InfraStruXure™ for Data Centers
Solution: Close Coupling
● Removing heat at the source saves energy
● Requires less fan horse power
● Enables variable speed fans
• Does not have to pressurize floor for air distribution
• Addresses varying heat loads
● Warmer air return
• Increases system capacity
• Reduces unit quantities
• Requires less space
● Enables High Density
• Future proofing for unknown densities
• Fully utilize expensive floor space
What is the cost of one additional rack if you are outWhat is the cost of one additional rack if you are out
of space in the data center?of space in the data center?
APC by Schneider Electric – Name – Date
InfraStruXure™ for Data Centers
Close Coupling Cooling
APC by Schneider Electric – Name – Date
InfraStruXure™ for Data Centers
Basic In-Row™ Design
InfraStruXure® InRow RC
InRow™ air
conditioner Can operate on hard
floor or raised floor
Hot-aisle air enters
from rear preventing
mixing
Cold air is supplied to
the cold aisle
Heat captured and
rejected to chilled
water
Low or No air mixing
APC by Schneider Electric – Name – Date
InfraStruXure™ for Data Centers
R & D leads the way
● Powerful new tools – CFD analysis
● “Out of the box” approaches driven by reality, not tradition
● Partnerships with chip/server manufacturers
● Professional focus by mechanical engineers through ASHRAE
● Market opportunity
Manufacturers have solutions that work will work up to 45 KW per rack,
now!
APC by Schneider Electric – Name – Date
InfraStruXure™ for Data Centers
Which leads to a real solutions………..
The secret is treating heat at
it’s source.
APC by Schneider Electric – Name – Date
InfraStruXure™ for Data Centers
CFD Allows us to see success
APC by Schneider Electric – Name – Date
InfraStruXure™ for Data Centers
And failure……………
APC by Schneider Electric – Name – Date
InfraStruXure™ for Data Centers
Hot-Aisle CI Calculations
Hot-Aisle CI
0 0.25 0.5 0.75 1
Concentration
Rack
900 cfm
Cooler
2000 cfm
From other racks or room
environment
Escapes coolers
%78
900
2000
35.0
900
702
=⎟⎟
⎠
⎞
⎜⎜
⎝
⎛
==
cfm
cfm
cfm
cfm
CI
900 cfm
C=1
198 cfm
C=1
2000 cfm
C=0.35
1298 cfm
C=0
702 cfm
C=1
CI=78%
APC by Schneider Electric – Name – Date
InfraStruXure™ for Data Centers
Designing Data Centers
With CI
● Compute CI for every rack in
data center
● Ideally, automated in CFD
tool
● Generally, with local coolers
or return vents, hot-aisle CI
preferred
• “Room-neutral” strategy
• Focus on equipment bounding a
hot aisle
● Can estimate cooling
performance exclusively with CI
(conservative)
CI
good
marginal
bad
APC by Schneider Electric – Name – Date
InfraStruXure™ for Data Centers
Rack-by-rack airflow analysis for various
failure conditions
in real time during designin real time during design
APC by Schneider Electric – Name – Date
InfraStruXure™ for Data Centers
Capacity Manager Product Design
Benefits
Rack elevations
Easy to use rack front view
enables accurate and detailed
representation of equipment
location
Airflow analysis
Locate new devices without
overheating new or existing
equipment by simulating
changes in; supply
temperature, airflow and
number of cooling units
Available capacity
Understand available capacity by
calculating actual space, power and
cooling consumption against data
center architecture constraints
Physical equipment
provisioning
Quickly locate the optimum spot for
that next server based on space,
cooling and power needs
Design analysis
Model the effects of and
compare alternative layouts
through detailed design analysis
Capacity Grouping
Specify architecture capabilities
to; match IT equipment with
availability needs ad avoid
stranded space, power and
cooling capacity
APC by Schneider Electric – Name – Date
InfraStruXure™ for Data Centers
In-Row Cooling
● Cooling systems are placed within IT rows instead of at the room leve
● Inherently higher power density capability than room designs
● Fan power is reduced by 50%
● Needless dehumidification / rehumidification is eliminated (saving millions of gallons of
water per year per MW). Hi ΔT is good!
