`
MICROCONTROLLER
BASED
AUTOMATIC RAILWAY
GATE CONTROL
1
1)Akbari Parth(110383116004)
2)Patel Amit(110383116013)
What happen in Traditional way,,,?
Once the train leaves the station, the stationmaster
informs the gatekeeper through the telephone.
Gatekeeper receives the information, he closes the gate
depending on the timing at which the train arrives.
If the train is late, then gate remain closed for a long
time causing traffic near the gates.
2
What happen when we use
automatic railway gate control,,,?
Train is detected by the sensor placed on either side of
the gate at about 5km from the level crossing.
The sensed signal is sent to the microcontroller and it
checks for possible presence of vehicle between the
gates, again using sensors.
Buzzer indication and light signals on either side are
provided to the road users indicating the closure of
gates.
3
Once, no vehicle is sensed in between the gate the
motor is activated and the gates are closed.
If any obstacle is sensed it is indicated to the train
driver by signals(RED) placed at about 2km.
When no obstacle is sensed GREEN light is
indicated, and the train is to free to move.
The departure of the train is detected by sensors
placed at about 1km from the gate. The signal about
the departure is sent to the microcontroller, which in
turn operates the motor and open the gate.
4
5
R1 & R2 : Sensors placed at about 5 km from the gate to
detect the train arrival on both directions.
R3 & R4 : Sensors placed at 1 km from the gate to
detect the train departure on both directions.
SG1,SG2,
SG3 & SG4 :Signals at the side of the track to indicate the
train driver about the closing of the gate.
B : Buzzer, an audio signal to warn the road user
about the approach of train.
M : Motor for gate operation.
L : Light signal to warn the road user.
6
Working of Automatic railway control
i)Initial Signal Display :
SG1 and SG3 are placed at 2Km on both side,
SG2 and SG4 are placed at 180m from the gate.
All signals are made RED initially to indicate
that gate is open and vehicles are passing through
the gate.
Road signal is GREEN for road user, Buzzer
is‘OFF’ means the road users not be warned.
7
ii) Train Arrival Detection:
R1 and R2 sense the arrival.
Sensor works on the base on the vibration of
the track, using IR transmitter, IR receiver the signal
send to the microcontroller.
8
iii) Warning For Road Users:
When train arrival is sensed on any side of the
gate, road users are warned by RED signal to the
road users passing through the gate.
RED signal appears for the road user once the
train cuts the relay sensor placed 5Km before the
gate. A buzzer is made “ON”,than nobody should
enter the gate at that moment.
9
iv) Sensing For Vehicles:
Laser light is used as a source and LDR as a
tool for sensing purpose.
If LDR sense no vehicles then signal S2 & S4
made GREEN for the train.
If any problem sense on track then signal S2 &
S4 made RED.
10
v) Gate Closing Operation:
Once the microcontroller senses that
there is no vehicle inside, then it automatically
produces the signal to operate the motor through
relay circuit and hence close the gate.
11
vi) Signal For Train:
When the path is clear inside the gate,
GREEN signal is produced for the train otherwise
signal is made RED for the train so it slow down its
speed before 5 Km from the gate.
Another signal placed at 180 m before the
gate, when it is still RED when train approaches if
then provisions if then provisions should be stop
the train.
12
vii) Train Departure Detection:
Train departure sensing is done by sensors R3
and R4 respectively considering the directions of
train approach.
13
viii) Gate Opening:
When the train departure is sensed by the
sensors, signal is given to the Microcontroller
which operates the motor in reverse direction
and the gates are opened.
Once the gate is opened signal for road
users are made GREEN so that the vehicles can
pass through the gate.
14
Advantage:
• Reduction of the time to wait vehicle
• No need for gatekeeper
• We can avoid accident which sometimes happen
• The mechanism works on a simple principle and
there is not much of complexity needed in the
circuit.
15
conclusion
• The idea of automating the process of railway
gate operation in level crossings has been
undertaken.
• As the system is completely automated, it
avoids manual errors and thus provides
ultimate safety to road users.
16
17

More Related Content

PPTX
Automation of railway gate using verilog presentation
PDF
Automatic railway gate using pic 16f877a
PPTX
Implementation of automatic railway platform
PPT
Presentationatchyuth 120413063530-phpapp02
PPT
Automatic railway gate control
PPTX
AUTOMATIC RAILWAY GATE CONTROL SYSTEM
PPT
Basics of Metro Railway Signalling system
PPTX
automatic railway platform-mini project
Automation of railway gate using verilog presentation
Automatic railway gate using pic 16f877a
Implementation of automatic railway platform
Presentationatchyuth 120413063530-phpapp02
Automatic railway gate control
AUTOMATIC RAILWAY GATE CONTROL SYSTEM
Basics of Metro Railway Signalling system
automatic railway platform-mini project

