There are four basic types of well completion:
1. Conventional Single zone Completion
2. Conventional Multiple zone Completion
3. Tubingless Completion
4. Horizontal and Multilateral Completions
Conventional Single Zone Completion
Open Hole Completion
This is the simplest of all completion types, where casing is run and cemented
just above the producing zone.
The pay section is drilled with a non-damaging fluid.
WELL COMPLETION
Open Hole Barefoot
WELL COMPLETION
Conventional Single Zone Completion
Open Hole Completion
Open hole completions can be barefoot, where tubing is run and a packer
is set in the casing above the open hole the well put on production.
Another option is to run a gravel pack liner or screen and gravel pack the
open interval.
This is known as an Open Hole Gravel Pack completion.
The open hole can also be widened using an under-reamer and then
gravel packed.
Open hole gravel pack
WELL COMPLETION
WELL COMPLETION
Conventional Single Zone Completion
Productivity of open hole gravel packs is higher than the cased hole
gravel packs because the hydrocarbon flows into a larger tube.
Some features of open hole completions:
1. It is run in unconsolidated sandstone or carbonate reservoirs
2. Perforating expense is eliminated
3. It provides good sand control
4. The entire pay section is produced
5. It can easily be converted to cased hole completion
WELL COMPLETION
Conventional Single Zone Completion
6. It is difficult to selectively stimulate using acid or fracturing
7. The casing is set “in the dark” before the pay section is drilled
8. It is difficult to eliminate water or gas production
Single Zone Cased Hole Completion
Casing is run and cemented to the bottom of the pay zone.
Single zone cased hole completions may be with gravel packed screens or
liners for sand control.
WELL COMPLETION
Single zone cased hole
WELL COMPLETION
Single Zone Cased Hole Completion
Some features of cased hole completions:
- It is easier to selectively stimulate using acid or fracturing
- Water or gas production can be eliminated
- Multiple completion is possible
- The well can be easily deepened
- Perforating cost can be high
- Various sand control techniques can be utilized
WELL COMPLETION
CASED HOLE GRAVEL PACK COMPLETION
17 1/2 " hole
13 3/8" casing
12 1/4" hole
casing liner hanger
9 5/8" casing
Gravel Pack Packer
Perforation Gravel
Gravel Pack Screen
Hydrocarbon
7" casing
WELL COMPLETION
Conventional Multiple Completion
Utilized when there are two zones in a well that contain significantly
different reservoir pressures.
If both are produced together and allowed to mix, some production from
the higher pressure zone will preferably flow into the lower
pressure zone, especially when the well is shut in.
Thus it is necessary to isolate production from both zones.
This is achieved by placing a dual packer between both zones and
allowing flow up two different tubing strings
WELL COMPLETION
Dual completion
WELL COMPLETION
Conventional Multiple Completion
Tubingless Completion
Casing is small and no inner tubing is run in the hole.
Tubingless completions can be single zone or multiple zone.
The zones are perforated using “orienting guns” which utilize
magnetism to orient the guns away from the other casing strings in the
hole, while perforating the selected zone.
Tubing
Tubing is set inside the casing to transmit fluids from downhole to
surface, with minimal pressure drop.
HORIZONTAL WELL COMPLETIONS
WELL COMPLETION
Open hole horizontal
CASED HOLE HORIZONTAL COMPLETION
Intermediate
Casing – 9 ⅝”
12 ¼” hole
Liner hanger
Toe
Heel
TVD=
11,000’
Surface Casing
– 13 ⅜”
17 ½” hole
Depth – 3000’
Production
Tubing – 2 ⅝”
Packer @ 9,000’
Perforation 7” casing liner
WELL COMPLETION
WELL COMPLETION
Slotted liner in Open hole with external casing packers
WELL COMPLETION
Tubing
Another factor is gas expansion in the tubing, which assists in the lifting
of the liquids to the surface.
To achieve this, tubing is usually small in diameter e.g 2 3/8”, 2 7/8”,
3 ½”.
In choosing the optimum size of tubing the following is considered:
1. The desired flow rate
2. Gas and liquid ratio for liquid loading in the tubing
3. Possible artificial lift method to be employed.
4. Special requirements for completion e.g. sand control
WELL COMPLETION
Packers
Set in the wellbore to provide a seal between the tubing and casing.
They also serve an anchors/hangers for the production tubing.
A packer may be classified by the way it is set: hydraulic or
mechanical set, by the way it is run: wireline or tubing,
or by whether permanent or temporary.
Packers are run for:
- Casing protection from pressure or fluid in the tubing
- Separation of zones
- Subsurface pressure and fluid control for safety
- Artificial lift support equipment
WELL
COMPLETION
Packers
WELL COMPLETION
Packers
Wellheads
Wellheads are the connection points for the tubing and the surface flow
lines as well as being the surface control point in all wells.
The selection of the wellhead is based on the pressure, temperature
and corrosivity of the produced fluids.
Both the casing and tubing strings are landed in the wellhead.
The casing also acts as a conduit allowing for all types of workover
operations.
Wellheads plays a major role in preventing oncontrolled flow from
downhole, through it’s configuration of valves.
Functions of a wellhead:
• Provide a means of casing suspension.
• Provides a means of tubing suspension.
• Provides a means of pressure sealing and isolation between casing at
surface when many casing strings are used.
• Provides access to annuli between the different casing/tubing strings.
• Provides a means of attaching a blowout preventer during drilling.
• Provides a means of attaching a christmas tree for well control during
production, injection, or other operations.
• Provides a reliable means of well access.
• Provides a means of attaching a well pump.
Wellhead for a flowing well
260416413-Well-Completion-ppt with examples
Wellhead for a pumping well
260416413-Well-Completion-ppt with examples

