Introduction
 Project name: Astha Green City
 Location : Bochachak, Phulwarisharif near AIIMS,
PATNA
 Construction Project Area: 9,604.06 m²
 Perimeter : 519.3 m
 Constructed by : Munakiya Properties and Construction
Pvt. Ltd
Project Typical layout plan
Picture taken from Google Earth
ABOUT THE PROJECT
 It is multistorey building project which
consist of 8 block named as Block
A,B,C,D,E,F,G,H.
 Block G is (G + 5) floors multistorey
building.
 Except block G, the every building is of
(G +6) floors.
 This site comes in the Airport Zone.
Safety Precautions
Safety of working on the site is most important thing.
So following safety garments should be wore by all worker while working.
•Boots
•Gloves
•Helmets
•And other safety garments if requires for work.
General sequence of construction
 Land Acquisition
 Land Clearance
 Approval of Project from RERA.
 Excavation & Compaction
 Leveling
 Setting Out, Layout
 Pile Marking
 Onward Construction Of Substructure & Super
Structure
 Finishing Work
Material used
 Coarse Aggregate
A majority of the volume of concrete (60 – 80%) is occupied
by aggregate. Its size ranges from 4.75mm to 40mm.
 Fine Aggregate
 If the aggregate size is less than 4.75mm, then it is
called as Fine aggregate. The minimum size of fine
aggregate is 0.075mm is preferred for construction
works.
 Cement
 Rebar
 Bricks
 Water
 Wooden Materials
 Sewer Pipe
 Water Supply Pipe
 Basin
 Finishing Material
 Tiles
 White Putty
 Paint
Site work I have been trained and
shown about
Sub-
Structure
• Setback &
layout
• Piling
• Pile cap
• Pedestal &
Short
Column
• Tie Beam
Column
• Layout
• Starter
• Reinforceme
nt
• Formwork
• Concreting
• Curing
Slab &
beam
• Leveling
• Formwork
• Reinforce
ment
• Concreting
• Finishing
• Curing
Brickwork
• Layout
• Brick wall
masonry
• finishing
• Curing
• Plastering
• Curing
• Painting
Staircas
e
• Shutter
ing of
stair
• Reinfor
cement
• Shutter
ing
treads
& risers
• Casting
• Curing
Substructure
 Set back
 It is a process to lay down outline of building by taking reference of
surrounding.
 Layout
 Making details like pile position and walls on ground.
 Piling
 It is process of constructing pile which will transfer load to sub soil.
Sub-structure continued…
 Pile Cap
 Pile cap is part of which distribute superstructure load
to piles equally.
 Pedestal
 Pedestal is formation level for short column.
 Short Column
 Short column is used to connect tie beam and pile cap
and is subjected to compressive load
 Tie Beam
 It is used to connect two or more columns.
Column
 It is the vertical member which transfers the
load from beam and slab to the substructure.
Layout
It is the process of marking for the column
outer surface with the reference of grid line.
Starter
Starter is basically casted to set the column
alignment correctly.
Shuttering/Formwork
Shuttering is done so that column will be in
specified shape and have proper clear cover.
Column alignment checking…
Casting and Curing
Casting is done with pouring concrete in the
shuttered work, where Curing is done to
maintain the moisture and rate of hydration.
Slab & Beam
 Slab is flat surface made up of concrete on
which mostly live loads acts.
 The slab which we casted is of 4.5 inches
and 114.3mm.
 The slab we casted is two way slab.
 Down slab is also casted for the bathroom
purpose.
 Beam is the horizontal member which is
mostly between the two column and it
transfers the load to column and then to the
foundation
Slab shuttering and leveling
Shuttering is done for casting the slab by
pouring the concrete on it with specified
thickness.
Leveling is done of the shuttering work to
level the surface properly so that slab lower
surface will be proper and plain.
Slab and Beam reinforcement
Slab casting & curing
 Casting is basically pouring the concrete on the
formwork and Curing is the done to maintain the
moisture and rate of hydration
Staircase
 Shuttering for staircase is first step of stair
construction, then reinforcement is placed and
then shuttering for treads and risers are placed.
 Now casting is done and compaction will be
done.
 After one 24 hrs curing is started.
Brick Work
Generally in brick work the layout is firstly done
and then above that layout wall is constructed.
Finishing work
 Finishing work is the last step in building
construction when main structure is fully built-up.
 Finishing work consists many work like
distempering, painting, wood work, electrical
wiring and connection.
 Plastering is done of thickness 20 to 30mm.
 Main finishing work are
 Painting
 Plumbing
 Electrical wiring
 Floor finishing.
Finishing work makes a building aesthetically more
appealing and comfortable to live.
(Avinash)residential building project

