Safety Requirements
Quality Requirements
Constructability Requirements
Materials and Delivery – RAS Critical
Build Narrative
Establish Areas of
Concern For
Dynamic Review
100%50%25% 75%
Considerations;
Planning is How, What and Who. Scheduling is When and Why
Estimate – Subject to Ongoing Reconciliation Throughout the Project
WFP (planning) Methodology Should Be Fit For Purpose
Coding Structure - Project Specific. Tied to EVM. Tied to schedule
Cost Breakdown Structure - Increases Details of Monitoring and Cost Control
What Level of Schedule is Required? Client; L2/3. Contractor; L5
Preliminary Schedule – all WP are tied into Logic Diagram and Critical Path.
Ie – can WP’s be completed with available resources, schedule?
Must Consider Earliest Start and Finish Dates of Every Activity in the Network
Kickoff Alignment With Client/Contractor Recommended
IWP
Package
Built
IWP
To Field
Final Sign
Off in
Field
Start Information Gathering Review Completion
IWP PLANNING
What work will be performed?
How will work will be performed?
In what sequence will work be performed?
Who will perform the work?
FIWP is a Project Deliverable
• Defined Schedules – Includes Detailed Engineering,
Procurement, and Construction Schedule
Must be an Intergrated Schedule where Engineering
Is sorted by Discipline, Grouped by Systems/Areas
depicting System Completion & Turnover Requirements
• Baseline Schedule is Mapped to Current Schedule
To Avoid Slippages. Consider it an Early Warning
• Also Provides Basis for S Curves and Histograms to
Keep Schedule on Track (EVM) (Coding)
• Float Identifies the Extent any Activity can be delayed
And Not Impact Completion of the Project
• Float is the product of the Critical Path Analysis
• Float belongs to the Project. Not the Contractor or Owner
• Resource Scheduling Utilizes Schedule Float. Defines
Which Resources Be Used on Specific Tasks and Evaluates
Effects of Limited Staffing, Equipment and Material Delivery
E/CWP released
To Construction
E/CWP reviewed
Documentation
Naming Conventions
Decided
All Required
Resources and
Documentation Must
Be Available.
WFP T & C’s Part of
Contract.
Sub contractors and
Fabricators Selected and
Engaged.
Start Build
On IWP
Define
Scope of Work
Work Definition
Sequencing and Logic
Resource Allocation
Consider What If Scenarios
Ensure
Engineered
Drawings
Correct
Gather
Required
Engineered
Drawings
Details of
IWP
Requirements
Establish Work to do/Not do
0%
Determine
Rates of Placement
(Unit Rates)
Estimates are Correct
Quantities are Correct
CMT Review
Establish KPI’s
Progress Tracking
Review Estimate
Crew Mix and Manhours
Equipment & Tools req’ed
Scaffold Requirements
Add Project Specific
Documents and Drawings
To IWP
Schedule Reference
Work Package Bagged & Tagged
On Pallet(s) Ready for Delivery
MTO Items Staged Close to Job

More Related Content

PPTX
Project Scheduling
PPTX
Software engineering 11 project scheduling
PPT
Critical Path Analysis Notes
PDF
160155061 project-monitoring-control
PDF
Methodologies of Project Progress Measurement
PPTX
Session 9 4th edition PMP
PPTX
Project planning and scheduling techniques
PPT
PROJECT SCHEDULING
Project Scheduling
Software engineering 11 project scheduling
Critical Path Analysis Notes
160155061 project-monitoring-control
Methodologies of Project Progress Measurement
Session 9 4th edition PMP
Project planning and scheduling techniques
PROJECT SCHEDULING

What's hot (20)

PPTX
2.07 cost management 1
PDF
(Presentation) Cis utilization of earned value management for monitoring prod...
PPTX
Project scheduling
PPTX
00 Introduction of project scheduling
PPTX
Lesson in fs cpm,cpa
PPTX
Project scheduling
DOCX
EVMS for Commercial projects
PPTX
PDF
PPTX
Project cost control
PPSX
PPTX
Promaxpmc Presentation 1
PPTX
PROJECT SCHEDULE
PPT
Ectp Valencheck
PPTX
Critical Path Method (CPM) & Network Analysis
PPTX
Project management technique PERT & CPM
PDF
construction project planing
PDF
Use of forward pass and backward pass in primavera
PPTX
Project Management Tools and Techniques (PERT- Project Evaluation and Review ...
2.07 cost management 1
(Presentation) Cis utilization of earned value management for monitoring prod...
Project scheduling
00 Introduction of project scheduling
Lesson in fs cpm,cpa
Project scheduling
EVMS for Commercial projects
Project cost control
Promaxpmc Presentation 1
PROJECT SCHEDULE
Ectp Valencheck
Critical Path Method (CPM) & Network Analysis
Project management technique PERT & CPM
construction project planing
Use of forward pass and backward pass in primavera
Project Management Tools and Techniques (PERT- Project Evaluation and Review ...
Ad

Similar to IWP Timeline (20)

