Barbil Angul Iron Ore Concentrate Slurry Pipe Line
Dr. Rakesh Saxena
Associate Vice President
Barbil Angul Iron Ore Slurry Pipe Line Team
Copyright © 2010 Jindal Steel & Power Ltd.2
Historical Perspective – PSI, USA
Progress Date Scope of Work Amount Remarks
LOI 30-
Apr-08
Design, Tech. Specifications, and
Procurement assistance for
a)10 MTPA, 225 km 8 MTPA, 200km
b)Feasibility study for less or greater than 10 MTPA
capacity.
c)Techno-commercial study for 2 x 5 MTPA and 1 x 10
MTPA
US$ 645,000 a) 70% pellet
& 30%
sinter feeds
b) 12 MTPA is
also
possible
Work
Order
05-
Jun-08
Based on the Techno – Commercial study, Capacity fixed
at 10 MTPA, with feed size (45 microns)
US$ 645,000
Change
Order 1
17-
Feb-09
On-site testing for iron ore fine samples US$ 23,880
Change
Order 2
01-
Oct-09
Change in pipeline route from 225 km to 181 km US$ 38,780 Capacity
uncertain
Change
Order 3
25-
Feb-10
Capacity change from 12 MTPA to 6 MTPA US$ 72,670 Sum up to
Change Order
3 - US$
780,330
Change
Order 4
20-
Apr-11
Capacity change from 6 MTPA to 12 MTPA US$ 103,930 Not approved
Copyright © 2010 Jindal Steel & Power Ltd.3
Summary of Payment to PSI
S.No Description Amount in % Amount Paid (US$)
1 Original WO price
a) Advance against bank guarantee 10% 64,500
b) Tests, Optimization & Design basis 20% 129,000
c) Steady state hydraulics 20% 129,000
d) Long lead items specs & MRs 20% 129,000
e) All other deliverables and specs 20% 129,000
f) Against performance bank guarantee (valid till 6 months
from the actual commissioning)
10% 64,500
2 Change Order 1 Full 23,880
3 Change Order 2 Full 38,780
4 Change Order 3 full 72,670
Total amount paid . WO closed 100% 780,330
Copyright © 2010 Jindal Steel & Power Ltd.4
PSI – Change Order 4
• Total value paid to PSI (up to change order No. 3) US$ 780,330
• If change order 4 shall be issued to PSI, then the total order value to
PSI shall scale up to US$ 884,260
– 12 MTPA is included
– Water pump back through the same pipeline is not included by
PSI
– Broad range of turndown ratio is not included by PSI
– Batch pumping (pellet feed & sinter feed) is not included by PSI
Progress Date Scope of Work Amount Remarks
Change
Order 4
20-Apr-
11
Capacity change from 6 MTPA to
12 MTPA
US$ 103,930 Not approved
Copyright © 2010 Jindal Steel & Power Ltd.5
Progress from Feb 2008 to June 2011
Throughput Decisions
• Project delayed due to:
– IPICOL water requirement
– 70% pellet & 30% sinter feeds
– Carrying capacity decisions
• Time Spent – 41 months
• Amount Spent – US$ 780,330
Output - ?
Copyright © 2010 Jindal Steel & Power Ltd.6
Changed Design Parameters July 2011
• July 11,2011- Rethinking process started due to changed
requirements
• 12 MTPA capacity upgraded only for pellet feed and not with
sinter feed.
• Pump back water with same pipeline
• Batch pumping (pellet feed & sinter feed)
• Broad range in operating turn down ratio
• Based on the changed requirements, enquiry made to PSI,
USA & OSD Pipelines, Australia
• PSI, USA is not responding to our enquiry
• OSD Pipelines has submitted the offer
Copyright © 2010 Jindal Steel & Power Ltd.7
 
OSD Proposal – Current Status
• The present design assumes a single 6 MTPA concentrate
pipeline for pellet feed (only) and turndown capacity to
approximately 4 MTPA
• The permission for water rights for the project require a water
management strategy to account for the potential recycle of
200 m³/hr to 900 m³/hr of process water. This is not addressed
in the PSI design
• The concentrate pipeline design philosophy requires to
accommodate the transport of sinter feed concentrate in
addition to pellet feed
• The plant ramp up schedule from 5 MTPA to 12 MTPA needs to
be addressed within the design of the concentrate pipeline
Copyright © 2010 Jindal Steel & Power Ltd.8
 
