SlideShare a Scribd company logo
Building Science 2 (ARC 3413)
Project 2:
Lighting & Acoustic Analysis Integration with Design Studio 5
Contemporary Food Market
Elaine Bong Poh Hui
0310432
Tutor: Mr Sanjay
Content
1.0 Lighting Proposal
1.1 Natural Daylighting
1.1.1 Space 1 – Ground Floor Café
1.1.2 Space 2 – First Floor Outdoor Area
1.1.3 Space 3 – Second Floor Seating Area
1.2 Artificial Lighting
1.2.1 Space 1 – Ground Floor Café
1.2.2 Space 2 – First Floor Outdoor Area
1.2.3 Space 3 – Second Floor Office
2.0 Acoustic Proposal
2.1 External Noise Sound Intensity Level
2.2 Sound Transmission Loss
2.2.1 Space 1 – Ground Floor Café Kitchen
2.2.2 Space 2 – Second Floor Office
2.3 Reverberation Time
2.3.1 Space 1 – Second Floor Office
2.3.2 Space 2 – Ground Floor Café Kitchen
3.0 Appendix & References
1.1 Natural Daylighting
Daylight Factor
𝐷𝐹 =
𝐸𝑖𝑛𝑑𝑜𝑜𝑟
𝐸 𝑜𝑢𝑡𝑑𝑜𝑜𝑟
𝑥 100%
Where,
DF = Daylight Factor (%)
𝐸𝑖𝑛𝑑𝑜𝑜𝑟 = Horizontal illumination of reference point indoor (Lux)
𝐸 𝑜𝑢𝑡𝑑𝑜𝑜𝑟 = Horizontal illumination of unobstructed point outdoor in an overcast sky condition
(Lux)
The table below shows the standards of daylight factor as set by Malaysian Standards.
Zone Daylight Factor (%) Distribution
Very bright > 6 Very large with thermal and
glare problem
Bright 3 - 6 Good
Average 1 - 3 Fair
Dark 0 - 1 Poor
1.1.1 Space 1 – Ground Floor Café
The café is located on the ground floor is very near to the street as the attract people to
go inside and dine in. The space is exposed to sunlight due to the façade which is
main of glass and is not fully covered. The daylight shining into the space is sufficient
and could have save energy from artificial lighting.
Daylight Factor, DF
Total Floor Area = 120.38 m²
Area of Openings = 75.6 m²
Daylight Factor =
75.6
120.38
𝑥 100% 𝑥 0.1
= 62.8 x 0.1
= 6.28%
Natural Illumination Calculation
Daylight Factor =
𝐸𝑖𝑛𝑑𝑜𝑜𝑟
𝐸 𝑜𝑢𝑡𝑑𝑜𝑜𝑟
𝑥 100%
6.28% =
𝐸𝑖𝑛𝑑𝑜𝑜𝑟
32000
𝑥 100%
𝐸𝑖𝑛𝑑𝑜𝑜𝑟 = 6.28 / 100 x 32000
= 20009.6 Lux
Conclusion
The space has a daylight factor of 6.28% which exceeded the standards set by
Malaysia Standards and there will be a slight thermal and glare problem. According to
MS 1525, the café should have a standard illuminance level of 200 lux, which the
space has already exceed by having an illuminance level of 2009.6 Lux. The
uncovered is due to the idea of allowing public to be able to see what happening in the
space. A sunscreen is added to the façade to reduce the sun glare problem.
1.1.2 Space 2 – First Floor Outdoor Area
The outdoor area on the second floor is for event to take place. This event space is
located on a high floor due to the level of the monorail track. By having the
happening space on the upper floor enable passer-by to view in the building and
getting hold of what is happening.
Daylight Factor, DF
Total Floor Area = 81 m²
Area of Openings = 61.32 m²
Daylight Factor =
61.32
81
𝑥 100% 𝑥 0.1
= 75.7 x 0.1
= 7.57%
Natural Illumination Calculation
Daylight Factor =
𝐸𝑖𝑛𝑑𝑜𝑜𝑟
𝐸 𝑜𝑢𝑡𝑑𝑜𝑜𝑟
𝑥 100%
7.57% =
𝐸𝑖𝑛𝑑𝑜𝑜𝑟
32000
𝑥 100%
𝐸𝑖𝑛𝑑𝑜𝑜𝑟 = 6.28 / 100 x 32000
= 2422.4 Lux
Conclusion
The area has a daylight factor of 7.57% which the zone is very bright with thermal
and glare problem. The standard illuminance level for this area is 500 Lux. The
calculation for natural illumination for indoor is 2422.4 lux. The concept of being able
to view from outside causes the resulting illuminance to be higher.
1.1.3 Space 3 – Second Floor Seating Area
The seating area on second floor is exposed to sunlight since it is nearer to the façade
on the upper floor. The space is partly screened by aluminium strips preventing
overheat. By introducing daylight into the space, les energy can be used on the
artificial lighting.
Daylight Factor, DF
Total Floor Area = 143.4 m²
Area of Openings = 87.465 m²
Daylight Factor =
87.465
143.4
𝑥 100% 𝑥 0.1
= 61 x 0.1
= 6.1%
Natural Illumination Calculation
Daylight Factor =
𝐸𝑖𝑛𝑑𝑜𝑜𝑟
𝐸 𝑜𝑢𝑡𝑑𝑜𝑜𝑟
𝑥 100%
6.1% =
𝐸𝑖𝑛𝑑𝑜𝑜𝑟
32000
𝑥 100%
𝐸𝑖𝑛𝑑𝑜𝑜𝑟 = 6.1 / 100 x 32000
= 1952 Lux
Conclusion
This space has a daylight factor of 6.1% which slightly exceeded the standard
illuminance level causing the area to be too bright and has thermal and glare problem.
The natural illuminance for the interior is 1952 which is more than the standard set by
the government, 200. The problem is reduced by having sunscreen in front of the
façade to block some of the daylight.
1.2 Artificial Lighting Analysis
1.2.1 Ground Floor Café
According to MS 1525, the illuminance level of café is 200 lux. The main activities in the
café is dining and serving so the type of lighting used in this area will be the ambient lighting.
Material Location Texture Surface
Type
Colour Reflectance
Value (%)
Concrete Floor Matt Absorptive Grey 20
Timber
Finishing
Wall Smooth Absorptive Brown 50
Plaster
Ceiling
Ceiling Matt Absorptive White 70
Product Philip Master LED Spotlight PAR
Luminous Flux(lm) 900 Lm per lamp / 5 lamps per luminaire
Colour Temperature,
K
2,700 K
Colour Rendering
Index
80
Beam Angle 250
Voltage 220-240 V
Bulb Finish Nil
Placement Ceiling
Location Café
Dimension of Room (m) L = 11.4, W = 10.56
Total Floor Area (m²) 120.38
Type of Lighting Fixture Ambient Lighting
Standard Illuminance Required (lux)
According to MS 1525
200
Height of Ceiling 4.2
Height of Working Level 1.0
Height of Luminaire 3.2
Mounting Height (h) 2.2
Room Index (K)
=
𝑳 × 𝑾
𝒉(𝑳 + 𝑾)
11.4 × 10.56
2.2(11.4 + 10.56)
= 2.49
Utilisation Factor (UF) 0.54
Maintenance Factor (MF) 0.8
Lumen Calculation
𝑵 =
𝑬 × 𝑨
𝑭 × 𝑼𝑭 × 𝑴𝑭
200 × 120.38
4500 × 0.54 × 0.8
= 12.38 = 13
Spacing (SHR = 3:2) 3/2 = Spacing/2.2
Spacing = 3/2 x 2.2
=3.3 metres
Number of Luminaires Across
(Width/Spacing)
10.56 / 3.3
= 3.3 = 4
Number of Luminaires Along (Total no.
of Luminaires/ No. of Luminaires
Across)
13 / 4
= 3.25 = 4
Conclusion
The café operates during evening and night time. The ambient lighting can help to create a
comfortable dining experience by achieving the standard illuminance and attract more public
to visit the place.