PPTX
2015 Toronto Section Presentation
PDF
Mastering the Critical Path and Mitigation Actions
PDF
Schedule Review PMI
PPT
Episode 23 : PROJECT TIME MANAGEMENT
PPTX
Time --updated 60b084af4f5af-
PDF
Intergrated baseline reviews as a tool in assurance
PDF
Mitigation And Performance Recovery Using Earned Value
PDF
Schedule Recovery Using Earned Value
PPT
7. (lecture 5) Project scheduling..ppt
PDF
Project Schedule Management
PPSX
Projectmanagement 130721095616-phpapp01
PPTX
Chapter 3 Project Cost Control and Monitoring.pptx
PPT
lecture8-190719030939.ppthjtyuiytiytiyti
PPT
Software Engineering (Project Scheduling)
PDF
Group 12 - Progress and Performance Measurement and Evaluation.pdf
PPTX
Project scheduling and tracking
PDF
139 مبادرة #تواصل_تطوير المحاضرة ال 139 من المبادرة مهندس / محمد ماجد استشاري...
PDF
Performance Management, Forecasting and Improved Decision-Making
PPT
Lecture 5- Monitoring and Controlling Projects.ppt
PPT
AMTPJ-Presentn-Lvl3 Sched Dev-2010-11
2015 Toronto Section Presentation
Mastering the Critical Path and Mitigation Actions
Schedule Review PMI
Episode 23 : PROJECT TIME MANAGEMENT
Time --updated 60b084af4f5af-
Intergrated baseline reviews as a tool in assurance
Mitigation And Performance Recovery Using Earned Value
Schedule Recovery Using Earned Value
7. (lecture 5) Project scheduling..ppt
Project Schedule Management
Projectmanagement 130721095616-phpapp01
Chapter 3 Project Cost Control and Monitoring.pptx
lecture8-190719030939.ppthjtyuiytiytiyti
Software Engineering (Project Scheduling)
Group 12 - Progress and Performance Measurement and Evaluation.pdf
Project scheduling and tracking
139 مبادرة #تواصل_تطوير المحاضرة ال 139 من المبادرة مهندس / محمد ماجد استشاري...
Performance Management, Forecasting and Improved Decision-Making
Lecture 5- Monitoring and Controlling Projects.ppt
AMTPJ-Presentn-Lvl3 Sched Dev-2010-11
Ad

IWP Timeline

  • 1. Safety Requirements Quality Requirements Constructability Requirements Materials and Delivery – RAS Critical Build Narrative Establish Areas of Concern For Dynamic Review 100%50%25% 75% Considerations; Planning is How, What and Who. Scheduling is When and Why Estimate – Subject to Ongoing Reconciliation Throughout the Project WFP (planning) Methodology Should Be Fit For Purpose Coding Structure - Project Specific. Tied to EVM. Tied to schedule Cost Breakdown Structure - Increases Details of Monitoring and Cost Control What Level of Schedule is Required? Client; L2/3. Contractor; L5 Preliminary Schedule – all WP are tied into Logic Diagram and Critical Path. Ie – can WP’s be completed with available resources, schedule? Must Consider Earliest Start and Finish Dates of Every Activity in the Network Kickoff Alignment With Client/Contractor Recommended IWP Package Built IWP To Field Final Sign Off in Field Start Information Gathering Review Completion IWP PLANNING What work will be performed? How will work will be performed? In what sequence will work be performed? Who will perform the work? FIWP is a Project Deliverable • Defined Schedules – Includes Detailed Engineering, Procurement, and Construction Schedule Must be an Intergrated Schedule where Engineering Is sorted by Discipline, Grouped by Systems/Areas depicting System Completion & Turnover Requirements • Baseline Schedule is Mapped to Current Schedule To Avoid Slippages. Consider it an Early Warning • Also Provides Basis for S Curves and Histograms to Keep Schedule on Track (EVM) (Coding) • Float Identifies the Extent any Activity can be delayed And Not Impact Completion of the Project • Float is the product of the Critical Path Analysis • Float belongs to the Project. Not the Contractor or Owner • Resource Scheduling Utilizes Schedule Float. Defines Which Resources Be Used on Specific Tasks and Evaluates Effects of Limited Staffing, Equipment and Material Delivery E/CWP released To Construction E/CWP reviewed Documentation Naming Conventions Decided All Required Resources and Documentation Must Be Available. WFP T & C’s Part of Contract. Sub contractors and Fabricators Selected and Engaged. Start Build On IWP Define Scope of Work Work Definition Sequencing and Logic Resource Allocation Consider What If Scenarios Ensure Engineered Drawings Correct Gather Required Engineered Drawings Details of IWP Requirements Establish Work to do/Not do 0% Determine Rates of Placement (Unit Rates) Estimates are Correct Quantities are Correct CMT Review Establish KPI’s Progress Tracking Review Estimate Crew Mix and Manhours Equipment & Tools req’ed Scaffold Requirements Add Project Specific Documents and Drawings To IWP Schedule Reference Work Package Bagged & Tagged On Pallet(s) Ready for Delivery MTO Items Staged Close to Job