ACOUSTIC ANALYSIS
Before
Rehearsal
1 2 3 4 5 6 7
A 76 76 78 63 50 77 83 Sitting Area
B 76 77 85 75 66 80 85 New Nursery 1
C 77 74 67 78 87 85 88 Stage
D 85 75 67 82 77 73 74 Robing Room
E 75 83 77 81 83 77 80 Audio Control Centre
F 66 81 73 79 75 71 75
G 71 77 71 64 70 66 70
After Rehearsal
1 2 3 4 5 6 7
A 62 55 60 67 62 54 83
B 57 63 68 56 65 66 85
C 62 66 63 53 68 67 88
D 65 60 61 63 75 70 74
E 58 58 58 61 66 69 80
F 56 64 56 71 71 69 75
G 51 62 65 66 66 64 70
Reverberation Time of Zone C ( Stage)
Materials (Wall) Area (𝒎 𝟐) Acoustic
Absorption
Coefficient
Area x Absorption
Coefficient
Perforated panel 156.44 m² 0.15 23.47
Materials (Ceiling
and flooring)
Area (𝒎 𝟐) Acoustic
Absorption
Coefficient
Area x Absorption
Coefficient
Timber flooring 95.16 m² 0.10 9.52
Perforated ceiling
panel
95.16 m² 0.72 68.52
Total sound absorption 101.51
𝑇 =
0.161 × 𝑉𝑜𝑙𝑢𝑚𝑒 𝑜𝑓 𝑍𝑜𝑛𝑒
(𝐴𝑟𝑒𝑎 𝑜𝑓 𝑆𝑢𝑟𝑓𝑎𝑐𝑒 × 𝐴𝑏𝑠𝑜𝑟𝑝𝑡𝑖𝑜𝑛 𝐶𝑜𝑒𝑓𝑓𝑖𝑐𝑖𝑒𝑛𝑡)
𝑇 =
0.161 × 531.14
101.51
𝑇 = 0.84𝑠
Reverberation Time of Zone A (Sitting Area)
Materials (Wall) Area (𝒎 𝟐) Acoustic Absorption
Coefficient
Area x Absorption
Coefficient
Plastered brick wall with
paint
59.1m² 0.02 1.2
Perforated acoustic
panel
135.4m² 0.15 20.2
Materials (Ceiling and
flooring)
Area (𝒎 𝟐) Acoustic Absorption
Coefficient
Area x Absorption
Coefficient
Nylon carpet on
concrete floor
699.3 m² 0.14 97.9
Perforated ceiling 814.8m² 0.72 819.8
Materials (Furniture) Area (𝒎 𝟐) Acoustic Absorption
Coefficient
Area x Absorption
Coefficient
Cushioned chair 286.7 m² 0.80 229.4
Timber double leaves
door
18 m² 0.15 2.7
Occupant 441 0.46 202.9
Total Sound Absorption 1374.1
Total Floor Area (m²) = 699.7 m²
Volume of Zone (𝑚3) = 4575.54𝑚3
Occupancy =441Calculation:
𝑇 =
0.161 × 𝑉𝑜𝑙𝑢𝑚𝑒 𝑜𝑓 𝑍𝑜𝑛𝑒
(𝐴𝑟𝑒𝑎 𝑜𝑓 𝑆𝑢𝑟𝑓𝑎𝑐𝑒 × 𝐴𝑏𝑠𝑜𝑟𝑝𝑡𝑖𝑜𝑛 𝐶𝑜𝑒𝑓𝑓𝑖𝑐𝑖𝑒𝑛𝑡)
𝑇 =
0.161 × 4575.54
1374.1
𝑇 = 0.54𝑠
Building Science 2 [ARC 3413] Project 1: Lighting and Acoustic Performance Evaluation and Design.|| Mr. Sanjeh Raman
Ch’ng Xing Yue 0310425 || Elaine Bong Poh Hui 0310432 || Goh Chin Zhi 0314562 || Lau Ee Tian 0309596 || Wesley Hew Xin Han 0307585
CONCLUSION
The materials used were
chosen specifically to
create a harmonic
acoustical environment.
Acoustic panels are
attached on most surfaces
to reduce echo while
allowing sounds from the
stage to be heard clearly
by the audience.
LIGHTING ANALYSIS
Zone A (Cashier Counter Top)
Zone B (Kitchen Counter Top)
Zone C (Dining Near Window)
Zone D (Entrance)
Zone E (Dining 1)
Zone F (Kitchen)
Zone G (Dining 2)
Zone H (Dining 3)
Zone I (Dining 4)
45°
45°45°
85°
Zone Daylight Factor
(%)
A 0.05
B 0.07
C 0.1
D 0.23
E 0.09
F 0.09
G 0.07
H 0.05
I 0.09
Zone Existing (Nos. of Fixtures) Calculated (Required nos. of
Fixtures)
A 6 11
B 6 8
C 3 3
D 12 4
E 10 11
F 6 7
G 24 20
H 12 10
I 18 16
CONCLUSION
The cafeteria acts as the main entry circulation path aside
from the lobby as it is more prominent in terms of location and
its potential to perpetuate numerous human activities. As such,
the lighting within the cafeteria plays a significant role to
ensure the comfortability and perceptibility of users. From the
research, we can deduce that the multiple fenestrations along
the edges of the cafeteria provides the space with substantial
amount of natural lighting where as artificial lighting is only
partially needed to light up spaces where light is unable to
reach. From evening onwards however, the space becomes
dependent on artificial lights positioned in the cafeteria which
is not sufficient and thus may appear very dim.
Building Science 2 [ARC 3413] Project 1: Lighting and Acoustic Performance Evaluation and Design.|| Mr. Sanjeh Raman
Ch’ng Xing Yue 0310425 || Elaine Bong Poh Hui 0310432 || Goh Chin Zhi 0314562 || Lau Ee Tian 0309596 || Wesley Hew Xin Han 0307585

