Than Lek Mei 0315538
Ng Wai Khong 0317980
Ngah Yea Zhe 0323204
Leong Karr Khei 0324362
Loh Wei Ling 0319225
Michael Chang Vui Loong 0319198
Kong Zhen Chung 0319528
Loh Pey Mun 0318572
BUILDING ECONOMIC
 Land Parcel is located at the city center of Kuala
Lumpur, where it is situated estimate 2km away
from KLCC
 It occupies a top-tier location in the heart of the
city, and is not far away from LRT station which
located at KLCC station
 site area of 7,603.2m2, the land parcel is
distributed into 3 plots; Plot A1 is the main parcel
for commercial use with an area of 5,990.9 sqm,
Plot A2 is an open space with an area of 1,612.4
sqm and lastly Plot A3 is a subterranean parcel
with an area of 180.0 sqm is stated
THE VOGUE SUITE CORPORATE HQ
BENCHMARK - It is the first privately owned office and
the third building in Malaysia to be certified Green Building Index (GBI)
Platinum, as well as GreenRE Platinum.
• Landmark: SP Setia Berhad Corporate HQ
• Location: 240-acre Setia City commercial center, Shah Alam
• Floors No: 11 floors, including rooftop and two basement
level.
• Aim: To create a benchmark for new urban development’s
locally, regionally and globally, and the developer’s corporate
HQ stands at the pinnacle of this by ensuring that all
developments within the commercial center meet the
minimum standards of sustainability.
Construction Period 3 years
Gross Development Cost (GDV) RM 104.28 million/RM 7,171.85 per
square meter
Green Building Index (GBI) RM 209 per square feet
Gross Floor Area (GFA) 33,798.24 square meters
Net Floor Area (NFA) 14,087.67 square meters
Plot ratio 1:1.74
Type of Office Item Space/Sqft No. of Workers Sqft Requried
10 pax President 400 1 400
Managers 150 1 150
Human Resource 150 1 150
Employee 125 6 750
Reception 100 1 100
Storage Room 200 200
Conference Room 300 300
Lunch Room 175 175
Toilet 125 125
Total Area 2,350.00
BREAKDOWN FOR OFFICE 10PAX
PROPOSED SITE
Assumption (A1) Area/Sqm
Office Area
(51% of GFA) 3,055.31
Unused Space 2,935.49
Total (PLOT A1) 5,990.80
Office Allowed GFA 61,730.00
No of Floors Estimate 20
Area/Sqm
Office Area
(51% of GFA) 3,055.31
Fire Escape Stairs (3 No) 31.68
Lift Lobby (6 No) 42.12
Ac Ledge (1%) 30.55
Corridor (4.3%) 131.38
Total Office Area 2,819.58
Area/Sqm
Total Office Area per floor 2,819.58
Total Office Area (20 floor) 56,391.53
Total Area (1 Unit) 218.34
No
Total No of Unit 258.00
Total Unit per floor 13.00
BREAKDOWN &
ESTIMATE FOR OFFICE PLOT
No. of floor estimate for office building
Total office area per floor
Total No of Unit & Unit per floor
BREAKDOWN &
ESTIMATE FOR OFFICE PLOT
Assumptions No
Parking per office Unit 258
Area/Sqm No of CP
Normal Carpark 2,972.16 258
Hybrid 149.76 13
Carpool 149.76 13
Motor Bay 258 129
OKU CP 103.68 6
Walkway & Division 3,016.80
Total Area of CP Total No of CP
Total Carpark Area required 6,650.16 419
Others Office & Water Tank
(30%) 1,944.08
Total Space required 8,594.24
Expected Area for 2 floor CP 8594.24
Assumption (A1) Area/Sqm
Office Area, F&B
(65% of GFA) 3894.02
Not enclosed
space 2,096.78
Total 5990.80
Others Use 15,432.00
CP Area 8,594.24
Use for Retail 6,837.76
No of Floors 2.00
Breakdown for basement carpark
