Earth-moving machines (EMM) are self-moving machines on pneumatic or
caterpillar tracks, designed for profiling earth embankments, moving and
leveling soils, separating rock mass from the massif and transporting it.
EMM
Bulldozer Motor grader Scraper Grader elevator
A characteristic distinguishing feature of these machines is that all elements of the
working process are performed during their movement.
Earthmoving and milling machines
Workflow of EMM
Soil digging Transportation Unloading
A bulldozer is an earth-moving machine consisting of
a tractor equipped with a controlled blade with a knife
for layer-by-layer cutting, moving the soil over short
distances (up to 100 m), leveling and laying it.
Bulldozer working cycle
Bulldozer - cyclic machine
1. gouging (cutting) and soil collection
(formation of a drawing/ drag
prism);
2. displacement (displacement of the
drawing prism);
3. unloading of soil (by lifting the
blade);
4. idling (return to the bulldozer face
to the place of soil collection).
Cycle work steps :
The largest bulldozer in the world
Komatsu D575A
Function
1. Layer-by-layer cut and move the soil at:
- construction of road embankments and excavation;
- digging of ditches;
- digging of ditches, holes, trenches, pits.
2. Perform the leveling (rough leveling ± 10 cm) of sites, slopes, leveling of the
dumped soil.
3. Distribute on the surface of various bulk and lumpy materials (sand, crushed stone,
gravel, etc.).
4. Felling of trees, uprooting of stumps, removal of stones, clearing of sites and roads.
5. Pushing scrapers at the final stage of loading the bucket (work as a "pusher").
Classification
By use:
a) general purpose;
b) special purposes: for underground mining (mines, tunnels), for underwater mining, for work
in the holds of ships.
By type of running equipment:
a) tracked;
b) wheeled.
Whenever possible to turn the blade:
a) with a fixed blade (the blade is permanently installed in the plan at an angle of 90 ° to the
longitudinal axis of the machine);
b) with a rotary blade or universal (the blade can be installed in the plan at an angle of 90 ° and
other angles to the longitudinal axis of the machine).
According to nominal tractive effort:
- very light ≤ 20kN
- light 30 - 50 kN
- medium 100 - 150 kN
- heavy 200 - 250 kN
- extra heavy> 300 kN.
а) b)
GENERAL STRUCTURE
(dozer with fixed blade)
1 - right hydraulic cylinder for blade lift;
2 - mechanical brace;
3 - dozer blade;
4 - right push bar;
5- right support of a push bar with a harness hinge.
Bulldozer with rotary blade
1 - hydraulic cylinder for lifting and lowering the blade; 2 - vertical brace;
3 - blade; 4 - pushing frame; 5 - support hinge; 6 - ball joint;
7 - bracket; 8 - horizontal brace.
1 - replaceable blade; 2 — frontal sheet; 3 — top stiffening frame; 4 — brace
attachment lug; 5 — lug that connect blade with the lifting-lowering hydraulic
cylinder; 6 — push bar attachment lug; 7 — bottom stiffening frame
Dozer blade
Blade types
1. Straight blade
2. Soil drag prism
3. Right and left soil rolls
Straight blade with
flaps
Hemispherical blade (3 parts)
Spherical blade (5 pieces)
1 - direct rotary;
2 - straight fixed;
3 - hemispherical;
4 - spherical;
5 - spherical for bulk materials;
6 - with pushing plate
Determination of bulldozer productivity
Operational productivity is calculated by the formula, m3 / h :
where V – volume of soil, a bulldozer moved in one cycle, m3;
Кп – coefficient of soil loss during movement;
Кв – coefficient of bulldozers time use (Кв=0,85…0,90);
Тц – cycle time, sec;
Кр – soil loosening coefficient.

More Related Content

PPTX
Tunnelling methods
PPTX
Bulldozer as machinery equipment
PPTX
types of excavators
PPTX
PPTX
Bulldozer
PPTX
Equipments for erection and compaction
PPTX
Dragline ppt
PPTX
DRAG-LINE CONSTRUCTION EQUIPMENT
Tunnelling methods
Bulldozer as machinery equipment
types of excavators
Bulldozer
Equipments for erection and compaction
Dragline ppt
DRAG-LINE CONSTRUCTION EQUIPMENT

What's hot (20)