More Related Content

PDF
Yaseen Syed BUILDING SCIENCE Integration
PDF
SEM 5 : PROJECT 1 REPORT BUILDING SCIENCE 2
PDF
BSCIENCE PROJECT 2 FINAL REPORT
PDF
Adler Planetarium
PDF
Building Science 2 Project 1 report - ASWARA
PPTX
acoustic and viewing angle analysis of an auditorium building
PDF
Finalbtech 1
PPTX
Bechtlerconstruction2 140718020052-phpapp02
Yaseen Syed BUILDING SCIENCE Integration
SEM 5 : PROJECT 1 REPORT BUILDING SCIENCE 2
BSCIENCE PROJECT 2 FINAL REPORT
Adler Planetarium
Building Science 2 Project 1 report - ASWARA
acoustic and viewing angle analysis of an auditorium building
Finalbtech 1
Bechtlerconstruction2 140718020052-phpapp02

Viewers also liked (6)

PPT
restaurant development + design: green building strategies
PDF
ITFT -- Sound and acoustics
PPT
Auditorium
PPTX
green building ppt
PDF
Nanyang report
PPTX
Architectural acoustics
restaurant development + design: green building strategies
ITFT -- Sound and acoustics
Auditorium
green building ppt
Nanyang report
Architectural acoustics
Ad

Similar to bscience Board (20)