Allowance for retail and carpark
Expected Car Park Area
Area Area/Sqm
A1 (GF-65%) 3894.02
A2 (25%) 403.1
Total for CP 4,297.12
Type Length Width Area/sqm Remark
Normal Carpark 2.40 4.80 11.52
OKU carpark 3.60 4.80 17.28 1:50 carpark ratio
Motor Bay 1.00 2.00 2.00
Hybrid (5%) 2.40 4.80 11.52 GBI standard
Car Pool (5%) 2.40 4.80 11.52 GBI standard
Public CP Lot (70) 2.40 4.80 11.52 Abv Grd
Space allowed per parking 3.00 2.40 7.20
Parking Space Allowance
BREAKDOWN &
ESTIMATE FOR OFFICE PLOT
 known as GBI
 is serving as a rating system to certify the
green building constructed in Malaysia.
 reduce of environmental impact to the
surrounding by increasing the efficient
usage of resource.
- solar power, wind, water, material and etc.
- PLATINUM -
GREEN BUILDING INDEX (GBI)
Achieving Client’s Required Ranking
to achieve the GBI Rating of Platinum. In order to achieve this rank, a minimum
of 86 points out of 100 points is needed to reach
Assessment to GBI
Energy Efficiency (EE), Indoor Environment Quality (EQ), Sustainable Site
Planning & Management (SM), Materials & Resources (MR), Water Efficiency
(WE) and Innovation (IN)
Energy Efficient (EE)
To improve energy consumption through the optimization of building
orientation, minimizing building’s solar heat gain, harvesting of natural lighting,
use of renewable energy, allow proper testing, commissioning and regular
maintenance
Indoor Environmental Quality (EQ)
verification of air quality, thermal comfort, lighting, visual and acoustic comfort
in a building
Sustainable Site Planning & Management (SM)
selection of the site, linkage with community services, open spaces and
landscaping
Materials & Resources (MR)
promote the use of materials with environmental friendly nature
Water Efficiency (WE)
applying rainwater harvesting and recycling which can lead to reduction in
potable water consumption
Innovation (IN)
promote innovative design and initiatives that aid in achieving GBI
HQ’s total estimated construction cost amount is RM468,578,108.29.
THE VOGUE SUITE CORPORATE HQ
Corporate HQ : 20 floors for office use
2 floors for retail use
2 floors for carpark at basement
Benchmark : SP Setia Bhd
It is a sucessful GBI building which
accolated as the third building in
Malaysia to be certified Green Building
Index (GBI) Platinum.
Design Concept : is attained
from the collective vision of SP
Setia Bhd.
THE BENEFITS OF ACHIEVING GREEN
BUILDING
.
• Provide sustainable and balanced working life for Team Vogue
• To learn and gain experience in all aspects of green building construction management and efficient use of
energy
• Create awareness among the team in reducing carbon footprint
• Reduce their carbon footprint by carpooling and green vehicles, watch paper usage, keep
recycling bins around, use landscaped pedestrian walkway, adopting more plants in the office,
using the stairs instead of lifts and etc
• Attract sales and rental premiums which is one of the market strategies. Green buildings have a
relatively higher selling value and provide every company with a better market image
• Save businesses’ and consumers’ money during the lifetime of the property

