2018
CONTECH CALENDAR
SUN MON TUES WED THUR FRI SAT
1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
31
DECEMBER 2017
Here’s to another year, partnering with you to provide civil and site solutions
through innovation, speed, quality, and technical expertise!
w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
P I P E
S O L U T I O N S
SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31
BNSF RAILWAY ALLIANCE
IMF EXPANSION
PIPE SOLUTIONS
NEW YEAR’S DAY
MARTIN LUTHER
KING DAY
Haslet, Texas
ULTRA FLO® CSP (7,000 LF)
Smooth Cor™ Double Wall CSP (350 LF)
Installation Date: February 2017
The BNSF Railway Alliance Intermodal
Facility (IMF) was in need of an expansion.
The engineer of record worked directly with
Contech to identify the best solution for the
storm sewer systems that would be needed.
Given the complexity of the site and the high
fill in one particular area, two different storm
sewer systems were specified.
JANUARY 2018
DECEMBER 2017
SUN MON TUES WED THUR FRI SAT
1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24/31 25 26 27 28 29 30
FEBRUARY 2018
SUN MON TUES WED THUR FRI SAT
1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28
w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
STRUCTURES
S O L U T I O N S
SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28
RICHLAND CREEK
RESERVOIR AND DAM
PRESIDENTS’ DAY
VALENTINE’S DAY
Paulding County, Georgia
MULTI-PLATE® Single Radius Arch
26’ span x 13’ rise x 185’ length
Installation Date: August 2016
An independent water supply was critically
needed in Paulding County. Access to the
new reservoir required the installation of
an environmentally-friendly structure that
could follow the alignment changes of the
stream without impacting the waterway –
saving both time and money. The County
selected a 184’ long MULTI-PLATE
structure as the best solution.
FEBRUARY 2018
JANUARY 2018
SUN MON TUES WED THUR FRI SAT
1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31
MARCH 2018
SUN MON TUES WED THUR FRI SAT
1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31
w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
STORMWATER
S O L U T I O N S
SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31
ARIZONA BEVERAGE
Filter
GOOD FRIDAY
ST. PATRICK’S DAYDAYLIGHT SAVING TIME
Woodbridge, New Jersey
JellyFish® Filter 12’ dia. units (6) & The
Stormwater Management StormFilter®
8’x24’ vaults (3) to treat over 25 CF
Installation Date: September 2017
Arizona Beverage Company constructed
a new filling facility in Woodbridge, New
Jersey. Jellyfish and StormFilter treatment
systems were chosen to meet 80%
reduction of TSS due to their ability to treat
high flows in a compact footprint. Moreover,
their configuration flexibility allowed
the engineer to eliminate unnecessary
structures, thus reducing costs.
MARCH 2018
FEBRUARY 2018
SUN MON TUES WED THUR FRI SAT
1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28
APRIL 2018
SUN MON TUES WED THUR FRI SAT
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30
w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
RETAININGWALLS
S O L U T I O N S
SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30
THE PARK AT OWA
EASTER
EARTH DAY
TAX DAY
Foley, Alabama
Keystone Retaining Wall Systems® with
Stonegate® Country Manor - 3,642 SF
BEBO® Precast Bridge System, Triple Cell
20’ span x 9’-2” rise x 14’ length
Installation Date: Spring of 2017
Keystone’s segmental retaining wall system
was employed to wrap concrete pillars rising
from the arch footing to form 30-inch square
columns and the headwalls for this triple cell
BEBO® precast bridge. Keystone engineered
the bridge wall design which provides both
reinforcing structural support needed for the
sandy soils, as well as a charming Old World
appearance for the new park gateway.
APRIL 2018
MAY 2018
SUN MON TUES WED THUR FRI SAT
1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31
MARCH 2018
SUN MON TUES WED THUR FRI SAT
1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31
w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
P I P E
S O L U T I O N S
SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31
DFW AIRCRAFT HARDSTAND
RAMP EXPANSION
PIPE SOLUTIONS
STEEL REINFORCED PE TECHNOLOGY
MEMORIAL DAY
MOTHER’S DAY
Dallas, Texas
DuroMaxx® SRPE Pipe with WC Joints
Two runs of 134 LF of 96” dia.