More Related Content

PPTX
Industrial training seminar PPT
PPTX
INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING
PDF
Svp field training report final
DOCX
Site visitation
DOC
Site visit report
PPTX
Summer training report
PDF
Site visit report 2017
DOCX
Site visit report
Industrial training seminar PPT
INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING
Svp field training report final
Site visitation
Site visit report
Summer training report
Site visit report 2017
Site visit report

What's hot (20)

PPTX
2016-03-17 Velocity 2_Construction of Steel Dome
PPTX
petronas twin tower
PPT
Top down construction
DOCX
SITE VISIT REPORT
PPTX
Capital Gate
DOCX
Assignment of Site Report
PPTX
Industrial training presentation
PPTX
Planning of multi storey building
DOCX
Significance of utilizing a slipform machine for all the development needs
DOCX
Site visit report
PPTX
Mivan aluminium formwork
PDF
Industrial project report ppt CIVIL ENGINEERING
PPT
Super-Structural Construction Work of a Six Storied Residential Building.
DOCX
site report
DOCX
Site report
PPTX
PROJECT ON Construction of a multistory building POWER POINT PRESENTATION
PPTX
A summer training at pwd b&r,hisar
DOCX
Site visit report
PPTX
Capital Gate Abu Dhabhi - Case Study
PDF
Tilt up concrete structures
2016-03-17 Velocity 2_Construction of Steel Dome
petronas twin tower
Top down construction
SITE VISIT REPORT
Capital Gate
Assignment of Site Report
Industrial training presentation
Planning of multi storey building
Significance of utilizing a slipform machine for all the development needs
Site visit report
Mivan aluminium formwork
Industrial project report ppt CIVIL ENGINEERING
Super-Structural Construction Work of a Six Storied Residential Building.
site report
Site report
PROJECT ON Construction of a multistory building POWER POINT PRESENTATION
A summer training at pwd b&r,hisar
Site visit report
Capital Gate Abu Dhabhi - Case Study
Tilt up concrete structures
Ad

Similar to (Avinash)residential building project (20)

PPTX
Site engineer internship report presentation.pptx
PPTX
Ñnnnndkdkxkxkxkckckxkcllclclclclcoclclfkocvivi.pptx
PDF
Building Construction II Report
PPTX
Pm burj case
PPTX
Construction and design process of duplex house
PPTX
CONSTRUCTION and types of bonding MODULE final.pptx
PPTX
Final PPT internship 4th year civil .pptx
PPTX
Column and Retaining Wall Analysis .pptx
PPTX
MAT/RAFT foundation presentation- Details of Construction
PPTX
foundation and structural system of the shard building
PPTX
INTERNSHIP PPT.pptx
PPTX
case study on foundation types and applications
PDF
PDF
Building construction ii report (1)
PPT
Chapter 10 structure construction
PPTX
Summer training report
PPTX
Top down construction
DOCX
report-on-emmar.docx13
DOCX
Report
PPTX
Burj khalifa
Site engineer internship report presentation.pptx
Ñnnnndkdkxkxkxkckckxkcllclclclclcoclclfkocvivi.pptx
Building Construction II Report
Pm burj case
Construction and design process of duplex house
CONSTRUCTION and types of bonding MODULE final.pptx
Final PPT internship 4th year civil .pptx
Column and Retaining Wall Analysis .pptx
MAT/RAFT foundation presentation- Details of Construction
foundation and structural system of the shard building
INTERNSHIP PPT.pptx
case study on foundation types and applications
Building construction ii report (1)
Chapter 10 structure construction
Summer training report
Top down construction
report-on-emmar.docx13
Report
Burj khalifa
Ad