1.2.2 First Floor Outdoor Area (Event Place)
According to MS 1525, the illuminance level of outdoor area is 500 lux. There will only
activity happening here when there is an event. Therefore, the type of lighting used in this
area will be the ambient lighting.
Material Location Texture Surface
Type
Colour Reflectance
Value (%)
Concrete Floor Matt Absorptive Dark Grey 20
Timber
Finishing
Wall Smooth Absorptive Brown 20
Plaster
Ceiling
Ceiling Matt Absorptive White 70
Product Philip Master LED Spotlight PAR
Luminous Flux(lm) 900 Lm per lamp / 5 lamps per luminaire
Colour Temperature, K 2,700 K
Colour Rendering Index 80
Beam Angle 250
Voltage 220-240 V
Bulb Finish Nil
Placement Ceiling
Location Outdoor Area (Event Space)
Dimension of Room (m) L = 12, W = 6.75
Total Floor Area (m²) 81
Type of Lighting Fixture Ambient Lighting
Standard Illuminance Required (lux)
According to MS 1525
500
Height of Ceiling 4.2
Height of Working Level 1.0
Height of Luminaire 3.6
Mounting Height (h) 2.6
Room Index (K)
=
𝑳 × 𝑾
𝒉(𝑳 + 𝑾)
12 × 6.75
2.6(12 + 6.75)
= 1.66
Utilisation Factor (UF) 0.51
Maintenance Factor (MF) 0.8
Lumen Calculation
𝑵 =
𝑬 × 𝑨
𝑭 × 𝑼𝑭 × 𝑴𝑭
500 × 81
4500 × 0.51 × 0.8
= 22.06 = 23
Spacing (SHR = 3:2) 3/2 = Spacing/2.6
Spacing = 3/2 x 2.6
=3.9 metres
Number of Luminaires Across
(Width/Spacing)
6.75 / 3.9
= 1.73 = 2
Number of Luminaires Along (Total no.
of Luminaires/ No. of Luminaires
Across)
23 / 2
= 11.5 = 12
Conclusion
Based on the calculation, 23 lightings is needed in this space. The number of luminaires
across is two rows but 2 x 12 does not satisfy the uniformity requirement. But an array of 3 x
8 is acceptable.
1.2.3 Second Floor Office
According to MS 1525, the illuminance level of office is 500 lux. The main activities in the
café is clerical task and typing so the type of lighting used in this area will be the task
lighting.
Material Location Texture Surface
Type
Colour Reflectance
Value (%)
Carpet Floor Rough Absorptive Grey 20
Timber
Finishing
Wall Smooth Absorptive Brown 50
Plaster
Ceiling
Ceiling Matt Absorptive White 70
Product Philip T8 TL-D Standard Colours
Luminous Flux(lm) 1200 Lm per lamp / 3 lamps per luminaire
Colour Temperature, K 4,100 K
Colour Rendering Index 63Ra8
Beam Angle Nil
Voltage 59 V
Bulb Finish Frosted
Placement Ceiling
Location Office
Dimension of Room (m) L = 5.365, W = 3.6
Total Floor Area (m²) 19.31
Type of Lighting Fixture Task Lighting
Standard Illuminance Required (lux)
According to MS 1525
500
Height of Ceiling 4.2
Height of Working Level 1.0
Height of Luminaire 3.6
Mounting Height (h) 2.6
Room Index (K)
=
𝑳 × 𝑾
𝒉(𝑳 + 𝑾)
5.365 × 3.6
2.6(5.365 + 3.6)
= 0.83
Utilisation Factor (UF) 0.47
Maintenance Factor (MF) 0.8
Lumen Calculation
𝑵 =
𝑬 × 𝑨
𝑭 × 𝑼𝑭 × 𝑴𝑭
500 × 19.31
3600 × 0.47 × 0.8
= 7.13 = 8
Spacing (SHR = 3:2) 3/2 = Spacing/2.6
Spacing = 3/2 x 2.6
=3.9 metres
Number of Luminaires Across
(Width/Spacing)
3.6 / 3.9
= 0.92 = 1
Number of Luminaires Along (Total no.
of Luminaires/ No. of Luminaires
Across)
8 / 1
= 8
Conclusion
Based on the calculation, 8 lightings is needed in this space. The number of luminaires across
is one rows but 1 x 8 does not satisfy the uniformity requirement. But an array of 2 x 4 is
acceptable.
2.0 Acoustic Proposal
2.1 External Noise
Sound Intensity Level
SIL = 10𝑙𝑜𝑔10
𝐼
𝐼𝑜
Where,
SIL = Sound intensity (dB)
𝐼 = The intensity of the sound being measured (W/m²)
𝐼 𝑜 = The intensity of the threshold of hearing taken as 1 × 10−12
External Noise Source
a. Site A = 80dB
80 = 10𝑙𝑜𝑔10
𝐼1
1 × 10−12
8 = 𝑙𝑜𝑔10
𝐼1
1 × 10−12
Antilog 8 =
𝐼1
1 × 10−12
𝐼1 = 1 × 10−4
b. Side alley = 70 dB
70 = 10𝑙𝑜𝑔10
𝐼2
1 × 10−12
7 = 𝑙𝑜𝑔10
𝐼2
1 × 10−12
Antilog 7 =
𝐼2
1 × 10−12
𝐼2 = 1 × 10−5
c. Back alley = 67 dB
67 = 10𝑙𝑜𝑔10
𝐼3
1 × 10−12
6.7 = 𝑙𝑜𝑔10
𝐼3
1 × 10−12
Antilog 6.7 =
𝐼3
1 × 10−12
𝐼3 = 5.01 × 10−6
Combined intensity, 𝐼𝑡𝑜𝑡𝑎𝑙 = 𝐼1 + 𝐼2 + 𝐼3
= 1 × 10−4
+ 1 × 10−5
+ 5.01 × 10−6
= 1.15 × 10−4
SIL = 10𝑙𝑜𝑔10
𝐼𝑡𝑜𝑡𝑎𝑙
𝐼 𝑜
= 10𝑙𝑜𝑔10
1.15 × 10−4
1 × 10−12
= 8.06 × 10
= 80.6 dB
Acoustic Standard ANSI (2008) S12.2-2008
Type of Interior, Task or Activity dB
Small Auditorium (<500 seats) 35-39
Large Auditorium (>500 seats) 30-35
Open Plan Classroom 35
Meeting Room 35-44
Office (Small, Private) 40-48
Corridors 44-53
Courtrooms 39-44
Restaurants 48-52
Shops and Garage 57-67
Circulation Path 48-52
Open Plan Office Area 35-39
The sound intensity level for a restaurant is 57-67 dB similar to a café. Due to the location
near the street, the sound intensity level has exceeded the requirement which is 80 dB. This is
caused by traffic that is constant on site. To reduce the sound, vegetation can be planted in
between the interior of building and the street.