● Need for high-bay areas and raised floors are reduced or eliminated (particularly for
small installations)
● Cooling capacity can “follow” IT loads that move due to Virtualization / server power
management
● Low mixing of Cool Air back into CRAC w/ Low ΔT!
Electrical savings possibility: 7-15%
For new designs;
Exceptional for high density designs
APC by Schneider Electric – Name – Date
InfraStruXure™ for Data Centers
Room Row Rack
Cooling Architectures
● The two main cooling equipment functions are to…
● Provide the bulk cooling capacity
● Distribute the air to the IT loads
● The major difference in architectures lies in how they perform
the second task.
● Airflow is crudely constrained by room design, is not visible in
implementation, and varies considerably between installations.
Floor plans showing the basic concept of room,
row, and rack-oriented cooling architecture.
APC by Schneider Electric – Name – Date
InfraStruXure™ for Data Centers
Benefits Comparison of Cooling
Architectures Summary and Analysis
The modular rack-oriented architecture is the most flexible, fast to
implement, and achieves extreme density, but at the cost of
additional expense.
Room-oriented architecture is inflexible, time consuming to
implement, and performs poorly at higher density, but has cost and
simplicity advantages at lower density.
The modular row-oriented architecture provides many of the
flexibility, speed, and density advantages of the rack-oriented
approach, but with cost similar to the room-oriented architecture.
APC by Schneider Electric – Name – Date
InfraStruXure™ for Data Centers
Electrical Efficiency
Rack-oriented Architecture
Lower electrical costs
Room-oriented Architecture
Lower electrical costs with low power densities,
but dramatically increase with rising densities
Air needs to travel more distance
Power consumed by unit to mix air
Row-oriented Architecture
Lower electrical costs with higher power
densities
Closely coupled with heat load
Usable capacity sustained
APC by Schneider Electric – Name – Date
InfraStruXure™ for Data Centers
Water or Other Heat Transport Piping
Concern: Leakage due to water or refrigerant
piping being located with IT equipment, causing
leaks and therefore downtime.
Solution: Advances in piping technology
dramatically reduced chance of leakage and
improved reliability.
See APC White Paper 131 for more information.
APC by Schneider Electric – Name – Date
InfraStruXure™ for Data Centers
Location
Rack-oriented Architecture
Complete performance predictability
Minimal future planning requirements
Room-oriented Architecture
Performance affected by CRAC location
Future planning required
Row-Oriented Architecture
Smaller footprint
Lower TCO
APC by Schneider Electric – Name – Date
InfraStruXure™ for Data Centers
Redundancy
Rack-oriented Architecture
2 CRAC systems per rack
Highly effective for high density
Room-oriented Architecture
1 additional CRAC unit per room
Cost effective at low densities
Row-Oriented Architecture
1 additional CRAC unit per row
Lower TCO for high density
APC by Schneider Electric – Name – Date
InfraStruXure™ for Data Centers
Mixed Cooling Architecture
Room-oriented
Rack-oriented
Row-oriented
See APC White Paper #130, “The Advantages of Row and Rack-Oriented Cooling Architectures for Data Centers
APC by Schneider Electric – Name – Date
InfraStruXure™ for Data Centers
Exemple of a Hybrid Data Center
Environment
APC by Schneider Electric – Name – Date
InfraStruXure™ for Data Centers
Summary
● Room-oriented architecture has limitations in next generation
data centers.
● Row and rack-oriented architectures provide flexibility,
predictability, scalability, reduced power consumption, reduced
TCO, and optimum availability for next generation data centers.
● High density server technologies are best suited with row-
oriented architecture.
