Introduction
In this assignment, we are required to write a report for 3 of the subjects
which is Measurement I, Construction Technology, and Building Materials. Our
class site visit was held on 26th June 2015 which is located at The Andes, Bukit
Jalil, Kuala Lumpur. This site visit was organised by our Measurement lecturer,
Ms Ang Fuey Lin. We are divided into two groups which we will go to the site
at different time. We can either chooseto go by our own or follow the bus that
organized by our lecturer. Each one of us are required to buy a safety helmet to
ensure us to be safe at the site.
The Andes, Bukit Jalil, Kuala Lumpur
Content
No Content Page
1 Introduction 1
2 Objectives 2
3 Content/Photo & Description 3-12
4 Conclusion 13
Content/Technical Observation
We arrived at the construction site at 10am. When we arrived at the site,
we saw many construction materials at the site and we can know the
construction team of this project from the information board.
When we went into the site, James Siow, the project manager briefed us
about some information of the construction site. There are 2 block in the site,
which is categorised as block A and block B. For block A, they are planning to
finish it in August while for block B, they are planning to finish it in October
this year.
The below pictures shows what we had saw in the construction site.
The information board was placed in front of A power crane machine was found in the
the site site used for lifting heavy things and
transporting them to other places
Project manager, Mr Siow briefing us Different types of steel bar found in the site
about the site
Bored piles that haven’t install to the ground
Stirrups use to strengthen up the beam 30mm concrete cover use at the site
This is the temporary accommodation for Water pump out from the underground
workers
Two big pilecap found at the site Installed bored piled
Starter bars
Construction Technology I
Types of foundation used in site:
• Piled foundation: Piled foundations consist of a number of piles
connected by a ring of concrete called a ground beam. This is similar to a
strip foundation but not as wide. It is usually used with multi storey
buildings or buildings along the sea shove or river bed. It transmits load
through weak & unstable soil conditions.
Reasonwhy choose piledfoundation for the site
Based on this project, it is going to build a condominium which consists of
many stories. Due to this situation, piled foundation is the most suitable
foundation to use because it transmit the buildings loads to the foundations and
the ground soil layers.
The Advantages and Disadvantages of Piled
Foundation
Advantages Disadvantages
Can be placed deep into soil Requires heavy equipment for
handling and driving
Can transmit heavy loads Poordrainage qualities
Helps to prevent any shifting/collapse Expensive
The work is neat and clean. The
supervision of work at the site can be
reduced to a minimum. The storage
spacerequired is very much less.
Advance planning is required for
handling and driving.
Piles of any size, length and shape
can be made in advance and used at
the site. As a result, the progress of
the work will be rapid.
Driven piles are not suitable in soils
of poordrainage qualities. If the
driving of piles is not properly phased
and arranged, there is every
possibility of heaving of the soil or
the lifting of the driven piles during
the driving of a new pile.
Bored Pile
Bored pile is another type of reinforced concrete pile. Bored pile is used to
supporttall buildings or massive industrial complexes, which require
foundations that can bear the load of thousands of tons, most probably in
unstable or difficult soil conditions. The method of drilling bored pile is
different from RC Square pile or spun pile, which is using driving method, the
piling machine to be used will be different too. Bored piling works required
specialist bored piling contractorto follow up instead of hiring general piling
contractor.
Objectives
- To enable us to have a better understanding of construction method and
construction technology as compare to what we have learn from lecture.
- To acquire first-hand information on construction site activities.
- To learn about site organisation and the importance of site safety.
- To enable us to witness and explore the different types of building
materials being used in a building project.
- The importance of time in relation to the project completion period.
- To learn how to communicate and work together with the construction
members.
Building Materials
The grade of reinforced concrete:
The grade of reinforced concrete used for the construction of the building is
Grade 35 reinforcedconcrete.
The advantages of using Grade 35 concrete are it is cheaper than other concrete,
more common used in construction site, better resistance to fire and long service
life with low maintenance cost. The disadvantages of using Grade 35 concrete
are low compressive strength as compared to other concrete and it will easily
cracks under service load.
The grade of reinforced concrete used for the construction of the building also
has Grade 45 reinforced concrete.
The advantages of using Grade 45 concrete are the size of the structure can be
reduced and therefore the amount of concrete required is consequently reduced,
it can save a lot of costtoo. Besides, it can be extended life cycles and it is
relatively high compressive strength. The disadvantages of using Grade 45
concrete are the surface of the concrete is very hard. Other than that, it is also
more expensive than other concrete.
Conclusion
This is my first visit to a construction site. During the visit, I had acquired
valuable experience and knowledge with regards to construction activities on
site. The experience I got from the site visit is valuable because seeing the
actual construction work being done at the site is something we cannot
visualised from lecture.
From the site visit, I had learned how steel bars in beam and column is
fixed, how formwork is constructed and supported and also seen installed bored
pile, but unfortunately I was not able to see how the bored pile is actually
constructed. I also learned about the importance of site safety so as to prevent
fatal accident from being happening at the construction site.
Other than that, I have also learned that in a construction team consists of
the architects, engineers, quantity surveyors and a contractor. The team member
must work hand in hand to ensure the project is completed on time.
Finally, I am very thankful to Ms Ang, Ms Azrina, and Ms Aishah who
had arranged the site visit successfully and all the students learned a valuable
lesson about construction activities at the site.
Group Photo!!!
SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN
BACHELOR OF QUANTITY SURVEYING (HONOURS)
MARCH INTAKE 2015
SEMESTER 1
[QSB 60104] MEASUREMENT 1
-Sr. Ang Fuey Lin
[BLD 60104] CONSTRUCTIONTECHNOLOGY1
-Pn. Azrina Md Yaakob
[BLD 62003] BUILDING MATERIALS
-Pn. Myzatul Aishah Kamarazaly
CONSTRUCTIONSITEREPORT
INDIVIDUAL ASSIGNMENT
Kong Zhen Chung (0319528)

