JIT/Lean Production
• Just-in-time

(JIT): A highly coordinated

processing system in which goods move
through the system, and services are
performed, just as they are needed
•

Highly Coordinated, Repetitive manufacturing
designed to produce high volumes with fewer
resources.

•

Developed by Taiichi Ohno
JIT
Produce and deliver goods just in time to be sold,
Subassemblies just in time to be assembled into
FP and purchase material just in time to be
transformed into fabricated parts.
• A production system to produce the kind of units
needed at the time needed and in the quantities
needed.
•
Goal of JIT
The ultimate goal of JIT is a balanced
system.
Achieves a smooth, rapid flow of materials
through the system
Pursue a system with min. inventories,
space, waste and min. transactions
Summary JIT Goals and Building Blocks
Ultimate
A
Goal balanced
rapid flow
Supporting
Goals
Eliminate disruptions
Make the system flexible

Product
Design

Process
Design

Eliminate waste

Personnel
Elements

Manufacturing Planning

Building
Blocks
Supporting Goals
•

Eliminate disruptions

•

Make system flexible

•

Eliminate waste, especially excess
inventory
Sources of Waste
•

Overproduction

•

Waiting time

•

Unnecessary transportation

•

Processing waste

•

Inefficient work methods

•

Product defects
JIT Building Blocks
•

Product design

•

Process design

•

Personnel/organizational
elements

•

Manufacturing
planning and control
Product Design
•

Standard parts

•

Modular design

•

Highly capable production systems

•

Concurrent
engineering
Process Design
•

Small lot sizes

•

Setup time reduction

•

Manufacturing cells

•

Limited work in process

•

Quality improvement

•

Production flexibility

•

Little inventory storage
Benefits of Small Lot Sizes
Reduces inventory
Less rework
Less storage space
Problems are more apparent
Increases product flexibility
Easier to balance operations
Production Flexibility
•

Reduce downtime by reducing
changeover time

•

Use preventive maintenance to reduce
breakdowns

•

Cross-train workers to help clear
bottlenecks
Production Flexibility (cont’d)
Use many small units of capacity
• Use off-line buffers
• Reserve capacity for important customers
•
Quality Improvement

•

Autonomation
•

Automatic detection of defects during
production
Personnel/Organizational Elements
•

Workers as assets

•

Cross-trained workers

•

Continuous
improvement

•

Cost accounting

•

Leadership/project
management
Manufacturing Planning and Control
•

Pull systems

•

Visual systems

•

Close vendor relationships

•

Reduced transaction
processing

•

Preventive maintenance
Jit and lean operations
Pull/Push Systems
•

Pull system: System for moving work where
a workstation pulls output from the preceding
station as needed. (e.g. Kanban)

•

Push system: System for moving work where
output is pushed to the next station as it is
completed
Kanban Production Control System
•

Kanban: Card or other device that
communicates demand for work or materials
from the preceding station

•

Kanban is the Japanese word meaning
“signal” or “visible record”

•

Paperless production control system

•

Authority to pull, or produce comes
from a downstream process.
Traditional Supplier Network

Buyer
Buyer
Supplier
Supplier

Supplier
Supplier
Supplier
Supplier

Supplier
Supplier

Supplier
Supplier

Supplier
Supplier

Supplier
Supplier
Tiered Supplier Network
Buyer
Buyer
First Tier Supplier
Second Tier Supplier

Third Tier Supplier

Supplier
Supplier
Supplier
Supplier

Supplier
Supplier

Supplier
Supplier

Supplier
Supplier

Supplier
Supplier

Supplier
Supplier
Comparison of JIT and Traditional
Factor

Traditional

JIT

Inventory

Much to offset forecast
errors, late deliveries

Minimal necessary to operate

Deliveries

Few, large

Many, small

Lot sizes

Large

Small

Setup; runs

Few, long runs

Many, short runs

Vendors

Long-term relationships
are unusual

Partners

Workers

Necessary to do the
work

Assets
Transitioning to a JIT System
•

Get top management commitment

•

Decide which parts need most effort

•

Obtain support of workers

•

Start by trying to reduce setup times

•

Gradually convert operations

•

Convert suppliers to JIT

•

Prepare for obstacles
Obstacles to Conversion
•

Management may not be committed

•

Workers/management may not be
cooperative

•

Suppliers may
resist
•

Why?
JIT in Services
The basic goal of the demand flow technology in
the service organization is to provide optimum
response to the customer with the highest quality
service and lowest possible cost.
Eliminate disruptions
• Make system flexible
• Reduce setup and lead times
• Eliminate waste
• Minimize WIP
• Simplify the process
•
Kaizen (Continuous Improvement)
Kaizen (Continuous Improvement)
•
•
•
•

