“Advance Concepts in OPC”
Presented By:-
SWAPNILKUMAR PAWAR(13253)
1
Contents
• OPC
• Push –Pull Systems
• KanBan
• KanBan cards
• Advantages
• ConWIP model
• TOC
• Applications of TOC
• IT in planning
• Planning for services
2
What Is PPC?
• Production planning is the system for
specifying the production procedure to obtain
the desired output in a given time at optimum
cost in conformance with specified standard of
quality
• Control is essential to ensure that
manufacturing takes place in the manner stated
in the plan
3
Push And Pull Systems
Push Strategy Pull Strategy
Push-
Pull
boundary
End
Customer
Raw
Materials
Supply chain time line
4
5
• Kanban is the Japanese word for
card
• The card is an authorization for the
next container of material to be
produced
• A sequence of kanban pulls material
through the process
• Many different sorts of signals are
used, but the system is still called
a kanban
6
ORIGIN
• In late 1940’s Toyota was studying supermarkets
• Customer can get what is needed, at the time needed, in
the amount needed
• Supermarkets stock what it believes it will sell
• Customers only take what they require
• In 1953, Toyota applied this logic in their main plant
machine shop
7
1. User removes a
standard sized
container
2. Signal is seen by the
producing department
as authorization to
replenish
Part numbersPart numbers
mark locationmark location
SignalSignal
marker onmarker on
boxesboxes
8
• When the producer and user are not in visual
contact, a card can be used
• When the producer and user are in visual contact,
a light or flag or empty spot on the floor may be
adequate
• Since several
components may
be required,
several different
kanban techniques
may be employed
9
• Usually each card controls a specific quantity
or parts
• Multiple card systems may be used if there
are several components or different lot sizes
• In an MRP system, the schedule can be
thought of as a build authorization and the
kanban a type of pull system that initiates
actual production
10
• Need to know the lead time needed to
produce a container of parts
• Need to know the amount of safety stock
needed
Number of kanbansNumber of kanbans
(containers)(containers)
Demand duringDemand during SafetySafety
lead timelead time ++ stockstock
Size of containerSize of container
==
11
Daily demand = 500 cakes
Production lead time = 2 days
(Wait time +
Material handling time +
Processing time)
Safety stock = 1/2 day
Container size = 250 cakes
Demand during lead time = 2 days x 500 cakes = 1,000
Number of kanbans = = 5
1,000 + 2501,000 + 250
250250
12
• Reduce WIP
• Allow only limited amount of faulty or
delayed material
• Problems are immediately evident
• Puts downward pressure on bad aspects of
inventory
• Standardized containers reduce weight,
disposal costs, wasted space, and labor
13
ADVANTAGES contd…
• A simple and understandable process
• Provides quick and precise information
• Low costs associated with the transfer of information
• Avoids overproduction
• Is minimizing waste
14
Feature to
develop Tasks in queue
Tasks in progress Tasks
complete
Feature complete
KanBan Example
15
KanBan Boards
16
Constant Work In Process
(CONWIP)
It is one of the variant of pull system.
It is known for its ease of implementation.
CONWIP systems are easier to implement and
adjust, since only one set of system cards is used to
manage system WIP
For example, no part is allowed to enter the system
without a card (authority). After a finished part is
completed at the last workstation, a card is
transferred to the first workstation and a new part is
pushed into the sequential process route.
17
Assumptions for CONWIP
• The production line consist of single routine
along which all parts flow.
• WIP can be measured in units, i.e. number of
jobs or parts in the line.
18
A CONWIP Production Line.
19
COMPARISON
Sr. No Kanban CONWIP
1 Focuses on individual work
station
Focuses on system as whole
2 Best in environment that is
stable and predictable
Best in environment that has
variability in production
3 Focuses on specific part no Does not focuses on specific
part no
4 Comparatively difficult to
implement
Easier to implement
5 Suitable for continuous or
repetitive production
Suitable for job shop
production
20
Theory Of Constraints(TOC)
• Theory of Constraints (TOC) is an overall
management philosophy introduced by Dr.
Eliyahu M. Goldratt in his 1984 book titled
The Goal.
• A system's constraint "is that part of the system
that constrains the objective of the system.“
• The TOC process of ongoing improvement seeks
to identify the constraint and restructure the rest
of the organization around it, through the use of
the Five Focusing Steps
21
The Basic principles of TOC
 Convergence
" that the more interconnected a system is the
fewer degrees of freedom it has, and consequently
the fewer points must be touched (managed) to
impact the whole system.
 Consistency
"If two interpretations of a natural phenomenon are
in conflict, one or possibly both must be wrong".
 Respect
this principle is states that people are not
inherently irrational.
22
BASIC PROCESSES
1. Identify the constraint (the resource/policy that
prevents the organization from obtaining more of the
goal)
2. Decide how to exploit the constraint (make sure the
constraint's time is not wasted doing things that it
should not do)
3. Subordinate all other processes to above decision
(align the whole system/organization to support the
decision made above)
4. Elevate the constraint (if required/possible,
permanently increase capacity of the constraint; "buy
more")
5. If, as a result of these steps, the constraint has moved,
return to Step 1. Don't let inertia become the
constraint.
23
Application of TOC
• Operations
 Drum-Buffer-Rope
 Simplified Drum-Buffer-Rope
• Supply chain / logistics
 TOC-Distribution
 TOC-VMI( Vendor Managed Inventory)
• Finance and accounting
• Project management
 A-Plants.
• Marketing and sales
24
IT IN PLANNING
 Information technology is the term used to describe
technologies which enable users to record ,store ,process ,
retrieve ,transmit and receive information which helps the
users for strategic planning and control of organization.
 Information Technology Management is concerned with
exploring and understanding Information Technology as a
corporate resource that determines both the strategic and
operational capabilities of the firm in designing and
developing products and services for maximum customer
satisfaction, corporate productivity, profitability and
competitiveness.
25
IT IN PLANNING
• IT is playing a significant role in planning
various activities in an organization ‘
• Due to IT we are able to store data in software
and retrieve it at any time and anywhere
through Internet.
• Organization is able to process data faster and
more reliably.
26
IT IN PLANNING
Computer
entry
Computer entry
Information system
Computer
Computer
Intranet
27
IT IN PLANNING
28
PLANNING FOR SERVICES
Service Management is integrated into Supply Chain
Management as the joint between the actual sales
and the customer
The aim of high performance Service Management
is to optimize the service-intensive supply chains,
which are usually more complex than the typical
finished-goods supply chain.
Most service-intensive supply chains require larger
inventories and tighter integration with field service
and third parties.
29
BENEFITS
High service costs can be reduced, i.e. by integrating
the service and products supply chain.
Inventory levels of service parts can be reduced and
therefore reduce total inventory costs.
Customer service or parts/service quality can be
optimized.
Increasing service revenue.
Reduce obsolescence costs of service parts through
improved forecasting.
Improve customer satisfaction levels.
Reduce expediting costs - with optimized service
parts inventory, there is no need to rush orders to
customers.
30
THANK YOU
31