More Related Content

DOCX
DOCX
site report
DOCX
Site visit report
DOCX
Site visit report
DOCX
Site visit report
DOCX
Site visit report
DOCX
Site visit report
DOC
BQS Site Visit Report
site report
Site visit report
Site visit report
Site visit report
Site visit report
Site visit report
BQS Site Visit Report

What's hot (20)

DOCX
Report
DOCX
Assignment of Site Report
PDF
Site visit report qs semester 1
DOC
Site visit report
PDF
Individual site report brief
DOCX
SITE VISIT REPORT
PDF
site visit report (final)
DOC
Site report
PDF
Site Visit Report CT BM M1
DOCX
Site report
DOCX
Technical site visit report
ODT
Construction Site Report
DOCX
Site Visit Report
DOCX
Site Visit Report
DOCX
MCB Final report
PPTX
SITE VISIT ARCHITECTRE
DOCX
Site report for Measurement 1
DOCX
Construction site
DOCX
Site report
DOCX
Site visit report
Report
Assignment of Site Report
Site visit report qs semester 1
Site visit report
Individual site report brief
SITE VISIT REPORT
site visit report (final)
Site report
Site Visit Report CT BM M1
Site report
Technical site visit report
Construction Site Report
Site Visit Report
Site Visit Report
MCB Final report
SITE VISIT ARCHITECTRE
Site report for Measurement 1
Construction site
Site report
Site visit report
Ad

Viewers also liked (20)