PDF
Lighting and Acoustic Performance - Absolute Coffee
PDF
FINAL REPORT PROJECT 1 LIGHTING AND ACOUSTIC PERFORMANCE.pdf
DOCX
CALCULATION
PDF
Building Science 2 Project 1 Presentation slides
PDF
Auditorium Design Final .pdf
PDF
BUILDING SCIENCE II INDIVIDUAL REPORT
PDF
A3-Lighting and Acoustic Research
PDF
CCEC Acoustic Design Analysis
PDF
Building science-2-report
PDF
B.science report 1.2
PPTX
xderthuj56xdrft6ujtrydgfhn cvbfgyhjdx rfjn
DOCX
TCC Building Science 2 Project 2 Calculation Report
PDF
ACUSTICKS CASE STUDY.pdf xcrfdyjmdc ftyhujmkc vgtfdyu7i jftg6hy7u68iok
PDF
Final bsc
PDF
Tech Individual Work Final
PDF
Acoustic Analysis on Permata Pintar Auditorium (presentation)
DOCX
Sound final
DOCX
Nadia bsc2 p2
DOCX
CALCULATIONS - Integration with Studio 5
DOCX
Building Science II: Acoustic Report
Lighting and Acoustic Performance - Absolute Coffee
FINAL REPORT PROJECT 1 LIGHTING AND ACOUSTIC PERFORMANCE.pdf
CALCULATION
Building Science 2 Project 1 Presentation slides
Auditorium Design Final .pdf
BUILDING SCIENCE II INDIVIDUAL REPORT
A3-Lighting and Acoustic Research
CCEC Acoustic Design Analysis
Building science-2-report
B.science report 1.2
xderthuj56xdrft6ujtrydgfhn cvbfgyhjdx rfjn
TCC Building Science 2 Project 2 Calculation Report
ACUSTICKS CASE STUDY.pdf xcrfdyjmdc ftyhujmkc vgtfdyu7i jftg6hy7u68iok
Final bsc
Tech Individual Work Final
Acoustic Analysis on Permata Pintar Auditorium (presentation)
Sound final
Nadia bsc2 p2
CALCULATIONS - Integration with Studio 5
Building Science II: Acoustic Report
Ad

More from Elaine Bong (20)

PDF
Merged document
PDF
B science project 2
PDF
A2 final boards
PDF
precedent
PDF
Both (1)
PPTX
Synopsis 3
PPTX
Towards a new architecture
PPTX
Synopsis 4
PPTX
Preschool proposal
DOCX
Contradictory levels the double functioning element final
PDF
Elaine bong 0310432 (complexity and contradiction in architecture)
DOCX
3 theories complexity and contradiction in architecture
PDF
Structure report
PDF
Bridge report
PDF
Building service board
PDF
Bservices report
PDF
Completed aa photobook 2.0
PDF
Aa case study project 1 (elaine bong 0310432)
PDF
Gtower report
PDF
Report 10.0 bcon xing
Merged document
B science project 2
A2 final boards
precedent
Both (1)
Synopsis 3
Towards a new architecture
Synopsis 4
Preschool proposal
Contradictory levels the double functioning element final
Elaine bong 0310432 (complexity and contradiction in architecture)
3 theories complexity and contradiction in architecture
Structure report
Bridge report
Building service board
Bservices report
Completed aa photobook 2.0
Aa case study project 1 (elaine bong 0310432)
Gtower report
Report 10.0 bcon xing

Recently uploaded (20)

