This document provides an outline for a lecture presentation on open pit mining methods and planning. It discusses key parameters such as bench height and geometry, cutoff grade calculation, and factors affecting open pit stability. The presentation covers the basic concept of open pit mining, how overburden is removed, and machinery used such as trucks, shovels, and drills. Diagrams illustrate typical bench terminology and pit slope angles. The importance of optimizing the pit design is addressed through considering elements like production scheduling, waste disposal, and ultimate pit limits.