Breakdowns Happen:
How to Factor Downtime
into your Simulation

Simulation expert Brian Harrington explains the key learning points
simulation modelers should consider when working with downtime.
Introductions
Brian Harrington, CSSBB
- 20 years in simulation at
Ford Motor Company
- Experienced Six
Sigma Blackbelt and
SIMUL8 Manufacturing Consultant
- Director of MTN-SIM, a
simulation specialist consulting firm

SIMUL8 Corporation | SIMUL8.com | info@SIMUL8.com
MTBF & MTTR
1. How often does a machine fail (MTBF)?
2. How long does it take to repair it (MTTR)?
These two questions may seem simple, however
are often abstracted within the forest of machinery
and clouded by human behavior.

SIMUL8 Corporation | SIMUL8.com | info@SIMUL8.com
One of the most debatable pieces of data
that goes into a simulation is the stochastic
behavior of machine downtime.
•
•
•
•
•
•
•
•
•
•
•

Introducing new equipment
Collecting downtime data
Summarizing downtime data
Catastrophic downtimes
Lock-out procedures
Time to react, travel, and repair
Distributions to represent downtimes
Limited skilled trades
Simultaneous faults
Protective capacity
Equations (MTBF, MTTF, MTBC, MTTR, etc…)

Plants perspective

Designer’s
perspective

SIMUL8 Corporation | SIMUL8.com | info@SIMUL8.com
Availability

SIMUL8 Corporation | SIMUL8.com | info@SIMUL8.com
SIMUL8 Efficiency… Prove it

MTBF

Availability

MTTR

Efficiency

Go to MTBF MTTR Defined.S8
SIMUL8 Corporation | SIMUL8.com | info@SIMUL8.com

6
Capture downtime at station or line level?

SIMUL8 Corporation | SIMUL8.com | info@SIMUL8.com
Math behind the Spreadsheet

SIMUL8 Corporation | SIMUL8.com | info@SIMUL8.com
Equivalent Results

SIMUL8 Corporation | SIMUL8.com | info@SIMUL8.com
Advantages of Aggregate Values
• Used for predicting station/cell level
downtime based on components
• Reduces large data files
• Ease of communicating downtime figures
• Aligned with scope of model

SIMUL8 Corporation | SIMUL8.com | info@SIMUL8.com
Distributions for MTBF & MTTR?
Exponential

Erlang

SIMUL8 Corporation | SIMUL8.com | info@SIMUL8.com
Stat::Fit (View your data!)
•
•
•

Data tables (Input data)
Input Graph
Descriptive Statistics

•
•

Auto::Fit
Distribution Viewer

SIMUL8 Corporation | SIMUL8.com | info@SIMUL8.com

Go to View Dist.S8
Time to React & Travel?

Named Distributions and the Combination
Distribution can capture some of this behavior.

SIMUL8 Corporation | SIMUL8.com | info@SIMUL8.com
Lock-out Procedure
A safety protocol which protects skilled trades
when entering a station or work cell. Each skilled
trade will have a named-lock, which will be
“locked” on an electrical panel before entering a
work cell for a repair. The protocol will have
several required steps to assure that all power is
off, assuring no machinery, robot, etc. movement.

A typical lock-out procedure might take 3 to 7 minutes to complete!

SIMUL8 Corporation | SIMUL8.com | info@SIMUL8.com
How do we account for the Lockout
Procedure?

A lockout procedure might be assumed
to be followed on the lengthier repairs
such as repair times that take 10
minutes or more.

SIMUL8 Corporation | SIMUL8.com | info@SIMUL8.com
VL for creating a Bimodal Distribution

SIMUL8 Corporation | SIMUL8.com | info@SIMUL8.com
Skilled Trades on Repairs

SIMUL8 Corporation | SIMUL8.com | info@SIMUL8.com
TimeView
Improve Performance

Downtimes cause
Performance issues!
(Wait & Blocks)

SIMUL8 Corporation | SIMUL8.com | info@SIMUL8.com
Design Facilities to Absorb Downtime
• Protective Capacity
– Resides in an over-speed (Push)
– Resides in buffers
– Preventative maintenance
– Skilled trades available
– Material handling systems
• Power & Free
• Electric Monorail Systems
• Power Friction
SIMUL8 Corporation | SIMUL8.com | info@SIMUL8.com
Questions