APC by Schneider Electric – Name – Date
InfraStruXure™ for Data Centers
Enclosing the Hot-aisle
Hot Aisle Ceiling
Tiles/Cable Trough
Seals in hot air, prevents
mixing with room air
Chamber Doors
Access to hot aisle, locks
for security. Prevents hot air
mixing
InRow RC unit
InRow air conditioner cools hot
exhaust air directly
APC by Schneider Electric – Name – Date
InfraStruXure™ for Data Centers
Enclosing the Hot Rack
All content in this presentation is protected – © 2008 American Power Conversion Corporation
New InRoom Precision Cooling
Room level precision cooling solutions
for all data center environments
APC by Schneider Electric – Name – Date
InfraStruXure™ for Data Centers
InRoom Introduction
Room level precision cooling solutions for all data center
environments
Efficient room cooling with a low cost of ownership
APC by Schneider Electric – Name – Date
InfraStruXure™ for Data Centers
InRoom Applications
●Temperature Control
● +/- 1 OC
● Prevents overheating of equipment
21kW (6 ton) to 150kW (43 ton)
Humidity Control
+/- 3-5% R.H.
Eliminates static
discharge
Prevents Condensation
Filtration
30-85% (ASHRAE),
Efficient
Minimizes airborne
particles
High Volume Air Flow
Provides 2600 CFM (189
L/s)
Improves Air Distribution
Reduces localized hot
spots
APC by Schneider Electric – Name – Date
InfraStruXure™ for Data Centers
InRoom Precision Cooling
● InRoom Air Cooled
● InRoom Chilled Water
● InRoom Glycol Cooled
● InRoom Air Cooled with Multi-Cool
● InRoom Glycol Cooled with Multi-
Cool
● InRoom Glycol with Economizer
InRoom Configurations
APC by Schneider Electric – Name – Date
InfraStruXure™ for Data Centers
InRoom Precision Cooling
1000mm
39.37
1400mm
55.11
1750mm
68.90
2150mm
84.65
2550mm
100.39
21kW 31kW 45kW 61kW 86kW
21kW 31kW 45kW 61kW
A,G,ACW,GCW: =1 Refrigerant Circuit
GE = 1 Refrigerant Circuit
A,G,ACW,GCW = 2 Refrigerant Circuits
GE = 2 Refrigerant Circuits
InRoom Direct Expansion Capacities
APC by Schneider Electric – Name – Date
InfraStruXure™ for Data Centers
InRoom Precision Cooling
1000mm
39.37
1400mm
55.11
1750mm
68.90
2150mm
84.65
2550mm
100.39
40kW 66kW 90kW 110kW 150kW
InRoom Chilled Water Capacities
Cooling Capacity
Return Air: 24’C/50%(75’F/50%)
Water: 7/12’C(44,6/53,6’F)

More Related Content

PDF
ICDL Module 1 - Concepts of ICT (Information and Communication Technology) - ...
PDF
IoT-Prototyping
PDF
Data center Building & General Specification
PDF
Internet of Things - module 1
PPSX
6G Technology
PPTX
Networking Projects
PPTX
IOT - Design Principles of Connected Devices
PDF
H19-401_V1.0 HCSP-Presales-Campus Network Planning and Design V1.0 Exam Quest...
ICDL Module 1 - Concepts of ICT (Information and Communication Technology) - ...
IoT-Prototyping
Data center Building & General Specification
Internet of Things - module 1
6G Technology
Networking Projects
IOT - Design Principles of Connected Devices
H19-401_V1.0 HCSP-Presales-Campus Network Planning and Design V1.0 Exam Quest...