More Related Content

PPTX
Be presentation rev
PPTX
BE presentation slides
PDF
Be final report (1)
PDF
Building economics final assignment report
PDF
BE COST APPRAISAL
PPTX
Building economics presentation 3 2
PPTX
Building Economics Group Presentation Slides
PPT
Environmental Impact Assessment( EIA)
Be presentation rev
BE presentation slides
Be final report (1)
Building economics final assignment report
BE COST APPRAISAL
Building economics presentation 3 2
Building Economics Group Presentation Slides
Environmental Impact Assessment( EIA)

Similar to Be assignment-presentation 0 (20)

PDF
BE Compiled
DOCX
Be cost appraisal
DOCX
BE cost appraisal
PPT
MOT New Presentation
PDF
KMC MAG Group/Savills - Sole Agency Appointments
PPTX
BE Assignment
PPTX
Annex Annex Annex AnnexAnnex PPT Variation 2.pptx
PDF
Menara PjH Handout
PDF
Kasa Luntian Project Briefing Materials
PDF
Kasa Luntian Project Briefing Materials 2012 0112
PDF
Service Operation Book ITIL 1st Edition Office Of Government Commerce
PDF
Building economic
DOCX
Group assignment-final
PPTX
Be presentation slides
PPTX
Burp thesis a study on development trend of tejgaon industrial area
DOCX
Section 1 – .docx
PDF
ECA Workshop - ECA Form
PDF
ECA form
PPTX
Site Plan for Rathmalana Railway Station - Amali Pathiraja
PDF
Continual service improvement ITIL 2. ed Edition Great Britain. Office Of Gov...
BE Compiled
Be cost appraisal
BE cost appraisal
MOT New Presentation
KMC MAG Group/Savills - Sole Agency Appointments
BE Assignment
Annex Annex Annex AnnexAnnex PPT Variation 2.pptx
Menara PjH Handout
Kasa Luntian Project Briefing Materials
Kasa Luntian Project Briefing Materials 2012 0112
Service Operation Book ITIL 1st Edition Office Of Government Commerce
Building economic
Group assignment-final
Be presentation slides
Burp thesis a study on development trend of tejgaon industrial area
Section 1 – .docx
ECA Workshop - ECA Form
ECA form
Site Plan for Rathmalana Railway Station - Amali Pathiraja
Continual service improvement ITIL 2. ed Edition Great Britain. Office Of Gov...
Ad

More from Jessyca Than (18)

PDF
Vm report
DOCX
Cl compilation
PPTX
Construction law lecture 10
DOCX
Fm compilation
PPTX
Seminar p8x
PDF
Pp2 asignment-1
DOCX
Chapter 1-research proposal
DOCX
Chap 2-literature-review (3)
DOCX
Indoor environmental-quality-in-healthcare-3-2
DOCX
Measurement 1 site report
PPTX
Presentation1 1
DOCX
Compilation
PPTX
Mural presentation
DOCX
Spiderman vs batman
DOCX
Psycho report
PPTX
Threesome love with storyline
PPTX
Psychology comic strip slides
DOCX
Psychology journal
Vm report
Cl compilation
Construction law lecture 10
Fm compilation
Seminar p8x
Pp2 asignment-1
Chapter 1-research proposal
Chap 2-literature-review (3)
Indoor environmental-quality-in-healthcare-3-2
Measurement 1 site report
Presentation1 1
Compilation
Mural presentation
Spiderman vs batman
Psycho report
Threesome love with storyline
Psychology comic strip slides
Psychology journal
Ad

Recently uploaded (20)

PDF
David L Page_DCI Research Study Journey_how Methodology can inform one's prac...
PPTX
Onco Emergencies - Spinal cord compression Superior vena cava syndrome Febr...
PPTX
Unit 4 Computer Architecture Multicore Processor.pptx
PPTX
Chinmaya Tiranga Azadi Quiz (Class 7-8 )
PDF
BP 704 T. NOVEL DRUG DELIVERY SYSTEMS (UNIT 2).pdf
PDF
Environmental Education MCQ BD2EE - Share Source.pdf
PDF
OBE - B.A.(HON'S) IN INTERIOR ARCHITECTURE -Ar.MOHIUDDIN.pdf
PDF
Trump Administration's workforce development strategy
PDF
Vision Prelims GS PYQ Analysis 2011-2022 www.upscpdf.com.pdf
PDF
Empowerment Technology for Senior High School Guide
PPTX
History, Philosophy and sociology of education (1).pptx
PDF
IGGE1 Understanding the Self1234567891011
PPTX
TNA_Presentation-1-Final(SAVE)) (1).pptx
PDF
medical_surgical_nursing_10th_edition_ignatavicius_TEST_BANK_pdf.pdf
PDF
What if we spent less time fighting change, and more time building what’s rig...
DOCX
Cambridge-Practice-Tests-for-IELTS-12.docx
PPTX
Computer Architecture Input Output Memory.pptx
PDF
FORM 1 BIOLOGY MIND MAPS and their schemes
PPTX
20th Century Theater, Methods, History.pptx
PPTX
202450812 BayCHI UCSC-SV 20250812 v17.pptx
David L Page_DCI Research Study Journey_how Methodology can inform one's prac...
Onco Emergencies - Spinal cord compression Superior vena cava syndrome Febr...
Unit 4 Computer Architecture Multicore Processor.pptx
Chinmaya Tiranga Azadi Quiz (Class 7-8 )
BP 704 T. NOVEL DRUG DELIVERY SYSTEMS (UNIT 2).pdf
Environmental Education MCQ BD2EE - Share Source.pdf
OBE - B.A.(HON'S) IN INTERIOR ARCHITECTURE -Ar.MOHIUDDIN.pdf
Trump Administration's workforce development strategy
Vision Prelims GS PYQ Analysis 2011-2022 www.upscpdf.com.pdf
Empowerment Technology for Senior High School Guide
History, Philosophy and sociology of education (1).pptx
IGGE1 Understanding the Self1234567891011
TNA_Presentation-1-Final(SAVE)) (1).pptx
medical_surgical_nursing_10th_edition_ignatavicius_TEST_BANK_pdf.pdf
What if we spent less time fighting change, and more time building what’s rig...
Cambridge-Practice-Tests-for-IELTS-12.docx
Computer Architecture Input Output Memory.pptx
FORM 1 BIOLOGY MIND MAPS and their schemes
20th Century Theater, Methods, History.pptx
202450812 BayCHI UCSC-SV 20250812 v17.pptx