PPTX
Building Contracts and CDM regulations
DOCX
Building Contractors Lessons: Duties and Responsibilities of a Building Contr...
PDF
Muhammad Aamir Javed
PPT
Building contract introduction
PDF
Bored pile-retaining-walls
PPTX
Spie Fondations UK - Profile - 2015
PPT
Implied term in building contracts
PDF
15.2.2 bored pile wall - method statement
PDF
EXCAVATIONS
PPTX
Building contracts and the JCT
PPTX
Temeltas Bored Piling 25.06
PDF
pile wall
PPT
Earth pr
PDF
2 1 excavation_basementconstruction
PDF
Various types of retaining walls
PDF
Secant piled walls dsign - تصميم خوازيق الجدران الساندة - ميكرو بايل
PPTX
Foundations
PDF
Bored piles production method
PPTX
Diaphragm wall
PPT
Problem in bored pile
Building Contracts and CDM regulations
Building Contractors Lessons: Duties and Responsibilities of a Building Contr...
Muhammad Aamir Javed
Building contract introduction
Bored pile-retaining-walls
Spie Fondations UK - Profile - 2015
Implied term in building contracts
15.2.2 bored pile wall - method statement
EXCAVATIONS
Building contracts and the JCT
Temeltas Bored Piling 25.06
pile wall
Earth pr
2 1 excavation_basementconstruction
Various types of retaining walls
Secant piled walls dsign - تصميم خوازيق الجدران الساندة - ميكرو بايل
Foundations
Bored piles production method
Diaphragm wall
Problem in bored pile
Ad

Similar to Project SlideShare (20)

DOCX
Site report
DOCX
Final Report
DOCX
bqs Site report
DOCX
Measurement 1-site-visit
DOCX
Integrated assignment site report
PDF
M1 CTec1 BMat Rep1
DOCX
Site report
PDF
Site visit report
DOCX
Site visit
DOCX
Assignment 1 - Antara Gapi, Hulu Selangor, Selangor
DOCX
Ctw site report(pg 1 to 8, 14)
DOCX
Site visitation
DOC
Site report
PDF
Site report
DOCX
Site report 1 sem1
DOCX
Site report
PDF
Bachelor in quantity surveying 2
DOCX
Site report
DOCX
Report
DOCX
Introduction
Site report
Final Report
bqs Site report
Measurement 1-site-visit
Integrated assignment site report
M1 CTec1 BMat Rep1
Site report
Site visit report
Site visit
Assignment 1 - Antara Gapi, Hulu Selangor, Selangor
Ctw site report(pg 1 to 8, 14)
Site visitation
Site report
Site report
Site report 1 sem1
Site report
Bachelor in quantity surveying 2
Site report
Report
Introduction

More from Yung Kai (20)

PDF
Urban planning
PDF
Site analysis
DOCX
Report
DOCX
Theories Synopsis
PPTX
Conservation Report Project 2
PPTX
Convervation Presentation Slide Project 2
PPTX
Petaling street
DOCX
B.science 2 Report
DOCX
Yung Part, structure
DOCX
Building Structure
PDF
Bservice final report newest
PDF
Asian architecti final report
PDF
Asian architect final report 00
PDF
Bcon report bus shelter
PDF
Sin Sze Si Ya Temple Report
DOCX
Culture History Report
PDF
Site A Analysis
PPTX
Building Contruction 1 Project 1: Experience Construction
DOC
Question 1 - San Vitale
PDF
Design Assignment 2b
Urban planning
Site analysis
Report
Theories Synopsis
Conservation Report Project 2
Convervation Presentation Slide Project 2
Petaling street
B.science 2 Report
Yung Part, structure
Building Structure
Bservice final report newest
Asian architecti final report
Asian architect final report 00
Bcon report bus shelter
Sin Sze Si Ya Temple Report
Culture History Report
Site A Analysis
Building Contruction 1 Project 1: Experience Construction
Question 1 - San Vitale
Design Assignment 2b

Recently uploaded (20)