SIMUL8 Corporation | SIMUL8.com | info@SIMUL8.com
•

•

SIMUL8 Corporation | SIMUL8.com | info@SIMUL8.com

More Related Content

PPTX
8219 worrawan-make a story
PPTX
ELEVATOR MAINTENANCE CONTROL PROGRAM IN WASHINGTON STATE
PPTX
WHAT'S IN YOUR ELEVATOR MAINTENANCE CONTRACT?
PDF
Maintenance Metrics that Matter
PPTX
Improving Incident Response: Building a More Efficient IT Infrastructure
DOCX
File closing, retention and destruction procedure for law firms
PPT
Ims Maint Mgmt Best Practice
PDF
HBase: How to get MTTR below 1 minute
8219 worrawan-make a story
ELEVATOR MAINTENANCE CONTROL PROGRAM IN WASHINGTON STATE
WHAT'S IN YOUR ELEVATOR MAINTENANCE CONTRACT?
Maintenance Metrics that Matter
Improving Incident Response: Building a More Efficient IT Infrastructure
File closing, retention and destruction procedure for law firms
Ims Maint Mgmt Best Practice
HBase: How to get MTTR below 1 minute

Viewers also liked (6)

PPTX
How to Reduce your MTTI/MTTR with a Single Click
PDF
White Belt DMAIC Project Line G MTTR
PDF
Reliability Centered Maintenance Made Simple
PPT
Reliability centered maintenance
PPTX
Reducing MTTR and False Escalations: Event Correlation at LinkedIn
PDF
Best Practices in Maintenance and Reliability
How to Reduce your MTTI/MTTR with a Single Click
White Belt DMAIC Project Line G MTTR
Reliability Centered Maintenance Made Simple
Reliability centered maintenance
Reducing MTTR and False Escalations: Event Correlation at LinkedIn
Best Practices in Maintenance and Reliability
Ad

Similar to Breakdowns Happen: Factoring Downtime Into Your Simulation (8)

PPT
Three primary steps in maintenance reliability engineering
PPTX
Basic Maintenance
DOC
PDF
Garment Industries Industrial Engineering
PPTX
MTBF vs MTTR.pptx
PDF
When Should I Use Simulation?
PDF
predictive-maintenance-ebook-all-chapters.pdf
PPTX
MTTR & MTBF pptx mean to time repair to analyse
Three primary steps in maintenance reliability engineering
Basic Maintenance
Garment Industries Industrial Engineering
MTBF vs MTTR.pptx
When Should I Use Simulation?
predictive-maintenance-ebook-all-chapters.pdf
MTTR & MTBF pptx mean to time repair to analyse
Ad

Recently uploaded (20)

PDF
A comparative study of natural language inference in Swahili using monolingua...
PDF
The influence of sentiment analysis in enhancing early warning system model f...
PDF
Flame analysis and combustion estimation using large language and vision assi...
PDF
A contest of sentiment analysis: k-nearest neighbor versus neural network
PPTX
Chapter 5: Probability Theory and Statistics
PDF
How ambidextrous entrepreneurial leaders react to the artificial intelligence...
PDF
Hybrid horned lizard optimization algorithm-aquila optimizer for DC motor
PDF
Developing a website for English-speaking practice to English as a foreign la...
PPTX
Configure Apache Mutual Authentication
PPT
Galois Field Theory of Risk: A Perspective, Protocol, and Mathematical Backgr...
PPTX
AI IN MARKETING- PRESENTED BY ANWAR KABIR 1st June 2025.pptx
PDF
Five Habits of High-Impact Board Members
PDF
Produktkatalog für HOBO Datenlogger, Wetterstationen, Sensoren, Software und ...
PPT
Geologic Time for studying geology for geologist
PDF
Hindi spoken digit analysis for native and non-native speakers
PDF
Zenith AI: Advanced Artificial Intelligence
PDF
A proposed approach for plagiarism detection in Myanmar Unicode text
PDF
ENT215_Completing-a-large-scale-migration-and-modernization-with-AWS.pdf
PPTX
Microsoft Excel 365/2024 Beginner's training
PDF
sbt 2.0: go big (Scala Days 2025 edition)
A comparative study of natural language inference in Swahili using monolingua...
The influence of sentiment analysis in enhancing early warning system model f...
Flame analysis and combustion estimation using large language and vision assi...
A contest of sentiment analysis: k-nearest neighbor versus neural network
Chapter 5: Probability Theory and Statistics
How ambidextrous entrepreneurial leaders react to the artificial intelligence...
Hybrid horned lizard optimization algorithm-aquila optimizer for DC motor
Developing a website for English-speaking practice to English as a foreign la...
Configure Apache Mutual Authentication
Galois Field Theory of Risk: A Perspective, Protocol, and Mathematical Backgr...
AI IN MARKETING- PRESENTED BY ANWAR KABIR 1st June 2025.pptx
Five Habits of High-Impact Board Members
Produktkatalog für HOBO Datenlogger, Wetterstationen, Sensoren, Software und ...
Geologic Time for studying geology for geologist
Hindi spoken digit analysis for native and non-native speakers
Zenith AI: Advanced Artificial Intelligence
A proposed approach for plagiarism detection in Myanmar Unicode text
ENT215_Completing-a-large-scale-migration-and-modernization-with-AWS.pdf
Microsoft Excel 365/2024 Beginner's training
sbt 2.0: go big (Scala Days 2025 edition)