Way Forward
• The design for the concentrate pipeline requires to be
optimized and provide a Customized Tailor made design for our
proposed operation.
• The design approach requires to consider the following
optimization:
• Sufficient turndown capacity to minimize water usage
• Consider the ability to transport pellet feed and sinter feed
concentrate
• Demonstrate the feasibility of returning 200-900 m³/hr of
water through the same pipeline
Copyright © 2010 Jindal Steel & Power Ltd.9
 
Action Plan
• OSD visited Angul on September 8th
and 9th
and reviewed the
existing 6 MTPA design and outlined a path forward to optimize
the design to a 12 MTPA pipeline with a 7.8 MTPA potential
turndown capacity
Copyright © 2010 Jindal Steel & Power Ltd.10
 
Path forward
• OSD provided a path forward to address the optimization of the
existing design and deliver a comprehensive slurry transport
solution to JSPL including the following:
• Auditing of the existing design with the objective of
upgrading to 12 MTPA
• Slurry characterization test work in Perth for Sinter feed and
validation of pipeline transport solution (batch operation)
• Revise/update existing system drawings as necessary to
correlate with 12 MTPA outcome and turndown
requirements.
• Exclusions: route selection, capital and operating cost
estimating, bid evaluation and material requisition
Copyright © 2010 Jindal Steel & Power Ltd.11
 
Who is OSD Slurry Pipelines Group
• Privately held pipeline consulting with 180 employees based in
Australia, Canada, Chile, and New Zealand.
• 50+ years of collective slurry pipeline design and operating
experience worldwide.
• Involved in the design and operation of over 1500 km of
successfully operating concentrate pipelines worldwide
including the Essar Iron Concentrate Pipeline in India.
• Specific concentrate design and operational experience in
current operation:
• 267 km, 24 inch iron concentrate pipeline (Essar, India)
• 170 km, 9 inch iron concentrate pipeline (Da Hong Shan, China)
• 398 km, 14-16 inch iron concentrate pipeline (Samarco, Brazil)
• 302 km, 8 inch copper/zinc (batching) concentrate pipeline (Antamina, Peru)
Copyright © 2010 Jindal Steel & Power Ltd.12
Comparison of PSI & OSD
Attributes PSI OSD Pipelines Remarks
Scope of work
a) Offered for 6MTPA of Pellet
plant feed (need reworking to
enhance the capacity to 12
MPTA)
a)Offering for 12MTPA includes
feed for both plants i.e Sinter &
Pellet .
With PSI- extra time &
cost involvement for
revised parameters.
b) No water returning facility
with same pipe line
b) Provision of water returning
facility with same pipe line
With OSD- Better
provision of water
conservation
c) Process for only one
type(pellet plant ) of feed
c) Process for two types of feed
(pellet plant & sinter plant )
With OSD- Better
utilization of facilities.
d) No desirable range in turn
down ratio
d) Have desirable Range in
Turndown ratio varies from 6MTPA
to 12 MTPA
With OSD- Better
flexibility of resource
utilization .
Option study
Techno-commercial comparison
of 2 x 5MTPA with 10MTPA for
pellet feed resulted in delay in
project proceedings and cost
escalation
Option has been freezed by JSPL
and offer has been made for the
same (no further study is required)
Additional cost is paid for
option study with PSI.
With OSD- offer is
customized & economical
in terms of cost & time .
Copyright © 2010 Jindal Steel & Power Ltd.13
Comparison of PSI & OSD (continued)
Attributes PSI OSD Pipelines Remarks
Quality of delivered
offer ( Time & quality
prospective)
Basic engineering is not
meeting JSPL requirement
even after working of 24.
months).
Offer for finishing the
basic engineering in 5
weeks only
>With PSI- Still need more
time & money for
customized delivery.
OSD
will study the work done by
PSI ,to incorporate positive
aspect of it in the project.
Quality of delivered
offer ( Cost prospective)
US$ 6450,000 (for BE) +
$106,000 (Revised Scope) +
$ extra to be paid for third
revision
A$320,000 + $60,000 +
$20,000= Total 4000
US$ (Provision of
progressive payment)
With PSI- Cost involvement
is 2.39 times more than OSD.
Availability of Supplier Availability is not easy. Committing for the
completion of job.
Even after long association
,PSI is not responding
recently, hence availability
can't be confirmed.
Scope of IPR &
Technology ownership
& royalty
Not clear in offer Scope of mutual
discussion &
finalization
 
