this is done properly involving the right people and being systematic. It is much better to complete a small number of analyses really well than to do a large number badly Finally use the findings. Otherwise, we have essentially wasted our time.