Be assignment-presentation 0

  • 1. Than Lek Mei 0315538 Ng Wai Khong 0317980 Ngah Yea Zhe 0323204 Leong Karr Khei 0324362 Loh Wei Ling 0319225 Michael Chang Vui Loong 0319198 Kong Zhen Chung 0319528 Loh Pey Mun 0318572 BUILDING ECONOMIC
  • 2.  Land Parcel is located at the city center of Kuala Lumpur, where it is situated estimate 2km away from KLCC  It occupies a top-tier location in the heart of the city, and is not far away from LRT station which located at KLCC station  site area of 7,603.2m2, the land parcel is distributed into 3 plots; Plot A1 is the main parcel for commercial use with an area of 5,990.9 sqm, Plot A2 is an open space with an area of 1,612.4 sqm and lastly Plot A3 is a subterranean parcel with an area of 180.0 sqm is stated THE VOGUE SUITE CORPORATE HQ
  • 3. BENCHMARK - It is the first privately owned office and the third building in Malaysia to be certified Green Building Index (GBI) Platinum, as well as GreenRE Platinum. • Landmark: SP Setia Berhad Corporate HQ • Location: 240-acre Setia City commercial center, Shah Alam • Floors No: 11 floors, including rooftop and two basement level. • Aim: To create a benchmark for new urban development’s locally, regionally and globally, and the developer’s corporate HQ stands at the pinnacle of this by ensuring that all developments within the commercial center meet the minimum standards of sustainability.
  • 4. Construction Period 3 years Gross Development Cost (GDV) RM 104.28 million/RM 7,171.85 per square meter Green Building Index (GBI) RM 209 per square feet Gross Floor Area (GFA) 33,798.24 square meters Net Floor Area (NFA) 14,087.67 square meters Plot ratio 1:1.74
  • 5. Type of Office Item Space/Sqft No. of Workers Sqft Requried 10 pax President 400 1 400 Managers 150 1 150 Human Resource 150 1 150 Employee 125 6 750 Reception 100 1 100 Storage Room 200 200 Conference Room 300 300 Lunch Room 175 175 Toilet 125 125 Total Area 2,350.00 BREAKDOWN FOR OFFICE 10PAX PROPOSED SITE
  • 6. Assumption (A1) Area/Sqm Office Area (51% of GFA) 3,055.31 Unused Space 2,935.49 Total (PLOT A1) 5,990.80 Office Allowed GFA 61,730.00 No of Floors Estimate 20 Area/Sqm Office Area (51% of GFA) 3,055.31 Fire Escape Stairs (3 No) 31.68 Lift Lobby (6 No) 42.12 Ac Ledge (1%) 30.55 Corridor (4.3%) 131.38 Total Office Area 2,819.58 Area/Sqm Total Office Area per floor 2,819.58 Total Office Area (20 floor) 56,391.53 Total Area (1 Unit) 218.34 No Total No of Unit 258.00 Total Unit per floor 13.00 BREAKDOWN & ESTIMATE FOR OFFICE PLOT No. of floor estimate for office building Total office area per floor Total No of Unit & Unit per floor
  • 7. BREAKDOWN & ESTIMATE FOR OFFICE PLOT Assumptions No Parking per office Unit 258 Area/Sqm No of CP Normal Carpark 2,972.16 258 Hybrid 149.76 13 Carpool 149.76 13 Motor Bay 258 129 OKU CP 103.68 6 Walkway & Division 3,016.80 Total Area of CP Total No of CP Total Carpark Area required 6,650.16 419 Others Office & Water Tank (30%) 1,944.08 Total Space required 8,594.24 Expected Area for 2 floor CP 8594.24 Assumption (A1) Area/Sqm Office Area, F&B (65% of GFA) 3894.02 Not enclosed space 2,096.78 Total 5990.80 Others Use 15,432.00 CP Area 8,594.24 Use for Retail 6,837.76 No of Floors 2.00 Breakdown for basement carpark Allowance for retail and carpark
