PROGRESS AND
PROGRESS AND
PERFORMANCE
PERFORMANCE
MEASUREMENT AND
MEASUREMENT AND
EVALUATION
EVALUATION
Chapter 13
GROUP 12
GROUP 12
Reporters
Reporters
Alvie Gane G. Ramada Jane M. Pinque
WHERE WE ARE NOW
WHERE WE ARE NOW
CHAPTER OUTLINE
CHAPTER OUTLINE
1. Structure of a Project
Monitoring Information System
2. The Project Control Process
3. Monitoring Time
Performance
4. Development of an Earned
Value Cost/Schedule System
5. Developing a Status Report:
A Hypothetical Example
6. Indexes to Monitor Progress
7. Forecasting Final Project
Cost
8. Other Control Issues
9. Summary
10. Key Terms
Creating a project monitoring system
involves determining:
What data to collect
How, when, and who will collect the
data
How to analyze the data
How to report current progress to
management
Structure of a Project
Structure of a Project
Monitoring Information
Monitoring Information
System
System
Information System Structure
Current status of project (schedule and cost)
Remaining cost to compete project
Date that project will be complete
Potential problems to be addressed now
Out-of-control activities requiring intervention
Cost and/or schedule overruns and the reasons for them
Forecast of overruns at time of project completion
-- What data are collected?
Project Monitoring
Project Monitoring
Information System
Information System
Information System Structure (cont’d)
Collecting data and analysis
Who will collect project data?
How will data be collected?
When will the data be collected?
Who will compile and analyze the data?
Reports and reporting
Who will receive the reports?
How will the reports be transmitted?
When will the reports be distributed?
Project Monitoring System… (cont’d)
Project Monitoring System… (cont’d)
Control
Project Control Steps
Setting a baseline plan.
Measuring progress and performance.
Comparing plan against actual.
Taking action.
Tools
- Tracking and baseline Gantt charts
- Control charts
The process of comparing actual performance against plan to
identify deviations, evaluate courses of action, and take appropriate
corrective action.
1.
2.
3.
4.
The Project Control Process
The Project Control Process
Baseline
Baseline
and
and
Tracking
Tracking
Gantt
Gantt
Charts
Charts
Project
Project
Schedule
Schedule
Control
Control
Chart
Chart
Glossary of Terms
Glossary of Terms
Developing an Integrated Cost/Schedule System
Developing an Integrated Cost/Schedule System
Scope
Work packages
Deliverables
Organization units
Resources
f. Budgets
Schedule resources to activities
1. Define the work using a WBS.
a.
b.
c.
d.
e.
2. Develop work and resource schedules.
a.
b.Time-phase work packages into a
network (EV-AC).
3. Develop a time-phased budget
using work packages included in an
activity. Accumulate budgets (PV).
4. At the work package level, collect
the actual costs for the work
performed (AC). Multiply percent
complete times original budget (EV).`
5. Compute the schedule variance
(EV-PV) and the cost variance
Project
Project
Management
Management
Information
Information
System
System
Overview
Overview
Development of Project Baselines
Development of Project Baselines
PURPOSES OF A BASELINE (PV)
WHAT COSTS ARE
INCLUDED IN BASELINES?
A planned cost and expected schedule
against which actual cost and schedule are
measured.
A basis for cash flows and awarding progress
payments.
A summation of time-phased budgets (cost
accounts as summed work packages) along a
project timeline.
- An anchor point for measuring performance
-- Labor, equipment, materials,
project direct overhead costs
(DOC)
Development of Project Baselines (cont’d)
Development of Project Baselines (cont’d)
RULES FOR PLACING COSTS IN BASELINES
Costs are periodically assigned to a baseline as
units of work are completed over the duration of a
work package.
-Costs are placed exactly as they are expected to be
“earned” in order to track them to their point of origin.
-Percent Complete Rule
Methods of Variance Analysis
Methods of Variance Analysis
Comparing Earned Value
Assessing Status of a Project
Data Budgeted cost of the work scheduled (PV)
Budgeted cost of the work completed (EV)
Actual cost of the work completed (AC)
A positive variance indicates a desirable condition, while
- With the expected schedule value.
- With the actual costs.
- Required data elements
- Calculate schedule and cost variances
a negative variance suggests problems or changes
that have taken place.
Methods of Variance Analysis
Methods of Variance Analysis
Cost Variance (CV)
Schedule Variance (SV)
- Indicates if the work accomplished using labor and materials costs
more or less than was planned at any point in the project.
- Presents an overall assessment in dollar terms of the progress
