Dwight Potter Boeing Exploration Launch Systems Deputy, IUA Program Manager
Boeing Producibility Team Boeing has been selected as the USPC and IUAC Producibility and Design Support Manufacturing Operations Sustaining Engineering USP Program Manager – Jim Chilton IUA Program Manager – Dwight Potter Team is engaged with NASA Design Team (NDT) Manufacturing Value Stream Mapping Producibility Summit Tooling Design Support Schedule Development Component Cost Updates Test Article Planning Support Special Studies
Our Objective – Safe and Affordable  Ares I Upper Stage We used the Value Stream  approach to develop “how” Imperatives guide  our approach Determined needed resources  using proven methods Value added from Delta IV  and other processes to  NDTs existing approach Production – Strategic Overview Objective Value Stream Mapping Four Manufacturing Imperatives: Safety, Incremental Transition, Innovation, R&O Management Resource Needs:   Facilities Staffing Supply & Tooling Chain Manufacturing Processes: Friction Stir Welding, Ultrasonic Inspection,  Robotic SOFI…
Manufacturing Imperatives Workforce, hardware and  mission safety Achieve design phase objectives Flow time Team size Surge capability Structured production  readiness process MAF capability re-use
The Production Strategy Requires Designing the Production Flow Along with the Product The Value Stream Approach A Program Leadership Tool Step #1 Start with the Answer: Program Sets Targets Objectives Customer expectations Quality improvement Cycle time reduction On-time delivery Improve cost Step #2 Value Stream Mapping Engage teams in the “How” Identify waste in the process (starbursts) Seek new value A Baseline   Step #3 Value Stream Analysis Design to achieve program vision Integrate Lean Best  Practices to reduce waste Integrate Program Management Best Practices for Execution Step #4 Action Plan Program commitment/ownership Team improvement targets Team Lean plans Seize Opportunities Visible to all
Lean Approach is Driving Upper Stage and Instrument Unit Integration Updated and mature production for a right sized production system, timeline and simulation Improve production layouts at MAF. Add definition to flows  Reduce flow times for materials, people, hardware, information, tooling IUA manufacturing & assembly flow integrated  to improve and mature the overall flow.  Define details on IU process flow (All integration and testing) Seek opportunities to reduce IU process flow time. Identify missing support hardware/software Include any process flow to turn over the IU structure (DD250 baseline) Any flow to turn over the integrated assembly (DD250 baseline) back to the US contract IU Box Installation Simulation IU Assembly onto Upper Stage
Engaging the Supply Chain Source Control Item and Component End Item Procurements Underway Upper Stage Production Ullage Settling Motors: Proposals received and in evaluation Pyros: Proposals received and in evaluation  Instrument Unit Avionics Flight Computer/Command Telemetry Computer: Proposals received and in evaluation  Battery:  RFP released to industry this month Combined Control System Electronics:  RFP released to industry All remaining procurements to be completed in 2009 Exceeding Supplier Diversity Goals & Reaching Out  Mentoring and Developing Small Businesses
Summary Supporting NASA in the development of a safe & affordable Upper Stage Made extensive producibility inputs into the design process Optimize manufacturing costs through lean approaches Have a plan to engage and integrate the Supply Chain into the program

More Related Content

PPTX
Project Cost Management
PDF
Building a Credible Performance Measurement Baseline (PM Journal)
PDF
IWP Timeline
PDF
Agile Program Management Process
DOCX
Project qulaity initiative report
PPTX
Progress control
DOCX
EVMS for Commercial projects
PPT
041 Integrating Lean Construction (PART 2)
Project Cost Management
Building a Credible Performance Measurement Baseline (PM Journal)
IWP Timeline
Agile Program Management Process
Project qulaity initiative report
Progress control
EVMS for Commercial projects
041 Integrating Lean Construction (PART 2)

What's hot (20)

PPT
Ils management overview
PPSX
PPSX
Project Control System
PDF
Prdz_resume_march16
DOC
EVMS with Technical Performance Measures
PDF
Hemant-Mukund-Kale-Resume
PPTX
EPA Presentation - Andy Smith
PDF
Shell chemicalsseraya
DOC
Verification process
DOCX
Wayne Hamilton Resume 5.9.16
PPTX
FlowCon 2013 Conference
PPTX
production planning_ Engineering Management
PPTX
For expressways
PPT
How the change control process affects project quality
PDF
How to optimize ddc systems to save energy in hospitals
PDF
CDS Construction Execution Process ^0 Strategy
PPS
Introduction to quality management
PDF
Apel GEF GHG accounting methods requirements Nov 10 2014
PDF
Implement risk responses
Ils management overview
Project Control System
Prdz_resume_march16
EVMS with Technical Performance Measures
Hemant-Mukund-Kale-Resume
EPA Presentation - Andy Smith
Shell chemicalsseraya
Verification process
Wayne Hamilton Resume 5.9.16
FlowCon 2013 Conference
production planning_ Engineering Management
For expressways
How the change control process affects project quality
How to optimize ddc systems to save energy in hospitals
CDS Construction Execution Process ^0 Strategy
Introduction to quality management
Apel GEF GHG accounting methods requirements Nov 10 2014
Implement risk responses
Ad