What's hot (20)

PPT
Datacenter
PPTX
Careers in electrical engineering
PPT
Creating A Network Cable.ppt
PDF
Configuration of ring topology in packet tracer by Tanjilur Rahman
PPTX
Home Automation System using iot
PDF
Nokia_IP-MPLS_SmartGrid_Application_Note_EN
DOC
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
PPTX
Electronics past,present and future
PPT
basic networking
PDF
telecom engineer cv-1
PPTX
IOT- information Technology
PPT
Bluetooth Slides
PPT
Computer network
PPTX
The future of IOT
PPTX
Bluetooth Power point presentation
PPT
Cableado estructurado
PPTX
Internet of things
PPTX
IoT(Internet of Things) ppt
PPTX
Internet of Things (IoT) - Seminar ppt
PPTX
Home automation using iot
Datacenter
Careers in electrical engineering
Creating A Network Cable.ppt
Configuration of ring topology in packet tracer by Tanjilur Rahman
Home Automation System using iot
Nokia_IP-MPLS_SmartGrid_Application_Note_EN
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
Electronics past,present and future
basic networking
telecom engineer cv-1
IOT- information Technology
Bluetooth Slides
Computer network
The future of IOT
Bluetooth Power point presentation
Cableado estructurado
Internet of things
IoT(Internet of Things) ppt
Internet of Things (IoT) - Seminar ppt
Home automation using iot
Ad

Similar to Apc cooling solutions (20)

PPT
Power Point Data Centre Uk Limited Apc
PDF
Cirrascale forest container march 2011
PPT
Datacentre Uk
PPT
Pmdc Smdc Technical Overview 24 Mar2010
PPT
Data Centre Efficiency
PDF
Slides: The Top 3 North America Data Center Trends for Cooling
PPT
Data Center Cooling Study on Liquid Cooling
PPT
Ever Green Dc
PPT
Lasting+ +centre+de+date+-++12mai2010
PPTX
What's Next in Cooling: Capacity, Containment, & More
PDF
Sb in rack-ver.1.0_en
PPTX
Green Data Center
PDF
Crac systems gb
PPTX
Data center m&e
PPT
Tia 942 Data Center Standards
PDF
Cold Aisle Containment – Maximum kW per Rack
PPT
IT cooling for Data Center
PDF
Data Center Cooling, Critical Facility and Infrastructure Optimization
PDF
Datacenter Efficiency: Building for High Density
PPT
Eliminating Data Center Hot Spots
Power Point Data Centre Uk Limited Apc
Cirrascale forest container march 2011
Datacentre Uk
Pmdc Smdc Technical Overview 24 Mar2010
Data Centre Efficiency
Slides: The Top 3 North America Data Center Trends for Cooling
Data Center Cooling Study on Liquid Cooling
Ever Green Dc
Lasting+ +centre+de+date+-++12mai2010
What's Next in Cooling: Capacity, Containment, & More
Sb in rack-ver.1.0_en
Green Data Center
Crac systems gb
Data center m&e
Tia 942 Data Center Standards
Cold Aisle Containment – Maximum kW per Rack
IT cooling for Data Center
Data Center Cooling, Critical Facility and Infrastructure Optimization
Datacenter Efficiency: Building for High Density
Eliminating Data Center Hot Spots
Ad

Recently uploaded (20)

PDF
Agricultural_Statistics_at_a_Glance_2022_0.pdf
PDF
Advanced methodologies resolving dimensionality complications for autism neur...
PDF
Machine learning based COVID-19 study performance prediction
PDF
Assigned Numbers - 2025 - Bluetooth® Document
PPTX
Machine Learning_overview_presentation.pptx
PDF
Build a system with the filesystem maintained by OSTree @ COSCUP 2025
PDF
gpt5_lecture_notes_comprehensive_20250812015547.pdf
PDF
Accuracy of neural networks in brain wave diagnosis of schizophrenia
PDF
Encapsulation_ Review paper, used for researhc scholars
PPTX
OMC Textile Division Presentation 2021.pptx
PDF
A comparative study of natural language inference in Swahili using monolingua...
PDF
Architecting across the Boundaries of two Complex Domains - Healthcare & Tech...