  • 8. Expected Car Park Area Area Area/Sqm A1 (GF-65%) 3894.02 A2 (25%) 403.1 Total for CP 4,297.12 Type Length Width Area/sqm Remark Normal Carpark 2.40 4.80 11.52 OKU carpark 3.60 4.80 17.28 1:50 carpark ratio Motor Bay 1.00 2.00 2.00 Hybrid (5%) 2.40 4.80 11.52 GBI standard Car Pool (5%) 2.40 4.80 11.52 GBI standard Public CP Lot (70) 2.40 4.80 11.52 Abv Grd Space allowed per parking 3.00 2.40 7.20 Parking Space Allowance BREAKDOWN & ESTIMATE FOR OFFICE PLOT
  • 9.  known as GBI  is serving as a rating system to certify the green building constructed in Malaysia.  reduce of environmental impact to the surrounding by increasing the efficient usage of resource. - solar power, wind, water, material and etc. - PLATINUM -
  • 10. GREEN BUILDING INDEX (GBI) Achieving Client’s Required Ranking to achieve the GBI Rating of Platinum. In order to achieve this rank, a minimum of 86 points out of 100 points is needed to reach Assessment to GBI Energy Efficiency (EE), Indoor Environment Quality (EQ), Sustainable Site Planning & Management (SM), Materials & Resources (MR), Water Efficiency (WE) and Innovation (IN) Energy Efficient (EE) To improve energy consumption through the optimization of building orientation, minimizing building’s solar heat gain, harvesting of natural lighting, use of renewable energy, allow proper testing, commissioning and regular maintenance Indoor Environmental Quality (EQ) verification of air quality, thermal comfort, lighting, visual and acoustic comfort in a building
  • 11. Sustainable Site Planning & Management (SM) selection of the site, linkage with community services, open spaces and landscaping Materials & Resources (MR) promote the use of materials with environmental friendly nature Water Efficiency (WE) applying rainwater harvesting and recycling which can lead to reduction in potable water consumption Innovation (IN) promote innovative design and initiatives that aid in achieving GBI
  • 12. HQ’s total estimated construction cost amount is RM468,578,108.29. THE VOGUE SUITE CORPORATE HQ Corporate HQ : 20 floors for office use 2 floors for retail use 2 floors for carpark at basement Benchmark : SP Setia Bhd It is a sucessful GBI building which accolated as the third building in Malaysia to be certified Green Building Index (GBI) Platinum. Design Concept : is attained from the collective vision of SP Setia Bhd.
  • 13. THE BENEFITS OF ACHIEVING GREEN BUILDING . • Provide sustainable and balanced working life for Team Vogue • To learn and gain experience in all aspects of green building construction management and efficient use of energy • Create awareness among the team in reducing carbon footprint • Reduce their carbon footprint by carpooling and green vehicles, watch paper usage, keep recycling bins around, use landscaped pedestrian walkway, adopting more plants in the office, using the stairs instead of lifts and etc • Attract sales and rental premiums which is one of the market strategies. Green buildings have a relatively higher selling value and provide every company with a better market image • Save businesses’ and consumers’ money during the lifetime of the property