of all work packages in the project scheduled to date.
Cost/Schedule
Cost/Schedule
Graph
Graph
Earned-Value
Earned-Value
Review
Review
Exercise
Exercise
Developing A Status Report:
Developing A Status Report:
A Hypothetical Example
A Hypothetical Example
ASSUMPTIONS
-Each cost account has only one work package, and each cost
account will be represented as an activity on the network.
-The project network early start times will serve as the basis for
assigning the baseline values.
-From the moment work an activity begins, some actual costs
will be incurred each period until the activity is completed.
Indexes to Monitor Progress
Indexes to Monitor Progress
Performance Indexes
Measures the cost efficiency of work accomplished to date.
CPI = EV/AC
Measures scheduling efficiency
SPI = EV/PV
Indicates how much of the work accomplished represents
PCIB = EV/BAC
PCIC = AC/EAC
- Cost Performance Index (CPI)
- Scheduling Performance Index (SPI)
- Percent Complete Indexes
of the total budgeted (BAC) and actual (AC) dollars to date.
Additional Earned Value Rules
Additional Earned Value Rules
Rules applied to short-duration activities
and/or small-cost activities
Assumes 100 % of budget credit is earned at once and
Allows for 50% of the value of the work package budget
Uses subjective estimated percent complete in
-- 0/100 percent rule
only when the work is completed.
-- 50/50 rule
to be earned when it is started and 50% to be earned
when the package is completed.
-- Percent complete with weighted monitoring gates
combination with hard, tangible monitoring points.
Forecasting Final Project Cost
Forecasting Final Project Cost
Methods used to revise estimates of
future project costs:
Allows experts in the field to change original
baseline durations and costs because new
information tells them the original estimates are
not accurate.
Uses actual costs-to-date plus an efficiency
index to project final costs in large projects where
the original budget is unreliable.
-- EACre
-- EACf
KEY TERMS
KEY TERMS
Baseline budget
Control chart
Cost performance index (CPI)
Cost variance (CV)
Earned value (EV)
Estimated Cost at Completion—Forecasted (EACf)
Estimated Cost at Completion—Revised Estimates (EACre)
Percent complete index—budget costs (PCIB)
Percent complete index—actual costs (PCIC)
Schedule performance index (SPI)
Schedule variance (SV)
Scope creep
To complete performance index (TCPI)
Tracking Gantt chart
Variance at completion (VAC)
Measures accomplishments against plan and deliverables.
Provides a method for tracking directly to a problem work package and organization unit responsible.
Alerts all stakeholders to early identification of problems, and allows for quick, proactive corrective action.
Improves communication because all stakeholders are using the same database.
Keeps customer informed of progress, and encourages customer confidence that the money spent is
resulting in the expected progress.
Provides for accountability over individual portions of the overall budget for each organizational unit.
The best information system does not result in good control. Control requires the project manager to use
information to steer the project through rough waters. Control and Gantt charts are useful vehicles for
monitoring time performance. The cost/ schedule system allows the manager to have a positive influence on
cost and schedule in a timely manner. The ability to influence cost decreases with time; therefore, timely
reports identifying adverse cost trends can greatly assist the project manager in getting back on budget and
schedule. The integrated cost/schedule model provides the project manager and other stakeholders with a
snapshot of the current and future status of the project. The benefits of the cost/schedule model are as
follows:
1.
2.
3.
4.
5.
6.
With your information system in place, you need to use your communication plan to keep stakeholders
informed so timely decisions can be made to ensure the project is managed effectively.
Chapter Summary
Chapter Summary
References
References
https://highered.mheducation.com/sites/0077158644/student_view
0/chapter13/powerpoint_presentations.html
https://highered.mheducation.com/sites/0077158644/student_view
0/chapter13/chapter_summary.html
https://highered.mheducation.com/sites/0077158644/student_view
0/chapter13/study_outlines.html
Ignoring progress and
Ignoring progress and
performance measurement in
performance measurement in
project
project management is like
management is like
building a house without a
building a house without a
blueprint. You’ll end up with a
blueprint. You’ll end up with a
structure full of uncertainties.
structure full of uncertainties.
THANKYOU
And God bless <3