2.2 Sound Transmission Loss
Sound Transmission Loss
𝑇𝑜 =
(𝑇1 × 𝐴1) + (𝑇2 × 𝐴2)
𝐴1 + 𝐴2
Where,
𝑇𝑜 = overall transmission coefficient
𝑇1 = transmission of coefficient one component
𝐴1 = area of that component etc.
Sound Reduction Index
𝑆𝑅𝐼 = 10𝑙𝑜𝑔10
1
𝑇𝑜
R = Sound Reduction Index. Unit = decibel (dB)
T = Transmitted Sound Energy / Incident Sound Energy
2.2.1 Ground Floor Café Kitchen
Transmission Loss, TL
Site Noise 80 dB
Required Noise Control for Kitchen 52 dB
Required Transmission Coefficient 52 = 10𝑙𝑜𝑔10
1
𝑇
Antilog 5.2 =
1
𝑇
T = 6.31 × 10−6
Brick Wall
Timber Door
Wall type: a. Brick Wall
TL of brick wall = 40
𝑅 = 10𝑙𝑜𝑔10
1
𝑇𝑜
40 = 10𝑙𝑜𝑔10
1
𝑇𝑏𝑟𝑖𝑐𝑘
𝐴𝑛𝑡𝑖𝑙𝑜𝑔 4 =
1
𝑇𝑏𝑟𝑖𝑐𝑘
𝑇𝑏𝑟𝑖𝑐𝑘 =
1
𝐴𝑛𝑡𝑖𝑙𝑜𝑔 4
𝑇𝑏𝑟𝑖𝑐𝑘 = 1 × 10−4
Wall type: b. Timber Door
TL of timber door =14
𝑅 = 10𝑙𝑜𝑔10
1
𝑇𝑜
14 = 10𝑙𝑜𝑔10
1
𝑇𝑡𝑖𝑚𝑏𝑒𝑟
𝐴𝑛𝑡𝑖𝑙𝑜𝑔 1.4 =
1
𝑇𝑡𝑖𝑚𝑏𝑒𝑟
𝑇𝑡𝑖𝑚𝑏𝑒𝑟 =
1
𝐴𝑛𝑡𝑖𝑙𝑜𝑔 1.4
𝑇𝑡𝑖𝑚𝑏𝑒𝑟 = 3.98 × 10−2
Surface Material Surface Area, A
(m²)
Transmission
Coefficient, T
A x T
Brick wall 57.1 1 × 10−4
5.71 × 10−3
Timber door 1.8 3.98 × 10−2
7.16 × 10−2
𝑇𝑜 =
(𝑇1 × 𝐴1) + (𝑇2 × 𝐴2)
𝐴1 + 𝐴2
𝑇𝑜 =
5.71 × 10−3
+ 7.16 × 10−2
57.1 + 1.8
=
7.73 × 10−2
58.9
= 1.31 × 10−3
𝑆𝑅𝐼 𝑜𝑣𝑒𝑟𝑎𝑙𝑙 = 10𝑙𝑜𝑔10
1
𝑇𝑜
= 10𝑙𝑜𝑔10
1
1.31 × 10−3
= 2.88 × 10
28.8 dB
28.8 dB of noise will reduced during the sound transmission from the traffic on the street to
the kitchen area. The selection of material to reduce unnecessary noise transmission is
enough the isolate the space from adjacent noise source.
2.2.2 Second Floor Office
Transmission Loss, TL
Site Noise 67 dB
Required Noise Control for Office 48 dB
Required Transmission Coefficient 48 = 10𝑙𝑜𝑔10
1
𝑇
Antilog 4.8 =
1
𝑇
T = 1.58 × 10−5
Brick Wall
Timber Door
Wall type: a. Concrete Wall
TL of concrete wall = 46
𝑅 = 10𝑙𝑜𝑔10
1
𝑇𝑜
46 = 10𝑙𝑜𝑔10
1
𝑇𝑐𝑜𝑛𝑐𝑟𝑒𝑡𝑒
𝐴𝑛𝑡𝑖𝑙𝑜𝑔 4.6 =
1
𝑇𝑐𝑜𝑛𝑐𝑟𝑒𝑡𝑒
𝑇𝑐𝑜𝑛𝑐𝑟𝑒𝑡𝑒 =
1
𝐴𝑛𝑡𝑖𝑙𝑜𝑔 4.6
𝑇𝑐𝑜𝑛𝑐𝑟𝑒𝑡𝑒 = 2.51 × 10−5
Wall type: b. Timber Door
TL of timber door =14
𝑅 = 10𝑙𝑜𝑔10
1
𝑇𝑜
14 = 10𝑙𝑜𝑔10
1
𝑇𝑡𝑖𝑚𝑏𝑒𝑟
𝐴𝑛𝑡𝑖𝑙𝑜𝑔 1.4 =
1
𝑇𝑡𝑖𝑚𝑏𝑒𝑟
𝑇𝑡𝑖𝑚𝑏𝑒𝑟 =
1
𝐴𝑛𝑡𝑖𝑙𝑜𝑔 1.4
𝑇𝑡𝑖𝑚𝑏𝑒𝑟 = 3.98 × 10−2
Surface Material Surface Area, A
(m²)
Transmission
Coefficient, T
A x T
Concrete wall 66.2 2.51 × 10−5 1.66 × 10−3
Timber door 1.8 3.98 × 10−2
7.16 × 10−2
𝑇𝑜 =
(𝑇1 × 𝐴1) + (𝑇2 × 𝐴2)
𝐴1 + 𝐴2
𝑇𝑜 =
1.66 × 10−3
+ 7.16 × 10−2
66.2 + 1.8
=
7.33 × 10−2
68
= 1.08 × 10−3
𝑆𝑅𝐼 𝑜𝑣𝑒𝑟𝑎𝑙𝑙 = 10𝑙𝑜𝑔10
1
𝑇𝑜
= 10𝑙𝑜𝑔10
1
1.08 × 10−3
= 2.97 × 10
29.7 dB
29.7 dB of noise will reduced during the sound transmission from the activities in the back
alley to the kitchen area. The selection of material to reduce unnecessary noise transmission
is enough the isolate the space from adjacent noise source.
2.3 Reverberation Time
Reverberation time is calculated based on Material Absorption Coefficient at 2000 Hz.