More Related Content

PPT
introduction to completions and workovers (2)
PPT
Wellhead
PDF
Landing nipples X & XN
PPT
Well completion and stimulation
PDF
Sequence of well completion part 1
PDF
Completion equipment part 1
PDF
Production packer
PDF
Sequence of well completion part 1
introduction to completions and workovers (2)
Wellhead
Landing nipples X & XN
Well completion and stimulation
Sequence of well completion part 1
Completion equipment part 1
Production packer
Sequence of well completion part 1

What's hot (20)

PDF
Completion equipment packer part #1
PDF
2.1 rig types
PPTX
PDF
1. completion sequance
PPTX
Workover job ppe
PDF
Well completion equipment 2. landing nipples
PDF
Liner hanger design and operations
DOCX
Completación de pozos petroleros
PDF
perforated joint, flow coupling and blast joint
PDF
Tubing Landing nipples in petroleum industry
PDF
PPTX
Well control equipment
PPTX
Well control system
PDF
Wellhead basics
PDF
3. sequances of drilling operations
PPT
PPT
Well design and construction i
PPSX
Well control and blowout preventer
PDF
Tubing string
PPT
Well completion fundamentals
Completion equipment packer part #1
2.1 rig types
1. completion sequance
Workover job ppe
Well completion equipment 2. landing nipples
Liner hanger design and operations
Completación de pozos petroleros
perforated joint, flow coupling and blast joint
Tubing Landing nipples in petroleum industry
Well control equipment
Well control system
Wellhead basics
3. sequances of drilling operations
Well design and construction i
Well control and blowout preventer
Tubing string
Well completion fundamentals
Ad

Similar to 260416413-Well-Completion-ppt with examples (20)

PPTX
WELL COMPLETIONS.pptx
PPTX
Well Complection - Basic-1.pptx
PDF
Defining Well completion
DOCX
Open Hole Completion Design
PPTX
Well completion.
PDF
PPT
Section 5 - Well Completion for drilling .ppt
PPTX
of the petroleum production engineering for oil and gas engineers
PPTX
Anmol bhargava casing basics
PDF
Chapter_6hdhdvd-OCW.pdf
PDF
Chapter_6-OCW.pdf
PPTX
Unit - 4 Well Completion, Development and Maintenance.pptx
PPTX
Presentation on well point system
PPT
Drainage
PPT
CH7.2.ppt,ground water hydrology in ethi
PPTX
Dewatering techniques
PPTX
dewateringtechniques 2.pptx
PPTX
Lecture02-1of the petroleum production engineering for oil and gas engineers....
PPTX
nwosu chioma sylvia
WELL COMPLETIONS.pptx
Well Complection - Basic-1.pptx
Defining Well completion
Open Hole Completion Design
Well completion.
Section 5 - Well Completion for drilling .ppt
of the petroleum production engineering for oil and gas engineers
Anmol bhargava casing basics
Chapter_6hdhdvd-OCW.pdf
Chapter_6-OCW.pdf
Unit - 4 Well Completion, Development and Maintenance.pptx
Presentation on well point system
Drainage
CH7.2.ppt,ground water hydrology in ethi
Dewatering techniques
dewateringtechniques 2.pptx
Lecture02-1of the petroleum production engineering for oil and gas engineers....
nwosu chioma sylvia
Ad