PDF
Profit Center Accounting in SAP S/4HANA, S4F28 Col11
PDF
Mobile App Security Testing_ A Comprehensive Guide.pdf
PPTX
Programs and apps: productivity, graphics, security and other tools
PDF
Univ-Connecticut-ChatGPT-Presentaion.pdf
PDF
Spectral efficient network and resource selection model in 5G networks
PPTX
TLE Review Electricity (Electricity).pptx
PPTX
Tartificialntelligence_presentation.pptx
PPT
Teaching material agriculture food technology
Agricultural_Statistics_at_a_Glance_2022_0.pdf
Advanced methodologies resolving dimensionality complications for autism neur...
Machine learning based COVID-19 study performance prediction
Assigned Numbers - 2025 - Bluetooth® Document
Machine Learning_overview_presentation.pptx
Build a system with the filesystem maintained by OSTree @ COSCUP 2025
gpt5_lecture_notes_comprehensive_20250812015547.pdf
Accuracy of neural networks in brain wave diagnosis of schizophrenia
Encapsulation_ Review paper, used for researhc scholars
OMC Textile Division Presentation 2021.pptx
A comparative study of natural language inference in Swahili using monolingua...
Architecting across the Boundaries of two Complex Domains - Healthcare & Tech...
Profit Center Accounting in SAP S/4HANA, S4F28 Col11
Mobile App Security Testing_ A Comprehensive Guide.pdf
Programs and apps: productivity, graphics, security and other tools
Univ-Connecticut-ChatGPT-Presentaion.pdf
Spectral efficient network and resource selection model in 5G networks
TLE Review Electricity (Electricity).pptx
Tartificialntelligence_presentation.pptx
Teaching material agriculture food technology

Apc cooling solutions

  • 1. APC by Schneider Electric – Name – Date InfraStruXure™ for Data Centers Solution: Close Coupling ● Removing heat at the source saves energy ● Requires less fan horse power ● Enables variable speed fans • Does not have to pressurize floor for air distribution • Addresses varying heat loads ● Warmer air return • Increases system capacity • Reduces unit quantities • Requires less space ● Enables High Density • Future proofing for unknown densities • Fully utilize expensive floor space What is the cost of one additional rack if you are outWhat is the cost of one additional rack if you are out of space in the data center?of space in the data center?
  • 2. APC by Schneider Electric – Name – Date InfraStruXure™ for Data Centers Close Coupling Cooling
  • 3. APC by Schneider Electric – Name – Date InfraStruXure™ for Data Centers Basic In-Row™ Design InfraStruXure® InRow RC InRow™ air conditioner Can operate on hard floor or raised floor Hot-aisle air enters from rear preventing mixing Cold air is supplied to the cold aisle Heat captured and rejected to chilled water Low or No air mixing
  • 4. APC by Schneider Electric – Name – Date InfraStruXure™ for Data Centers R & D leads the way ● Powerful new tools – CFD analysis ● “Out of the box” approaches driven by reality, not tradition ● Partnerships with chip/server manufacturers ● Professional focus by mechanical engineers through ASHRAE ● Market opportunity Manufacturers have solutions that work will work up to 45 KW per rack, now!
  • 5. APC by Schneider Electric – Name – Date InfraStruXure™ for Data Centers Which leads to a real solutions……….. The secret is treating heat at it’s source.