Reverberation Time
𝑡 =
0.16𝑉
𝐴
Where,
t = reverberation time (s)
V = volume of the room (m³)
A = total absorption of room surfaces (m² sabins)
= ∑(Area × Absorption Coefficient)
2.3.1 Second Floor Office
Room Height = 4.2 m
Standard Reverberation Time for Office = 1s
Peak Hour Capacity = 3 people
Volume of Office = 81.1 m³
Materials (Wall) Area, A (𝒎 𝟐
) Absorption
Coefficient, S
Sound Absorption
(S x A)
Plastered brick wall
with paint
66.2m² 0.02 1.32
Materials (Ceiling
and flooring)
Area, A (𝒎 𝟐
) Absorption
Coefficient, S
Sound Absorption
(S x A)
Carpet, thin, over thin
felt on concrete floor
19.31m² 0.3 5.79
Gypsum plaster tiles,
17% perforated,
22mm
19.31m² 0.65 8.58
Materials
(Furniture)
Area, A (𝒎 𝟐
) Absorption
Coefficient, S
Sound Absorption
(S x A)
Adult office furniture
per desk
3 0.60 1.80
Solid timber door 1.8 m² 0.10 0.18
Total Sound Absorption 17.7
Reverberation time
𝑡 =
0.16𝑉
𝐴
=
0.16 x 81.1
17.7
= 0.734s
The reverberation time for the office during peak hour is 0.734s which has met the standard
reverberation time (1s) according to the Acoustic Standard ANSI (2008). The selection of
material is suitable for the office area for a comfortable working environment.
2.3.2 Ground Floor Café Kitchen
Room Height = 4.2 m
Standard Reverberation Time for Kitchen = 1.2 – 1.5s
Peak Hour Capacity = 3 people
Volume of Kitchen = 55.6 m³
Materials (Wall) Area, A (𝒎 𝟐
) Absorption
Coefficient, S
Sound Absorption
(S x A)
Standard brickwork 58.8m² 0.05 2.94
Ceramic tiles with
smooth surface
58.8 m² 0.02 1.18
Materials (Ceiling
and flooring)
Area, A (𝒎 𝟐
) Absorption
Coefficient, S
Sound Absorption
(S x A)
Floor tiles 13.2m² 0.05 0.66
Gypsum plaster tiles,
17% perforated,
22mm
13.2m² 0.65 8.58
Materials
(Furniture)
Area, A (𝒎 𝟐
) Absorption
Coefficient, S
Sound Absorption
(S x A)
Aluminium working
table
4.5 0.45 2.03
Solid timber door 1.8 m² 0.10 0.18
Occupants Area, A (𝒎 𝟐
) Absorption
Coefficient, S
Sound Absorption
(S x A)
People 3 0.5 0.75
Total Sound Absorption 16.3
Reverberation time
𝑡 =
0.16𝑉
𝐴
=
0.16 x 55.6
16.3
= 0.546s
The reverberation time for the kitchen during peak hour is 0.546s which has met the standard
reverberation time (1.2 – 1.5s) according to the Acoustic Standard ANSI (2008). The
selection of material is suitable for the kitchen area for a comfortable working environment.
3.0 Appendix
MS 1525 Lighting Standard
Light Reflectance Table
Utilization Factor Table
B science project 2
B science project 2
B science project 2
B science project 2
B science project 2
Reference
ABSORPTION COEFFICIENTS. Retrieved 4 July 2015, from
http://www.acoustic.ua/st/web_absorption_data_eng.pdf
CMS Danskin Acoustics,. (2015). Absorption & Reverberation - CMS Danskin
Acoustics. Retrieved 4 July 2015, from http://www.cmsdanskin.co.uk/general-
construction/absorption-reverberation/
Khan, A. (2015). Acoustics: Room Criteria (1st ed.). Retrieved from
http://web.iit.edu/sites/web/files/departments/academic-
affairs/Academic%20Resource%20Center/pdfs/Workshop_-_Acoustic.pdf
Lightcalc.com,. LightCalc Lighting Design Software Glossary. Retrieved 4 July 2015,
from http://www.lightcalc.com/lighting_info/glossary/glossary.html

More Related Content

PDF
Building Science 2
PDF
Preston bsci proj 2
PDF
BUILDING SCIENCE 2 PROJECT 2 REPORT
DOCX
Final report
PDF
Final report
DOCX
Final report project 2 GYN integration
PDF
Project 2
DOCX
Building science 2
Building Science 2
Preston bsci proj 2
BUILDING SCIENCE 2 PROJECT 2 REPORT
Final report
Final report
Final report project 2 GYN integration
Project 2
Building science 2

What's hot (20)

DOCX
Building science project 2
PDF
Building Science 2 Project 2 Integration project
PDF
Building science ii project 2 (1)
DOCX
Final report
DOCX
Building Science 2 (Project 2)
PDF
Project 2 Building Science
PDF
Building Science 2 Report
PDF
Bb science project 2
PDF
abcde
DOCX
B science II Report
PDF
Building Science 2 Final Project
PDF
A4 report
PDF
Lighting proposal
PDF
Bscience ii
PPTX
Building Science II
PDF
Bscience
PDF
Building Science Project 2
PDF
Building science 2 final
PPTX
Building Science 2
DOCX
CALCULATION
Building science project 2
Building Science 2 Project 2 Integration project
Building science ii project 2 (1)
Final report
Building Science 2 (Project 2)
Project 2 Building Science
Building Science 2 Report
Bb science project 2
abcde
B science II Report
Building Science 2 Final Project
A4 report
Lighting proposal
Bscience ii
Building Science II
Bscience
Building Science Project 2
Building science 2 final
Building Science 2
CALCULATION
Ad

Viewers also liked (12)

PDF
INTERIOR LIGHTING DESIGN A STUDENT'S GUIDE
PPT
J321 multimedia news sites
PPS
World Largest Biggest Highest
PDF
Building Services 2
PPTX
Textile structures for noise reduction
PDF
Building Services Project 1 - Summit Mall
PDF
Building Services Report Sunway Medical Centre
PDF
Final building service (assignment)
PPTX
Building Services- Ventilation
PDF
Acoustic, Sound and Noise Control
PDF
How to measure illumination
PPSX
Building services
INTERIOR LIGHTING DESIGN A STUDENT'S GUIDE
J321 multimedia news sites
World Largest Biggest Highest
Building Services 2
Textile structures for noise reduction
Building Services Project 1 - Summit Mall
Building Services Report Sunway Medical Centre
Final building service (assignment)
Building Services- Ventilation
Acoustic, Sound and Noise Control
How to measure illumination
Building services
Ad

Similar to B science project 2 (20)

DOCX
Day lighting 2
PDF
Light Analysis of Building Science II
PDF
Bscience report
PDF
BSCIENCE_REPORT_yihui-a4.pdf
DOCX
Report Building Science 2 P2
PDF
B. science
DOCX
Final building science report
PDF
Building Science Project 2 Report
PDF
INTEGRATION TO C.LIBRARY
PDF
Building science 2 project 2 light integration
PDF
Project 2: Integration Project
PDF
B science Project 2
PDF
bscience integration A4 report
PDF
Bscience project 2
PDF
Bscience Final report
PDF
Bscience final 3
PDF
Lighting Analysis: Integration project (Community library)
DOCX
Report
DOCX
Building Science II: Lighting Integration Report
PDF
Building Science II : Project 1
Day lighting 2
Light Analysis of Building Science II
Bscience report
BSCIENCE_REPORT_yihui-a4.pdf
Report Building Science 2 P2
B. science
Final building science report
Building Science Project 2 Report
INTEGRATION TO C.LIBRARY
Building science 2 project 2 light integration
Project 2: Integration Project
B science Project 2
bscience integration A4 report
Bscience project 2
Bscience Final report
Bscience final 3
Lighting Analysis: Integration project (Community library)
Report
Building Science II: Lighting Integration Report
Building Science II : Project 1

More from Elaine Bong (20)

PPTX
Bechtlerconstruction2 140718020052-phpapp02
PDF
Merged document
PDF
Finalbtech 1
PDF
A2 final boards
PDF
bscience Board
PDF
B.science report 1.2
PDF
precedent
PDF
Both (1)
PPTX
Synopsis 3
PPTX
Towards a new architecture
PPTX
Synopsis 4
PPTX
Preschool proposal
DOCX
Contradictory levels the double functioning element final
PDF
Elaine bong 0310432 (complexity and contradiction in architecture)
DOCX
3 theories complexity and contradiction in architecture
PDF
Structure report
PDF
Bridge report
PDF
Building service board
PDF
Bservices report
PDF
Completed aa photobook 2.0
Bechtlerconstruction2 140718020052-phpapp02
Merged document
Finalbtech 1
A2 final boards
bscience Board
B.science report 1.2
precedent
Both (1)
Synopsis 3
Towards a new architecture
Synopsis 4
Preschool proposal
Contradictory levels the double functioning element final
Elaine bong 0310432 (complexity and contradiction in architecture)
3 theories complexity and contradiction in architecture
Structure report
Bridge report
Building service board
Bservices report
Completed aa photobook 2.0

Recently uploaded (20)

PDF
Chapter 2 Heredity, Prenatal Development, and Birth.pdf
PPTX
Renaissance Architecture: A Journey from Faith to Humanism
PPTX
GDM (1) (1).pptx small presentation for students
PDF
Abdominal Access Techniques with Prof. Dr. R K Mishra
PPTX
Institutional Correction lecture only . . .