PDF
Concrete equipment
PPTX
earth moving equipments
PPTX
Construction Equipment -Crane - Hoisting equipment
PPTX
Earth work equipment
PPTX
Scraper
PPTX
Left hand turnout
PPTX
GRADERS
PPTX
Unit ii railways
PPTX
Advance Construction Technology
PPTX
CONSTRUCTION CONVEYER EQUIPMENTS.
PPTX
Highway & road geomatric and its component
PPTX
Construction equipments
PPTX
Dump truck
PPT
Submerged tunnel ppt
PPTX
Pile and pile driving equipments
PPTX
CONCRETE EQUIPMENTS.pptx
PPTX
HOISTING EQUIPMENT
PPTX
Construction equipment (earth work)
Concrete equipment
earth moving equipments
Construction Equipment -Crane - Hoisting equipment
Earth work equipment
Scraper
Left hand turnout
GRADERS
Unit ii railways
Advance Construction Technology
CONSTRUCTION CONVEYER EQUIPMENTS.
Highway & road geomatric and its component
Construction equipments
Dump truck
Submerged tunnel ppt
Pile and pile driving equipments
CONCRETE EQUIPMENTS.pptx
HOISTING EQUIPMENT
Construction equipment (earth work)
Ad

Similar to Bulldozer.ppt (20)

PPTX
Bulldozers
PPTX
bulldozers.pptx
PDF
Dozer & ripper
PPTX
Bulldozers
PPTX
bulldozers-130804131337-phpapp01 (2).pptx
PPTX
презентация бульдозер и скрепер
PPTX
Heavy-duty-and equipment-2.pptxjjhhhhhhh
PPTX
1.2.3.bulldozers
PPTX
CHAPTER 7 POWERPOINT powerpoint powerpoint .pptx
PDF
BULLDOZER (Building Construction & Material)
PPTX
PPTX
Bulldozer
PPTX
Classification of heavy duty and construction equipment
PDF
Scraper ripper-grader-dozer
PPTX
EARTH MOVING EQUIPMENTS
PPTX
Earth moving equipment
PPTX
Modern Construction equipments (dozers & power shovels)
PDF
Construction equipment.pdf
PPTX
Equipment for earth work (for civil engineering)
PDF
Oc mechanical excavation
Bulldozers
bulldozers.pptx
Dozer & ripper
Bulldozers
bulldozers-130804131337-phpapp01 (2).pptx
презентация бульдозер и скрепер
Heavy-duty-and equipment-2.pptxjjhhhhhhh
1.2.3.bulldozers
CHAPTER 7 POWERPOINT powerpoint powerpoint .pptx
BULLDOZER (Building Construction & Material)
Bulldozer
Classification of heavy duty and construction equipment
Scraper ripper-grader-dozer
EARTH MOVING EQUIPMENTS
Earth moving equipment
Modern Construction equipments (dozers & power shovels)
Construction equipment.pdf
Equipment for earth work (for civil engineering)
Oc mechanical excavation
Ad

Recently uploaded (20)

PDF
Human-AI Collaboration: Balancing Agentic AI and Autonomy in Hybrid Systems
PPT
Occupational Health and Safety Management System
PDF
III.4.1.2_The_Space_Environment.p pdffdf
PPTX
MET 305 2019 SCHEME MODULE 2 COMPLETE.pptx
PDF
737-MAX_SRG.pdf student reference guides
PDF
Categorization of Factors Affecting Classification Algorithms Selection
PPTX
Nature of X-rays, X- Ray Equipment, Fluoroscopy
PPT
INTRODUCTION -Data Warehousing and Mining-M.Tech- VTU.ppt
PDF
The CXO Playbook 2025 – Future-Ready Strategies for C-Suite Leaders Cerebrai...
PPTX
6ME3A-Unit-II-Sensors and Actuators_Handouts.pptx
PDF
R24 SURVEYING LAB MANUAL for civil enggi
PPTX
Artificial Intelligence
PDF
BIO-INSPIRED ARCHITECTURE FOR PARSIMONIOUS CONVERSATIONAL INTELLIGENCE : THE ...
PPT
A5_DistSysCh1.ppt_INTRODUCTION TO DISTRIBUTED SYSTEMS
PPTX
Fundamentals of Mechanical Engineering.pptx
PDF
Automation-in-Manufacturing-Chapter-Introduction.pdf
PPTX
communication and presentation skills 01
PDF
86236642-Electric-Loco-Shed.pdf jfkduklg
PPTX
Information Storage and Retrieval Techniques Unit III
PDF
Analyzing Impact of Pakistan Economic Corridor on Import and Export in Pakist...
Human-AI Collaboration: Balancing Agentic AI and Autonomy in Hybrid Systems
Occupational Health and Safety Management System
III.4.1.2_The_Space_Environment.p pdffdf
MET 305 2019 SCHEME MODULE 2 COMPLETE.pptx
737-MAX_SRG.pdf student reference guides
Categorization of Factors Affecting Classification Algorithms Selection
Nature of X-rays, X- Ray Equipment, Fluoroscopy
INTRODUCTION -Data Warehousing and Mining-M.Tech- VTU.ppt
The CXO Playbook 2025 – Future-Ready Strategies for C-Suite Leaders Cerebrai...
6ME3A-Unit-II-Sensors and Actuators_Handouts.pptx
R24 SURVEYING LAB MANUAL for civil enggi
Artificial Intelligence
BIO-INSPIRED ARCHITECTURE FOR PARSIMONIOUS CONVERSATIONAL INTELLIGENCE : THE ...
A5_DistSysCh1.ppt_INTRODUCTION TO DISTRIBUTED SYSTEMS
Fundamentals of Mechanical Engineering.pptx
Automation-in-Manufacturing-Chapter-Introduction.pdf
communication and presentation skills 01
86236642-Electric-Loco-Shed.pdf jfkduklg
Information Storage and Retrieval Techniques Unit III
Analyzing Impact of Pakistan Economic Corridor on Import and Export in Pakist...

