Project Synopsis:
Railway safety is a crucial aspect of rail operation
system worldwide. The purpose of our project is to
design an AUTOMATIC RAIL CROSSING SYSTEM. This
system is capable of closing the gate/barrier when a
train is going to cross the road and the system will be
restored to its initial condition after the train leaves.
Thus it saves time and man power and reduces the
chance of error.
1. Previously, no gate or barrier was used at rail
crossings.
2. After some period, flagmen were posted to rail
crossings to warn the traffic about the incoming
train. Generally they used flag or lamp to do their
job.
3. Later manually controlled barricades were
introduced. The gates were intended to be a
complete barrier against intrusion of any road traffic
on the railway.
1. Manual rail crossings need a lot of man power to do
the job of signaling and operating the barrier.
2. So manual rail crossing is not cost efficient.
3. Most of the time this procedure is not time efficient.
Often train arrives a long time after the gate has
been closed.
4. Manual system is erroneous, and can cause severe
damage which may worth a heavy loss of life and
capital.
To avoid human error and to enhance efficiency,
railway crossing system can be controlled in an
automated manner. In an automatic rail crossing
system a train which approaches the gate is
detected by a sensor, and also the speed of the
train is noted. Then the time taken by the train to
reach the road is calculated and the gate/barrier
is closed down accordingly. Also the departure of
the train is detected by another sensor and the
gate/barrier is restored to its initial position.
railway gate using servo and arduino uno
•Microcontroller Unit ATMEGA16
•LEDs AND Light Dependent Resistors(LDR)
•LM324 OPAMP
•DC Stepper Motor (5 wire unipolar type)
•ULN2003A (motor driver)
•Resistances for proper biasing, control and
safety measure
•An LCD Display
•Microcontroller Unit ATMEGA16
•LEDs AND Light Dependent Resistors(LDR)
•LM324 OP-AMP
•DC Stepper Gear Motor (5 wire unipolar type)
•ULN2003A (motor driver)
•Resistances for proper biasing, control and
safety measure
•An LCD Display
Train
Sensed
Micro
controller
Barrier
Closed
Departure
Sensed
Micro
controller
Barrier
Opened
1. Automatic Train Sensing
2. Traffic Signal Control
3. Warning Buzzer
4. Obstacle Detection
5. Gate Malfunction Detection
6. Auto Communication With Train
railway gate using servo and arduino uno
railway gate using servo and arduino uno
Train approaching sensor Train detected by LDR
No Train
Green
Signal
On
Train
Detected
Yellow
Signal On
Train
Approached
Red Signal
On
When there is no crossing
ahead.
When the train is approaching
a rail gate
When train crosses a rail gate
If an obstacle is detected on the line
after the gate is closed
In case of a gate failure
• Light Sensors were used.
• No wireless communication with train is done
in this project.
• Backup motor system can be added.
• Automatic train deceleration.
• Effective wireless communication.
Prepared by

More Related Content

PPT
Nabil slide fyp1 new
PDF
Automatic railway gate using pic 16f877a
PPTX
RAGU PPT
PPTX
automatic railway gate control system
PDF
IRJET-Solar Operated Automatic Railway Gate Control
DOCX
Design engineering 1 a gaurav
PPTX
Automatic railway gate controller AUP
PPTX
Implementation of automatic railway platform
Nabil slide fyp1 new
Automatic railway gate using pic 16f877a
RAGU PPT
automatic railway gate control system
IRJET-Solar Operated Automatic Railway Gate Control
Design engineering 1 a gaurav
Automatic railway gate controller AUP
Implementation of automatic railway platform

Similar to railway gate using servo and arduino uno (20)

