Terminology
BENCH: Ledge that forms a single level
of operation above which mineral or
waste materials are mined from the
bench face.




                                         2
Terminology
BENCH HEIGHT: Vertical distance between the
highest point on the bench (crest) and the lowest
point or the bench (toe). It is influenced by size of
the equipment, mining selectivity, government
regulations and safety.




                                                        2
Terminology

BENCH SLOPE or BANK ANGLE :
Horizontal angle of the line connecting
bench toe to the bench crest.




                                          2
Terminology
BERM: Horizontal shelf or ledge within the ultimate pit
wall slope left to enhance the stability of the a slope
within the pit and improve the safety. Berm interval,
berm width and berm slope angle are determined by the
geotechnical investigation.




                                                          5
Terminology
OVERALL PIT SLOPE ANGLE: The angle measured
from the bottom bench toe to the top bench crest. It is
the angle at which the wall of an open pit stands and it
is determined by rock strength, geologic structures and
water conditions.




                                                           5
Terminology

The overall pit slope angle is affected by the width and
grade of the haul road.




                                                           5
Terminology

HAUL ROADS: During the
life of the pit a haul road
must be maintained for
access.


HAUL ROAD - SPIRAL
SYSTEM: Haul road is
arranged spirally along the
perimeter walls of the pit.



                                    8
Terminology

HAUL ROAD – SWITCH BACK SYSTEM: Zigzag pattern on
one side of the pit.

HAUL ROAD WIDTH:
Function of capacity of
the road and the size
of the equipment. Haul
road width must be
considered      in  the
overall pit design.



                                                    9
Haul Road Effect on Pit Limits




                                 10
Terminology

ANGLE OF REPOSE: Maximum slope of the
broken material.

SUBCROP OR ORE DEPTH: Depth of waste
removed to reach initial ore.

PRE-PRODUCTION STRIPPING:     Stripping
done to reach initial ore.


                                          11
Terminology
ULTIMATE PIT LIMITS: Vertical and lateral extend of
the economically mineable pit boundary. Determined on
the basis of cost of removing overburden or waste
material vs. the mineable value of the ore.

PIT SCHEDULING: Material may be mined from the pit
either in:
1) sequential push backs
2) conventional push backs.




                                                        12
Terminology
STRIPPING RATIO: Expressed in tons of waste to tons
of ore in hard rock open pit operations. Critical and
important parameter in pit design and scheduling.

AVERAGE STRIP RATIO: Total waste divided by total
ore within the ultimate pit.

CUTOFF STRIPPING RATIO: Costs of mining a ton of
ore and associated waste equals to net revenue from the
ton of Ore.
Single Working Bench




                       14
Shovel in Working Bench




                          15
Two Working Benches




                      16
Final
 Pit
Limit



        17
Example Mine
2001         2007     2011




                             18
Pit
Sequence
   (1)




           21
Pit
Sequence
   (2)




           22
Pit
Sequence
   (3)




           23
Pit
Sequence
   (4)




           24
Section of Pit Sequence




                          25
25

More Related Content

PDF
Open pit mining
PDF
Design of openpit mining
PPT
Concept of oc mine planning & design(final)
PDF
Surface mining planning and design of open pit mining
PPTX
Lecture 2 basic surface mining practise-2
PDF
Mine Opening and Development
PDF
Differnt technologies in oc mines
PDF
Basics of openpit mining
Open pit mining
Design of openpit mining
Concept of oc mine planning & design(final)
Surface mining planning and design of open pit mining
Lecture 2 basic surface mining practise-2
Mine Opening and Development
Differnt technologies in oc mines
Basics of openpit mining

What's hot (20)