PPTX
Orientation - ARALprogram of Deped to the Parents.pptx
PDF
Yogi Goddess Pres Conference Studio Updates
PDF
grade 11-chemistry_fetena_net_5883.pdf teacher guide for all student
PPTX
Tissue processing ( HISTOPATHOLOGICAL TECHNIQUE
PPTX
master seminar digital applications in india
PDF
OBE - B.A.(HON'S) IN INTERIOR ARCHITECTURE -Ar.MOHIUDDIN.pdf
PPTX
Pharmacology of Heart Failure /Pharmacotherapy of CHF
PDF
A systematic review of self-coping strategies used by university students to ...
PDF
Module 4: Burden of Disease Tutorial Slides S2 2025
PDF
FourierSeries-QuestionsWithAnswers(Part-A).pdf
PDF
Anesthesia in Laparoscopic Surgery in India
PDF
Complications of Minimal Access Surgery at WLH
PDF
Abdominal Access Techniques with Prof. Dr. R K Mishra
PDF
VCE English Exam - Section C Student Revision Booklet
PDF
Black Hat USA 2025 - Micro ICS Summit - ICS/OT Threat Landscape
PDF
RMMM.pdf make it easy to upload and study
PDF
O7-L3 Supply Chain Operations - ICLT Program
PPTX
Cell Types and Its function , kingdom of life
PDF
O5-L3 Freight Transport Ops (International) V1.pdf
DOC
Soft-furnishing-By-Architect-A.F.M.Mohiuddin-Akhand.doc
Orientation - ARALprogram of Deped to the Parents.pptx
Yogi Goddess Pres Conference Studio Updates
grade 11-chemistry_fetena_net_5883.pdf teacher guide for all student
Tissue processing ( HISTOPATHOLOGICAL TECHNIQUE
master seminar digital applications in india
OBE - B.A.(HON'S) IN INTERIOR ARCHITECTURE -Ar.MOHIUDDIN.pdf
Pharmacology of Heart Failure /Pharmacotherapy of CHF
A systematic review of self-coping strategies used by university students to ...
Module 4: Burden of Disease Tutorial Slides S2 2025
FourierSeries-QuestionsWithAnswers(Part-A).pdf
Anesthesia in Laparoscopic Surgery in India
Complications of Minimal Access Surgery at WLH
Abdominal Access Techniques with Prof. Dr. R K Mishra
VCE English Exam - Section C Student Revision Booklet
Black Hat USA 2025 - Micro ICS Summit - ICS/OT Threat Landscape
RMMM.pdf make it easy to upload and study
O7-L3 Supply Chain Operations - ICLT Program
Cell Types and Its function , kingdom of life
O5-L3 Freight Transport Ops (International) V1.pdf
Soft-furnishing-By-Architect-A.F.M.Mohiuddin-Akhand.doc