Japanese concept –
Focus on gradual and continuous improvement
A whole business philosophy
Importance of EVERYONE buying into the concept and
the vision
Kaizen
Great attention paid to customer
•Efficient stock control
requirements and needs

•

methods help reduce costs
and improve cash-flow
•Flexible working practices
and empowerment – help
increase efficiency, reduce
costs and improve
•Leadership seen as vital.
motivation

Ability to communicate a
clear vision, take people
•Fundamental principles –
along with the vision and
often characterised as ‘lean
to think about where the
production’ – reducing waste,
company needs to be in
zero defects, high quality
5, 10, 15 and 20 yearsdelivery,
•Punctuality in all aspects –
control measures at all stages
supply,
time manufacture, etc.
5 S of Kaizen
Sort - the first step in making things
cleaned up and organized
• Set In Order - organize, identify and
arrange everything in a work area
• Shine - regular cleaning and maintenance
• Standardize - make it easy to maintain simplify and standardize
• Sustain -maintaining what has been
accomplished
•
Benefits of JIT Systems
•

Reduced inventory levels

•

High quality

•

Flexibility

•

Reduced lead times

•

Increased productivity
Benefits of JIT Systems (cont’d)
•

Increased equipment utilization

•

Reduced scrap and rework

•

Reduced space requirements

•

Pressure for good vendor relationships

•

Reduced need for indirect labor
Elements of JIT
Smooth flow of work (the ultimate goal)
• Elimination of waste
• Continuous improvement
• Eliminating anything that does not add
value
• Simple systems that are easy to manage
• Use of product layouts to minimize moving
materials and parts
• Quality at the source
•
Elements of JIT (cont’d)
Poka-yoke – fail safe tools and methods
• Preventative maintenance
• Good housekeeping
• Set-up time reduction
•

•

Cross-trained employees

•

A pull system

More Related Content

PPTX
JIT and lean operations
PPT
Jit & Lean Operations
PPTX
JIT inventory
PPTX
Just in time (jit) and lean production
PPT
Operations management chapter: facility location
PPT
Operations management
PPTX
Just In Time and Lean Operation Chapter Presentation
PPTX
Chapter 15; Short-Term Scheduling
JIT and lean operations
Jit & Lean Operations
JIT inventory
Just in time (jit) and lean production
Operations management chapter: facility location
Operations management
Just In Time and Lean Operation Chapter Presentation
Chapter 15; Short-Term Scheduling

What's hot (20)

PPTX
Facility layout ppt
PPTX
job shop production system in productions and operations system
PPT
Facility Layout
PPT
Operation scheduling
PPT
CAPACITY PLANNING
PPT
Capacity planning
PPT
Strategic capacity planning for products and services
PPT
6. process selection and facility layout
PPT
Scheduling and sequencing
PPTX
OPERATION STRATEGY
PPTX
Process selection
PPSX
Aggregate planning
PPTX
Capacity planning ppt
PDF
SUPPLY CHAIN STRATEGIES
PPTX
Design of supply chain networks
PPTX
Product layout in Food Industry and Line Balancing
PPT
material requirement planning
PPTX
Facility location and techniques
PPTX
AGGREGATE PRODUCTION PLANNING
Facility layout ppt
job shop production system in productions and operations system
Facility Layout
Operation scheduling
CAPACITY PLANNING
Capacity planning
Strategic capacity planning for products and services
6. process selection and facility layout
Scheduling and sequencing
OPERATION STRATEGY
Process selection
Aggregate planning
Capacity planning ppt
SUPPLY CHAIN STRATEGIES
Design of supply chain networks
Product layout in Food Industry and Line Balancing
material requirement planning
Facility location and techniques
AGGREGATE PRODUCTION PLANNING
Ad