PPT
Presentationatchyuth 120413063530-phpapp02
PPTX
Rail gate controller ppt
PPTX
Un manned railway gate
PPTX
Automatic_Railway_Gate_Control_System.pptx
PPTX
Visualize gate control and track switching (GHanshyam Dusane)
PPTX
Automation of railway gate using verilog presentation
PPTX
AUTOMATIC RAILWAY GATE CONTROL SYSTEM
PDF
Arts final project(MOBILE BRIDGE PLATFORM)
PPTX
KAVACH.pptx
PPT
Automatic railway gate control
DOC
Automatic gate open and closin ggate
DOC
Automatic gate open and closin ggate
DOC
Automatic gate control for opening
DOC
Automatic gate open and closin ggate
DOC
Automatic gate open and closin ggate
DOC
Automatic gate control for opening
DOC
Automatic gate open and closin ggate
PPTX
LMRC Industrial Training Seminar by Rohan Singh.pptx
DOC
Automatic gate open and closin ggate
PPTX
Presentation1
Presentationatchyuth 120413063530-phpapp02
Rail gate controller ppt
Un manned railway gate
Automatic_Railway_Gate_Control_System.pptx
Visualize gate control and track switching (GHanshyam Dusane)
Automation of railway gate using verilog presentation
AUTOMATIC RAILWAY GATE CONTROL SYSTEM
Arts final project(MOBILE BRIDGE PLATFORM)
KAVACH.pptx
Automatic railway gate control
Automatic gate open and closin ggate
Automatic gate open and closin ggate
Automatic gate control for opening
Automatic gate open and closin ggate
Automatic gate open and closin ggate
Automatic gate control for opening
Automatic gate open and closin ggate
LMRC Industrial Training Seminar by Rohan Singh.pptx
Automatic gate open and closin ggate
Presentation1
Ad

More from Hamed Raza (20)

DOCX
project report for engineering studfents
DOCX
project report format for engineering stufents
PPT
blind stick for assistive technology project
PPT
helmetdetection for bikers security and alert.ppt
PPTX
fish feeder ppt using arduino and microcontroller
PPT
nawab shah alam college engineering technology
PPT
metal detection using arduino uno ppt.ppt
PPTX
ULTRASONIC NAVIGATION AID FOR VISUALLY IMPAIRED.pptx
PPTX
shop lifting using deep learnign and python pptx
PPTX
handgesture leds control by mems sensor and arduino uno
PPTX
fingerprint-based-exam-hall-authentication-system.pptx
PPTX
career guidance using ml and python for college students projects
PPTX
toxic commnets classification using python
PPT
night lighting using ldr and arduino uno
PPTX
INTELLIGENT STUDENTS TRACKING SYSTEM IN CAMPUS RF.pptx
PPTX
solar tracker sunflower model based.pptx
PPT
home automation ppt using google assistant and wifi
PPT
railway gate using arduino uno and servo motors
PPT
patient monitoring using iot and heart beat sensor
PPTX
Automatic Head Light Intensity control for avoid accidents at night times..pptx
project report for engineering studfents
project report format for engineering stufents
blind stick for assistive technology project
helmetdetection for bikers security and alert.ppt
fish feeder ppt using arduino and microcontroller
nawab shah alam college engineering technology
metal detection using arduino uno ppt.ppt
ULTRASONIC NAVIGATION AID FOR VISUALLY IMPAIRED.pptx
shop lifting using deep learnign and python pptx
handgesture leds control by mems sensor and arduino uno
fingerprint-based-exam-hall-authentication-system.pptx
career guidance using ml and python for college students projects
toxic commnets classification using python
night lighting using ldr and arduino uno
INTELLIGENT STUDENTS TRACKING SYSTEM IN CAMPUS RF.pptx
solar tracker sunflower model based.pptx
home automation ppt using google assistant and wifi
railway gate using arduino uno and servo motors
patient monitoring using iot and heart beat sensor
Automatic Head Light Intensity control for avoid accidents at night times..pptx
Ad

Recently uploaded (20)