Recently uploaded (20)

PPTX
Share_Module_2_Power_conflict_and_negotiation.pptx
PDF
Τίμαιος είναι φιλοσοφικός διάλογος του Πλάτωνα
PDF
FORM 1 BIOLOGY MIND MAPS and their schemes
PPTX
Unit 4 Computer Architecture Multicore Processor.pptx
PPTX
TNA_Presentation-1-Final(SAVE)) (1).pptx
PPTX
B.Sc. DS Unit 2 Software Engineering.pptx
PDF
Computing-Curriculum for Schools in Ghana
PDF
ChatGPT for Dummies - Pam Baker Ccesa007.pdf
PPTX
Introduction to pro and eukaryotes and differences.pptx
PDF
OBE - B.A.(HON'S) IN INTERIOR ARCHITECTURE -Ar.MOHIUDDIN.pdf
PDF
AI-driven educational solutions for real-life interventions in the Philippine...
PDF
Weekly quiz Compilation Jan -July 25.pdf
PDF
Trump Administration's workforce development strategy
PPTX
A powerpoint presentation on the Revised K-10 Science Shaping Paper
PDF
MBA _Common_ 2nd year Syllabus _2021-22_.pdf
PDF
Practical Manual AGRO-233 Principles and Practices of Natural Farming
PPTX
Onco Emergencies - Spinal cord compression Superior vena cava syndrome Febr...
PDF
1.3 FINAL REVISED K-10 PE and Health CG 2023 Grades 4-10 (1).pdf
PDF
A GUIDE TO GENETICS FOR UNDERGRADUATE MEDICAL STUDENTS
PDF
medical_surgical_nursing_10th_edition_ignatavicius_TEST_BANK_pdf.pdf
Share_Module_2_Power_conflict_and_negotiation.pptx
Τίμαιος είναι φιλοσοφικός διάλογος του Πλάτωνα
FORM 1 BIOLOGY MIND MAPS and their schemes
Unit 4 Computer Architecture Multicore Processor.pptx
TNA_Presentation-1-Final(SAVE)) (1).pptx
B.Sc. DS Unit 2 Software Engineering.pptx
Computing-Curriculum for Schools in Ghana
ChatGPT for Dummies - Pam Baker Ccesa007.pdf
Introduction to pro and eukaryotes and differences.pptx
OBE - B.A.(HON'S) IN INTERIOR ARCHITECTURE -Ar.MOHIUDDIN.pdf
AI-driven educational solutions for real-life interventions in the Philippine...
Weekly quiz Compilation Jan -July 25.pdf
Trump Administration's workforce development strategy
A powerpoint presentation on the Revised K-10 Science Shaping Paper
MBA _Common_ 2nd year Syllabus _2021-22_.pdf
Practical Manual AGRO-233 Principles and Practices of Natural Farming
Onco Emergencies - Spinal cord compression Superior vena cava syndrome Febr...
1.3 FINAL REVISED K-10 PE and Health CG 2023 Grades 4-10 (1).pdf
A GUIDE TO GENETICS FOR UNDERGRADUATE MEDICAL STUDENTS
medical_surgical_nursing_10th_edition_ignatavicius_TEST_BANK_pdf.pdf