PDF
01-Introduction-to-Information-Management.pdf
PDF
Physiotherapy_for_Respiratory_and_Cardiac_Problems WEBBER.pdf
PDF
Classroom Observation Tools for Teachers
PDF
TR - Agricultural Crops Production NC III.pdf
PDF
Sports Quiz easy sports quiz sports quiz
PPTX
Microbial diseases, their pathogenesis and prophylaxis
PDF
Microbial disease of the cardiovascular and lymphatic systems
PPTX
IMMUNITY IMMUNITY refers to protection against infection, and the immune syst...
PDF
2.FourierTransform-ShortQuestionswithAnswers.pdf
PPTX
PPT- ENG7_QUARTER1_LESSON1_WEEK1. IMAGERY -DESCRIPTIONS pptx.pptx
PDF
Supply Chain Operations Speaking Notes -ICLT Program
PDF
Pre independence Education in Inndia.pdf
PPTX
PPH.pptx obstetrics and gynecology in nursing
PDF
Computing-Curriculum for Schools in Ghana
PDF
FourierSeries-QuestionsWithAnswers(Part-A).pdf
Chapter 2 Heredity, Prenatal Development, and Birth.pdf
Renaissance Architecture: A Journey from Faith to Humanism
GDM (1) (1).pptx small presentation for students
Abdominal Access Techniques with Prof. Dr. R K Mishra
Institutional Correction lecture only . . .
01-Introduction-to-Information-Management.pdf
Physiotherapy_for_Respiratory_and_Cardiac_Problems WEBBER.pdf
Classroom Observation Tools for Teachers
TR - Agricultural Crops Production NC III.pdf
Sports Quiz easy sports quiz sports quiz
Microbial diseases, their pathogenesis and prophylaxis
Microbial disease of the cardiovascular and lymphatic systems
IMMUNITY IMMUNITY refers to protection against infection, and the immune syst...
2.FourierTransform-ShortQuestionswithAnswers.pdf
PPT- ENG7_QUARTER1_LESSON1_WEEK1. IMAGERY -DESCRIPTIONS pptx.pptx
Supply Chain Operations Speaking Notes -ICLT Program
Pre independence Education in Inndia.pdf
PPH.pptx obstetrics and gynecology in nursing
Computing-Curriculum for Schools in Ghana
FourierSeries-QuestionsWithAnswers(Part-A).pdf

B science project 2

  • 1. Building Science 2 (ARC 3413) Project 2: Lighting & Acoustic Analysis Integration with Design Studio 5 Contemporary Food Market Elaine Bong Poh Hui 0310432 Tutor: Mr Sanjay
  • 2. Content 1.0 Lighting Proposal 1.1 Natural Daylighting 1.1.1 Space 1 – Ground Floor Café 1.1.2 Space 2 – First Floor Outdoor Area 1.1.3 Space 3 – Second Floor Seating Area 1.2 Artificial Lighting 1.2.1 Space 1 – Ground Floor Café 1.2.2 Space 2 – First Floor Outdoor Area 1.2.3 Space 3 – Second Floor Office 2.0 Acoustic Proposal 2.1 External Noise Sound Intensity Level 2.2 Sound Transmission Loss 2.2.1 Space 1 – Ground Floor Café Kitchen 2.2.2 Space 2 – Second Floor Office 2.3 Reverberation Time 2.3.1 Space 1 – Second Floor Office 2.3.2 Space 2 – Ground Floor Café Kitchen 3.0 Appendix & References
  • 3. 1.1 Natural Daylighting Daylight Factor 𝐷𝐹 = 𝐸𝑖𝑛𝑑𝑜𝑜𝑟 𝐸 𝑜𝑢𝑡𝑑𝑜𝑜𝑟 𝑥 100% Where, DF = Daylight Factor (%) 𝐸𝑖𝑛𝑑𝑜𝑜𝑟 = Horizontal illumination of reference point indoor (Lux) 𝐸 𝑜𝑢𝑡𝑑𝑜𝑜𝑟 = Horizontal illumination of unobstructed point outdoor in an overcast sky condition (Lux) The table below shows the standards of daylight factor as set by Malaysian Standards. Zone Daylight Factor (%) Distribution Very bright > 6 Very large with thermal and glare problem Bright 3 - 6 Good Average 1 - 3 Fair Dark 0 - 1 Poor
  • 4. 1.1.1 Space 1 – Ground Floor Café The café is located on the ground floor is very near to the street as the attract people to go inside and dine in. The space is exposed to sunlight due to the façade which is main of glass and is not fully covered. The daylight shining into the space is sufficient and could have save energy from artificial lighting. Daylight Factor, DF Total Floor Area = 120.38 m² Area of Openings = 75.6 m² Daylight Factor = 75.6 120.38 𝑥 100% 𝑥 0.1 = 62.8 x 0.1 = 6.28% Natural Illumination Calculation Daylight Factor = 𝐸𝑖𝑛𝑑𝑜𝑜𝑟 𝐸 𝑜𝑢𝑡𝑑𝑜𝑜𝑟 𝑥 100% 6.28% = 𝐸𝑖𝑛𝑑𝑜𝑜𝑟 32000 𝑥 100% 𝐸𝑖𝑛𝑑𝑜𝑜𝑟 = 6.28 / 100 x 32000 = 20009.6 Lux Conclusion The space has a daylight factor of 6.28% which exceeded the standards set by Malaysia Standards and there will be a slight thermal and glare problem. According to MS 1525, the café should have a standard illuminance level of 200 lux, which the space has already exceed by having an illuminance level of 2009.6 Lux. The uncovered is due to the idea of allowing public to be able to see what happening in the space. A sunscreen is added to the façade to reduce the sun glare problem.