Viewers also liked (16)

PPT
Just in-time and lean production
PPT
PDF
Heizer om10 ch16-jit and lean operations
DOCX
Lean production and jit
PPTX
Theory of Constraints
PPTX
Bajaj operation
DOCX
just in time and lean manufacturing
PDF
Theory of constraints
PPTX
PPT
Tata Motors
PPTX
Tata strategy
PPTX
PPT on TATA motors limited by MohamedArif and his team!!
DOC
Project on-tata-motors
DOCX
A project report on comparative study of bajaj and hero honda
PPT
Lean presentation ppt
PPTX
tata motors
Just in-time and lean production
Heizer om10 ch16-jit and lean operations
Lean production and jit
Theory of Constraints
Bajaj operation
just in time and lean manufacturing
Theory of constraints
Tata Motors
Tata strategy
PPT on TATA motors limited by MohamedArif and his team!!
Project on-tata-motors
A project report on comparative study of bajaj and hero honda
Lean presentation ppt
tata motors
Ad

Similar to Jit and lean operations (20)

PPT
Just-In-Time
PDF
Introduction to JIT & Lean Operations.pdf
PPT
Just In Time
PPT
Just in-time systems
PPT
Just-In-Timeasdfffffffghhhhhhhhhhj Systems.ppt
PPT
jit just in time in lean manufacturing by
PDF
JUST IN TIME PRODUCTION SYSTEM
PPT
Just In Time(JIT)
PPTX
Just In Time
PPTX
Just in Time and Lean Manufacturing
PDF
5a session 5a_jit systems cfvg 2012
PPTX
JIT and Lean Manufacturing
PPT
just-in-time-by-sashi-prabhu
PPT
37021790 just-in-time-by-sashi-prabhu
PPTX
Presentation on Just in Time
PPTX
HaidarDiabnewpresentaationjitofproduction.pptx
PPT
Just in Time and Lean operation management
PPT
chapter15 just in time technique new.ppt
PPT
Chapter.1 just in time
Just-In-Time
Introduction to JIT & Lean Operations.pdf
Just In Time
Just in-time systems
Just-In-Timeasdfffffffghhhhhhhhhhj Systems.ppt
jit just in time in lean manufacturing by
JUST IN TIME PRODUCTION SYSTEM
Just In Time(JIT)
Just In Time
Just in Time and Lean Manufacturing
5a session 5a_jit systems cfvg 2012
JIT and Lean Manufacturing
just-in-time-by-sashi-prabhu
37021790 just-in-time-by-sashi-prabhu
Presentation on Just in Time
HaidarDiabnewpresentaationjitofproduction.pptx
Just in Time and Lean operation management
chapter15 just in time technique new.ppt
Chapter.1 just in time

More from Sumit Malhotra (20)

PPT
Types of retailing done
PPTX
Retail communications done
PPT
PPT
Retail buying behaviour
PPT
Merchandising
PPT
What does retailer do
PPTX
Banking tools
PPTX
Introduction to indian banking
PPTX
Debt recovery
DOC
Tata case
PPT
Project cycle
PPT
Intro to ventures
PPT
Dmaic model
DOCX
99 % syndrome
PPT
Resistant to change 2 copy (1)
PPT
Location decision
PPT
Introduction to pom
PPT
Product design
PDF
Types of retailing done
Retail communications done
Retail buying behaviour
Merchandising
What does retailer do
Banking tools
Introduction to indian banking
Debt recovery
Tata case
Project cycle
Intro to ventures
Dmaic model
99 % syndrome
Resistant to change 2 copy (1)
Location decision
Introduction to pom
Product design

Recently uploaded (20)