More Related Content

PPT
Ch10 supp.chain+strategy
PPTX
Inventory management in supply chain
PDF
Basics of Supply Chain Managment
PPT
Advance Supply Chain Management : Holistic Overview with respect to an ERP an...
PPTX
Inventory Management , MRP, JIT and SCM
PDF
Operations and Supply Chain Management
PPT
Jit And Lean
PPT
6 just in-time and lean thinking
Ch10 supp.chain+strategy
Inventory management in supply chain
Basics of Supply Chain Managment
Advance Supply Chain Management : Holistic Overview with respect to an ERP an...
Inventory Management , MRP, JIT and SCM
Operations and Supply Chain Management
Jit And Lean
6 just in-time and lean thinking

What's hot (20)

PPTX
Production Management
PPTX
Supply chain design and operation
PPTX
Logistical Performance Cycle
PPTX
Supply chain design and analysis
PPTX
Lecture 1 - Sent 1.pptx
PPTX
9-supply Chain Design. OPerations Management
PPTX
Supply chain management
PPT
Introduction to production operation management
PPTX
Inventory managment and improvements
PPT
MATERIAL MANAGEMENT
PPTX
Material flow
PPTX
Supply chain management
PPTX
Week 1 building blocks of scm
PDF
TOC ConWIP Kanban
PPT
Chapter 4: Production and Supply Chain Management Information Systems
PPTX
Pom ppt main
PDF
Operation Process
PPTX
Materials Flow Methods & Analysis
PPT
Supply chain management INVENTORY MANAGEMENT IN A SUPPLY CHAIN
PPTX
Best practices in Inventory Management
Production Management
Supply chain design and operation
Logistical Performance Cycle
Supply chain design and analysis
Lecture 1 - Sent 1.pptx
9-supply Chain Design. OPerations Management
Supply chain management
Introduction to production operation management
Inventory managment and improvements
MATERIAL MANAGEMENT
Material flow
Supply chain management
Week 1 building blocks of scm
TOC ConWIP Kanban
Chapter 4: Production and Supply Chain Management Information Systems
Pom ppt main
Operation Process
Materials Flow Methods & Analysis
Supply chain management INVENTORY MANAGEMENT IN A SUPPLY CHAIN
Best practices in Inventory Management
Ad