13,053 CF of volume storage
Installation Date: August 2017
The Dallas/Fort Worth (DFW) International
Airport needed a cost-effective solution to
properly store stormwater contaminated
with deicing fluid prior to being treated
as part of the aircraft hardstand ramp
expansions. A DuroMaxx SRPE glycol
storage tank was selected.
MAY 2018
APRIL 2018
SUN MON TUES WED THUR FRI SAT
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30
JUNE 2018
SUN MON TUES WED THUR FRI SAT
1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
STRUCTURES
S O L U T I O N S
SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
LOUDOUN COUNTY PARKWAY
FATHER’S DAY
Loudoun County, Virginia
CON/SPAN® O-Series®
Triple Cell
65’ span x 13.5’ rise x 128’ length
Installation Date: Summer 2016
When access was needed for a new high-
end development, a triple cell CON/SPAN
O-Series was selected in lieu of a
conventional bridge. The prefabricated arch
system choice resulted in faster installation
time, substantial savings, and efficiently
allowed critical fiber optic lines to remain
untouched during the installation process.
JUNE 2018
MAY 2018
SUN MON TUES WED THUR FRI SAT
1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31
JULY 2018
SUN MON TUES WED THUR FRI SAT
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31
w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
STORMWATER
S O L U T I O N S
SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31
PORT OF GULFPORT
PIPE SOLUTIONS
INDEPENDENCE DAY
Gulfport, Mississippi
Vortechs® Model 1522 (6) & Model 1421 (2)
Contech Slotted Drain™ - 6,000 LF,
variable height, 18” - 36” diameters
Installation Date: Summer 2016
The Port of Gulfport expansion brought
challenges of additional rainfall to the site. The
water had to be collected as well as treated before
it was discharged into the Gulf of Mexico. The
local engineer worked with Contech to design a
solution which utilized Slotted Drain for collection
and conveyance of the stormwater and Vortechs
hydrodynamic separators to treat the stormwater
before flowing into the Gulf of Mexico.
JULY 2018
JUNE 2018
SUN MON TUES WED THUR FRI SAT
1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
AUGUST 2018
SUN MON TUES WED THUR FRI SAT
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31
w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
P I P E
S O L U T I O N S
SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31
LAKEHURST NAVAL AIR
STATION RELINE
PIPE SOLUTIONS
Lakehurst, New Jersey
SPR™ PE structural lining for 786 LF of
48” dia. RCP & 703 LF of 54” dia. RCP
Installation Date: March 2014
During a routine inspection at the Lakehurst
Naval Air Station, it was discovered that
a number of reinforced concrete pipe
(RCP) runs used to carry stormwater had
deteriorated and were no longer hydraulically
or structurally sufficient. The facilities
engineer decided to reline the existing RCP
with SPR™ PE through the manholes directly.
AUGUST 2018
JULY 2018
SUN MON TUES WED THUR FRI SAT
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31
SEPTEMBER 2018
SUN MON TUES WED THUR FRI SAT
1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23/30 24 25 26 27 28 29
w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
STRUCTURES
S O L U T I O N S
SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23/30 24 25 26 27 28 29
CLARK COUNTY - SALEM
NOBLE ROAD
LABOR DAY
Charleston, Indiana
Steadfast® Vehicular Truss
Keystone® Style
120’ span x 34’ width
Installation Date: March 2017
In order to improve the roadway conditions
along Salem Noble Road and avoid the
regular flooding that occurred at the
Pleasant Run crossing, Clark County chose
a 120’ clear span Steadfast truss structure
as the replacement. The new bridge can
accommodate the rapid growth in the area
and increased traffic volume.
SEPTEMBER 2018
AUGUST 2018
SUN MON TUES WED THUR FRI SAT
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31
OCTOBER 2018
SUN MON TUES WED THUR FRI SAT
1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31
w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
STORMWATER
S O L U T I O N S
SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31
UPPER NORTH PARKING LOT
COLUMBUS DAY
HALLOWEEN
Red Rocks, Colorado
120” Aluminized CMP Detention
CDS® Hydrodynamic Separators -
CDS2025-5 (2)
Installation Date: March 2017
A detention system was needed that would have
minimal impact to the breathtaking mountains
that provide the unequaled acoustics for which
the 640 acre Red Rocks open air amphitheater
is famous. The solution? A stormwater system
consisting of a CMP detention system pretreated
with a CDS hydrodynamic separator, to meet
water quality and quantity requirements.
