MODULE-3
AGGREGATE PLANNING
• Aggregate planning involves planning the best quality to
produce in the intermediate-range horizon (3 months to
one year)
• Aggregate production planning is the process of
determining output levels of product groups over the next
6 to 18 months period.
• Objectives of Aggregate Planning
i. The overall objective is to balance conflicting
objectives involving customer service, work force
stability, cost and profit.
ii. To establish company-wide strategic plan for
allocating resources.
iii.To develop an economic strategy to meet customer
demand.
Inputs to and Outputs from Aggregate Production
Planning
Importance of Aggregate Plans
 The various inputs to aggregate plans that affect
the performance of production and operations
managers are:
i. Engineering
ii. Materials
iii.Operations
iv. Marketing and distribution
v. Accounting and finance
vi. Human resources
Aggregate Planning or Aggregate
Capacity Planning
 Need for Aggregate Capacity Planning
1. It facilitates fully loaded facilities and minimizes
overloading and underloading and keeps production
costs low.
2. Adequate production capacity is provided to meet
expected aggregate demand.
3. Orderly and systematic transition of production
capacity to meet the peaks and valleys of expected
customer demand is facilitated.
 Steps in Aggregate Capacity Planning
i. Determine the demand (i.e., sales forecast) for each product for
each time period (i.e., weeks or months or quarters) over the
planning horizon (6 to 12 months).
ii. Determine the aggregate demand by summing up the demand for
individual products.
iii. Transform the aggregate demand for each time period into workers,
materials, machines required to satisfy aggregate demand.
iv. Identify company policies that are pertinent (e.g., policy regarding
safety stock maintenance, maintaining stable workforce etc.).
v. Determine unit costs for regular time, overtime, subcontracting,
holding inventories, back orders, layoffs etc.
vi. Develop alternative resource plans for providing necessary
production capacity to support the cumulative aggregate demand
and compute the cost of each alternative plan.
vii.Select the resource plan from among the alternatives considered that
satisfies aggregate demand and best meets the objectives of the
firm.
Capacity Types
 Production capacity is defined as the maximum production
rate of a facility or a plant.
• Types of Capacity
1. License Capacity
2. Installed Capacity
3. Rated Capacity
4. Normal Capacity
5. Practical Capacity
6. Ideal Capacity
7. Actual or utilised capacity
Actual Output
• System efficiency is the ratio of the actual measured
output of goods/services to the system capacity
• System efficiency=
System capacity
• Capacity Decisions
• Major considerations in capacity decisions are
a. What size of plant? How much capacity to install?
b. When capacity is needed? When to phase-in capacity or
phase-out capacity?
c. At what cost? How to budget for the cost?
• Factors Affecting Determination of Plant Capacity
1. Market demand for a product/service.
2. The amount of capital that can be invested.
3. Degree of automation desired.
4. Level of integration (i.e., vertical integration).
5. Type of technology selected.
6. Flexibility for capacity additions.
Capacity Planning
 Capacity planning involves activities such as:
a. Assessing existing capacity
b. Forecasting future capacity needs
c. Identifying alternative ways to modify capacity
d. Evaluating financial, economical and technological
capacity alternatives
e. Selecting a capacity alternative most suited to achieve
the strategic mission of the firm. Capacity planning
involves capacity decisions that must merge consumer
demands with human, material and financial resources
of the organization.
4 Types of Capacity Planning are:
• Long term Capacity Planning
• Short-term Capacity Planing
• Finite Capacity Planning
• Infinite Capacity Planning.
• Two catagories of factors affecting capacity planning are:
• Controllable Factors
• Less Controllable Factors.
• Capacity Requirement Planning (CRP): A technique to
determine the labour and equipment capacities needed to
meet the objectives.
Capacity Requirement Planning (CRP)
Process
Capacity Requirement Planning Process (Flow Chart)
Master Production Scheduling
• Objectives of Master Production Scheduling
1. To schedule end items to be completed promptly
and when promised to customers.
2. To avoid overloading or underloading the
production facility so that production capacity is
efficiently utilized and low production costs result.
Functions of MPS:
• Translating aggregate plans
• Evaluating alternative master schedules
• Generating material and capacity requirements
• Facilitating information processing
• Maintaining priorities
• Utilizing the capacity effectively.
Master Production Schedule - Flow Chart
Guidelines for Master Scheduling
1. Work from an aggregate production plan
2. Schedule common modules when possible
3. Load facilities realistically
4. Release orders on a timely basis
5. Monitor inventory levels closely
6. Reschedule as required
MPS in Produce-to-stock and
Produce-to-order Firms
 The elements of the MPS that are affected by
the type of production system are:
a. Demand management
b. Lot-sizing
c. Number of products to be scheduled (product-mix).
Flow Chart for Rough-cut Capacity Planning

