This document provides details about a construction solutions assignment for a learning center building in Klang, Malaysia. It includes the following:
1. Precedent studies of a steel frame structural system and composite floor slab system used in a previous project called Spring House.
2. Proposed use of a steel frame structure and composite floor slabs for the learning center building, along with construction details.
3. Two alternative facade systems - timber louvers and GRP facade panels - that are being considered for the learning center building.