PDF
Mark Klimek Lecture Notes_240423 revision books _173037.pdf
PPTX
The Healthy Child – Unit II | Child Health Nursing I | B.Sc Nursing 5th Semester
PPTX
Cell Types and Its function , kingdom of life
PDF
Saundersa Comprehensive Review for the NCLEX-RN Examination.pdf
PPTX
Microbial diseases, their pathogenesis and prophylaxis
PDF
Insiders guide to clinical Medicine.pdf
PPTX
PPT- ENG7_QUARTER1_LESSON1_WEEK1. IMAGERY -DESCRIPTIONS pptx.pptx
PDF
Business Ethics Teaching Materials for college
PDF
STATICS OF THE RIGID BODIES Hibbelers.pdf
PDF
The Lost Whites of Pakistan by Jahanzaib Mughal.pdf
PPTX
Institutional Correction lecture only . . .
PDF
VCE English Exam - Section C Student Revision Booklet
PDF
FourierSeries-QuestionsWithAnswers(Part-A).pdf
PPTX
Week 4 Term 3 Study Techniques revisited.pptx
PPTX
PPH.pptx obstetrics and gynecology in nursing
PDF
RMMM.pdf make it easy to upload and study
PDF
102 student loan defaulters named and shamed – Is someone you know on the list?
PPTX
Introduction_to_Human_Anatomy_and_Physiology_for_B.Pharm.pptx
PPTX
Pharma ospi slides which help in ospi learning
PDF
ANTIBIOTICS.pptx.pdf………………… xxxxxxxxxxxxx
Mark Klimek Lecture Notes_240423 revision books _173037.pdf
The Healthy Child – Unit II | Child Health Nursing I | B.Sc Nursing 5th Semester
Cell Types and Its function , kingdom of life
Saundersa Comprehensive Review for the NCLEX-RN Examination.pdf
Microbial diseases, their pathogenesis and prophylaxis
Insiders guide to clinical Medicine.pdf
PPT- ENG7_QUARTER1_LESSON1_WEEK1. IMAGERY -DESCRIPTIONS pptx.pptx
Business Ethics Teaching Materials for college
STATICS OF THE RIGID BODIES Hibbelers.pdf
The Lost Whites of Pakistan by Jahanzaib Mughal.pdf
Institutional Correction lecture only . . .
VCE English Exam - Section C Student Revision Booklet
FourierSeries-QuestionsWithAnswers(Part-A).pdf
Week 4 Term 3 Study Techniques revisited.pptx
PPH.pptx obstetrics and gynecology in nursing
RMMM.pdf make it easy to upload and study
102 student loan defaulters named and shamed – Is someone you know on the list?
Introduction_to_Human_Anatomy_and_Physiology_for_B.Pharm.pptx
Pharma ospi slides which help in ospi learning
ANTIBIOTICS.pptx.pdf………………… xxxxxxxxxxxxx