More Related Content

PPTX
Aggregate planning
PPTX
UNIT-3 AGGREGATE PLANNING AND MAINTENANCE MANAGEMENT.pptx
PPT
Aggregrate_production_plan_operations.ppt
PPT
PPTX
3. Aggregate Planning and Master Scheduling.pptx
PPTX
Capacity-Planning-Report - Measurement of Capacity
PPTX
CAPACITY & AGGREGATE PLANNING
PDF
Master planning
Aggregate planning
UNIT-3 AGGREGATE PLANNING AND MAINTENANCE MANAGEMENT.pptx
Aggregrate_production_plan_operations.ppt
3. Aggregate Planning and Master Scheduling.pptx
Capacity-Planning-Report - Measurement of Capacity
CAPACITY & AGGREGATE PLANNING
Master planning

Similar to aggregate planning.ppt (20)

PPTX
APP_MPS_ATP_QUALITY.pptx
PDF
aggregateplanningreport-121002061533-phpapp02.pdf
PPT
Capacity Planning Product and operation management
PPTX
Aggregate planning
PPTX
Module no 3 - Planning Functions.pptx
PPT
06.999999999999999999 Aggregate Planning.ppt
PPT
03. 333333333333333333333Capacity Planning.ppt
PPT
prakash agrawal crp presentation
PPT
OM CH 04QUALITY MANAGEMENT AND CONTROL (2).ppt
PPTX
Capacity and agrregate planning
PPTX
Mba ii pmom_unit-2.1 capacity a
PPT
08_02_19_Aggregate Planning for operation managment .ppt
PPTX
CHAPTER 3 System and design Capacity.pptx
PPTX
AGGREGATE PLANNING.pptx
PPTX
Aggregate planning in supply chain
PPT
Sales & Operations Planning
PPTX
IBS_OM_MBA_M10.pptx operation managemenet
PPTX
Production Planning and Control
PPTX
Production Planning
APP_MPS_ATP_QUALITY.pptx
aggregateplanningreport-121002061533-phpapp02.pdf
Capacity Planning Product and operation management
Aggregate planning
Module no 3 - Planning Functions.pptx
06.999999999999999999 Aggregate Planning.ppt
03. 333333333333333333333Capacity Planning.ppt
prakash agrawal crp presentation
OM CH 04QUALITY MANAGEMENT AND CONTROL (2).ppt
Capacity and agrregate planning
Mba ii pmom_unit-2.1 capacity a
08_02_19_Aggregate Planning for operation managment .ppt
CHAPTER 3 System and design Capacity.pptx
AGGREGATE PLANNING.pptx
Aggregate planning in supply chain
Sales & Operations Planning
IBS_OM_MBA_M10.pptx operation managemenet
Production Planning and Control
Production Planning
Ad

More from ShitalVyas3 (9)