Similar to automaticrailwaygatecontrol-.pdf (20)

PPT
railway gate using servo and arduino uno
PPTX
Visualize gate control and track switching (GHanshyam Dusane)
PDF
IRJET - Automated Railway Crossing System using IoT
PPTX
Advance Signalling System-Rajbansh
PPT
railway gate using arduino uno and servo motors
PPTX
Anti Collision For Train using RF PPT.pptx
PPT
automatic rail gate control with collision avoidance
PPTX
Automatic railway gate controller AUP
PPTX
Un manned railway gate
PPTX
AUTOMATIC RAILWAY GATE DETECTION SYSTEM PPT
PDF
IRJET-Solar Operated Automatic Railway Gate Control
PPTX
automatic railway gate control system
PPTX
Simple Railway gate automation
PPTX
automatic railway gate control system using arduino
PPTX
RAILWAY TRACK GEOMETRY SURVEYING SYSTEM
PPT
Tlc.finalppt
PPT
Nabil slide fyp1 new
PPTX
Railway level crossing gate operation remotely by android
PDF
Arts final project(MOBILE BRIDGE PLATFORM)
PDF
IRJET- Design and Implementation of Automatic Traction System
railway gate using servo and arduino uno
Visualize gate control and track switching (GHanshyam Dusane)
IRJET - Automated Railway Crossing System using IoT
Advance Signalling System-Rajbansh
railway gate using arduino uno and servo motors
Anti Collision For Train using RF PPT.pptx
automatic rail gate control with collision avoidance
Automatic railway gate controller AUP
Un manned railway gate
AUTOMATIC RAILWAY GATE DETECTION SYSTEM PPT
IRJET-Solar Operated Automatic Railway Gate Control
automatic railway gate control system
Simple Railway gate automation
automatic railway gate control system using arduino
RAILWAY TRACK GEOMETRY SURVEYING SYSTEM
Tlc.finalppt
Nabil slide fyp1 new
Railway level crossing gate operation remotely by android
Arts final project(MOBILE BRIDGE PLATFORM)
IRJET- Design and Implementation of Automatic Traction System

Recently uploaded (20)

PPTX
Chapter 5: Probability Theory and Statistics
PDF
Convolutional neural network based encoder-decoder for efficient real-time ob...
PDF
Five Habits of High-Impact Board Members
PPT
Module 1.ppt Iot fundamentals and Architecture
PDF
Developing a website for English-speaking practice to English as a foreign la...
PDF
A review of recent deep learning applications in wood surface defect identifi...
PDF
“A New Era of 3D Sensing: Transforming Industries and Creating Opportunities,...
PPT
Galois Field Theory of Risk: A Perspective, Protocol, and Mathematical Backgr...
PDF
How ambidextrous entrepreneurial leaders react to the artificial intelligence...
PDF
Zenith AI: Advanced Artificial Intelligence
PDF
OpenACC and Open Hackathons Monthly Highlights July 2025
PDF
Flame analysis and combustion estimation using large language and vision assi...
PDF
The influence of sentiment analysis in enhancing early warning system model f...
PDF
NewMind AI Weekly Chronicles – August ’25 Week III
PDF
Improvisation in detection of pomegranate leaf disease using transfer learni...
PPTX
Build Your First AI Agent with UiPath.pptx
PDF
Hybrid horned lizard optimization algorithm-aquila optimizer for DC motor
PDF
Produktkatalog für HOBO Datenlogger, Wetterstationen, Sensoren, Software und ...
PDF
Credit Without Borders: AI and Financial Inclusion in Bangladesh
PDF
Taming the Chaos: How to Turn Unstructured Data into Decisions
Chapter 5: Probability Theory and Statistics
Convolutional neural network based encoder-decoder for efficient real-time ob...
Five Habits of High-Impact Board Members
Module 1.ppt Iot fundamentals and Architecture
Developing a website for English-speaking practice to English as a foreign la...
A review of recent deep learning applications in wood surface defect identifi...
“A New Era of 3D Sensing: Transforming Industries and Creating Opportunities,...
Galois Field Theory of Risk: A Perspective, Protocol, and Mathematical Backgr...
How ambidextrous entrepreneurial leaders react to the artificial intelligence...
Zenith AI: Advanced Artificial Intelligence
OpenACC and Open Hackathons Monthly Highlights July 2025
Flame analysis and combustion estimation using large language and vision assi...
The influence of sentiment analysis in enhancing early warning system model f...
NewMind AI Weekly Chronicles – August ’25 Week III
Improvisation in detection of pomegranate leaf disease using transfer learni...
Build Your First AI Agent with UiPath.pptx
Hybrid horned lizard optimization algorithm-aquila optimizer for DC motor
Produktkatalog für HOBO Datenlogger, Wetterstationen, Sensoren, Software und ...
Credit Without Borders: AI and Financial Inclusion in Bangladesh
Taming the Chaos: How to Turn Unstructured Data into Decisions