Bulldozer.ppt

  • 2. Earth-moving machines (EMM) are self-moving machines on pneumatic or caterpillar tracks, designed for profiling earth embankments, moving and leveling soils, separating rock mass from the massif and transporting it. EMM Bulldozer Motor grader Scraper Grader elevator A characteristic distinguishing feature of these machines is that all elements of the working process are performed during their movement. Earthmoving and milling machines Workflow of EMM Soil digging Transportation Unloading
  • 3. A bulldozer is an earth-moving machine consisting of a tractor equipped with a controlled blade with a knife for layer-by-layer cutting, moving the soil over short distances (up to 100 m), leveling and laying it.
  • 4. Bulldozer working cycle Bulldozer - cyclic machine 1. gouging (cutting) and soil collection (formation of a drawing/ drag prism); 2. displacement (displacement of the drawing prism); 3. unloading of soil (by lifting the blade); 4. idling (return to the bulldozer face to the place of soil collection). Cycle work steps :
  • 5. The largest bulldozer in the world Komatsu D575A
  • 6. Function 1. Layer-by-layer cut and move the soil at: - construction of road embankments and excavation; - digging of ditches; - digging of ditches, holes, trenches, pits. 2. Perform the leveling (rough leveling ± 10 cm) of sites, slopes, leveling of the dumped soil. 3. Distribute on the surface of various bulk and lumpy materials (sand, crushed stone, gravel, etc.). 4. Felling of trees, uprooting of stumps, removal of stones, clearing of sites and roads. 5. Pushing scrapers at the final stage of loading the bucket (work as a "pusher").
  • 7. Classification By use: a) general purpose; b) special purposes: for underground mining (mines, tunnels), for underwater mining, for work in the holds of ships. By type of running equipment: a) tracked; b) wheeled. Whenever possible to turn the blade: a) with a fixed blade (the blade is permanently installed in the plan at an angle of 90 ° to the longitudinal axis of the machine); b) with a rotary blade or universal (the blade can be installed in the plan at an angle of 90 ° and other angles to the longitudinal axis of the machine). According to nominal tractive effort: - very light ≤ 20kN - light 30 - 50 kN - medium 100 - 150 kN - heavy 200 - 250 kN - extra heavy> 300 kN. а) b)
  • 8. GENERAL STRUCTURE (dozer with fixed blade) 1 - right hydraulic cylinder for blade lift; 2 - mechanical brace; 3 - dozer blade; 4 - right push bar; 5- right support of a push bar with a harness hinge.
  • 9. Bulldozer with rotary blade 1 - hydraulic cylinder for lifting and lowering the blade; 2 - vertical brace; 3 - blade; 4 - pushing frame; 5 - support hinge; 6 - ball joint; 7 - bracket; 8 - horizontal brace.
  • 10. 1 - replaceable blade; 2 — frontal sheet; 3 — top stiffening frame; 4 — brace attachment lug; 5 — lug that connect blade with the lifting-lowering hydraulic cylinder; 6 — push bar attachment lug; 7 — bottom stiffening frame Dozer blade
  • 11. Blade types 1. Straight blade 2. Soil drag prism 3. Right and left soil rolls Straight blade with flaps Hemispherical blade (3 parts) Spherical blade (5 pieces) 1 - direct rotary; 2 - straight fixed; 3 - hemispherical; 4 - spherical; 5 - spherical for bulk materials; 6 - with pushing plate
  • 12. Determination of bulldozer productivity Operational productivity is calculated by the formula, m3 / h : where V – volume of soil, a bulldozer moved in one cycle, m3; Кп – coefficient of soil loss during movement; Кв – coefficient of bulldozers time use (Кв=0,85…0,90); Тц – cycle time, sec; Кр – soil loosening coefficient.