OCTOBER 2018
SEPTEMBER 2018
SUN MON TUES WED THUR FRI SAT
1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23/30 24 25 26 27 28 29
NOVEMBER 2018
SUN MON TUES WED THUR FRI SAT
1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30
w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
HARD ARMOR
S O L U T I O N S
SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30
BOARDMAN DAM REMOVAL &
RIVER RESTORATION
THANKSGIVING DAY
VETERANS DAY
Boardman, Michigan
ArmorFlex® Articulating Concrete Blocks
11,068 sq. ft. of ArmorFlex Class 40T
Installation Date: July 2017
When fully implemented, the Boardman Dam
Removal & River Restoration Project will reconnect
over 160 miles of river and tributary streams while
restoring wetlands and upland habitats. It is the most
comprehensive dam removal and restoration projects
in Michigan’s history and one of the largest such
projects in the Great Lakes Basin. Contech provided
ArmorFlex erosion control mats as an advanced
protective measure during the drawdown stages of
the Boardman Dam.
NOVEMBER 2018
OCTOBER 2018
SUN MON TUES WED THUR FRI SAT
1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31
DECEMBER 2018
SUN MON TUES WED THUR FRI SAT
1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23/30 24/31 25 26 27 28 29
w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
STORMWATER
S O L U T I O N S
9025 CENTRE POINTE DRIVE, SUITE 400 | WEST CHESTER, OH 45069© 2017 Contech Engineered Solutions LLC, a QUIKRETE Company
ENGINEERED SOLUTIONS
ENGINEERED SOLUTIONS
COMPLETE SITE SOLUTIONS
SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23/30 24/31 25 26 27 28 29
ROBERSTON RANCH
™
®
CHRISTMAS
Carlsbad, California
Filterra® Bioscape™ (20 vaults)
Installation Date: August 2016
Twenty Filterra Bioscape vaults were installed
upstream of infiltration to meet stormwater
requirements in a large subdivision in Carlsbad,
CA. The original design utilized large ponds that
took up the entire green spaces making them
unusable for other purposes. The Filterra vaults
have a much smaller footprint, blend well with
the other landscaping, and increase the property
values of the homes closest to the green spaces.
DECEMBER 2018
NOVEMBER 2018
SUN MON TUES WED THUR FRI SAT
1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30
JANUARY 2019
SUN MON TUES WED THUR FRI SAT
1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31
CHRISTMAS EVE/NEW YEAR’S EVE

More Related Content

PDF
2017 Contech Calendar
PDF
2016 Contech Calendar
PDF
2015 Contech Calendar
PDF
Assessing and constructing a cost effective bridge replacement christopher si...
PDF
Californa Science Center
PDF
Pervious Concrete Pilot Project COT 042413
PPT
Presentación Libia
PPTX
Huntington Levee Community Meeting: Oct. 26. 2016
2017 Contech Calendar
2016 Contech Calendar
2015 Contech Calendar
Assessing and constructing a cost effective bridge replacement christopher si...
Californa Science Center
Pervious Concrete Pilot Project COT 042413
Presentación Libia
Huntington Levee Community Meeting: Oct. 26. 2016

Similar to 2018 Contech Calendar (20)

DOCX
Sustainable Storm-water Management Report
PDF
Site Solutions by Contech
PDF
EWB: Adventure in Giving Back
PPTX
The permitting advantages and challenges of green infrastructure
DOCX
SELP 500 First Project Review Session Preparing .docx
DOCX
STORM WATER RUN OFF PRIMEVAL PAVEMENTS
PDF
Sustainable Drainage Innovation International Conference
PPTX
Control storm water run off with lake-wise landscaping
PPTX
Innovative Solutions for Challenging Drainage Projects
PPTX
Transforming Our Cities: High Performance Green Infrastructure and Distribute...