PPTX
Roof supports in coal mines
PPTX
Blast design in opencast mining
PDF
Mining Methods
PPTX
Shaft sinking
PPTX
Underground mining method
PPTX
Drilling and blasting
PDF
Longwall Mining
PPTX
Blasting
PPTX
Blasting Gallery Method
PPTX
Blasting and rock fragmentation
PPTX
Design of Bord and Pillar method in coal mines
DOCX
Mining Machinery Learning Material
PPTX
Rock burst presentation
DOCX
Mine planning
PPTX
Underground mining
PPT
Inundation
PDF
Oc mechanical excavation
PDF
Subsidence in coal mines
PDF
Selection of longwall powered roof support
Roof supports in coal mines
Blast design in opencast mining
Mining Methods
Shaft sinking
Underground mining method
Drilling and blasting
Longwall Mining
Blasting
Blasting Gallery Method
Blasting and rock fragmentation
Design of Bord and Pillar method in coal mines
Mining Machinery Learning Material
Rock burst presentation
Mine planning
Underground mining
Inundation
Oc mechanical excavation
Subsidence in coal mines
Selection of longwall powered roof support
Ad

More from RAMANA M V (20)

PDF
Dragline Planning
PPTX
Spry Scheduling and Haulage model - Tutorial
PPTX
Mine scheduling process
PDF
Energy - India (11th Plan)
PDF
Methods of extraction in Opencast mine
PDF
Vulcan tutorial 01
PDF
Project Management (PMP Material)
PDF
Haul road design
PDF
Openpit Design Fundas
PDF
Bolter miner @ Russia
PDF
Longwall AFC changing - innovation
PDF
Statutory clearances required to start a greenfield captive opencast coal mine
PPTX
Top ten in world
PPT
Highwall Mining Technology
PPT
Legal flow schemes for a greenfield mining project
DOCX
Mine communication sysetms
PPTX
Mine Tech Seminar '10 - Gist of Papers
DOC
Reduction of risk from roof and side fall in Indian coal mines
DOC
goaves effect on subsidence
DOC
Longwall - The road ahead
Dragline Planning
Spry Scheduling and Haulage model - Tutorial
Mine scheduling process
Energy - India (11th Plan)
Methods of extraction in Opencast mine
Vulcan tutorial 01
Project Management (PMP Material)
Haul road design
Openpit Design Fundas
Bolter miner @ Russia
Longwall AFC changing - innovation
Statutory clearances required to start a greenfield captive opencast coal mine
Top ten in world
Highwall Mining Technology
Legal flow schemes for a greenfield mining project
Mine communication sysetms
Mine Tech Seminar '10 - Gist of Papers
Reduction of risk from roof and side fall in Indian coal mines
goaves effect on subsidence
Longwall - The road ahead
Ad

Recently uploaded (20)

PDF
Optimiser vos workloads AI/ML sur Amazon EC2 et AWS Graviton
PPTX
Spectroscopy.pptx food analysis technology
PPTX
Digital-Transformation-Roadmap-for-Companies.pptx
PPT
“AI and Expert System Decision Support & Business Intelligence Systems”
PPTX
Cloud computing and distributed systems.
PDF
Architecting across the Boundaries of two Complex Domains - Healthcare & Tech...
PDF
Unlocking AI with Model Context Protocol (MCP)
PDF
Agricultural_Statistics_at_a_Glance_2022_0.pdf
PDF
Chapter 3 Spatial Domain Image Processing.pdf
DOCX
The AUB Centre for AI in Media Proposal.docx
PPTX
Programs and apps: productivity, graphics, security and other tools
PDF
Spectral efficient network and resource selection model in 5G networks
PDF
Review of recent advances in non-invasive hemoglobin estimation
PDF
Per capita expenditure prediction using model stacking based on satellite ima...
PPTX
KOM of Painting work and Equipment Insulation REV00 update 25-dec.pptx
PDF
Network Security Unit 5.pdf for BCA BBA.
PDF
Machine learning based COVID-19 study performance prediction
PDF
Peak of Data & AI Encore- AI for Metadata and Smarter Workflows
PDF
NewMind AI Weekly Chronicles - August'25 Week I
PDF
KodekX | Application Modernization Development
Optimiser vos workloads AI/ML sur Amazon EC2 et AWS Graviton
Spectroscopy.pptx food analysis technology
Digital-Transformation-Roadmap-for-Companies.pptx
“AI and Expert System Decision Support & Business Intelligence Systems”
Cloud computing and distributed systems.
Architecting across the Boundaries of two Complex Domains - Healthcare & Tech...
Unlocking AI with Model Context Protocol (MCP)
Agricultural_Statistics_at_a_Glance_2022_0.pdf
Chapter 3 Spatial Domain Image Processing.pdf
The AUB Centre for AI in Media Proposal.docx
Programs and apps: productivity, graphics, security and other tools
Spectral efficient network and resource selection model in 5G networks
Review of recent advances in non-invasive hemoglobin estimation
Per capita expenditure prediction using model stacking based on satellite ima...
KOM of Painting work and Equipment Insulation REV00 update 25-dec.pptx
Network Security Unit 5.pdf for BCA BBA.
Machine learning based COVID-19 study performance prediction
Peak of Data & AI Encore- AI for Metadata and Smarter Workflows
NewMind AI Weekly Chronicles - August'25 Week I
KodekX | Application Modernization Development