PPT
Types of Insurance.ppt in insurance mgmt
PPTX
Accounting Terminology.pptx
PPT
derivatives.ppt
PDF
exim policy.pdf
PPT
Ch-9.ppt
PPT
iso standard.ppt
PPT
Ch-6.ppt
PPT
WBGOVERV.PPT
PPT
7330 Lecture 03 Project Analysis Lecture F10.ppt
Types of Insurance.ppt in insurance mgmt
Accounting Terminology.pptx
derivatives.ppt
exim policy.pdf
Ch-9.ppt
iso standard.ppt
Ch-6.ppt
WBGOVERV.PPT
7330 Lecture 03 Project Analysis Lecture F10.ppt
Ad

Recently uploaded (20)

PDF
RMMM.pdf make it easy to upload and study
PPTX
PPT- ENG7_QUARTER1_LESSON1_WEEK1. IMAGERY -DESCRIPTIONS pptx.pptx
PDF
Saundersa Comprehensive Review for the NCLEX-RN Examination.pdf
PPTX
Institutional Correction lecture only . . .
PDF
Anesthesia in Laparoscopic Surgery in India
PDF
Supply Chain Operations Speaking Notes -ICLT Program
PPTX
human mycosis Human fungal infections are called human mycosis..pptx
PPTX
Cell Types and Its function , kingdom of life
PDF
Microbial disease of the cardiovascular and lymphatic systems
PDF
A GUIDE TO GENETICS FOR UNDERGRADUATE MEDICAL STUDENTS
PPTX
Final Presentation General Medicine 03-08-2024.pptx
PPTX
Cell Structure & Organelles in detailed.
PPTX
Final Presentation General Medicine 03-08-2024.pptx
PPTX
IMMUNITY IMMUNITY refers to protection against infection, and the immune syst...
PDF
Computing-Curriculum for Schools in Ghana
PPTX
Pharma ospi slides which help in ospi learning
PPTX
Lesson notes of climatology university.
PPTX
Tissue processing ( HISTOPATHOLOGICAL TECHNIQUE
PPTX
master seminar digital applications in india
PDF
Complications of Minimal Access Surgery at WLH
RMMM.pdf make it easy to upload and study
PPT- ENG7_QUARTER1_LESSON1_WEEK1. IMAGERY -DESCRIPTIONS pptx.pptx
Saundersa Comprehensive Review for the NCLEX-RN Examination.pdf
Institutional Correction lecture only . . .
Anesthesia in Laparoscopic Surgery in India
Supply Chain Operations Speaking Notes -ICLT Program
human mycosis Human fungal infections are called human mycosis..pptx
Cell Types and Its function , kingdom of life
Microbial disease of the cardiovascular and lymphatic systems
A GUIDE TO GENETICS FOR UNDERGRADUATE MEDICAL STUDENTS
Final Presentation General Medicine 03-08-2024.pptx
Cell Structure & Organelles in detailed.
Final Presentation General Medicine 03-08-2024.pptx
IMMUNITY IMMUNITY refers to protection against infection, and the immune syst...
Computing-Curriculum for Schools in Ghana
Pharma ospi slides which help in ospi learning
Lesson notes of climatology university.
Tissue processing ( HISTOPATHOLOGICAL TECHNIQUE
master seminar digital applications in india
Complications of Minimal Access Surgery at WLH