PDF
Little Hunting Creek Sewer Replacement Community Meeting: 12-11-2017
PDF
Innovation - Extending Cast-In-Place Box Culverts with Precast Box Culverts -...
PDF
Feb. 10 Waste Management Daily Progress Report
PPSX
Huntington Levee Community Meeting: Nov. 1, 2017
PPTX
Education & Outreach CSO044 - NYWEA 2012
PPTX
Futuristic construction
PDF
Nykilde geoweb channel protection design package
PDF
RainStore 3 Brochure
PPTX
Cistern construction alteration review inspections 2019 no humor
PPT
Using Trees To Reduce Stormwater Runoff
Sustainable Storm-water Management Report
Site Solutions by Contech
EWB: Adventure in Giving Back
The permitting advantages and challenges of green infrastructure
SELP 500 First Project Review Session Preparing .docx
STORM WATER RUN OFF PRIMEVAL PAVEMENTS
Sustainable Drainage Innovation International Conference
Control storm water run off with lake-wise landscaping
Innovative Solutions for Challenging Drainage Projects
Transforming Our Cities: High Performance Green Infrastructure and Distribute...
Little Hunting Creek Sewer Replacement Community Meeting: 12-11-2017
Innovation - Extending Cast-In-Place Box Culverts with Precast Box Culverts -...
Feb. 10 Waste Management Daily Progress Report
Huntington Levee Community Meeting: Nov. 1, 2017
Education & Outreach CSO044 - NYWEA 2012
Futuristic construction
Nykilde geoweb channel protection design package
RainStore 3 Brochure
Cistern construction alteration review inspections 2019 no humor
Using Trees To Reduce Stormwater Runoff
Ad

More from Contech Engineered Solutions (14)

PDF
CMP Solutions by Contech
PDF
Contech Slotted Drain for Commercial Markets
PDF
Contech DuroMaxx Steel Reinforced Polyethylene
PDF
How Stormwater Treatment Trains Work
PPTX
Raising the Bar North of the Border: The Ins and Outs of Canada’s New Evaluat...
PPTX
Taking out the Trash: Setting achievable trash discharge reduction goals and ...
PDF
How Rainwater Harvesting Works
PPTX
Maximizing Phosphorus Load Reduction
PPTX
Low Impact Developement Site Planner
PPTX
Stormwater Products Slideshow - Contech Engineered Solution
PDF
Underground Wet Ponds for Stormwater Management in Wisconsin
PDF
Enhancing Low Impact Development Designs Using Manufactrured BMP's
PDF
Rainwater Harvesting Answer Book
PDF
Rehab Solutions for Today's Infrastructure
CMP Solutions by Contech
Contech Slotted Drain for Commercial Markets
Contech DuroMaxx Steel Reinforced Polyethylene
How Stormwater Treatment Trains Work
Raising the Bar North of the Border: The Ins and Outs of Canada’s New Evaluat...
Taking out the Trash: Setting achievable trash discharge reduction goals and ...
How Rainwater Harvesting Works
Maximizing Phosphorus Load Reduction
Low Impact Developement Site Planner
Stormwater Products Slideshow - Contech Engineered Solution
Underground Wet Ponds for Stormwater Management in Wisconsin
Enhancing Low Impact Development Designs Using Manufactrured BMP's
Rainwater Harvesting Answer Book
Rehab Solutions for Today's Infrastructure
Ad

Recently uploaded (20)

PDF
The B2B Startup Marketing Playbook - How To Build A Revenue-Generating B2B Ma...
PDF
DigiBrandX: Crafting Identities That Resonate
PPTX
AI usage and the Social Media Marketing World
PDF
The Role of Search Intent in Shaping SEO Strategies in 2025
PPTX
1 percent Clicks, percent Traffic Loss-Your SEO Stack Isn’t Built for AI
PPT
Market Segmentation and Positioning(3).ppt
PPTX
Choose the Right SEO Agency India - 7 Key Tips by Clickbold Media
PPTX
Top Digital Marketing Companies in Mumbai
PDF
Digital Marketing Training in Hyderabad
DOCX
Auctioneer project lead by Ali Hasnain jappa
PDF
Retaining SEO Rankings During Website Redesign.pdf
PPT
Introduction to consumer behavior(1).PPT
PDF
It Takes a Village Campaign Plan Book; Sidra Medicine
PPTX
Smart Optics in the Field: Understanding the AX Visio
PPTX
CH 2 The Role of IMC in the Marketing Process (combined)
PDF
digital marketing courses online with od
PDF
AI powered Digital Marketing- How AI changes
PDF
Social Media Optimization Basic Introduction
PPTX
B2B Marketplace India – Connect & Grow..