Copyright © 2010 Jindal Steel & Power Ltd.14
Recommendation for OSD Pipeline
• Integrated technology for both type of slurry feeds in single pipeline
• Use of existing PSI work to reduce the CAPEX
• Broad operating range of turndown capacity from 12 to 6 MTPA
• Saving of US$ 60,000 by minimizing the site visits
• Optimized Design for pumping back water with the same pipeline
• Minimum allowable velocity of 1.3 m/s against 1.6 m/s of PSI
• Lower cost of per hourly working rates than PSI
• Customized design with lower CAPEX (A$ 400,000)
• Offered duration to complete the job is in 16-20 weeks
• OSD offers a long term relationship and a lower risk profile to the
design and sustainable operation of the concentrate pipeline
• The OSD Slurry Group is the fastest growing slurry group in the
industry and is currently working with tier 1 mining and engineering
firms worldwide
Status as on 15.11.10
Copyright © 2010 Jindal Steel & Power Ltd.15 Copyright © 2010 Jindal Steel & Power Ltd.
Thank youThank you

More Related Content

DOC
Steel Making: Lecture deoxidation
PPTX
Introduction to steel making processes
PDF
PROJECT REPORT TATA STEEL- Rahul
PDF
Tata steel west bokaro washery #3 report
PPTX
Reverberatory furnace
PDF
Spontaneous combustion of coal
DOCX
RMHS Manual 2.1
PPTX
Steel making process
Steel Making: Lecture deoxidation
Introduction to steel making processes
PROJECT REPORT TATA STEEL- Rahul
Tata steel west bokaro washery #3 report
Reverberatory furnace
Spontaneous combustion of coal
RMHS Manual 2.1
Steel making process

What's hot (20)

PPTX
Cast iron its types , properties and its applications....
PPTX
Furnace, fuels and fluxes
PDF
Copper Mould
PDF
BSP Project (Based on Continuous Casting) [Final]
PPTX
Coal utilization
PDF
Iron Making Lecture Notes
PDF
(DRI) Direct Reduction Iron Plant Flowsheet Options
PPTX
Manufacturing process of TMT Steel Bar
PPTX
durgapur steel plant
PPTX
PPTX
conversion of UG to OC mine
PPTX
Shell moulding casting technology
PPTX
A VOCATIONAL TRAINNING REPORT_aman
PPTX
Continuous casting of steel
PPT
Steel making
PDF
Induction melting technologies and processes
PDF
Surface mining planning and design of open pit mining
PPT
Blast furnace
PPTX
C 18 - steel melting
PDF
Design And Fabrication Of Iron Ore Sintering Machine
Cast iron its types , properties and its applications....
Furnace, fuels and fluxes
Copper Mould
BSP Project (Based on Continuous Casting) [Final]
Coal utilization
Iron Making Lecture Notes
(DRI) Direct Reduction Iron Plant Flowsheet Options
Manufacturing process of TMT Steel Bar
durgapur steel plant
conversion of UG to OC mine
Shell moulding casting technology
A VOCATIONAL TRAINNING REPORT_aman
Continuous casting of steel
Steel making
Induction melting technologies and processes
Surface mining planning and design of open pit mining
Blast furnace
C 18 - steel melting
Design And Fabrication Of Iron Ore Sintering Machine
Ad

Recently uploaded (20)