Recently uploaded (20)

PDF
737-MAX_SRG.pdf student reference guides
PPTX
6ME3A-Unit-II-Sensors and Actuators_Handouts.pptx
PPTX
tack Data Structure with Array and Linked List Implementation, Push and Pop O...
PPTX
introduction to high performance computing
PDF
Visual Aids for Exploratory Data Analysis.pdf
PPTX
Feature types and data preprocessing steps
PDF
22EC502-MICROCONTROLLER AND INTERFACING-8051 MICROCONTROLLER.pdf
PDF
Level 2 – IBM Data and AI Fundamentals (1)_v1.1.PDF
PPTX
Software Engineering and software moduleing
PDF
Accra-Kumasi Expressway - Prefeasibility Report Volume 1 of 7.11.2018.pdf
PPTX
"Array and Linked List in Data Structures with Types, Operations, Implementat...
PPTX
Current and future trends in Computer Vision.pptx
PPTX
Module 8- Technological and Communication Skills.pptx
PDF
August 2025 - Top 10 Read Articles in Network Security & Its Applications
PDF
BIO-INSPIRED ARCHITECTURE FOR PARSIMONIOUS CONVERSATIONAL INTELLIGENCE : THE ...
PPTX
Chemical Technological Processes, Feasibility Study and Chemical Process Indu...
PPTX
Fundamentals of Mechanical Engineering.pptx
PDF
August -2025_Top10 Read_Articles_ijait.pdf
PDF
Artificial Superintelligence (ASI) Alliance Vision Paper.pdf
PPTX
CURRICULAM DESIGN engineering FOR CSE 2025.pptx
737-MAX_SRG.pdf student reference guides
6ME3A-Unit-II-Sensors and Actuators_Handouts.pptx
tack Data Structure with Array and Linked List Implementation, Push and Pop O...
introduction to high performance computing
Visual Aids for Exploratory Data Analysis.pdf
Feature types and data preprocessing steps
22EC502-MICROCONTROLLER AND INTERFACING-8051 MICROCONTROLLER.pdf
Level 2 – IBM Data and AI Fundamentals (1)_v1.1.PDF
Software Engineering and software moduleing
Accra-Kumasi Expressway - Prefeasibility Report Volume 1 of 7.11.2018.pdf
"Array and Linked List in Data Structures with Types, Operations, Implementat...
Current and future trends in Computer Vision.pptx
Module 8- Technological and Communication Skills.pptx
August 2025 - Top 10 Read Articles in Network Security & Its Applications
BIO-INSPIRED ARCHITECTURE FOR PARSIMONIOUS CONVERSATIONAL INTELLIGENCE : THE ...
Chemical Technological Processes, Feasibility Study and Chemical Process Indu...
Fundamentals of Mechanical Engineering.pptx
August -2025_Top10 Read_Articles_ijait.pdf
Artificial Superintelligence (ASI) Alliance Vision Paper.pdf
CURRICULAM DESIGN engineering FOR CSE 2025.pptx