Viewers also liked (17)

PDF
Financial report 2011 eng
PPTX
Podsumowanie działań Stowarzyszenia Uśmiech Nadziei 2014
PDF
MANILA STAGE AND TRUSSES RENTALS (MNL STAGE RENTALS )
PPTX
Practica 5 jesus garza
PDF
13.02.2014 odf ukraine_attacks_on_journalists_pl
PPTX
Engaging citizens
PPT
SCM Revenue Generation Engines
PDF
03.03.2014 odf war_russia_ukraine_ru
PPTX
WEEE Recycling
PPTX
Hearsay Social - DDM Alliance Summit Marketing on Facebook
PDF
11.03.2014 odf ukraine_list_of_dead_ru
DOC
25 04-2014-odf-45-days-of-russian-occupation-of-crimea-eng
PDF
28.02.2014 odf armed_invasion_of_russian_troops_in_crimea_en
PDF
Doc092
PDF
Macroestructura- Santiago Mariño
PDF
Sca digital disruption - march 2016
PDF
A Matter of Plain Reason: Why Christians Must Believe in Joseph Smith
Financial report 2011 eng
Podsumowanie działań Stowarzyszenia Uśmiech Nadziei 2014
MANILA STAGE AND TRUSSES RENTALS (MNL STAGE RENTALS )
Practica 5 jesus garza
13.02.2014 odf ukraine_attacks_on_journalists_pl
Engaging citizens
SCM Revenue Generation Engines
03.03.2014 odf war_russia_ukraine_ru
WEEE Recycling
Hearsay Social - DDM Alliance Summit Marketing on Facebook
11.03.2014 odf ukraine_list_of_dead_ru
25 04-2014-odf-45-days-of-russian-occupation-of-crimea-eng
28.02.2014 odf armed_invasion_of_russian_troops_in_crimea_en
Doc092
Macroestructura- Santiago Mariño
Sca digital disruption - march 2016
A Matter of Plain Reason: Why Christians Must Believe in Joseph Smith
Ad

Similar to Advance concepts in Operations Planning and Control. (20)

PPT
Ch12 jit+&+lean+systems
PPTX
Lean-TAREQ.pptx
PPT
lean manufacturing.ppt cost profit accounts
PPTX
Just in time
PPTX
JIT and lean operations
PPT
Distribution management concluding session revised
PPT
Jit and lean operations
PPT
Just-In-Timeasdfffffffghhhhhhhhhhj Systems.ppt
PPT
jit just in time in lean manufacturing by
PDF
Lean Management and Kanban System
PPTX
Operation management
PPT
TEE-P670026.ppt aula teórica sobre lean manufacturing
PPTX
Lean Manufacturing
PPTX
Lean Tools
PPTX
BASIC OF TOYOTA PRODUCTION SYSTEM
PDF
5a session 5a_jit systems cfvg 2012
PPTX
efficiency in supply chain & ware hosing
PPTX
Operation management
PDF
Toc in a nutshell
PPT
Lean management
Ch12 jit+&+lean+systems
Lean-TAREQ.pptx
lean manufacturing.ppt cost profit accounts
Just in time
JIT and lean operations
Distribution management concluding session revised
Jit and lean operations
Just-In-Timeasdfffffffghhhhhhhhhhj Systems.ppt
jit just in time in lean manufacturing by
Lean Management and Kanban System
Operation management
TEE-P670026.ppt aula teórica sobre lean manufacturing
Lean Manufacturing
Lean Tools
BASIC OF TOYOTA PRODUCTION SYSTEM
5a session 5a_jit systems cfvg 2012
efficiency in supply chain & ware hosing
Operation management
Toc in a nutshell
Lean management

Recently uploaded (20)