PPTX
Cell Types and Its function , kingdom of life
PPTX
Digestion and Absorption of Carbohydrates, Proteina and Fats
PPTX
Chinmaya Tiranga Azadi Quiz (Class 7-8 )
PDF
RTP_AR_KS1_Tutor's Guide_English [FOR REPRODUCTION].pdf
PDF
RMMM.pdf make it easy to upload and study
PPTX
Lesson notes of climatology university.
PDF
Supply Chain Operations Speaking Notes -ICLT Program
PPTX
Orientation - ARALprogram of Deped to the Parents.pptx
PPTX
UNIT III MENTAL HEALTH NURSING ASSESSMENT
PDF
A GUIDE TO GENETICS FOR UNDERGRADUATE MEDICAL STUDENTS
PDF
LDMMIA Reiki Yoga Finals Review Spring Summer
PDF
LNK 2025 (2).pdf MWEHEHEHEHEHEHEHEHEHEHE
PPTX
A powerpoint presentation on the Revised K-10 Science Shaping Paper
PPTX
UV-Visible spectroscopy..pptx UV-Visible Spectroscopy – Electronic Transition...
PPTX
Final Presentation General Medicine 03-08-2024.pptx
PDF
Trump Administration's workforce development strategy
PDF
SOIL: Factor, Horizon, Process, Classification, Degradation, Conservation
PDF
A systematic review of self-coping strategies used by university students to ...
PDF
OBE - B.A.(HON'S) IN INTERIOR ARCHITECTURE -Ar.MOHIUDDIN.pdf
PDF
Classroom Observation Tools for Teachers
Cell Types and Its function , kingdom of life
Digestion and Absorption of Carbohydrates, Proteina and Fats
Chinmaya Tiranga Azadi Quiz (Class 7-8 )
RTP_AR_KS1_Tutor's Guide_English [FOR REPRODUCTION].pdf
RMMM.pdf make it easy to upload and study
Lesson notes of climatology university.
Supply Chain Operations Speaking Notes -ICLT Program
Orientation - ARALprogram of Deped to the Parents.pptx
UNIT III MENTAL HEALTH NURSING ASSESSMENT
A GUIDE TO GENETICS FOR UNDERGRADUATE MEDICAL STUDENTS
LDMMIA Reiki Yoga Finals Review Spring Summer
LNK 2025 (2).pdf MWEHEHEHEHEHEHEHEHEHEHE
A powerpoint presentation on the Revised K-10 Science Shaping Paper
UV-Visible spectroscopy..pptx UV-Visible Spectroscopy – Electronic Transition...
Final Presentation General Medicine 03-08-2024.pptx
Trump Administration's workforce development strategy
SOIL: Factor, Horizon, Process, Classification, Degradation, Conservation
A systematic review of self-coping strategies used by university students to ...
OBE - B.A.(HON'S) IN INTERIOR ARCHITECTURE -Ar.MOHIUDDIN.pdf
Classroom Observation Tools for Teachers
Ad