  • 5. 1.1.2 Space 2 – First Floor Outdoor Area The outdoor area on the second floor is for event to take place. This event space is located on a high floor due to the level of the monorail track. By having the happening space on the upper floor enable passer-by to view in the building and getting hold of what is happening. Daylight Factor, DF Total Floor Area = 81 m² Area of Openings = 61.32 m² Daylight Factor = 61.32 81 𝑥 100% 𝑥 0.1 = 75.7 x 0.1 = 7.57% Natural Illumination Calculation Daylight Factor = 𝐸𝑖𝑛𝑑𝑜𝑜𝑟 𝐸 𝑜𝑢𝑡𝑑𝑜𝑜𝑟 𝑥 100% 7.57% = 𝐸𝑖𝑛𝑑𝑜𝑜𝑟 32000 𝑥 100% 𝐸𝑖𝑛𝑑𝑜𝑜𝑟 = 6.28 / 100 x 32000 = 2422.4 Lux Conclusion The area has a daylight factor of 7.57% which the zone is very bright with thermal and glare problem. The standard illuminance level for this area is 500 Lux. The calculation for natural illumination for indoor is 2422.4 lux. The concept of being able to view from outside causes the resulting illuminance to be higher.
  • 6. 1.1.3 Space 3 – Second Floor Seating Area The seating area on second floor is exposed to sunlight since it is nearer to the façade on the upper floor. The space is partly screened by aluminium strips preventing overheat. By introducing daylight into the space, les energy can be used on the artificial lighting. Daylight Factor, DF Total Floor Area = 143.4 m² Area of Openings = 87.465 m² Daylight Factor = 87.465 143.4 𝑥 100% 𝑥 0.1 = 61 x 0.1 = 6.1% Natural Illumination Calculation Daylight Factor = 𝐸𝑖𝑛𝑑𝑜𝑜𝑟 𝐸 𝑜𝑢𝑡𝑑𝑜𝑜𝑟 𝑥 100% 6.1% = 𝐸𝑖𝑛𝑑𝑜𝑜𝑟 32000 𝑥 100% 𝐸𝑖𝑛𝑑𝑜𝑜𝑟 = 6.1 / 100 x 32000 = 1952 Lux Conclusion This space has a daylight factor of 6.1% which slightly exceeded the standard illuminance level causing the area to be too bright and has thermal and glare problem. The natural illuminance for the interior is 1952 which is more than the standard set by the government, 200. The problem is reduced by having sunscreen in front of the façade to block some of the daylight.
  • 7. 1.2 Artificial Lighting Analysis 1.2.1 Ground Floor Café According to MS 1525, the illuminance level of café is 200 lux. The main activities in the café is dining and serving so the type of lighting used in this area will be the ambient lighting. Material Location Texture Surface Type Colour Reflectance Value (%) Concrete Floor Matt Absorptive Grey 20 Timber Finishing Wall Smooth Absorptive Brown 50 Plaster Ceiling Ceiling Matt Absorptive White 70 Product Philip Master LED Spotlight PAR Luminous Flux(lm) 900 Lm per lamp / 5 lamps per luminaire Colour Temperature, K 2,700 K Colour Rendering Index 80 Beam Angle 250 Voltage 220-240 V Bulb Finish Nil Placement Ceiling
  • 8. Location Café Dimension of Room (m) L = 11.4, W = 10.56 Total Floor Area (m²) 120.38 Type of Lighting Fixture Ambient Lighting Standard Illuminance Required (lux) According to MS 1525 200 Height of Ceiling 4.2 Height of Working Level 1.0 Height of Luminaire 3.2 Mounting Height (h) 2.2 Room Index (K) = 𝑳 × 𝑾 𝒉(𝑳 + 𝑾) 11.4 × 10.56 2.2(11.4 + 10.56) = 2.49 Utilisation Factor (UF) 0.54 Maintenance Factor (MF) 0.8 Lumen Calculation 𝑵 = 𝑬 × 𝑨 𝑭 × 𝑼𝑭 × 𝑴𝑭 200 × 120.38 4500 × 0.54 × 0.8 = 12.38 = 13 Spacing (SHR = 3:2) 3/2 = Spacing/2.2 Spacing = 3/2 x 2.2 =3.3 metres Number of Luminaires Across (Width/Spacing) 10.56 / 3.3 = 3.3 = 4 Number of Luminaires Along (Total no. of Luminaires/ No. of Luminaires Across) 13 / 4 = 3.25 = 4
  • 9. Conclusion The café operates during evening and night time. The ambient lighting can help to create a comfortable dining experience by achieving the standard illuminance and attract more public to visit the place.
  • 10. 1.2.2 First Floor Outdoor Area (Event Place) According to MS 1525, the illuminance level of outdoor area is 500 lux. There will only activity happening here when there is an event. Therefore, the type of lighting used in this area will be the ambient lighting. Material Location Texture Surface Type Colour Reflectance Value (%) Concrete Floor Matt Absorptive Dark Grey 20 Timber Finishing Wall Smooth Absorptive Brown 20 Plaster Ceiling Ceiling Matt Absorptive White 70 Product Philip Master LED Spotlight PAR Luminous Flux(lm) 900 Lm per lamp / 5 lamps per luminaire Colour Temperature, K 2,700 K Colour Rendering Index 80 Beam Angle 250 Voltage 220-240 V Bulb Finish Nil Placement Ceiling
  • 11. Location Outdoor Area (Event Space) Dimension of Room (m) L = 12, W = 6.75 Total Floor Area (m²) 81 Type of Lighting Fixture Ambient Lighting Standard Illuminance Required (lux) According to MS 1525 500 Height of Ceiling 4.2 Height of Working Level 1.0 Height of Luminaire 3.6 Mounting Height (h) 2.6 Room Index (K) = 𝑳 × 𝑾 𝒉(𝑳 + 𝑾) 12 × 6.75 2.6(12 + 6.75) = 1.66 Utilisation Factor (UF) 0.51 Maintenance Factor (MF) 0.8 Lumen Calculation 𝑵 = 𝑬 × 𝑨 𝑭 × 𝑼𝑭 × 𝑴𝑭 500 × 81 4500 × 0.51 × 0.8 = 22.06 = 23 Spacing (SHR = 3:2) 3/2 = Spacing/2.6 Spacing = 3/2 x 2.6 =3.9 metres Number of Luminaires Across (Width/Spacing) 6.75 / 3.9 = 1.73 = 2 Number of Luminaires Along (Total no. of Luminaires/ No. of Luminaires Across) 23 / 2 = 11.5 = 12
  • 12. Conclusion Based on the calculation, 23 lightings is needed in this space. The number of luminaires across is two rows but 2 x 12 does not satisfy the uniformity requirement. But an array of 3 x 8 is acceptable.