PDF
CISA (Certified Information Systems Auditor) Domain-Wise Summary.pdf
PPTX
Virtual and Augmented Reality in Current Scenario
PDF
AI-driven educational solutions for real-life interventions in the Philippine...
PDF
BP 505 T. PHARMACEUTICAL JURISPRUDENCE (UNIT 2).pdf
PDF
LEARNERS WITH ADDITIONAL NEEDS ProfEd Topic
PPTX
B.Sc. DS Unit 2 Software Engineering.pptx
PDF
1.3 FINAL REVISED K-10 PE and Health CG 2023 Grades 4-10 (1).pdf
PPTX
Share_Module_2_Power_conflict_and_negotiation.pptx
PDF
Hazard Identification & Risk Assessment .pdf
PDF
Mucosal Drug Delivery system_NDDS_BPHARMACY__SEM VII_PCI.pdf
PPTX
Module on health assessment of CHN. pptx
PDF
BP 704 T. NOVEL DRUG DELIVERY SYSTEMS (UNIT 2).pdf
PDF
semiconductor packaging in vlsi design fab
PPTX
Computer Architecture Input Output Memory.pptx
PDF
Journal of Dental Science - UDMY (2021).pdf
PPTX
What’s under the hood: Parsing standardized learning content for AI
PDF
MICROENCAPSULATION_NDDS_BPHARMACY__SEM VII_PCI .pdf
PDF
Race Reva University – Shaping Future Leaders in Artificial Intelligence
PDF
LIFE & LIVING TRILOGY - PART - (2) THE PURPOSE OF LIFE.pdf
PPTX
Unit 4 Computer Architecture Multicore Processor.pptx
CISA (Certified Information Systems Auditor) Domain-Wise Summary.pdf
Virtual and Augmented Reality in Current Scenario
AI-driven educational solutions for real-life interventions in the Philippine...
BP 505 T. PHARMACEUTICAL JURISPRUDENCE (UNIT 2).pdf
LEARNERS WITH ADDITIONAL NEEDS ProfEd Topic
B.Sc. DS Unit 2 Software Engineering.pptx
1.3 FINAL REVISED K-10 PE and Health CG 2023 Grades 4-10 (1).pdf
Share_Module_2_Power_conflict_and_negotiation.pptx
Hazard Identification & Risk Assessment .pdf
Mucosal Drug Delivery system_NDDS_BPHARMACY__SEM VII_PCI.pdf
Module on health assessment of CHN. pptx
BP 704 T. NOVEL DRUG DELIVERY SYSTEMS (UNIT 2).pdf
semiconductor packaging in vlsi design fab
Computer Architecture Input Output Memory.pptx
Journal of Dental Science - UDMY (2021).pdf
What’s under the hood: Parsing standardized learning content for AI
MICROENCAPSULATION_NDDS_BPHARMACY__SEM VII_PCI .pdf
Race Reva University – Shaping Future Leaders in Artificial Intelligence
LIFE & LIVING TRILOGY - PART - (2) THE PURPOSE OF LIFE.pdf
Unit 4 Computer Architecture Multicore Processor.pptx

Advance concepts in Operations Planning and Control.