Barbil Angul Slurry Pipe line

  • 1. Copyright © 2010 Jindal Steel & Power Ltd.1 Barbil Angul Iron Ore Concentrate Slurry Pipe Line Dr. Rakesh Saxena Associate Vice President Barbil Angul Iron Ore Slurry Pipe Line Team
  • 2. Copyright © 2010 Jindal Steel & Power Ltd.2 Historical Perspective – PSI, USA Progress Date Scope of Work Amount Remarks LOI 30- Apr-08 Design, Tech. Specifications, and Procurement assistance for a)10 MTPA, 225 km 8 MTPA, 200km b)Feasibility study for less or greater than 10 MTPA capacity. c)Techno-commercial study for 2 x 5 MTPA and 1 x 10 MTPA US$ 645,000 a) 70% pellet & 30% sinter feeds b) 12 MTPA is also possible Work Order 05- Jun-08 Based on the Techno – Commercial study, Capacity fixed at 10 MTPA, with feed size (45 microns) US$ 645,000 Change Order 1 17- Feb-09 On-site testing for iron ore fine samples US$ 23,880 Change Order 2 01- Oct-09 Change in pipeline route from 225 km to 181 km US$ 38,780 Capacity uncertain Change Order 3 25- Feb-10 Capacity change from 12 MTPA to 6 MTPA US$ 72,670 Sum up to Change Order 3 - US$ 780,330 Change Order 4 20- Apr-11 Capacity change from 6 MTPA to 12 MTPA US$ 103,930 Not approved
  • 3. Copyright © 2010 Jindal Steel & Power Ltd.3 Summary of Payment to PSI S.No Description Amount in % Amount Paid (US$) 1 Original WO price a) Advance against bank guarantee 10% 64,500 b) Tests, Optimization & Design basis 20% 129,000 c) Steady state hydraulics 20% 129,000 d) Long lead items specs & MRs 20% 129,000 e) All other deliverables and specs 20% 129,000 f) Against performance bank guarantee (valid till 6 months from the actual commissioning) 10% 64,500 2 Change Order 1 Full 23,880 3 Change Order 2 Full 38,780 4 Change Order 3 full 72,670 Total amount paid . WO closed 100% 780,330
  • 4. Copyright © 2010 Jindal Steel & Power Ltd.4 PSI – Change Order 4 • Total value paid to PSI (up to change order No. 3) US$ 780,330 • If change order 4 shall be issued to PSI, then the total order value to PSI shall scale up to US$ 884,260 – 12 MTPA is included – Water pump back through the same pipeline is not included by PSI – Broad range of turndown ratio is not included by PSI – Batch pumping (pellet feed & sinter feed) is not included by PSI Progress Date Scope of Work Amount Remarks Change Order 4 20-Apr- 11 Capacity change from 6 MTPA to 12 MTPA US$ 103,930 Not approved
  • 5. Copyright © 2010 Jindal Steel & Power Ltd.5 Progress from Feb 2008 to June 2011 Throughput Decisions • Project delayed due to: – IPICOL water requirement – 70% pellet & 30% sinter feeds – Carrying capacity decisions • Time Spent – 41 months • Amount Spent – US$ 780,330 Output - ?
  • 6. Copyright © 2010 Jindal Steel & Power Ltd.6 Changed Design Parameters July 2011 • July 11,2011- Rethinking process started due to changed requirements • 12 MTPA capacity upgraded only for pellet feed and not with sinter feed. • Pump back water with same pipeline • Batch pumping (pellet feed & sinter feed) • Broad range in operating turn down ratio • Based on the changed requirements, enquiry made to PSI, USA & OSD Pipelines, Australia • PSI, USA is not responding to our enquiry • OSD Pipelines has submitted the offer
  • 7. Copyright © 2010 Jindal Steel & Power Ltd.7   OSD Proposal – Current Status • The present design assumes a single 6 MTPA concentrate pipeline for pellet feed (only) and turndown capacity to approximately 4 MTPA • The permission for water rights for the project require a water management strategy to account for the potential recycle of 200 m³/hr to 900 m³/hr of process water. This is not addressed in the PSI design • The concentrate pipeline design philosophy requires to accommodate the transport of sinter feed concentrate in addition to pellet feed • The plant ramp up schedule from 5 MTPA to 12 MTPA needs to be addressed within the design of the concentrate pipeline
  • 8. Copyright © 2010 Jindal Steel & Power Ltd.8   Way Forward • The design for the concentrate pipeline requires to be optimized and provide a Customized Tailor made design for our proposed operation. • The design approach requires to consider the following optimization: • Sufficient turndown capacity to minimize water usage • Consider the ability to transport pellet feed and sinter feed concentrate • Demonstrate the feasibility of returning 200-900 m³/hr of water through the same pipeline
  • 9. Copyright © 2010 Jindal Steel & Power Ltd.9   Action Plan • OSD visited Angul on September 8th and 9th and reviewed the existing 6 MTPA design and outlined a path forward to optimize the design to a 12 MTPA pipeline with a 7.8 MTPA potential turndown capacity