PDF
sm_67a1bc7f35716dcb1a9195ea_382528b8-2159-47be-a7ba-d034a449f849.pdf
The B2B Startup Marketing Playbook - How To Build A Revenue-Generating B2B Ma...
DigiBrandX: Crafting Identities That Resonate
AI usage and the Social Media Marketing World
The Role of Search Intent in Shaping SEO Strategies in 2025
1 percent Clicks, percent Traffic Loss-Your SEO Stack Isn’t Built for AI
Market Segmentation and Positioning(3).ppt
Choose the Right SEO Agency India - 7 Key Tips by Clickbold Media
Top Digital Marketing Companies in Mumbai
Digital Marketing Training in Hyderabad
Auctioneer project lead by Ali Hasnain jappa
Retaining SEO Rankings During Website Redesign.pdf
Introduction to consumer behavior(1).PPT
It Takes a Village Campaign Plan Book; Sidra Medicine
Smart Optics in the Field: Understanding the AX Visio
CH 2 The Role of IMC in the Marketing Process (combined)
digital marketing courses online with od
AI powered Digital Marketing- How AI changes
Social Media Optimization Basic Introduction
B2B Marketplace India – Connect & Grow..
sm_67a1bc7f35716dcb1a9195ea_382528b8-2159-47be-a7ba-d034a449f849.pdf

2018 Contech Calendar

  • 1. 2018 CONTECH CALENDAR SUN MON TUES WED THUR FRI SAT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 DECEMBER 2017 Here’s to another year, partnering with you to provide civil and site solutions through innovation, speed, quality, and technical expertise!
  • 2. w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2 P I P E S O L U T I O N S SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 BNSF RAILWAY ALLIANCE IMF EXPANSION PIPE SOLUTIONS NEW YEAR’S DAY MARTIN LUTHER KING DAY Haslet, Texas ULTRA FLO® CSP (7,000 LF) Smooth Cor™ Double Wall CSP (350 LF) Installation Date: February 2017 The BNSF Railway Alliance Intermodal Facility (IMF) was in need of an expansion. The engineer of record worked directly with Contech to identify the best solution for the storm sewer systems that would be needed. Given the complexity of the site and the high fill in one particular area, two different storm sewer systems were specified. JANUARY 2018 DECEMBER 2017 SUN MON TUES WED THUR FRI SAT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24/31 25 26 27 28 29 30 FEBRUARY 2018 SUN MON TUES WED THUR FRI SAT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
  • 3. w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2 STRUCTURES S O L U T I O N S SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 RICHLAND CREEK RESERVOIR AND DAM PRESIDENTS’ DAY VALENTINE’S DAY Paulding County, Georgia MULTI-PLATE® Single Radius Arch 26’ span x 13’ rise x 185’ length Installation Date: August 2016 An independent water supply was critically needed in Paulding County. Access to the new reservoir required the installation of an environmentally-friendly structure that could follow the alignment changes of the stream without impacting the waterway – saving both time and money. The County selected a 184’ long MULTI-PLATE structure as the best solution. FEBRUARY 2018 JANUARY 2018 SUN MON TUES WED THUR FRI SAT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 MARCH 2018 SUN MON TUES WED THUR FRI SAT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
  • 4. w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2 STORMWATER S O L U T I O N S SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 ARIZONA BEVERAGE Filter GOOD FRIDAY ST. PATRICK’S DAYDAYLIGHT SAVING TIME Woodbridge, New Jersey JellyFish® Filter 12’ dia. units (6) & The Stormwater Management StormFilter® 8’x24’ vaults (3) to treat over 25 CF Installation Date: September 2017 Arizona Beverage Company constructed a new filling facility in Woodbridge, New Jersey. Jellyfish and StormFilter treatment systems were chosen to meet 80% reduction of TSS due to their ability to treat high flows in a compact footprint. Moreover, their configuration flexibility allowed the engineer to eliminate unnecessary structures, thus reducing costs. MARCH 2018 FEBRUARY 2018 SUN MON TUES WED THUR FRI SAT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 APRIL 2018 SUN MON TUES WED THUR FRI SAT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