Jit and lean operations

  • 1. JIT/Lean Production • Just-in-time (JIT): A highly coordinated processing system in which goods move through the system, and services are performed, just as they are needed • Highly Coordinated, Repetitive manufacturing designed to produce high volumes with fewer resources. • Developed by Taiichi Ohno
  • 2. JIT Produce and deliver goods just in time to be sold, Subassemblies just in time to be assembled into FP and purchase material just in time to be transformed into fabricated parts. • A production system to produce the kind of units needed at the time needed and in the quantities needed. •
  • 3. Goal of JIT The ultimate goal of JIT is a balanced system. Achieves a smooth, rapid flow of materials through the system Pursue a system with min. inventories, space, waste and min. transactions
  • 4. Summary JIT Goals and Building Blocks Ultimate A Goal balanced rapid flow Supporting Goals Eliminate disruptions Make the system flexible Product Design Process Design Eliminate waste Personnel Elements Manufacturing Planning Building Blocks
  • 5. Supporting Goals • Eliminate disruptions • Make system flexible • Eliminate waste, especially excess inventory
  • 6. Sources of Waste • Overproduction • Waiting time • Unnecessary transportation • Processing waste • Inefficient work methods • Product defects
  • 7. JIT Building Blocks • Product design • Process design • Personnel/organizational elements • Manufacturing planning and control
  • 8. Product Design • Standard parts • Modular design • Highly capable production systems • Concurrent engineering
  • 9. Process Design • Small lot sizes • Setup time reduction • Manufacturing cells • Limited work in process • Quality improvement • Production flexibility • Little inventory storage
  • 10. Benefits of Small Lot Sizes Reduces inventory Less rework Less storage space Problems are more apparent Increases product flexibility Easier to balance operations
  • 11. Production Flexibility • Reduce downtime by reducing changeover time • Use preventive maintenance to reduce breakdowns • Cross-train workers to help clear bottlenecks
  • 12. Production Flexibility (cont’d) Use many small units of capacity • Use off-line buffers • Reserve capacity for important customers •
  • 14. Personnel/Organizational Elements • Workers as assets • Cross-trained workers • Continuous improvement • Cost accounting • Leadership/project management
  • 15. Manufacturing Planning and Control • Pull systems • Visual systems • Close vendor relationships • Reduced transaction processing • Preventive maintenance
  • 17. Pull/Push Systems • Pull system: System for moving work where a workstation pulls output from the preceding station as needed. (e.g. Kanban) • Push system: System for moving work where output is pushed to the next station as it is completed
  • 18. Kanban Production Control System • Kanban: Card or other device that communicates demand for work or materials from the preceding station • Kanban is the Japanese word meaning “signal” or “visible record” • Paperless production control system • Authority to pull, or produce comes from a downstream process.
  • 20. Tiered Supplier Network Buyer Buyer First Tier Supplier Second Tier Supplier Third Tier Supplier Supplier Supplier Supplier Supplier Supplier Supplier Supplier Supplier Supplier Supplier Supplier Supplier Supplier Supplier
  • 21. Comparison of JIT and Traditional Factor Traditional JIT Inventory Much to offset forecast errors, late deliveries Minimal necessary to operate Deliveries Few, large Many, small Lot sizes Large Small Setup; runs Few, long runs Many, short runs Vendors Long-term relationships are unusual Partners Workers Necessary to do the work Assets
  • 22. Transitioning to a JIT System • Get top management commitment • Decide which parts need most effort • Obtain support of workers • Start by trying to reduce setup times • Gradually convert operations • Convert suppliers to JIT • Prepare for obstacles
  • 23. Obstacles to Conversion • Management may not be committed • Workers/management may not be cooperative • Suppliers may resist • Why?
  • 24. JIT in Services The basic goal of the demand flow technology in the service organization is to provide optimum response to the customer with the highest quality service and lowest possible cost. Eliminate disruptions • Make system flexible • Reduce setup and lead times • Eliminate waste • Minimize WIP • Simplify the process •
  • 26. Kaizen (Continuous Improvement) • • • • Japanese concept – Focus on gradual and continuous improvement A whole business philosophy Importance of EVERYONE buying into the concept and the vision
  • 27. Kaizen Great attention paid to customer •Efficient stock control requirements and needs • methods help reduce costs and improve cash-flow •Flexible working practices and empowerment – help increase efficiency, reduce costs and improve •Leadership seen as vital. motivation Ability to communicate a clear vision, take people •Fundamental principles – along with the vision and often characterised as ‘lean to think about where the production’ – reducing waste, company needs to be in zero defects, high quality 5, 10, 15 and 20 yearsdelivery, •Punctuality in all aspects – control measures at all stages supply, time manufacture, etc.
  • 28. 5 S of Kaizen Sort - the first step in making things cleaned up and organized • Set In Order - organize, identify and arrange everything in a work area • Shine - regular cleaning and maintenance • Standardize - make it easy to maintain simplify and standardize • Sustain -maintaining what has been accomplished •
  • 29. Benefits of JIT Systems • Reduced inventory levels • High quality • Flexibility • Reduced lead times • Increased productivity
  • 30. Benefits of JIT Systems (cont’d) • Increased equipment utilization • Reduced scrap and rework • Reduced space requirements • Pressure for good vendor relationships • Reduced need for indirect labor
  • 31. Elements of JIT Smooth flow of work (the ultimate goal) • Elimination of waste • Continuous improvement • Eliminating anything that does not add value • Simple systems that are easy to manage • Use of product layouts to minimize moving materials and parts • Quality at the source •
  • 32. Elements of JIT (cont’d) Poka-yoke – fail safe tools and methods • Preventative maintenance • Good housekeeping • Set-up time reduction • • Cross-trained employees • A pull system