Viewers also liked (20)

DOC
Jamie Matthews A1 P2 essay
PDF
Marine surveys – loss adjuster – p& i agent
DOC
Tsil profile summary
PPT
Bio-Microbics Company Overview
PDF
Gaurav Gupta
PDF
50 Mwe Concentrated Solar Power Plant (1)
DOC
PDF
Afra Marine Technologies Pte Ltd Brochure
PDF
So are we winning yet?
DOC
CV_MAR 2015
PPTX
Training pack multi hose product receiving z cott translated
PPTX
Cellar Management
PPTX
COMPANY PROFILE - TAKK-SAMM INERNATIONAL LTD (3)
PDF
Rex safety manual_ed1_308020_en
PPS
Reusable lunar lander
PPT
41 Atg&Ctm Fope06
PDF
LPG specifications for candidates
PPTX
Work Experience @ Kemblefield.(Thomas Heath)
 
PPTX
Modeling of Propellant Tank Pressurization
DOCX
GUIDELINES FOR IMPORTING PRODUCT INTO NIGERIA
Jamie Matthews A1 P2 essay
Marine surveys – loss adjuster – p& i agent
Tsil profile summary
Bio-Microbics Company Overview
Gaurav Gupta
50 Mwe Concentrated Solar Power Plant (1)
Afra Marine Technologies Pte Ltd Brochure
So are we winning yet?
CV_MAR 2015
Training pack multi hose product receiving z cott translated
Cellar Management
COMPANY PROFILE - TAKK-SAMM INERNATIONAL LTD (3)
Rex safety manual_ed1_308020_en
Reusable lunar lander
41 Atg&Ctm Fope06
LPG specifications for candidates
Work Experience @ Kemblefield.(Thomas Heath)
 
Modeling of Propellant Tank Pressurization
GUIDELINES FOR IMPORTING PRODUCT INTO NIGERIA
Ad

Similar to Ares I Instrument Unit Status and Progress (20)

PPTX
Software Project Health Check: Best Practices and Techniques for Your Product...
PPT
Design of a Prevention, Appraisal and Failure Cost Model
PPT
Faster New Product Introduction Using Oracle Project Portfolio Management
PPT
Software Product Life Cycle
PDF
Key implementation activities_asap
PPTX
Lean Introduction.pptx
PPTX
Rotation #2_Review_Sarah Brown
PPT
PGP New Product Generation Project 2003
PDF
CV Guru_doc
ODP
IEEE 12207
PPTX
Module 4 Process planning for final year mechanical engineering
PPTX
CPI_MOM_KBR_20110909_v1
PPT
Ray-Goodfellow.ppt
PPTX
Dev ops I Best Practices I NuggetHub
PPT
Lean Thinking Inside and Outside a Software Engineering Company (Dave Jackson)
PDF
Using Lean Thinking to identify and address Delivery Pipeline bottlenecks
PPTX
Tiger (AO4) AWP Implementation #COMIT2019
PPTX
APQP_Training_Content_APQP_PPAP_DevR1.pptx
PPTX
#FiaComit - Advanced Works Packaging & Integrated Materials Management
PPT
Training on ASAP Methodology_11.10.2020.ppt
Software Project Health Check: Best Practices and Techniques for Your Product...
Design of a Prevention, Appraisal and Failure Cost Model
Faster New Product Introduction Using Oracle Project Portfolio Management
Software Product Life Cycle
Key implementation activities_asap
Lean Introduction.pptx
Rotation #2_Review_Sarah Brown
PGP New Product Generation Project 2003
CV Guru_doc
IEEE 12207
Module 4 Process planning for final year mechanical engineering
CPI_MOM_KBR_20110909_v1
Ray-Goodfellow.ppt
Dev ops I Best Practices I NuggetHub
Lean Thinking Inside and Outside a Software Engineering Company (Dave Jackson)
Using Lean Thinking to identify and address Delivery Pipeline bottlenecks
Tiger (AO4) AWP Implementation #COMIT2019
APQP_Training_Content_APQP_PPAP_DevR1.pptx
#FiaComit - Advanced Works Packaging & Integrated Materials Management
Training on ASAP Methodology_11.10.2020.ppt