  • 6. APC by Schneider Electric – Name – Date InfraStruXure™ for Data Centers CFD Allows us to see success
  • 7. APC by Schneider Electric – Name – Date InfraStruXure™ for Data Centers And failure……………
  • 8. APC by Schneider Electric – Name – Date InfraStruXure™ for Data Centers Hot-Aisle CI Calculations Hot-Aisle CI 0 0.25 0.5 0.75 1 Concentration Rack 900 cfm Cooler 2000 cfm From other racks or room environment Escapes coolers %78 900 2000 35.0 900 702 =⎟⎟ ⎠ ⎞ ⎜⎜ ⎝ ⎛ == cfm cfm cfm cfm CI 900 cfm C=1 198 cfm C=1 2000 cfm C=0.35 1298 cfm C=0 702 cfm C=1 CI=78%
  • 9. APC by Schneider Electric – Name – Date InfraStruXure™ for Data Centers Designing Data Centers With CI ● Compute CI for every rack in data center ● Ideally, automated in CFD tool ● Generally, with local coolers or return vents, hot-aisle CI preferred • “Room-neutral” strategy • Focus on equipment bounding a hot aisle ● Can estimate cooling performance exclusively with CI (conservative) CI good marginal bad
  • 10. APC by Schneider Electric – Name – Date InfraStruXure™ for Data Centers Rack-by-rack airflow analysis for various failure conditions in real time during designin real time during design
  • 11. APC by Schneider Electric – Name – Date InfraStruXure™ for Data Centers Capacity Manager Product Design Benefits Rack elevations Easy to use rack front view enables accurate and detailed representation of equipment location Airflow analysis Locate new devices without overheating new or existing equipment by simulating changes in; supply temperature, airflow and number of cooling units Available capacity Understand available capacity by calculating actual space, power and cooling consumption against data center architecture constraints Physical equipment provisioning Quickly locate the optimum spot for that next server based on space, cooling and power needs Design analysis Model the effects of and compare alternative layouts through detailed design analysis Capacity Grouping Specify architecture capabilities to; match IT equipment with availability needs ad avoid stranded space, power and cooling capacity
  • 12. APC by Schneider Electric – Name – Date InfraStruXure™ for Data Centers In-Row Cooling ● Cooling systems are placed within IT rows instead of at the room leve ● Inherently higher power density capability than room designs ● Fan power is reduced by 50% ● Needless dehumidification / rehumidification is eliminated (saving millions of gallons of water per year per MW). Hi ΔT is good! ● Need for high-bay areas and raised floors are reduced or eliminated (particularly for small installations) ● Cooling capacity can “follow” IT loads that move due to Virtualization / server power management ● Low mixing of Cool Air back into CRAC w/ Low ΔT! Electrical savings possibility: 7-15% For new designs; Exceptional for high density designs
  • 13. APC by Schneider Electric – Name – Date InfraStruXure™ for Data Centers Room Row Rack Cooling Architectures ● The two main cooling equipment functions are to… ● Provide the bulk cooling capacity ● Distribute the air to the IT loads ● The major difference in architectures lies in how they perform the second task. ● Airflow is crudely constrained by room design, is not visible in implementation, and varies considerably between installations. Floor plans showing the basic concept of room, row, and rack-oriented cooling architecture.
  • 14. APC by Schneider Electric – Name – Date InfraStruXure™ for Data Centers Benefits Comparison of Cooling Architectures Summary and Analysis The modular rack-oriented architecture is the most flexible, fast to implement, and achieves extreme density, but at the cost of additional expense. Room-oriented architecture is inflexible, time consuming to implement, and performs poorly at higher density, but has cost and simplicity advantages at lower density. The modular row-oriented architecture provides many of the flexibility, speed, and density advantages of the rack-oriented approach, but with cost similar to the room-oriented architecture.
  • 15. APC by Schneider Electric – Name – Date InfraStruXure™ for Data Centers Electrical Efficiency Rack-oriented Architecture Lower electrical costs Room-oriented Architecture Lower electrical costs with low power densities, but dramatically increase with rising densities Air needs to travel more distance Power consumed by unit to mix air Row-oriented Architecture Lower electrical costs with higher power densities Closely coupled with heat load Usable capacity sustained
  • 16. APC by Schneider Electric – Name – Date InfraStruXure™ for Data Centers Water or Other Heat Transport Piping Concern: Leakage due to water or refrigerant piping being located with IT equipment, causing leaks and therefore downtime. Solution: Advances in piping technology dramatically reduced chance of leakage and improved reliability. See APC White Paper 131 for more information.