  • 1. “Advance Concepts in OPC” Presented By:- SWAPNILKUMAR PAWAR(13253) 1
  • 2. Contents • OPC • Push –Pull Systems • KanBan • KanBan cards • Advantages • ConWIP model • TOC • Applications of TOC • IT in planning • Planning for services 2
  • 3. What Is PPC? • Production planning is the system for specifying the production procedure to obtain the desired output in a given time at optimum cost in conformance with specified standard of quality • Control is essential to ensure that manufacturing takes place in the manner stated in the plan 3
  • 4. Push And Pull Systems Push Strategy Pull Strategy Push- Pull boundary End Customer Raw Materials Supply chain time line 4
  • 5. 5
  • 6. • Kanban is the Japanese word for card • The card is an authorization for the next container of material to be produced • A sequence of kanban pulls material through the process • Many different sorts of signals are used, but the system is still called a kanban 6
  • 7. ORIGIN • In late 1940’s Toyota was studying supermarkets • Customer can get what is needed, at the time needed, in the amount needed • Supermarkets stock what it believes it will sell • Customers only take what they require • In 1953, Toyota applied this logic in their main plant machine shop 7
  • 8. 1. User removes a standard sized container 2. Signal is seen by the producing department as authorization to replenish Part numbersPart numbers mark locationmark location SignalSignal marker onmarker on boxesboxes 8
  • 9. • When the producer and user are not in visual contact, a card can be used • When the producer and user are in visual contact, a light or flag or empty spot on the floor may be adequate • Since several components may be required, several different kanban techniques may be employed 9
  • 10. • Usually each card controls a specific quantity or parts • Multiple card systems may be used if there are several components or different lot sizes • In an MRP system, the schedule can be thought of as a build authorization and the kanban a type of pull system that initiates actual production 10
  • 11. • Need to know the lead time needed to produce a container of parts • Need to know the amount of safety stock needed Number of kanbansNumber of kanbans (containers)(containers) Demand duringDemand during SafetySafety lead timelead time ++ stockstock Size of containerSize of container == 11
  • 12. Daily demand = 500 cakes Production lead time = 2 days (Wait time + Material handling time + Processing time) Safety stock = 1/2 day Container size = 250 cakes Demand during lead time = 2 days x 500 cakes = 1,000 Number of kanbans = = 5 1,000 + 2501,000 + 250 250250 12
  • 13. • Reduce WIP • Allow only limited amount of faulty or delayed material • Problems are immediately evident • Puts downward pressure on bad aspects of inventory • Standardized containers reduce weight, disposal costs, wasted space, and labor 13
  • 14. ADVANTAGES contd… • A simple and understandable process • Provides quick and precise information • Low costs associated with the transfer of information • Avoids overproduction • Is minimizing waste 14
  • 15. Feature to develop Tasks in queue Tasks in progress Tasks complete Feature complete KanBan Example 15
  • 17. Constant Work In Process (CONWIP) It is one of the variant of pull system. It is known for its ease of implementation. CONWIP systems are easier to implement and adjust, since only one set of system cards is used to manage system WIP For example, no part is allowed to enter the system without a card (authority). After a finished part is completed at the last workstation, a card is transferred to the first workstation and a new part is pushed into the sequential process route. 17
  • 18. Assumptions for CONWIP • The production line consist of single routine along which all parts flow. • WIP can be measured in units, i.e. number of jobs or parts in the line. 18
  • 20. COMPARISON Sr. No Kanban CONWIP 1 Focuses on individual work station Focuses on system as whole 2 Best in environment that is stable and predictable Best in environment that has variability in production 3 Focuses on specific part no Does not focuses on specific part no 4 Comparatively difficult to implement Easier to implement 5 Suitable for continuous or repetitive production Suitable for job shop production 20
  • 21. Theory Of Constraints(TOC) • Theory of Constraints (TOC) is an overall management philosophy introduced by Dr. Eliyahu M. Goldratt in his 1984 book titled The Goal. • A system's constraint "is that part of the system that constrains the objective of the system.“ • The TOC process of ongoing improvement seeks to identify the constraint and restructure the rest of the organization around it, through the use of the Five Focusing Steps 21
  • 22. The Basic principles of TOC  Convergence " that the more interconnected a system is the fewer degrees of freedom it has, and consequently the fewer points must be touched (managed) to impact the whole system.  Consistency "If two interpretations of a natural phenomenon are in conflict, one or possibly both must be wrong".  Respect this principle is states that people are not inherently irrational. 22
  • 23. BASIC PROCESSES 1. Identify the constraint (the resource/policy that prevents the organization from obtaining more of the goal) 2. Decide how to exploit the constraint (make sure the constraint's time is not wasted doing things that it should not do) 3. Subordinate all other processes to above decision (align the whole system/organization to support the decision made above) 4. Elevate the constraint (if required/possible, permanently increase capacity of the constraint; "buy more") 5. If, as a result of these steps, the constraint has moved, return to Step 1. Don't let inertia become the constraint. 23
  • 24. Application of TOC • Operations  Drum-Buffer-Rope  Simplified Drum-Buffer-Rope • Supply chain / logistics  TOC-Distribution  TOC-VMI( Vendor Managed Inventory) • Finance and accounting • Project management  A-Plants. • Marketing and sales 24
  • 25. IT IN PLANNING  Information technology is the term used to describe technologies which enable users to record ,store ,process , retrieve ,transmit and receive information which helps the users for strategic planning and control of organization.  Information Technology Management is concerned with exploring and understanding Information Technology as a corporate resource that determines both the strategic and operational capabilities of the firm in designing and developing products and services for maximum customer satisfaction, corporate productivity, profitability and competitiveness. 25
  • 26. IT IN PLANNING • IT is playing a significant role in planning various activities in an organization ‘ • Due to IT we are able to store data in software and retrieve it at any time and anywhere through Internet. • Organization is able to process data faster and more reliably. 26
  • 27. IT IN PLANNING Computer entry Computer entry Information system Computer Computer Intranet 27
  • 29. PLANNING FOR SERVICES Service Management is integrated into Supply Chain Management as the joint between the actual sales and the customer The aim of high performance Service Management is to optimize the service-intensive supply chains, which are usually more complex than the typical finished-goods supply chain. Most service-intensive supply chains require larger inventories and tighter integration with field service and third parties. 29
  • 30. BENEFITS High service costs can be reduced, i.e. by integrating the service and products supply chain. Inventory levels of service parts can be reduced and therefore reduce total inventory costs. Customer service or parts/service quality can be optimized. Increasing service revenue. Reduce obsolescence costs of service parts through improved forecasting. Improve customer satisfaction levels. Reduce expediting costs - with optimized service parts inventory, there is no need to rush orders to customers. 30