automaticrailwaygatecontrol-.pdf

  • 1. ` MICROCONTROLLER BASED AUTOMATIC RAILWAY GATE CONTROL 1 1)Akbari Parth(110383116004) 2)Patel Amit(110383116013)
  • 2. What happen in Traditional way,,,? Once the train leaves the station, the stationmaster informs the gatekeeper through the telephone. Gatekeeper receives the information, he closes the gate depending on the timing at which the train arrives. If the train is late, then gate remain closed for a long time causing traffic near the gates. 2
  • 3. What happen when we use automatic railway gate control,,,? Train is detected by the sensor placed on either side of the gate at about 5km from the level crossing. The sensed signal is sent to the microcontroller and it checks for possible presence of vehicle between the gates, again using sensors. Buzzer indication and light signals on either side are provided to the road users indicating the closure of gates. 3
  • 4. Once, no vehicle is sensed in between the gate the motor is activated and the gates are closed. If any obstacle is sensed it is indicated to the train driver by signals(RED) placed at about 2km. When no obstacle is sensed GREEN light is indicated, and the train is to free to move. The departure of the train is detected by sensors placed at about 1km from the gate. The signal about the departure is sent to the microcontroller, which in turn operates the motor and open the gate. 4
  • 5. 5
  • 6. R1 & R2 : Sensors placed at about 5 km from the gate to detect the train arrival on both directions. R3 & R4 : Sensors placed at 1 km from the gate to detect the train departure on both directions. SG1,SG2, SG3 & SG4 :Signals at the side of the track to indicate the train driver about the closing of the gate. B : Buzzer, an audio signal to warn the road user about the approach of train. M : Motor for gate operation. L : Light signal to warn the road user. 6
  • 7. Working of Automatic railway control i)Initial Signal Display : SG1 and SG3 are placed at 2Km on both side, SG2 and SG4 are placed at 180m from the gate. All signals are made RED initially to indicate that gate is open and vehicles are passing through the gate. Road signal is GREEN for road user, Buzzer is‘OFF’ means the road users not be warned. 7
  • 8. ii) Train Arrival Detection: R1 and R2 sense the arrival. Sensor works on the base on the vibration of the track, using IR transmitter, IR receiver the signal send to the microcontroller. 8
  • 9. iii) Warning For Road Users: When train arrival is sensed on any side of the gate, road users are warned by RED signal to the road users passing through the gate. RED signal appears for the road user once the train cuts the relay sensor placed 5Km before the gate. A buzzer is made “ON”,than nobody should enter the gate at that moment. 9
  • 10. iv) Sensing For Vehicles: Laser light is used as a source and LDR as a tool for sensing purpose. If LDR sense no vehicles then signal S2 & S4 made GREEN for the train. If any problem sense on track then signal S2 & S4 made RED. 10
  • 11. v) Gate Closing Operation: Once the microcontroller senses that there is no vehicle inside, then it automatically produces the signal to operate the motor through relay circuit and hence close the gate. 11
  • 12. vi) Signal For Train: When the path is clear inside the gate, GREEN signal is produced for the train otherwise signal is made RED for the train so it slow down its speed before 5 Km from the gate. Another signal placed at 180 m before the gate, when it is still RED when train approaches if then provisions if then provisions should be stop the train. 12
  • 13. vii) Train Departure Detection: Train departure sensing is done by sensors R3 and R4 respectively considering the directions of train approach. 13
  • 14. viii) Gate Opening: When the train departure is sensed by the sensors, signal is given to the Microcontroller which operates the motor in reverse direction and the gates are opened. Once the gate is opened signal for road users are made GREEN so that the vehicles can pass through the gate. 14
  • 15. Advantage: • Reduction of the time to wait vehicle • No need for gatekeeper • We can avoid accident which sometimes happen • The mechanism works on a simple principle and there is not much of complexity needed in the circuit. 15
  • 16. conclusion • The idea of automating the process of railway gate operation in level crossings has been undertaken. • As the system is completely automated, it avoids manual errors and thus provides ultimate safety to road users. 16
  • 17. 17