Project SlideShare

  • 1. Introduction In this assignment, we are required to write a report for 3 of the subjects which is Measurement I, Construction Technology, and Building Materials. Our class site visit was held on 26th June 2015 which is located at The Andes, Bukit Jalil, Kuala Lumpur. This site visit was organised by our Measurement lecturer, Ms Ang Fuey Lin. We are divided into two groups which we will go to the site at different time. We can either chooseto go by our own or follow the bus that organized by our lecturer. Each one of us are required to buy a safety helmet to ensure us to be safe at the site. The Andes, Bukit Jalil, Kuala Lumpur
  • 2. Content No Content Page 1 Introduction 1 2 Objectives 2 3 Content/Photo & Description 3-12 4 Conclusion 13
  • 3. Content/Technical Observation We arrived at the construction site at 10am. When we arrived at the site, we saw many construction materials at the site and we can know the construction team of this project from the information board. When we went into the site, James Siow, the project manager briefed us about some information of the construction site. There are 2 block in the site, which is categorised as block A and block B. For block A, they are planning to finish it in August while for block B, they are planning to finish it in October this year. The below pictures shows what we had saw in the construction site. The information board was placed in front of A power crane machine was found in the the site site used for lifting heavy things and transporting them to other places
  • 4. Project manager, Mr Siow briefing us Different types of steel bar found in the site about the site Bored piles that haven’t install to the ground Stirrups use to strengthen up the beam 30mm concrete cover use at the site
  • 5. This is the temporary accommodation for Water pump out from the underground workers Two big pilecap found at the site Installed bored piled Starter bars
  • 6. Construction Technology I Types of foundation used in site: • Piled foundation: Piled foundations consist of a number of piles connected by a ring of concrete called a ground beam. This is similar to a strip foundation but not as wide. It is usually used with multi storey buildings or buildings along the sea shove or river bed. It transmits load through weak & unstable soil conditions. Reasonwhy choose piledfoundation for the site Based on this project, it is going to build a condominium which consists of many stories. Due to this situation, piled foundation is the most suitable foundation to use because it transmit the buildings loads to the foundations and the ground soil layers.
  • 7. The Advantages and Disadvantages of Piled Foundation Advantages Disadvantages Can be placed deep into soil Requires heavy equipment for handling and driving Can transmit heavy loads Poordrainage qualities Helps to prevent any shifting/collapse Expensive The work is neat and clean. The supervision of work at the site can be reduced to a minimum. The storage spacerequired is very much less. Advance planning is required for handling and driving. Piles of any size, length and shape can be made in advance and used at the site. As a result, the progress of the work will be rapid. Driven piles are not suitable in soils of poordrainage qualities. If the driving of piles is not properly phased and arranged, there is every possibility of heaving of the soil or the lifting of the driven piles during the driving of a new pile.
  • 8. Bored Pile Bored pile is another type of reinforced concrete pile. Bored pile is used to supporttall buildings or massive industrial complexes, which require foundations that can bear the load of thousands of tons, most probably in unstable or difficult soil conditions. The method of drilling bored pile is different from RC Square pile or spun pile, which is using driving method, the piling machine to be used will be different too. Bored piling works required specialist bored piling contractorto follow up instead of hiring general piling contractor.
  • 9. Objectives - To enable us to have a better understanding of construction method and construction technology as compare to what we have learn from lecture. - To acquire first-hand information on construction site activities. - To learn about site organisation and the importance of site safety. - To enable us to witness and explore the different types of building materials being used in a building project. - The importance of time in relation to the project completion period. - To learn how to communicate and work together with the construction members.
  • 10. Building Materials The grade of reinforced concrete: The grade of reinforced concrete used for the construction of the building is Grade 35 reinforcedconcrete. The advantages of using Grade 35 concrete are it is cheaper than other concrete, more common used in construction site, better resistance to fire and long service life with low maintenance cost. The disadvantages of using Grade 35 concrete are low compressive strength as compared to other concrete and it will easily cracks under service load.
  • 11. The grade of reinforced concrete used for the construction of the building also has Grade 45 reinforced concrete. The advantages of using Grade 45 concrete are the size of the structure can be reduced and therefore the amount of concrete required is consequently reduced, it can save a lot of costtoo. Besides, it can be extended life cycles and it is relatively high compressive strength. The disadvantages of using Grade 45 concrete are the surface of the concrete is very hard. Other than that, it is also more expensive than other concrete.
  • 12. Conclusion This is my first visit to a construction site. During the visit, I had acquired valuable experience and knowledge with regards to construction activities on site. The experience I got from the site visit is valuable because seeing the actual construction work being done at the site is something we cannot visualised from lecture. From the site visit, I had learned how steel bars in beam and column is fixed, how formwork is constructed and supported and also seen installed bored pile, but unfortunately I was not able to see how the bored pile is actually constructed. I also learned about the importance of site safety so as to prevent fatal accident from being happening at the construction site. Other than that, I have also learned that in a construction team consists of the architects, engineers, quantity surveyors and a contractor. The team member must work hand in hand to ensure the project is completed on time. Finally, I am very thankful to Ms Ang, Ms Azrina, and Ms Aishah who had arranged the site visit successfully and all the students learned a valuable lesson about construction activities at the site. Group Photo!!!
  • 13. SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN BACHELOR OF QUANTITY SURVEYING (HONOURS) MARCH INTAKE 2015 SEMESTER 1 [QSB 60104] MEASUREMENT 1 -Sr. Ang Fuey Lin [BLD 60104] CONSTRUCTIONTECHNOLOGY1 -Pn. Azrina Md Yaakob [BLD 62003] BUILDING MATERIALS -Pn. Myzatul Aishah Kamarazaly CONSTRUCTIONSITEREPORT INDIVIDUAL ASSIGNMENT Kong Zhen Chung (0319528)