  • 10. Copyright © 2010 Jindal Steel & Power Ltd.10   Path forward • OSD provided a path forward to address the optimization of the existing design and deliver a comprehensive slurry transport solution to JSPL including the following: • Auditing of the existing design with the objective of upgrading to 12 MTPA • Slurry characterization test work in Perth for Sinter feed and validation of pipeline transport solution (batch operation) • Revise/update existing system drawings as necessary to correlate with 12 MTPA outcome and turndown requirements. • Exclusions: route selection, capital and operating cost estimating, bid evaluation and material requisition
  • 11. Copyright © 2010 Jindal Steel & Power Ltd.11   Who is OSD Slurry Pipelines Group • Privately held pipeline consulting with 180 employees based in Australia, Canada, Chile, and New Zealand. • 50+ years of collective slurry pipeline design and operating experience worldwide. • Involved in the design and operation of over 1500 km of successfully operating concentrate pipelines worldwide including the Essar Iron Concentrate Pipeline in India. • Specific concentrate design and operational experience in current operation: • 267 km, 24 inch iron concentrate pipeline (Essar, India) • 170 km, 9 inch iron concentrate pipeline (Da Hong Shan, China) • 398 km, 14-16 inch iron concentrate pipeline (Samarco, Brazil) • 302 km, 8 inch copper/zinc (batching) concentrate pipeline (Antamina, Peru)
  • 12. Copyright © 2010 Jindal Steel & Power Ltd.12 Comparison of PSI & OSD Attributes PSI OSD Pipelines Remarks Scope of work a) Offered for 6MTPA of Pellet plant feed (need reworking to enhance the capacity to 12 MPTA) a)Offering for 12MTPA includes feed for both plants i.e Sinter & Pellet . With PSI- extra time & cost involvement for revised parameters. b) No water returning facility with same pipe line b) Provision of water returning facility with same pipe line With OSD- Better provision of water conservation c) Process for only one type(pellet plant ) of feed c) Process for two types of feed (pellet plant & sinter plant ) With OSD- Better utilization of facilities. d) No desirable range in turn down ratio d) Have desirable Range in Turndown ratio varies from 6MTPA to 12 MTPA With OSD- Better flexibility of resource utilization . Option study Techno-commercial comparison of 2 x 5MTPA with 10MTPA for pellet feed resulted in delay in project proceedings and cost escalation Option has been freezed by JSPL and offer has been made for the same (no further study is required) Additional cost is paid for option study with PSI. With OSD- offer is customized & economical in terms of cost & time .
  • 13. Copyright © 2010 Jindal Steel & Power Ltd.13 Comparison of PSI & OSD (continued) Attributes PSI OSD Pipelines Remarks Quality of delivered offer ( Time & quality prospective) Basic engineering is not meeting JSPL requirement even after working of 24. months). Offer for finishing the basic engineering in 5 weeks only >With PSI- Still need more time & money for customized delivery. OSD will study the work done by PSI ,to incorporate positive aspect of it in the project. Quality of delivered offer ( Cost prospective) US$ 6450,000 (for BE) + $106,000 (Revised Scope) + $ extra to be paid for third revision A$320,000 + $60,000 + $20,000= Total 4000 US$ (Provision of progressive payment) With PSI- Cost involvement is 2.39 times more than OSD. Availability of Supplier Availability is not easy. Committing for the completion of job. Even after long association ,PSI is not responding recently, hence availability can't be confirmed. Scope of IPR & Technology ownership & royalty Not clear in offer Scope of mutual discussion & finalization  
  • 14. Copyright © 2010 Jindal Steel & Power Ltd.14 Recommendation for OSD Pipeline • Integrated technology for both type of slurry feeds in single pipeline • Use of existing PSI work to reduce the CAPEX • Broad operating range of turndown capacity from 12 to 6 MTPA • Saving of US$ 60,000 by minimizing the site visits • Optimized Design for pumping back water with the same pipeline • Minimum allowable velocity of 1.3 m/s against 1.6 m/s of PSI • Lower cost of per hourly working rates than PSI • Customized design with lower CAPEX (A$ 400,000) • Offered duration to complete the job is in 16-20 weeks • OSD offers a long term relationship and a lower risk profile to the design and sustainable operation of the concentrate pipeline • The OSD Slurry Group is the fastest growing slurry group in the industry and is currently working with tier 1 mining and engineering firms worldwide
  • 15. Status as on 15.11.10 Copyright © 2010 Jindal Steel & Power Ltd.15 Copyright © 2010 Jindal Steel & Power Ltd. Thank youThank you