Openpit fundamentals

  • 2. Terminology BENCH: Ledge that forms a single level of operation above which mineral or waste materials are mined from the bench face. 2
  • 3. Terminology BENCH HEIGHT: Vertical distance between the highest point on the bench (crest) and the lowest point or the bench (toe). It is influenced by size of the equipment, mining selectivity, government regulations and safety. 2
  • 4. Terminology BENCH SLOPE or BANK ANGLE : Horizontal angle of the line connecting bench toe to the bench crest. 2
  • 5. Terminology BERM: Horizontal shelf or ledge within the ultimate pit wall slope left to enhance the stability of the a slope within the pit and improve the safety. Berm interval, berm width and berm slope angle are determined by the geotechnical investigation. 5
  • 6. Terminology OVERALL PIT SLOPE ANGLE: The angle measured from the bottom bench toe to the top bench crest. It is the angle at which the wall of an open pit stands and it is determined by rock strength, geologic structures and water conditions. 5
  • 7. Terminology The overall pit slope angle is affected by the width and grade of the haul road. 5
  • 8. Terminology HAUL ROADS: During the life of the pit a haul road must be maintained for access. HAUL ROAD - SPIRAL SYSTEM: Haul road is arranged spirally along the perimeter walls of the pit. 8
  • 9. Terminology HAUL ROAD – SWITCH BACK SYSTEM: Zigzag pattern on one side of the pit. HAUL ROAD WIDTH: Function of capacity of the road and the size of the equipment. Haul road width must be considered in the overall pit design. 9
  • 10. Haul Road Effect on Pit Limits 10
  • 11. Terminology ANGLE OF REPOSE: Maximum slope of the broken material. SUBCROP OR ORE DEPTH: Depth of waste removed to reach initial ore. PRE-PRODUCTION STRIPPING: Stripping done to reach initial ore. 11
  • 12. Terminology ULTIMATE PIT LIMITS: Vertical and lateral extend of the economically mineable pit boundary. Determined on the basis of cost of removing overburden or waste material vs. the mineable value of the ore. PIT SCHEDULING: Material may be mined from the pit either in: 1) sequential push backs 2) conventional push backs. 12
  • 13. Terminology STRIPPING RATIO: Expressed in tons of waste to tons of ore in hard rock open pit operations. Critical and important parameter in pit design and scheduling. AVERAGE STRIP RATIO: Total waste divided by total ore within the ultimate pit. CUTOFF STRIPPING RATIO: Costs of mining a ton of ore and associated waste equals to net revenue from the ton of Ore.
  • 15. Shovel in Working Bench 15
  • 18. Example Mine 2001 2007 2011 18
  • 19. Pit Sequence (1) 21
  • 20. Pit Sequence (2) 22
  • 21. Pit Sequence (3) 23
  • 22. Pit Sequence (4) 24
  • 23. Section of Pit Sequence 25
  • 24. 25