More Related Content

PPT
Project Management
PPTX
Pert,cpm, resource allocation and gert
PDF
Lect-6&7: Network Diagrams, PERT and CPM
PPTX
RESOURCE LEVELLING (MS PROJECT)
PPT
Pert & Cpm
PPT
Project Monitoring & Evaluation
PPT
Pert
PPTX
Critical Path Method: Activities And Events, Float/Slacks
Project Management
Pert,cpm, resource allocation and gert
Lect-6&7: Network Diagrams, PERT and CPM
RESOURCE LEVELLING (MS PROJECT)
Pert & Cpm
Project Monitoring & Evaluation
Pert
Critical Path Method: Activities And Events, Float/Slacks

What's hot (20)

PPTX
Project Network project approaches and rules
PPTX
Earned Value Analysis
PPTX
Project Cost Management
PPT
Introduction to Project Management
PPT
Lecture5---Gantt Chart
PPTX
Earned Value Analysis
PPT
Chap 3 Organization Structure
PPTX
Work breakdown structure in project management ppt by kiran j
PPTX
SPM Activity Planning Introduction
PPTX
Project networks
PPT
Project cycle
PPSX
Project evaluation
PPTX
Project Management Knowledge Areas
PPT
Project selection
PPSX
Project organization
PPT
06. Project Management Process Groups
PDF
PERT AND CPM PROJECT MANAGEMENT
PDF
Project Planning and Management
PPTX
PROJECT LIFE CYCLE
PPT
Introduction-to-project-management
Project Network project approaches and rules
Earned Value Analysis
Project Cost Management
Introduction to Project Management
Lecture5---Gantt Chart
Earned Value Analysis
Chap 3 Organization Structure
Work breakdown structure in project management ppt by kiran j
SPM Activity Planning Introduction
Project networks
Project cycle
Project evaluation
Project Management Knowledge Areas
Project selection
Project organization
06. Project Management Process Groups
PERT AND CPM PROJECT MANAGEMENT
Project Planning and Management
PROJECT LIFE CYCLE
Introduction-to-project-management
Ad

Similar to Group 12 - Progress and Performance Measurement and Evaluation.pdf (20)

PPT
The Project Management Process - Week 9 Performance Management
PPTX
2.07 cost management 1
PDF
Topic 10 - Project Performance Management.pdf
PDF
Monitor and control process group part two
PPT
7 cost managmenet
PDF
Performing against the wall - SPI after completion
PDF
07.cost management updated
PDF
7 cost PMBOK
PDF
A brief on project cost management
PDF
Performance Management, Forecasting and Improved Decision-Making
PPT
Software Project Management Spm1176
PDF
Earned Value Probabilistic Forecasting Using Monte Carlo Simulation
PPTX
PMP Training - 07 project cost management
PPTX
Chapter 07
PPT
L06 cost management
PPTX
Project Cost Management
PDF
CostManagementSlides.pdf
PPTX
Software Project Cost Management and estimation
PPTX
7.4 Control Costs
PPTX
PROJECT HEALTH MONITORING BY EARNED VALUE ANALYSIS
The Project Management Process - Week 9 Performance Management
2.07 cost management 1
Topic 10 - Project Performance Management.pdf
Monitor and control process group part two
7 cost managmenet
Performing against the wall - SPI after completion
07.cost management updated
7 cost PMBOK
A brief on project cost management
Performance Management, Forecasting and Improved Decision-Making
Software Project Management Spm1176
Earned Value Probabilistic Forecasting Using Monte Carlo Simulation
PMP Training - 07 project cost management
Chapter 07
L06 cost management
Project Cost Management
CostManagementSlides.pdf
Software Project Cost Management and estimation
7.4 Control Costs
PROJECT HEALTH MONITORING BY EARNED VALUE ANALYSIS
Ad

Recently uploaded (20)