aggregate planning.ppt

  • 2. • Aggregate planning involves planning the best quality to produce in the intermediate-range horizon (3 months to one year) • Aggregate production planning is the process of determining output levels of product groups over the next 6 to 18 months period. • Objectives of Aggregate Planning i. The overall objective is to balance conflicting objectives involving customer service, work force stability, cost and profit. ii. To establish company-wide strategic plan for allocating resources. iii.To develop an economic strategy to meet customer demand.
  • 3. Inputs to and Outputs from Aggregate Production Planning
  • 4. Importance of Aggregate Plans  The various inputs to aggregate plans that affect the performance of production and operations managers are: i. Engineering ii. Materials iii.Operations iv. Marketing and distribution v. Accounting and finance vi. Human resources
  • 5. Aggregate Planning or Aggregate Capacity Planning  Need for Aggregate Capacity Planning 1. It facilitates fully loaded facilities and minimizes overloading and underloading and keeps production costs low. 2. Adequate production capacity is provided to meet expected aggregate demand. 3. Orderly and systematic transition of production capacity to meet the peaks and valleys of expected customer demand is facilitated.
  • 6.  Steps in Aggregate Capacity Planning i. Determine the demand (i.e., sales forecast) for each product for each time period (i.e., weeks or months or quarters) over the planning horizon (6 to 12 months). ii. Determine the aggregate demand by summing up the demand for individual products. iii. Transform the aggregate demand for each time period into workers, materials, machines required to satisfy aggregate demand. iv. Identify company policies that are pertinent (e.g., policy regarding safety stock maintenance, maintaining stable workforce etc.). v. Determine unit costs for regular time, overtime, subcontracting, holding inventories, back orders, layoffs etc. vi. Develop alternative resource plans for providing necessary production capacity to support the cumulative aggregate demand and compute the cost of each alternative plan. vii.Select the resource plan from among the alternatives considered that satisfies aggregate demand and best meets the objectives of the firm.
  • 7. Capacity Types  Production capacity is defined as the maximum production rate of a facility or a plant. • Types of Capacity 1. License Capacity 2. Installed Capacity 3. Rated Capacity 4. Normal Capacity 5. Practical Capacity 6. Ideal Capacity 7. Actual or utilised capacity
  • 8. Actual Output • System efficiency is the ratio of the actual measured output of goods/services to the system capacity • System efficiency= System capacity
  • 9. • Capacity Decisions • Major considerations in capacity decisions are a. What size of plant? How much capacity to install? b. When capacity is needed? When to phase-in capacity or phase-out capacity? c. At what cost? How to budget for the cost? • Factors Affecting Determination of Plant Capacity 1. Market demand for a product/service. 2. The amount of capital that can be invested. 3. Degree of automation desired. 4. Level of integration (i.e., vertical integration). 5. Type of technology selected. 6. Flexibility for capacity additions.
  • 10. Capacity Planning  Capacity planning involves activities such as: a. Assessing existing capacity b. Forecasting future capacity needs c. Identifying alternative ways to modify capacity d. Evaluating financial, economical and technological capacity alternatives e. Selecting a capacity alternative most suited to achieve the strategic mission of the firm. Capacity planning involves capacity decisions that must merge consumer demands with human, material and financial resources of the organization.
  • 11. 4 Types of Capacity Planning are: • Long term Capacity Planning • Short-term Capacity Planing • Finite Capacity Planning • Infinite Capacity Planning. • Two catagories of factors affecting capacity planning are: • Controllable Factors • Less Controllable Factors. • Capacity Requirement Planning (CRP): A technique to determine the labour and equipment capacities needed to meet the objectives.
  • 12. Capacity Requirement Planning (CRP) Process Capacity Requirement Planning Process (Flow Chart)
  • 13. Master Production Scheduling • Objectives of Master Production Scheduling 1. To schedule end items to be completed promptly and when promised to customers. 2. To avoid overloading or underloading the production facility so that production capacity is efficiently utilized and low production costs result. Functions of MPS: • Translating aggregate plans • Evaluating alternative master schedules • Generating material and capacity requirements • Facilitating information processing • Maintaining priorities • Utilizing the capacity effectively.
  • 15. Guidelines for Master Scheduling 1. Work from an aggregate production plan 2. Schedule common modules when possible 3. Load facilities realistically 4. Release orders on a timely basis 5. Monitor inventory levels closely 6. Reschedule as required
  • 16. MPS in Produce-to-stock and Produce-to-order Firms  The elements of the MPS that are affected by the type of production system are: a. Demand management b. Lot-sizing c. Number of products to be scheduled (product-mix).
  • 17. Flow Chart for Rough-cut Capacity Planning