  • 13. 1.2.3 Second Floor Office According to MS 1525, the illuminance level of office is 500 lux. The main activities in the café is clerical task and typing so the type of lighting used in this area will be the task lighting. Material Location Texture Surface Type Colour Reflectance Value (%) Carpet Floor Rough Absorptive Grey 20 Timber Finishing Wall Smooth Absorptive Brown 50 Plaster Ceiling Ceiling Matt Absorptive White 70 Product Philip T8 TL-D Standard Colours Luminous Flux(lm) 1200 Lm per lamp / 3 lamps per luminaire Colour Temperature, K 4,100 K Colour Rendering Index 63Ra8 Beam Angle Nil Voltage 59 V Bulb Finish Frosted Placement Ceiling
  • 14. Location Office Dimension of Room (m) L = 5.365, W = 3.6 Total Floor Area (m²) 19.31 Type of Lighting Fixture Task Lighting Standard Illuminance Required (lux) According to MS 1525 500 Height of Ceiling 4.2 Height of Working Level 1.0 Height of Luminaire 3.6 Mounting Height (h) 2.6 Room Index (K) = 𝑳 × 𝑾 𝒉(𝑳 + 𝑾) 5.365 × 3.6 2.6(5.365 + 3.6) = 0.83 Utilisation Factor (UF) 0.47 Maintenance Factor (MF) 0.8 Lumen Calculation 𝑵 = 𝑬 × 𝑨 𝑭 × 𝑼𝑭 × 𝑴𝑭 500 × 19.31 3600 × 0.47 × 0.8 = 7.13 = 8 Spacing (SHR = 3:2) 3/2 = Spacing/2.6 Spacing = 3/2 x 2.6 =3.9 metres Number of Luminaires Across (Width/Spacing) 3.6 / 3.9 = 0.92 = 1 Number of Luminaires Along (Total no. of Luminaires/ No. of Luminaires Across) 8 / 1 = 8
  • 15. Conclusion Based on the calculation, 8 lightings is needed in this space. The number of luminaires across is one rows but 1 x 8 does not satisfy the uniformity requirement. But an array of 2 x 4 is acceptable.
  • 16. 2.0 Acoustic Proposal 2.1 External Noise Sound Intensity Level SIL = 10𝑙𝑜𝑔10 𝐼 𝐼𝑜 Where, SIL = Sound intensity (dB) 𝐼 = The intensity of the sound being measured (W/m²) 𝐼 𝑜 = The intensity of the threshold of hearing taken as 1 × 10−12 External Noise Source a. Site A = 80dB 80 = 10𝑙𝑜𝑔10 𝐼1 1 × 10−12 8 = 𝑙𝑜𝑔10 𝐼1 1 × 10−12 Antilog 8 = 𝐼1 1 × 10−12 𝐼1 = 1 × 10−4 b. Side alley = 70 dB 70 = 10𝑙𝑜𝑔10 𝐼2 1 × 10−12 7 = 𝑙𝑜𝑔10 𝐼2 1 × 10−12 Antilog 7 = 𝐼2 1 × 10−12 𝐼2 = 1 × 10−5 c. Back alley = 67 dB
  • 17. 67 = 10𝑙𝑜𝑔10 𝐼3 1 × 10−12 6.7 = 𝑙𝑜𝑔10 𝐼3 1 × 10−12 Antilog 6.7 = 𝐼3 1 × 10−12 𝐼3 = 5.01 × 10−6 Combined intensity, 𝐼𝑡𝑜𝑡𝑎𝑙 = 𝐼1 + 𝐼2 + 𝐼3 = 1 × 10−4 + 1 × 10−5 + 5.01 × 10−6 = 1.15 × 10−4 SIL = 10𝑙𝑜𝑔10 𝐼𝑡𝑜𝑡𝑎𝑙 𝐼 𝑜 = 10𝑙𝑜𝑔10 1.15 × 10−4 1 × 10−12 = 8.06 × 10 = 80.6 dB Acoustic Standard ANSI (2008) S12.2-2008 Type of Interior, Task or Activity dB Small Auditorium (<500 seats) 35-39 Large Auditorium (>500 seats) 30-35 Open Plan Classroom 35 Meeting Room 35-44 Office (Small, Private) 40-48 Corridors 44-53 Courtrooms 39-44 Restaurants 48-52 Shops and Garage 57-67 Circulation Path 48-52 Open Plan Office Area 35-39
  • 18. The sound intensity level for a restaurant is 57-67 dB similar to a café. Due to the location near the street, the sound intensity level has exceeded the requirement which is 80 dB. This is caused by traffic that is constant on site. To reduce the sound, vegetation can be planted in between the interior of building and the street. 2.2 Sound Transmission Loss Sound Transmission Loss 𝑇𝑜 = (𝑇1 × 𝐴1) + (𝑇2 × 𝐴2) 𝐴1 + 𝐴2 Where, 𝑇𝑜 = overall transmission coefficient 𝑇1 = transmission of coefficient one component 𝐴1 = area of that component etc. Sound Reduction Index 𝑆𝑅𝐼 = 10𝑙𝑜𝑔10 1 𝑇𝑜 R = Sound Reduction Index. Unit = decibel (dB) T = Transmitted Sound Energy / Incident Sound Energy
  • 19. 2.2.1 Ground Floor Café Kitchen Transmission Loss, TL Site Noise 80 dB Required Noise Control for Kitchen 52 dB Required Transmission Coefficient 52 = 10𝑙𝑜𝑔10 1 𝑇 Antilog 5.2 = 1 𝑇 T = 6.31 × 10−6 Brick Wall Timber Door
  • 20. Wall type: a. Brick Wall TL of brick wall = 40 𝑅 = 10𝑙𝑜𝑔10 1 𝑇𝑜 40 = 10𝑙𝑜𝑔10 1 𝑇𝑏𝑟𝑖𝑐𝑘 𝐴𝑛𝑡𝑖𝑙𝑜𝑔 4 = 1 𝑇𝑏𝑟𝑖𝑐𝑘 𝑇𝑏𝑟𝑖𝑐𝑘 = 1 𝐴𝑛𝑡𝑖𝑙𝑜𝑔 4 𝑇𝑏𝑟𝑖𝑐𝑘 = 1 × 10−4 Wall type: b. Timber Door TL of timber door =14 𝑅 = 10𝑙𝑜𝑔10 1 𝑇𝑜 14 = 10𝑙𝑜𝑔10 1 𝑇𝑡𝑖𝑚𝑏𝑒𝑟 𝐴𝑛𝑡𝑖𝑙𝑜𝑔 1.4 = 1 𝑇𝑡𝑖𝑚𝑏𝑒𝑟 𝑇𝑡𝑖𝑚𝑏𝑒𝑟 = 1 𝐴𝑛𝑡𝑖𝑙𝑜𝑔 1.4 𝑇𝑡𝑖𝑚𝑏𝑒𝑟 = 3.98 × 10−2 Surface Material Surface Area, A (m²) Transmission Coefficient, T A x T Brick wall 57.1 1 × 10−4 5.71 × 10−3 Timber door 1.8 3.98 × 10−2 7.16 × 10−2
  • 21. 𝑇𝑜 = (𝑇1 × 𝐴1) + (𝑇2 × 𝐴2) 𝐴1 + 𝐴2 𝑇𝑜 = 5.71 × 10−3 + 7.16 × 10−2 57.1 + 1.8 = 7.73 × 10−2 58.9 = 1.31 × 10−3 𝑆𝑅𝐼 𝑜𝑣𝑒𝑟𝑎𝑙𝑙 = 10𝑙𝑜𝑔10 1 𝑇𝑜 = 10𝑙𝑜𝑔10 1 1.31 × 10−3 = 2.88 × 10 28.8 dB 28.8 dB of noise will reduced during the sound transmission from the traffic on the street to the kitchen area. The selection of material to reduce unnecessary noise transmission is enough the isolate the space from adjacent noise source.