PPTX
CkgxkgxydkydyldylydlydyldlyddolydyoyyU2.pptx
PDF
Power and position in leadershipDOC-20250808-WA0011..pdf
PPTX
5 Stages of group development guide.pptx
PDF
Business model innovation report 2022.pdf
PDF
Dr. Enrique Segura Ense Group - A Self-Made Entrepreneur And Executive
PDF
COST SHEET- Tender and Quotation unit 2.pdf
PPTX
Amazon (Business Studies) management studies
PDF
Elevate Cleaning Efficiency Using Tallfly Hair Remover Roller Factory Expertise
PDF
A Brief Introduction About Julia Allison
DOCX
unit 2 cost accounting- Tender and Quotation & Reconciliation Statement
PDF
MSPs in 10 Words - Created by US MSP Network
PDF
pdfcoffee.com-opt-b1plus-sb-answers.pdfvi
PDF
Roadmap Map-digital Banking feature MB,IB,AB
PPTX
New Microsoft PowerPoint Presentation - Copy.pptx
PPTX
HR Introduction Slide (1).pptx on hr intro
PDF
kom-180-proposal-for-a-directive-amending-directive-2014-45-eu-and-directive-...
PDF
Traveri Digital Marketing Seminar 2025 by Corey and Jessica Perlman
PPTX
ICG2025_ICG 6th steering committee 30-8-24.pptx
PPTX
job Avenue by vinith.pptxvnbvnvnvbnvbnbmnbmbh
PDF
DOC-20250806-WA0002._20250806_112011_0000.pdf
CkgxkgxydkydyldylydlydyldlyddolydyoyyU2.pptx
Power and position in leadershipDOC-20250808-WA0011..pdf
5 Stages of group development guide.pptx
Business model innovation report 2022.pdf
Dr. Enrique Segura Ense Group - A Self-Made Entrepreneur And Executive
COST SHEET- Tender and Quotation unit 2.pdf
Amazon (Business Studies) management studies
Elevate Cleaning Efficiency Using Tallfly Hair Remover Roller Factory Expertise
A Brief Introduction About Julia Allison
unit 2 cost accounting- Tender and Quotation & Reconciliation Statement
MSPs in 10 Words - Created by US MSP Network
pdfcoffee.com-opt-b1plus-sb-answers.pdfvi
Roadmap Map-digital Banking feature MB,IB,AB
New Microsoft PowerPoint Presentation - Copy.pptx
HR Introduction Slide (1).pptx on hr intro
kom-180-proposal-for-a-directive-amending-directive-2014-45-eu-and-directive-...
Traveri Digital Marketing Seminar 2025 by Corey and Jessica Perlman
ICG2025_ICG 6th steering committee 30-8-24.pptx
job Avenue by vinith.pptxvnbvnvnvbnvbnbmnbmbh
DOC-20250806-WA0002._20250806_112011_0000.pdf