PDF
OBE - B.A.(HON'S) IN INTERIOR ARCHITECTURE -Ar.MOHIUDDIN.pdf
PDF
Vision Prelims GS PYQ Analysis 2011-2022 www.upscpdf.com.pdf
PPTX
ELIAS-SEZIURE AND EPilepsy semmioan session.pptx
PDF
Paper A Mock Exam 9_ Attempt review.pdf.
PDF
MBA _Common_ 2nd year Syllabus _2021-22_.pdf
PPTX
History, Philosophy and sociology of education (1).pptx
PPTX
Virtual and Augmented Reality in Current Scenario
PPTX
CHAPTER IV. MAN AND BIOSPHERE AND ITS TOTALITY.pptx
PDF
Τίμαιος είναι φιλοσοφικός διάλογος του Πλάτωνα
PDF
What if we spent less time fighting change, and more time building what’s rig...
PPTX
TNA_Presentation-1-Final(SAVE)) (1).pptx
PDF
medical_surgical_nursing_10th_edition_ignatavicius_TEST_BANK_pdf.pdf
PPTX
202450812 BayCHI UCSC-SV 20250812 v17.pptx
PPTX
B.Sc. DS Unit 2 Software Engineering.pptx
PDF
LDMMIA Reiki Yoga Finals Review Spring Summer
PPTX
Computer Architecture Input Output Memory.pptx
PDF
Environmental Education MCQ BD2EE - Share Source.pdf
PDF
Uderstanding digital marketing and marketing stratergie for engaging the digi...
PDF
Weekly quiz Compilation Jan -July 25.pdf
PDF
Practical Manual AGRO-233 Principles and Practices of Natural Farming
OBE - B.A.(HON'S) IN INTERIOR ARCHITECTURE -Ar.MOHIUDDIN.pdf
Vision Prelims GS PYQ Analysis 2011-2022 www.upscpdf.com.pdf
ELIAS-SEZIURE AND EPilepsy semmioan session.pptx
Paper A Mock Exam 9_ Attempt review.pdf.
MBA _Common_ 2nd year Syllabus _2021-22_.pdf
History, Philosophy and sociology of education (1).pptx
Virtual and Augmented Reality in Current Scenario
CHAPTER IV. MAN AND BIOSPHERE AND ITS TOTALITY.pptx
Τίμαιος είναι φιλοσοφικός διάλογος του Πλάτωνα
What if we spent less time fighting change, and more time building what’s rig...
TNA_Presentation-1-Final(SAVE)) (1).pptx
medical_surgical_nursing_10th_edition_ignatavicius_TEST_BANK_pdf.pdf
202450812 BayCHI UCSC-SV 20250812 v17.pptx
B.Sc. DS Unit 2 Software Engineering.pptx
LDMMIA Reiki Yoga Finals Review Spring Summer
Computer Architecture Input Output Memory.pptx
Environmental Education MCQ BD2EE - Share Source.pdf
Uderstanding digital marketing and marketing stratergie for engaging the digi...
Weekly quiz Compilation Jan -July 25.pdf
Practical Manual AGRO-233 Principles and Practices of Natural Farming