Breakdowns Happen: Factoring Downtime Into Your Simulation

  • 1. Breakdowns Happen: How to Factor Downtime into your Simulation Simulation expert Brian Harrington explains the key learning points simulation modelers should consider when working with downtime.
  • 2. Introductions Brian Harrington, CSSBB - 20 years in simulation at Ford Motor Company - Experienced Six Sigma Blackbelt and SIMUL8 Manufacturing Consultant - Director of MTN-SIM, a simulation specialist consulting firm SIMUL8 Corporation | SIMUL8.com | info@SIMUL8.com
  • 3. MTBF & MTTR 1. How often does a machine fail (MTBF)? 2. How long does it take to repair it (MTTR)? These two questions may seem simple, however are often abstracted within the forest of machinery and clouded by human behavior. SIMUL8 Corporation | SIMUL8.com | info@SIMUL8.com
  • 4. One of the most debatable pieces of data that goes into a simulation is the stochastic behavior of machine downtime. • • • • • • • • • • • Introducing new equipment Collecting downtime data Summarizing downtime data Catastrophic downtimes Lock-out procedures Time to react, travel, and repair Distributions to represent downtimes Limited skilled trades Simultaneous faults Protective capacity Equations (MTBF, MTTF, MTBC, MTTR, etc…) Plants perspective Designer’s perspective SIMUL8 Corporation | SIMUL8.com | info@SIMUL8.com
  • 5. Availability SIMUL8 Corporation | SIMUL8.com | info@SIMUL8.com
  • 6. SIMUL8 Efficiency… Prove it MTBF Availability MTTR Efficiency Go to MTBF MTTR Defined.S8 SIMUL8 Corporation | SIMUL8.com | info@SIMUL8.com 6
  • 7. Capture downtime at station or line level? SIMUL8 Corporation | SIMUL8.com | info@SIMUL8.com
  • 8. Math behind the Spreadsheet SIMUL8 Corporation | SIMUL8.com | info@SIMUL8.com
  • 9. Equivalent Results SIMUL8 Corporation | SIMUL8.com | info@SIMUL8.com
  • 10. Advantages of Aggregate Values • Used for predicting station/cell level downtime based on components • Reduces large data files • Ease of communicating downtime figures • Aligned with scope of model SIMUL8 Corporation | SIMUL8.com | info@SIMUL8.com
  • 11. Distributions for MTBF & MTTR? Exponential Erlang SIMUL8 Corporation | SIMUL8.com | info@SIMUL8.com
  • 12. Stat::Fit (View your data!) • • • Data tables (Input data) Input Graph Descriptive Statistics • • Auto::Fit Distribution Viewer SIMUL8 Corporation | SIMUL8.com | info@SIMUL8.com Go to View Dist.S8
  • 13. Time to React & Travel? Named Distributions and the Combination Distribution can capture some of this behavior. SIMUL8 Corporation | SIMUL8.com | info@SIMUL8.com
  • 14. Lock-out Procedure A safety protocol which protects skilled trades when entering a station or work cell. Each skilled trade will have a named-lock, which will be “locked” on an electrical panel before entering a work cell for a repair. The protocol will have several required steps to assure that all power is off, assuring no machinery, robot, etc. movement. A typical lock-out procedure might take 3 to 7 minutes to complete! SIMUL8 Corporation | SIMUL8.com | info@SIMUL8.com
  • 15. How do we account for the Lockout Procedure? A lockout procedure might be assumed to be followed on the lengthier repairs such as repair times that take 10 minutes or more. SIMUL8 Corporation | SIMUL8.com | info@SIMUL8.com
  • 16. VL for creating a Bimodal Distribution SIMUL8 Corporation | SIMUL8.com | info@SIMUL8.com
  • 17. Skilled Trades on Repairs SIMUL8 Corporation | SIMUL8.com | info@SIMUL8.com
  • 18. TimeView Improve Performance Downtimes cause Performance issues! (Wait & Blocks) SIMUL8 Corporation | SIMUL8.com | info@SIMUL8.com
  • 19. Design Facilities to Absorb Downtime • Protective Capacity – Resides in an over-speed (Push) – Resides in buffers – Preventative maintenance – Skilled trades available – Material handling systems • Power & Free • Electric Monorail Systems • Power Friction SIMUL8 Corporation | SIMUL8.com | info@SIMUL8.com
  • 20. Questions SIMUL8 Corporation | SIMUL8.com | info@SIMUL8.com
  • 21. • • SIMUL8 Corporation | SIMUL8.com | info@SIMUL8.com