PDF
Well-logging-methods_new................
PDF
Evaluating the Democratization of the Turkish Armed Forces from a Normative P...
DOCX
573137875-Attendance-Management-System-original
PPTX
MET 305 2019 SCHEME MODULE 2 COMPLETE.pptx
PPTX
Infosys Presentation by1.Riyan Bagwan 2.Samadhan Naiknavare 3.Gaurav Shinde 4...
PPTX
Safety Seminar civil to be ensured for safe working.
PPT
Mechanical Engineering MATERIALS Selection
PDF
keyrequirementskkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk
PPTX
CH1 Production IntroductoryConcepts.pptx
PPT
Project quality management in manufacturing
PPTX
Sustainable Sites - Green Building Construction
PDF
R24 SURVEYING LAB MANUAL for civil enggi
PPTX
Current and future trends in Computer Vision.pptx
PDF
The CXO Playbook 2025 – Future-Ready Strategies for C-Suite Leaders Cerebrai...
PDF
Operating System & Kernel Study Guide-1 - converted.pdf
PDF
Model Code of Practice - Construction Work - 21102022 .pdf
PPTX
Construction Project Organization Group 2.pptx
PPTX
Internet of Things (IOT) - A guide to understanding
DOCX
ASol_English-Language-Literature-Set-1-27-02-2023-converted.docx
PDF
BMEC211 - INTRODUCTION TO MECHATRONICS-1.pdf
Well-logging-methods_new................
Evaluating the Democratization of the Turkish Armed Forces from a Normative P...
573137875-Attendance-Management-System-original
MET 305 2019 SCHEME MODULE 2 COMPLETE.pptx
Infosys Presentation by1.Riyan Bagwan 2.Samadhan Naiknavare 3.Gaurav Shinde 4...
Safety Seminar civil to be ensured for safe working.
Mechanical Engineering MATERIALS Selection
keyrequirementskkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk
CH1 Production IntroductoryConcepts.pptx
Project quality management in manufacturing
Sustainable Sites - Green Building Construction
R24 SURVEYING LAB MANUAL for civil enggi
Current and future trends in Computer Vision.pptx
The CXO Playbook 2025 – Future-Ready Strategies for C-Suite Leaders Cerebrai...
Operating System & Kernel Study Guide-1 - converted.pdf
Model Code of Practice - Construction Work - 21102022 .pdf
Construction Project Organization Group 2.pptx
Internet of Things (IOT) - A guide to understanding
ASol_English-Language-Literature-Set-1-27-02-2023-converted.docx
BMEC211 - INTRODUCTION TO MECHATRONICS-1.pdf

railway gate using servo and arduino uno

  • 2. Project Synopsis: Railway safety is a crucial aspect of rail operation system worldwide. The purpose of our project is to design an AUTOMATIC RAIL CROSSING SYSTEM. This system is capable of closing the gate/barrier when a train is going to cross the road and the system will be restored to its initial condition after the train leaves. Thus it saves time and man power and reduces the chance of error.
  • 3. 1. Previously, no gate or barrier was used at rail crossings. 2. After some period, flagmen were posted to rail crossings to warn the traffic about the incoming train. Generally they used flag or lamp to do their job. 3. Later manually controlled barricades were introduced. The gates were intended to be a complete barrier against intrusion of any road traffic on the railway.
  • 4. 1. Manual rail crossings need a lot of man power to do the job of signaling and operating the barrier. 2. So manual rail crossing is not cost efficient. 3. Most of the time this procedure is not time efficient. Often train arrives a long time after the gate has been closed. 4. Manual system is erroneous, and can cause severe damage which may worth a heavy loss of life and capital.
  • 5. To avoid human error and to enhance efficiency, railway crossing system can be controlled in an automated manner. In an automatic rail crossing system a train which approaches the gate is detected by a sensor, and also the speed of the train is noted. Then the time taken by the train to reach the road is calculated and the gate/barrier is closed down accordingly. Also the departure of the train is detected by another sensor and the gate/barrier is restored to its initial position.
  • 7. •Microcontroller Unit ATMEGA16 •LEDs AND Light Dependent Resistors(LDR) •LM324 OPAMP •DC Stepper Motor (5 wire unipolar type) •ULN2003A (motor driver) •Resistances for proper biasing, control and safety measure •An LCD Display
  • 8. •Microcontroller Unit ATMEGA16 •LEDs AND Light Dependent Resistors(LDR) •LM324 OP-AMP •DC Stepper Gear Motor (5 wire unipolar type) •ULN2003A (motor driver) •Resistances for proper biasing, control and safety measure •An LCD Display
  • 10. 1. Automatic Train Sensing 2. Traffic Signal Control 3. Warning Buzzer 4. Obstacle Detection 5. Gate Malfunction Detection 6. Auto Communication With Train
  • 13. Train approaching sensor Train detected by LDR
  • 17. When there is no crossing ahead. When the train is approaching a rail gate When train crosses a rail gate
  • 18. If an obstacle is detected on the line after the gate is closed In case of a gate failure
  • 19. • Light Sensors were used. • No wireless communication with train is done in this project.
  • 20. • Backup motor system can be added. • Automatic train deceleration. • Effective wireless communication.