bscience Board

  • 1. ACOUSTIC ANALYSIS Before Rehearsal 1 2 3 4 5 6 7 A 76 76 78 63 50 77 83 Sitting Area B 76 77 85 75 66 80 85 New Nursery 1 C 77 74 67 78 87 85 88 Stage D 85 75 67 82 77 73 74 Robing Room E 75 83 77 81 83 77 80 Audio Control Centre F 66 81 73 79 75 71 75 G 71 77 71 64 70 66 70 After Rehearsal 1 2 3 4 5 6 7 A 62 55 60 67 62 54 83 B 57 63 68 56 65 66 85 C 62 66 63 53 68 67 88 D 65 60 61 63 75 70 74 E 58 58 58 61 66 69 80 F 56 64 56 71 71 69 75 G 51 62 65 66 66 64 70 Reverberation Time of Zone C ( Stage) Materials (Wall) Area (𝒎 𝟐) Acoustic Absorption Coefficient Area x Absorption Coefficient Perforated panel 156.44 m² 0.15 23.47 Materials (Ceiling and flooring) Area (𝒎 𝟐) Acoustic Absorption Coefficient Area x Absorption Coefficient Timber flooring 95.16 m² 0.10 9.52 Perforated ceiling panel 95.16 m² 0.72 68.52 Total sound absorption 101.51 𝑇 = 0.161 × 𝑉𝑜𝑙𝑢𝑚𝑒 𝑜𝑓 𝑍𝑜𝑛𝑒 (𝐴𝑟𝑒𝑎 𝑜𝑓 𝑆𝑢𝑟𝑓𝑎𝑐𝑒 × 𝐴𝑏𝑠𝑜𝑟𝑝𝑡𝑖𝑜𝑛 𝐶𝑜𝑒𝑓𝑓𝑖𝑐𝑖𝑒𝑛𝑡) 𝑇 = 0.161 × 531.14 101.51 𝑇 = 0.84𝑠 Reverberation Time of Zone A (Sitting Area) Materials (Wall) Area (𝒎 𝟐) Acoustic Absorption Coefficient Area x Absorption Coefficient Plastered brick wall with paint 59.1m² 0.02 1.2 Perforated acoustic panel 135.4m² 0.15 20.2 Materials (Ceiling and flooring) Area (𝒎 𝟐) Acoustic Absorption Coefficient Area x Absorption Coefficient Nylon carpet on concrete floor 699.3 m² 0.14 97.9 Perforated ceiling 814.8m² 0.72 819.8 Materials (Furniture) Area (𝒎 𝟐) Acoustic Absorption Coefficient Area x Absorption Coefficient Cushioned chair 286.7 m² 0.80 229.4 Timber double leaves door 18 m² 0.15 2.7 Occupant 441 0.46 202.9 Total Sound Absorption 1374.1 Total Floor Area (m²) = 699.7 m² Volume of Zone (𝑚3) = 4575.54𝑚3 Occupancy =441Calculation: 𝑇 = 0.161 × 𝑉𝑜𝑙𝑢𝑚𝑒 𝑜𝑓 𝑍𝑜𝑛𝑒 (𝐴𝑟𝑒𝑎 𝑜𝑓 𝑆𝑢𝑟𝑓𝑎𝑐𝑒 × 𝐴𝑏𝑠𝑜𝑟𝑝𝑡𝑖𝑜𝑛 𝐶𝑜𝑒𝑓𝑓𝑖𝑐𝑖𝑒𝑛𝑡) 𝑇 = 0.161 × 4575.54 1374.1 𝑇 = 0.54𝑠 Building Science 2 [ARC 3413] Project 1: Lighting and Acoustic Performance Evaluation and Design.|| Mr. Sanjeh Raman Ch’ng Xing Yue 0310425 || Elaine Bong Poh Hui 0310432 || Goh Chin Zhi 0314562 || Lau Ee Tian 0309596 || Wesley Hew Xin Han 0307585 CONCLUSION The materials used were chosen specifically to create a harmonic acoustical environment. Acoustic panels are attached on most surfaces to reduce echo while allowing sounds from the stage to be heard clearly by the audience.
  • 2. LIGHTING ANALYSIS Zone A (Cashier Counter Top) Zone B (Kitchen Counter Top) Zone C (Dining Near Window) Zone D (Entrance) Zone E (Dining 1) Zone F (Kitchen) Zone G (Dining 2) Zone H (Dining 3) Zone I (Dining 4) 45° 45°45° 85° Zone Daylight Factor (%) A 0.05 B 0.07 C 0.1 D 0.23 E 0.09 F 0.09 G 0.07 H 0.05 I 0.09 Zone Existing (Nos. of Fixtures) Calculated (Required nos. of Fixtures) A 6 11 B 6 8 C 3 3 D 12 4 E 10 11 F 6 7 G 24 20 H 12 10 I 18 16 CONCLUSION The cafeteria acts as the main entry circulation path aside from the lobby as it is more prominent in terms of location and its potential to perpetuate numerous human activities. As such, the lighting within the cafeteria plays a significant role to ensure the comfortability and perceptibility of users. From the research, we can deduce that the multiple fenestrations along the edges of the cafeteria provides the space with substantial amount of natural lighting where as artificial lighting is only partially needed to light up spaces where light is unable to reach. From evening onwards however, the space becomes dependent on artificial lights positioned in the cafeteria which is not sufficient and thus may appear very dim. Building Science 2 [ARC 3413] Project 1: Lighting and Acoustic Performance Evaluation and Design.|| Mr. Sanjeh Raman Ch’ng Xing Yue 0310425 || Elaine Bong Poh Hui 0310432 || Goh Chin Zhi 0314562 || Lau Ee Tian 0309596 || Wesley Hew Xin Han 0307585