  • 5. w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2 RETAININGWALLS S O L U T I O N S SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 THE PARK AT OWA EASTER EARTH DAY TAX DAY Foley, Alabama Keystone Retaining Wall Systems® with Stonegate® Country Manor - 3,642 SF BEBO® Precast Bridge System, Triple Cell 20’ span x 9’-2” rise x 14’ length Installation Date: Spring of 2017 Keystone’s segmental retaining wall system was employed to wrap concrete pillars rising from the arch footing to form 30-inch square columns and the headwalls for this triple cell BEBO® precast bridge. Keystone engineered the bridge wall design which provides both reinforcing structural support needed for the sandy soils, as well as a charming Old World appearance for the new park gateway. APRIL 2018 MAY 2018 SUN MON TUES WED THUR FRI SAT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 MARCH 2018 SUN MON TUES WED THUR FRI SAT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
  • 6. w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2 P I P E S O L U T I O N S SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 DFW AIRCRAFT HARDSTAND RAMP EXPANSION PIPE SOLUTIONS STEEL REINFORCED PE TECHNOLOGY MEMORIAL DAY MOTHER’S DAY Dallas, Texas DuroMaxx® SRPE Pipe with WC Joints Two runs of 134 LF of 96” dia. 13,053 CF of volume storage Installation Date: August 2017 The Dallas/Fort Worth (DFW) International Airport needed a cost-effective solution to properly store stormwater contaminated with deicing fluid prior to being treated as part of the aircraft hardstand ramp expansions. A DuroMaxx SRPE glycol storage tank was selected. MAY 2018 APRIL 2018 SUN MON TUES WED THUR FRI SAT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 JUNE 2018 SUN MON TUES WED THUR FRI SAT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
  • 7. w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2 STRUCTURES S O L U T I O N S SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 LOUDOUN COUNTY PARKWAY FATHER’S DAY Loudoun County, Virginia CON/SPAN® O-Series® Triple Cell 65’ span x 13.5’ rise x 128’ length Installation Date: Summer 2016 When access was needed for a new high- end development, a triple cell CON/SPAN O-Series was selected in lieu of a conventional bridge. The prefabricated arch system choice resulted in faster installation time, substantial savings, and efficiently allowed critical fiber optic lines to remain untouched during the installation process. JUNE 2018 MAY 2018 SUN MON TUES WED THUR FRI SAT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 JULY 2018 SUN MON TUES WED THUR FRI SAT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
  • 8. w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2 STORMWATER S O L U T I O N S SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 PORT OF GULFPORT PIPE SOLUTIONS INDEPENDENCE DAY Gulfport, Mississippi Vortechs® Model 1522 (6) & Model 1421 (2) Contech Slotted Drain™ - 6,000 LF, variable height, 18” - 36” diameters Installation Date: Summer 2016 The Port of Gulfport expansion brought challenges of additional rainfall to the site. The water had to be collected as well as treated before it was discharged into the Gulf of Mexico. The local engineer worked with Contech to design a solution which utilized Slotted Drain for collection and conveyance of the stormwater and Vortechs hydrodynamic separators to treat the stormwater before flowing into the Gulf of Mexico. JULY 2018 JUNE 2018 SUN MON TUES WED THUR FRI SAT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 AUGUST 2018 SUN MON TUES WED THUR FRI SAT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
  • 9. w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2 P I P E S O L U T I O N S SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 LAKEHURST NAVAL AIR STATION RELINE PIPE SOLUTIONS Lakehurst, New Jersey SPR™ PE structural lining for 786 LF of 48” dia. RCP & 703 LF of 54” dia. RCP Installation Date: March 2014 During a routine inspection at the Lakehurst Naval Air Station, it was discovered that a number of reinforced concrete pipe (RCP) runs used to carry stormwater had deteriorated and were no longer hydraulically or structurally sufficient. The facilities engineer decided to reline the existing RCP with SPR™ PE through the manholes directly. AUGUST 2018 JULY 2018 SUN MON TUES WED THUR FRI SAT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 SEPTEMBER 2018 SUN MON TUES WED THUR FRI SAT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23/30 24 25 26 27 28 29