260416413-Well-Completion-ppt with examples

  • 1. WELL COMPLETION There are four basic types of well completion: 1. Conventional Single zone Completion 2. Conventional Multiple zone Completion 3. Tubingless Completion 4. Horizontal and Multilateral Completions Conventional Single Zone Completion Open Hole Completion This is the simplest of all completion types, where casing is run and cemented just above the producing zone. The pay section is drilled with a non-damaging fluid.
  • 3. WELL COMPLETION Conventional Single Zone Completion Open Hole Completion Open hole completions can be barefoot, where tubing is run and a packer is set in the casing above the open hole the well put on production. Another option is to run a gravel pack liner or screen and gravel pack the open interval. This is known as an Open Hole Gravel Pack completion. The open hole can also be widened using an under-reamer and then gravel packed.
  • 4. Open hole gravel pack WELL COMPLETION
  • 5. WELL COMPLETION Conventional Single Zone Completion Productivity of open hole gravel packs is higher than the cased hole gravel packs because the hydrocarbon flows into a larger tube. Some features of open hole completions: 1. It is run in unconsolidated sandstone or carbonate reservoirs 2. Perforating expense is eliminated 3. It provides good sand control 4. The entire pay section is produced 5. It can easily be converted to cased hole completion
  • 6. WELL COMPLETION Conventional Single Zone Completion 6. It is difficult to selectively stimulate using acid or fracturing 7. The casing is set “in the dark” before the pay section is drilled 8. It is difficult to eliminate water or gas production Single Zone Cased Hole Completion Casing is run and cemented to the bottom of the pay zone. Single zone cased hole completions may be with gravel packed screens or liners for sand control.
  • 8. WELL COMPLETION Single Zone Cased Hole Completion Some features of cased hole completions: - It is easier to selectively stimulate using acid or fracturing - Water or gas production can be eliminated - Multiple completion is possible - The well can be easily deepened - Perforating cost can be high - Various sand control techniques can be utilized
  • 9. WELL COMPLETION CASED HOLE GRAVEL PACK COMPLETION 17 1/2 " hole 13 3/8" casing 12 1/4" hole casing liner hanger 9 5/8" casing Gravel Pack Packer Perforation Gravel Gravel Pack Screen Hydrocarbon 7" casing
  • 10. WELL COMPLETION Conventional Multiple Completion Utilized when there are two zones in a well that contain significantly different reservoir pressures. If both are produced together and allowed to mix, some production from the higher pressure zone will preferably flow into the lower pressure zone, especially when the well is shut in. Thus it is necessary to isolate production from both zones. This is achieved by placing a dual packer between both zones and allowing flow up two different tubing strings
  • 12. WELL COMPLETION Conventional Multiple Completion Tubingless Completion Casing is small and no inner tubing is run in the hole. Tubingless completions can be single zone or multiple zone. The zones are perforated using “orienting guns” which utilize magnetism to orient the guns away from the other casing strings in the hole, while perforating the selected zone. Tubing Tubing is set inside the casing to transmit fluids from downhole to surface, with minimal pressure drop.
  • 15. CASED HOLE HORIZONTAL COMPLETION Intermediate Casing – 9 ⅝” 12 ¼” hole Liner hanger Toe Heel TVD= 11,000’ Surface Casing – 13 ⅜” 17 ½” hole Depth – 3000’ Production Tubing – 2 ⅝” Packer @ 9,000’ Perforation 7” casing liner WELL COMPLETION
  • 16. WELL COMPLETION Slotted liner in Open hole with external casing packers
  • 17. WELL COMPLETION Tubing Another factor is gas expansion in the tubing, which assists in the lifting of the liquids to the surface. To achieve this, tubing is usually small in diameter e.g 2 3/8”, 2 7/8”, 3 ½”. In choosing the optimum size of tubing the following is considered: 1. The desired flow rate 2. Gas and liquid ratio for liquid loading in the tubing 3. Possible artificial lift method to be employed. 4. Special requirements for completion e.g. sand control
  • 18. WELL COMPLETION Packers Set in the wellbore to provide a seal between the tubing and casing. They also serve an anchors/hangers for the production tubing. A packer may be classified by the way it is set: hydraulic or mechanical set, by the way it is run: wireline or tubing, or by whether permanent or temporary. Packers are run for: - Casing protection from pressure or fluid in the tubing - Separation of zones - Subsurface pressure and fluid control for safety - Artificial lift support equipment
  • 20. WELL COMPLETION Packers Wellheads Wellheads are the connection points for the tubing and the surface flow lines as well as being the surface control point in all wells. The selection of the wellhead is based on the pressure, temperature and corrosivity of the produced fluids. Both the casing and tubing strings are landed in the wellhead. The casing also acts as a conduit allowing for all types of workover operations. Wellheads plays a major role in preventing oncontrolled flow from downhole, through it’s configuration of valves.
  • 21. Functions of a wellhead: • Provide a means of casing suspension. • Provides a means of tubing suspension. • Provides a means of pressure sealing and isolation between casing at surface when many casing strings are used. • Provides access to annuli between the different casing/tubing strings. • Provides a means of attaching a blowout preventer during drilling. • Provides a means of attaching a christmas tree for well control during production, injection, or other operations. • Provides a reliable means of well access. • Provides a means of attaching a well pump.
  • 22. Wellhead for a flowing well
  • 24. Wellhead for a pumping well