Group 12 - Progress and Performance Measurement and Evaluation.pdf

  • 1. PROGRESS AND PROGRESS AND PERFORMANCE PERFORMANCE MEASUREMENT AND MEASUREMENT AND EVALUATION EVALUATION Chapter 13
  • 2. GROUP 12 GROUP 12 Reporters Reporters Alvie Gane G. Ramada Jane M. Pinque
  • 3. WHERE WE ARE NOW WHERE WE ARE NOW
  • 4. CHAPTER OUTLINE CHAPTER OUTLINE 1. Structure of a Project Monitoring Information System 2. The Project Control Process 3. Monitoring Time Performance 4. Development of an Earned Value Cost/Schedule System 5. Developing a Status Report: A Hypothetical Example 6. Indexes to Monitor Progress 7. Forecasting Final Project Cost 8. Other Control Issues 9. Summary 10. Key Terms
  • 5. Creating a project monitoring system involves determining: What data to collect How, when, and who will collect the data How to analyze the data How to report current progress to management Structure of a Project Structure of a Project Monitoring Information Monitoring Information System System
  • 6. Information System Structure Current status of project (schedule and cost) Remaining cost to compete project Date that project will be complete Potential problems to be addressed now Out-of-control activities requiring intervention Cost and/or schedule overruns and the reasons for them Forecast of overruns at time of project completion -- What data are collected? Project Monitoring Project Monitoring Information System Information System
  • 7. Information System Structure (cont’d) Collecting data and analysis Who will collect project data? How will data be collected? When will the data be collected? Who will compile and analyze the data? Reports and reporting Who will receive the reports? How will the reports be transmitted? When will the reports be distributed? Project Monitoring System… (cont’d) Project Monitoring System… (cont’d)
  • 8. Control Project Control Steps Setting a baseline plan. Measuring progress and performance. Comparing plan against actual. Taking action. Tools - Tracking and baseline Gantt charts - Control charts The process of comparing actual performance against plan to identify deviations, evaluate courses of action, and take appropriate corrective action. 1. 2. 3. 4. The Project Control Process The Project Control Process
  • 12. Developing an Integrated Cost/Schedule System Developing an Integrated Cost/Schedule System Scope Work packages Deliverables Organization units Resources f. Budgets Schedule resources to activities 1. Define the work using a WBS. a. b. c. d. e. 2. Develop work and resource schedules. a. b.Time-phase work packages into a network (EV-AC). 3. Develop a time-phased budget using work packages included in an activity. Accumulate budgets (PV). 4. At the work package level, collect the actual costs for the work performed (AC). Multiply percent complete times original budget (EV).` 5. Compute the schedule variance (EV-PV) and the cost variance
  • 14. Development of Project Baselines Development of Project Baselines PURPOSES OF A BASELINE (PV) WHAT COSTS ARE INCLUDED IN BASELINES? A planned cost and expected schedule against which actual cost and schedule are measured. A basis for cash flows and awarding progress payments. A summation of time-phased budgets (cost accounts as summed work packages) along a project timeline. - An anchor point for measuring performance -- Labor, equipment, materials, project direct overhead costs (DOC)
  • 15. Development of Project Baselines (cont’d) Development of Project Baselines (cont’d) RULES FOR PLACING COSTS IN BASELINES Costs are periodically assigned to a baseline as units of work are completed over the duration of a work package. -Costs are placed exactly as they are expected to be “earned” in order to track them to their point of origin. -Percent Complete Rule
  • 16. Methods of Variance Analysis Methods of Variance Analysis Comparing Earned Value Assessing Status of a Project Data Budgeted cost of the work scheduled (PV) Budgeted cost of the work completed (EV) Actual cost of the work completed (AC) A positive variance indicates a desirable condition, while - With the expected schedule value. - With the actual costs. - Required data elements - Calculate schedule and cost variances a negative variance suggests problems or changes that have taken place.
  • 17. Methods of Variance Analysis Methods of Variance Analysis Cost Variance (CV) Schedule Variance (SV) - Indicates if the work accomplished using labor and materials costs more or less than was planned at any point in the project. - Presents an overall assessment in dollar terms of the progress of all work packages in the project scheduled to date.
  • 20. Developing A Status Report: Developing A Status Report: A Hypothetical Example A Hypothetical Example ASSUMPTIONS -Each cost account has only one work package, and each cost account will be represented as an activity on the network. -The project network early start times will serve as the basis for assigning the baseline values. -From the moment work an activity begins, some actual costs will be incurred each period until the activity is completed.
  • 21. Indexes to Monitor Progress Indexes to Monitor Progress Performance Indexes Measures the cost efficiency of work accomplished to date. CPI = EV/AC Measures scheduling efficiency SPI = EV/PV Indicates how much of the work accomplished represents PCIB = EV/BAC PCIC = AC/EAC - Cost Performance Index (CPI) - Scheduling Performance Index (SPI) - Percent Complete Indexes of the total budgeted (BAC) and actual (AC) dollars to date.
  • 22. Additional Earned Value Rules Additional Earned Value Rules Rules applied to short-duration activities and/or small-cost activities Assumes 100 % of budget credit is earned at once and Allows for 50% of the value of the work package budget Uses subjective estimated percent complete in -- 0/100 percent rule only when the work is completed. -- 50/50 rule to be earned when it is started and 50% to be earned when the package is completed. -- Percent complete with weighted monitoring gates combination with hard, tangible monitoring points.
  • 23. Forecasting Final Project Cost Forecasting Final Project Cost Methods used to revise estimates of future project costs: Allows experts in the field to change original baseline durations and costs because new information tells them the original estimates are not accurate. Uses actual costs-to-date plus an efficiency index to project final costs in large projects where the original budget is unreliable. -- EACre -- EACf
  • 24. KEY TERMS KEY TERMS Baseline budget Control chart Cost performance index (CPI) Cost variance (CV) Earned value (EV) Estimated Cost at Completion—Forecasted (EACf) Estimated Cost at Completion—Revised Estimates (EACre) Percent complete index—budget costs (PCIB) Percent complete index—actual costs (PCIC) Schedule performance index (SPI) Schedule variance (SV) Scope creep To complete performance index (TCPI) Tracking Gantt chart Variance at completion (VAC)
  • 25. Measures accomplishments against plan and deliverables. Provides a method for tracking directly to a problem work package and organization unit responsible. Alerts all stakeholders to early identification of problems, and allows for quick, proactive corrective action. Improves communication because all stakeholders are using the same database. Keeps customer informed of progress, and encourages customer confidence that the money spent is resulting in the expected progress. Provides for accountability over individual portions of the overall budget for each organizational unit. The best information system does not result in good control. Control requires the project manager to use information to steer the project through rough waters. Control and Gantt charts are useful vehicles for monitoring time performance. The cost/ schedule system allows the manager to have a positive influence on cost and schedule in a timely manner. The ability to influence cost decreases with time; therefore, timely reports identifying adverse cost trends can greatly assist the project manager in getting back on budget and schedule. The integrated cost/schedule model provides the project manager and other stakeholders with a snapshot of the current and future status of the project. The benefits of the cost/schedule model are as follows: 1. 2. 3. 4. 5. 6. With your information system in place, you need to use your communication plan to keep stakeholders informed so timely decisions can be made to ensure the project is managed effectively. Chapter Summary Chapter Summary
  • 27. Ignoring progress and Ignoring progress and performance measurement in performance measurement in project project management is like management is like building a house without a building a house without a blueprint. You’ll end up with a blueprint. You’ll end up with a structure full of uncertainties. structure full of uncertainties.