  • 10. w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2 STRUCTURES S O L U T I O N S SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23/30 24 25 26 27 28 29 CLARK COUNTY - SALEM NOBLE ROAD LABOR DAY Charleston, Indiana Steadfast® Vehicular Truss Keystone® Style 120’ span x 34’ width Installation Date: March 2017 In order to improve the roadway conditions along Salem Noble Road and avoid the regular flooding that occurred at the Pleasant Run crossing, Clark County chose a 120’ clear span Steadfast truss structure as the replacement. The new bridge can accommodate the rapid growth in the area and increased traffic volume. SEPTEMBER 2018 AUGUST 2018 SUN MON TUES WED THUR FRI SAT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 OCTOBER 2018 SUN MON TUES WED THUR FRI SAT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
  • 11. w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2 STORMWATER S O L U T I O N S SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 UPPER NORTH PARKING LOT COLUMBUS DAY HALLOWEEN Red Rocks, Colorado 120” Aluminized CMP Detention CDS® Hydrodynamic Separators - CDS2025-5 (2) Installation Date: March 2017 A detention system was needed that would have minimal impact to the breathtaking mountains that provide the unequaled acoustics for which the 640 acre Red Rocks open air amphitheater is famous. The solution? A stormwater system consisting of a CMP detention system pretreated with a CDS hydrodynamic separator, to meet water quality and quantity requirements. OCTOBER 2018 SEPTEMBER 2018 SUN MON TUES WED THUR FRI SAT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23/30 24 25 26 27 28 29 NOVEMBER 2018 SUN MON TUES WED THUR FRI SAT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
  • 12. w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2 HARD ARMOR S O L U T I O N S SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 BOARDMAN DAM REMOVAL & RIVER RESTORATION THANKSGIVING DAY VETERANS DAY Boardman, Michigan ArmorFlex® Articulating Concrete Blocks 11,068 sq. ft. of ArmorFlex Class 40T Installation Date: July 2017 When fully implemented, the Boardman Dam Removal & River Restoration Project will reconnect over 160 miles of river and tributary streams while restoring wetlands and upland habitats. It is the most comprehensive dam removal and restoration projects in Michigan’s history and one of the largest such projects in the Great Lakes Basin. Contech provided ArmorFlex erosion control mats as an advanced protective measure during the drawdown stages of the Boardman Dam. NOVEMBER 2018 OCTOBER 2018 SUN MON TUES WED THUR FRI SAT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 DECEMBER 2018 SUN MON TUES WED THUR FRI SAT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23/30 24/31 25 26 27 28 29
  • 13. w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2 STORMWATER S O L U T I O N S 9025 CENTRE POINTE DRIVE, SUITE 400 | WEST CHESTER, OH 45069© 2017 Contech Engineered Solutions LLC, a QUIKRETE Company ENGINEERED SOLUTIONS ENGINEERED SOLUTIONS COMPLETE SITE SOLUTIONS SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23/30 24/31 25 26 27 28 29 ROBERSTON RANCH ™ ® CHRISTMAS Carlsbad, California Filterra® Bioscape™ (20 vaults) Installation Date: August 2016 Twenty Filterra Bioscape vaults were installed upstream of infiltration to meet stormwater requirements in a large subdivision in Carlsbad, CA. The original design utilized large ponds that took up the entire green spaces making them unusable for other purposes. The Filterra vaults have a much smaller footprint, blend well with the other landscaping, and increase the property values of the homes closest to the green spaces. DECEMBER 2018 NOVEMBER 2018 SUN MON TUES WED THUR FRI SAT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 JANUARY 2019 SUN MON TUES WED THUR FRI SAT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 CHRISTMAS EVE/NEW YEAR’S EVE