More from American Astronautical Society (20)

PDF
Astronauts and Robots 2015: Kevin Hand, JPL
PDF
Astronauts and Robots 2015: Bob Mase, JPL
PDF
Astronauts and Robots 2015: John Guidi, NASA
PDF
Astronauts and Robots 2015: Frank Culbertson, Orbital ATK
PPTX
Astronauts and Robots 2015: Bob Pappalardo, JPL
PPTX
Astronauts and Robots 2015: Gary Blackwood, JPL
PPTX
Astronauts and Robots 2015: Jonas Zmuidzinas, JPL
PPTX
Astronauts and Robots 2015: Scott Gaudi, Ohio State
PPT
Astronauts and Robots 2015: Randall Friedl, JPL
PPTX
Astronauts and Robots 2015: JPL
PPTX
Astronauts and Robots 2015: Jeff Grant, Northrop Grumman
PPTX
Astronauts and Robots 2015: Jim Crocker, Lockheed Martin
PPTX
Astronauts and Robots 2015: Michael Potter, International Institute of Space ...
PPTX
Astronauts and Robots 2015: JPL
PPT
Astronauts and Robots 2015: NASA
PPTX
Astronauts and Robots 2015: Steve Stich, NASA
PPTX
Astronauts and Robots 2015: Mike Gernhardt, NASA
PPT
Astronauts and Robots 2015: Scott Hubbard, Stanford
PPT
Astronauts and Robots 2015: David Des Marais, NASA
PPTX
Astronauts and Robots 2015: Matt Wallace, JPL
Astronauts and Robots 2015: Kevin Hand, JPL
Astronauts and Robots 2015: Bob Mase, JPL
Astronauts and Robots 2015: John Guidi, NASA
Astronauts and Robots 2015: Frank Culbertson, Orbital ATK
Astronauts and Robots 2015: Bob Pappalardo, JPL
Astronauts and Robots 2015: Gary Blackwood, JPL
Astronauts and Robots 2015: Jonas Zmuidzinas, JPL
Astronauts and Robots 2015: Scott Gaudi, Ohio State
Astronauts and Robots 2015: Randall Friedl, JPL
Astronauts and Robots 2015: JPL
Astronauts and Robots 2015: Jeff Grant, Northrop Grumman
Astronauts and Robots 2015: Jim Crocker, Lockheed Martin
Astronauts and Robots 2015: Michael Potter, International Institute of Space ...
Astronauts and Robots 2015: JPL
Astronauts and Robots 2015: NASA
Astronauts and Robots 2015: Steve Stich, NASA
Astronauts and Robots 2015: Mike Gernhardt, NASA
Astronauts and Robots 2015: Scott Hubbard, Stanford
Astronauts and Robots 2015: David Des Marais, NASA
Astronauts and Robots 2015: Matt Wallace, JPL

Recently uploaded (20)

PPTX
Tartificialntelligence_presentation.pptx
PDF
Transform Your ITIL® 4 & ITSM Strategy with AI in 2025.pdf
PDF
Enhancing emotion recognition model for a student engagement use case through...
PDF
Approach and Philosophy of On baking technology
PDF
gpt5_lecture_notes_comprehensive_20250812015547.pdf
PDF
From MVP to Full-Scale Product A Startup’s Software Journey.pdf
PPTX
TechTalks-8-2019-Service-Management-ITIL-Refresh-ITIL-4-Framework-Supports-Ou...
PDF
DP Operators-handbook-extract for the Mautical Institute
PDF
Web App vs Mobile App What Should You Build First.pdf
PDF
NewMind AI Weekly Chronicles - August'25-Week II
PPTX
Programs and apps: productivity, graphics, security and other tools
PDF
Univ-Connecticut-ChatGPT-Presentaion.pdf
PDF
Video forgery: An extensive analysis of inter-and intra-frame manipulation al...
PDF
Hindi spoken digit analysis for native and non-native speakers
PDF
7 ChatGPT Prompts to Help You Define Your Ideal Customer Profile.pdf
PDF
Profit Center Accounting in SAP S/4HANA, S4F28 Col11
PPTX
Digital-Transformation-Roadmap-for-Companies.pptx
PDF
Unlocking AI with Model Context Protocol (MCP)
PDF
Accuracy of neural networks in brain wave diagnosis of schizophrenia
PPTX
TLE Review Electricity (Electricity).pptx
Tartificialntelligence_presentation.pptx
Transform Your ITIL® 4 & ITSM Strategy with AI in 2025.pdf
Enhancing emotion recognition model for a student engagement use case through...
Approach and Philosophy of On baking technology
gpt5_lecture_notes_comprehensive_20250812015547.pdf
From MVP to Full-Scale Product A Startup’s Software Journey.pdf
TechTalks-8-2019-Service-Management-ITIL-Refresh-ITIL-4-Framework-Supports-Ou...
DP Operators-handbook-extract for the Mautical Institute
Web App vs Mobile App What Should You Build First.pdf
NewMind AI Weekly Chronicles - August'25-Week II
Programs and apps: productivity, graphics, security and other tools
Univ-Connecticut-ChatGPT-Presentaion.pdf
Video forgery: An extensive analysis of inter-and intra-frame manipulation al...
Hindi spoken digit analysis for native and non-native speakers
7 ChatGPT Prompts to Help You Define Your Ideal Customer Profile.pdf
Profit Center Accounting in SAP S/4HANA, S4F28 Col11
Digital-Transformation-Roadmap-for-Companies.pptx
Unlocking AI with Model Context Protocol (MCP)
Accuracy of neural networks in brain wave diagnosis of schizophrenia
TLE Review Electricity (Electricity).pptx