  • 22. 2.2.2 Second Floor Office Transmission Loss, TL Site Noise 67 dB Required Noise Control for Office 48 dB Required Transmission Coefficient 48 = 10𝑙𝑜𝑔10 1 𝑇 Antilog 4.8 = 1 𝑇 T = 1.58 × 10−5 Brick Wall Timber Door
  • 23. Wall type: a. Concrete Wall TL of concrete wall = 46 𝑅 = 10𝑙𝑜𝑔10 1 𝑇𝑜 46 = 10𝑙𝑜𝑔10 1 𝑇𝑐𝑜𝑛𝑐𝑟𝑒𝑡𝑒 𝐴𝑛𝑡𝑖𝑙𝑜𝑔 4.6 = 1 𝑇𝑐𝑜𝑛𝑐𝑟𝑒𝑡𝑒 𝑇𝑐𝑜𝑛𝑐𝑟𝑒𝑡𝑒 = 1 𝐴𝑛𝑡𝑖𝑙𝑜𝑔 4.6 𝑇𝑐𝑜𝑛𝑐𝑟𝑒𝑡𝑒 = 2.51 × 10−5 Wall type: b. Timber Door TL of timber door =14 𝑅 = 10𝑙𝑜𝑔10 1 𝑇𝑜 14 = 10𝑙𝑜𝑔10 1 𝑇𝑡𝑖𝑚𝑏𝑒𝑟 𝐴𝑛𝑡𝑖𝑙𝑜𝑔 1.4 = 1 𝑇𝑡𝑖𝑚𝑏𝑒𝑟 𝑇𝑡𝑖𝑚𝑏𝑒𝑟 = 1 𝐴𝑛𝑡𝑖𝑙𝑜𝑔 1.4 𝑇𝑡𝑖𝑚𝑏𝑒𝑟 = 3.98 × 10−2 Surface Material Surface Area, A (m²) Transmission Coefficient, T A x T Concrete wall 66.2 2.51 × 10−5 1.66 × 10−3 Timber door 1.8 3.98 × 10−2 7.16 × 10−2
  • 24. 𝑇𝑜 = (𝑇1 × 𝐴1) + (𝑇2 × 𝐴2) 𝐴1 + 𝐴2 𝑇𝑜 = 1.66 × 10−3 + 7.16 × 10−2 66.2 + 1.8 = 7.33 × 10−2 68 = 1.08 × 10−3 𝑆𝑅𝐼 𝑜𝑣𝑒𝑟𝑎𝑙𝑙 = 10𝑙𝑜𝑔10 1 𝑇𝑜 = 10𝑙𝑜𝑔10 1 1.08 × 10−3 = 2.97 × 10 29.7 dB 29.7 dB of noise will reduced during the sound transmission from the activities in the back alley to the kitchen area. The selection of material to reduce unnecessary noise transmission is enough the isolate the space from adjacent noise source.
  • 25. 2.3 Reverberation Time Reverberation time is calculated based on Material Absorption Coefficient at 2000 Hz. Reverberation Time 𝑡 = 0.16𝑉 𝐴 Where, t = reverberation time (s) V = volume of the room (m³) A = total absorption of room surfaces (m² sabins) = ∑(Area × Absorption Coefficient) 2.3.1 Second Floor Office
  • 26. Room Height = 4.2 m Standard Reverberation Time for Office = 1s Peak Hour Capacity = 3 people Volume of Office = 81.1 m³ Materials (Wall) Area, A (𝒎 𝟐 ) Absorption Coefficient, S Sound Absorption (S x A) Plastered brick wall with paint 66.2m² 0.02 1.32 Materials (Ceiling and flooring) Area, A (𝒎 𝟐 ) Absorption Coefficient, S Sound Absorption (S x A) Carpet, thin, over thin felt on concrete floor 19.31m² 0.3 5.79 Gypsum plaster tiles, 17% perforated, 22mm 19.31m² 0.65 8.58 Materials (Furniture) Area, A (𝒎 𝟐 ) Absorption Coefficient, S Sound Absorption (S x A) Adult office furniture per desk 3 0.60 1.80 Solid timber door 1.8 m² 0.10 0.18 Total Sound Absorption 17.7 Reverberation time 𝑡 = 0.16𝑉 𝐴 = 0.16 x 81.1 17.7 = 0.734s The reverberation time for the office during peak hour is 0.734s which has met the standard reverberation time (1s) according to the Acoustic Standard ANSI (2008). The selection of material is suitable for the office area for a comfortable working environment.
  • 27. 2.3.2 Ground Floor Café Kitchen Room Height = 4.2 m Standard Reverberation Time for Kitchen = 1.2 – 1.5s Peak Hour Capacity = 3 people Volume of Kitchen = 55.6 m³ Materials (Wall) Area, A (𝒎 𝟐 ) Absorption Coefficient, S Sound Absorption (S x A) Standard brickwork 58.8m² 0.05 2.94 Ceramic tiles with smooth surface 58.8 m² 0.02 1.18 Materials (Ceiling and flooring) Area, A (𝒎 𝟐 ) Absorption Coefficient, S Sound Absorption (S x A) Floor tiles 13.2m² 0.05 0.66 Gypsum plaster tiles, 17% perforated, 22mm 13.2m² 0.65 8.58 Materials (Furniture) Area, A (𝒎 𝟐 ) Absorption Coefficient, S Sound Absorption (S x A) Aluminium working table 4.5 0.45 2.03 Solid timber door 1.8 m² 0.10 0.18 Occupants Area, A (𝒎 𝟐 ) Absorption Coefficient, S Sound Absorption (S x A) People 3 0.5 0.75 Total Sound Absorption 16.3
  • 28. Reverberation time 𝑡 = 0.16𝑉 𝐴 = 0.16 x 55.6 16.3 = 0.546s The reverberation time for the kitchen during peak hour is 0.546s which has met the standard reverberation time (1.2 – 1.5s) according to the Acoustic Standard ANSI (2008). The selection of material is suitable for the kitchen area for a comfortable working environment.
  • 29. 3.0 Appendix MS 1525 Lighting Standard
  • 36. Reference ABSORPTION COEFFICIENTS. Retrieved 4 July 2015, from http://www.acoustic.ua/st/web_absorption_data_eng.pdf CMS Danskin Acoustics,. (2015). Absorption & Reverberation - CMS Danskin Acoustics. Retrieved 4 July 2015, from http://www.cmsdanskin.co.uk/general- construction/absorption-reverberation/ Khan, A. (2015). Acoustics: Room Criteria (1st ed.). Retrieved from http://web.iit.edu/sites/web/files/departments/academic- affairs/Academic%20Resource%20Center/pdfs/Workshop_-_Acoustic.pdf Lightcalc.com,. LightCalc Lighting Design Software Glossary. Retrieved 4 July 2015, from http://www.lightcalc.com/lighting_info/glossary/glossary.html