(Avinash)residential building project

  • 1. AT BOCHACHAK ,PHULWARISHARIFF NEAR AIIMS, PATNA -2 PRESENTED BY AVINASH KUMAR 11505036 LOVELY PROFESSIONAL UNIVERSITY PHAGWARA, PUNJAB
  • 2. Introduction  Project name: Astha Green City  Location : Bochachak, Phulwarisharif near AIIMS, PATNA  Construction Project Area: 9,604.06 m²  Perimeter : 519.3 m  Constructed by : Munakiya Properties and Construction Pvt. Ltd
  • 4. Picture taken from Google Earth
  • 5. ABOUT THE PROJECT  It is multistorey building project which consist of 8 block named as Block A,B,C,D,E,F,G,H.  Block G is (G + 5) floors multistorey building.  Except block G, the every building is of (G +6) floors.  This site comes in the Airport Zone.
  • 6. Safety Precautions Safety of working on the site is most important thing. So following safety garments should be wore by all worker while working. •Boots •Gloves •Helmets •And other safety garments if requires for work.
  • 7. General sequence of construction  Land Acquisition  Land Clearance  Approval of Project from RERA.  Excavation & Compaction  Leveling  Setting Out, Layout  Pile Marking  Onward Construction Of Substructure & Super Structure  Finishing Work
  • 8. Material used  Coarse Aggregate A majority of the volume of concrete (60 – 80%) is occupied by aggregate. Its size ranges from 4.75mm to 40mm.
  • 9.  Fine Aggregate  If the aggregate size is less than 4.75mm, then it is called as Fine aggregate. The minimum size of fine aggregate is 0.075mm is preferred for construction works.
  • 10.  Cement  Rebar  Bricks  Water
  • 11.  Wooden Materials  Sewer Pipe  Water Supply Pipe  Basin  Finishing Material  Tiles  White Putty  Paint
  • 12. Site work I have been trained and shown about Sub- Structure • Setback & layout • Piling • Pile cap • Pedestal & Short Column • Tie Beam Column • Layout • Starter • Reinforceme nt • Formwork • Concreting • Curing Slab & beam • Leveling • Formwork • Reinforce ment • Concreting • Finishing • Curing Brickwork • Layout • Brick wall masonry • finishing • Curing • Plastering • Curing • Painting Staircas e • Shutter ing of stair • Reinfor cement • Shutter ing treads & risers • Casting • Curing
  • 13. Substructure  Set back  It is a process to lay down outline of building by taking reference of surrounding.  Layout  Making details like pile position and walls on ground.  Piling  It is process of constructing pile which will transfer load to sub soil.
  • 14. Sub-structure continued…  Pile Cap  Pile cap is part of which distribute superstructure load to piles equally.  Pedestal  Pedestal is formation level for short column.  Short Column  Short column is used to connect tie beam and pile cap and is subjected to compressive load  Tie Beam  It is used to connect two or more columns.
  • 15. Column  It is the vertical member which transfers the load from beam and slab to the substructure.
  • 16. Layout It is the process of marking for the column outer surface with the reference of grid line.
  • 17. Starter Starter is basically casted to set the column alignment correctly.
  • 18. Shuttering/Formwork Shuttering is done so that column will be in specified shape and have proper clear cover.
  • 20. Casting and Curing Casting is done with pouring concrete in the shuttered work, where Curing is done to maintain the moisture and rate of hydration.
  • 21. Slab & Beam  Slab is flat surface made up of concrete on which mostly live loads acts.  The slab which we casted is of 4.5 inches and 114.3mm.  The slab we casted is two way slab.  Down slab is also casted for the bathroom purpose.  Beam is the horizontal member which is mostly between the two column and it transfers the load to column and then to the foundation
  • 22. Slab shuttering and leveling Shuttering is done for casting the slab by pouring the concrete on it with specified thickness. Leveling is done of the shuttering work to level the surface properly so that slab lower surface will be proper and plain.
  • 23. Slab and Beam reinforcement
  • 24. Slab casting & curing  Casting is basically pouring the concrete on the formwork and Curing is the done to maintain the moisture and rate of hydration
  • 25. Staircase  Shuttering for staircase is first step of stair construction, then reinforcement is placed and then shuttering for treads and risers are placed.  Now casting is done and compaction will be done.  After one 24 hrs curing is started.
  • 26. Brick Work Generally in brick work the layout is firstly done and then above that layout wall is constructed.
  • 27. Finishing work  Finishing work is the last step in building construction when main structure is fully built-up.  Finishing work consists many work like distempering, painting, wood work, electrical wiring and connection.  Plastering is done of thickness 20 to 30mm.  Main finishing work are  Painting  Plumbing  Electrical wiring  Floor finishing. Finishing work makes a building aesthetically more appealing and comfortable to live.