  • 17. APC by Schneider Electric – Name – Date InfraStruXure™ for Data Centers Location Rack-oriented Architecture Complete performance predictability Minimal future planning requirements Room-oriented Architecture Performance affected by CRAC location Future planning required Row-Oriented Architecture Smaller footprint Lower TCO
  • 18. APC by Schneider Electric – Name – Date InfraStruXure™ for Data Centers Redundancy Rack-oriented Architecture 2 CRAC systems per rack Highly effective for high density Room-oriented Architecture 1 additional CRAC unit per room Cost effective at low densities Row-Oriented Architecture 1 additional CRAC unit per row Lower TCO for high density
  • 19. APC by Schneider Electric – Name – Date InfraStruXure™ for Data Centers Mixed Cooling Architecture Room-oriented Rack-oriented Row-oriented See APC White Paper #130, “The Advantages of Row and Rack-Oriented Cooling Architectures for Data Centers
  • 20. APC by Schneider Electric – Name – Date InfraStruXure™ for Data Centers Exemple of a Hybrid Data Center Environment
  • 21. APC by Schneider Electric – Name – Date InfraStruXure™ for Data Centers Summary ● Room-oriented architecture has limitations in next generation data centers. ● Row and rack-oriented architectures provide flexibility, predictability, scalability, reduced power consumption, reduced TCO, and optimum availability for next generation data centers. ● High density server technologies are best suited with row- oriented architecture.
  • 22. APC by Schneider Electric – Name – Date InfraStruXure™ for Data Centers Enclosing the Hot-aisle Hot Aisle Ceiling Tiles/Cable Trough Seals in hot air, prevents mixing with room air Chamber Doors Access to hot aisle, locks for security. Prevents hot air mixing InRow RC unit InRow air conditioner cools hot exhaust air directly
  • 23. APC by Schneider Electric – Name – Date InfraStruXure™ for Data Centers Enclosing the Hot Rack
  • 24. All content in this presentation is protected – © 2008 American Power Conversion Corporation New InRoom Precision Cooling Room level precision cooling solutions for all data center environments
  • 25. APC by Schneider Electric – Name – Date InfraStruXure™ for Data Centers InRoom Introduction Room level precision cooling solutions for all data center environments Efficient room cooling with a low cost of ownership
  • 26. APC by Schneider Electric – Name – Date InfraStruXure™ for Data Centers InRoom Applications ●Temperature Control ● +/- 1 OC ● Prevents overheating of equipment 21kW (6 ton) to 150kW (43 ton) Humidity Control +/- 3-5% R.H. Eliminates static discharge Prevents Condensation Filtration 30-85% (ASHRAE), Efficient Minimizes airborne particles High Volume Air Flow Provides 2600 CFM (189 L/s) Improves Air Distribution Reduces localized hot spots
  • 27. APC by Schneider Electric – Name – Date InfraStruXure™ for Data Centers InRoom Precision Cooling ● InRoom Air Cooled ● InRoom Chilled Water ● InRoom Glycol Cooled ● InRoom Air Cooled with Multi-Cool ● InRoom Glycol Cooled with Multi- Cool ● InRoom Glycol with Economizer InRoom Configurations
  • 28. APC by Schneider Electric – Name – Date InfraStruXure™ for Data Centers InRoom Precision Cooling 1000mm 39.37 1400mm 55.11 1750mm 68.90 2150mm 84.65 2550mm 100.39 21kW 31kW 45kW 61kW 86kW 21kW 31kW 45kW 61kW A,G,ACW,GCW: =1 Refrigerant Circuit GE = 1 Refrigerant Circuit A,G,ACW,GCW = 2 Refrigerant Circuits GE = 2 Refrigerant Circuits InRoom Direct Expansion Capacities
  • 29. APC by Schneider Electric – Name – Date InfraStruXure™ for Data Centers InRoom Precision Cooling 1000mm 39.37 1400mm 55.11 1750mm 68.90 2150mm 84.65 2550mm 100.39 40kW 66kW 90kW 110kW 150kW InRoom Chilled Water Capacities Cooling Capacity Return Air: 24’C/50%(75’F/50%) Water: 7/12’C(44,6/53,6’F)