Ares I Instrument Unit Status and Progress

  • 1. Dwight Potter Boeing Exploration Launch Systems Deputy, IUA Program Manager
  • 2. Boeing Producibility Team Boeing has been selected as the USPC and IUAC Producibility and Design Support Manufacturing Operations Sustaining Engineering USP Program Manager – Jim Chilton IUA Program Manager – Dwight Potter Team is engaged with NASA Design Team (NDT) Manufacturing Value Stream Mapping Producibility Summit Tooling Design Support Schedule Development Component Cost Updates Test Article Planning Support Special Studies
  • 3. Our Objective – Safe and Affordable Ares I Upper Stage We used the Value Stream approach to develop “how” Imperatives guide our approach Determined needed resources using proven methods Value added from Delta IV and other processes to NDTs existing approach Production – Strategic Overview Objective Value Stream Mapping Four Manufacturing Imperatives: Safety, Incremental Transition, Innovation, R&O Management Resource Needs: Facilities Staffing Supply & Tooling Chain Manufacturing Processes: Friction Stir Welding, Ultrasonic Inspection, Robotic SOFI…
  • 4. Manufacturing Imperatives Workforce, hardware and mission safety Achieve design phase objectives Flow time Team size Surge capability Structured production readiness process MAF capability re-use
  • 5. The Production Strategy Requires Designing the Production Flow Along with the Product The Value Stream Approach A Program Leadership Tool Step #1 Start with the Answer: Program Sets Targets Objectives Customer expectations Quality improvement Cycle time reduction On-time delivery Improve cost Step #2 Value Stream Mapping Engage teams in the “How” Identify waste in the process (starbursts) Seek new value A Baseline Step #3 Value Stream Analysis Design to achieve program vision Integrate Lean Best Practices to reduce waste Integrate Program Management Best Practices for Execution Step #4 Action Plan Program commitment/ownership Team improvement targets Team Lean plans Seize Opportunities Visible to all
  • 6. Lean Approach is Driving Upper Stage and Instrument Unit Integration Updated and mature production for a right sized production system, timeline and simulation Improve production layouts at MAF. Add definition to flows Reduce flow times for materials, people, hardware, information, tooling IUA manufacturing & assembly flow integrated to improve and mature the overall flow. Define details on IU process flow (All integration and testing) Seek opportunities to reduce IU process flow time. Identify missing support hardware/software Include any process flow to turn over the IU structure (DD250 baseline) Any flow to turn over the integrated assembly (DD250 baseline) back to the US contract IU Box Installation Simulation IU Assembly onto Upper Stage
  • 7. Engaging the Supply Chain Source Control Item and Component End Item Procurements Underway Upper Stage Production Ullage Settling Motors: Proposals received and in evaluation Pyros: Proposals received and in evaluation Instrument Unit Avionics Flight Computer/Command Telemetry Computer: Proposals received and in evaluation Battery: RFP released to industry this month Combined Control System Electronics: RFP released to industry All remaining procurements to be completed in 2009 Exceeding Supplier Diversity Goals & Reaching Out Mentoring and Developing Small Businesses
  • 8. Summary Supporting NASA in the development of a safe & affordable Upper Stage Made extensive producibility inputs into the design process Optimize manufacturing costs through lean approaches Have a plan to engage and integrate the Supply Chain into the program