Using Systems Thinking, Lean, Six Sigma and Theory of Constraints (ToC) Business process improvement -  Doing the right things, effectively and efficiently - First stage of significant improvement Optimise -GB
Knowledge base Lean:  is centred around creating more value with less work by removing waste and increasing efficiencies in business processes. Six Sigma:  seeks to improve the quality of process outputs by identifying and removing the causes of defects (errors) Optimise -GB
Knowledge base Theory of Constraints (TOC ) ...seeks to identify bottlenecks / constraints and restructure the rest of the organisation around it to eliminate it and improve process flow Systems thinking ...views "problems" as parts of an overall system, rather than reacting to specific part through the context of relationships with each other. Systems thinking focuses on cyclical rather than linear cause and effect. Optimise -GB
Six Sigma Process Improvement methodology Optimise -GB
Define  the objectives What do customers want from you? What are their issues? What are the issues you wish to address? What are the Critical To Quality aspects of your business? What are the milestones? What are the key objectives to be achieved? By failing to prepare you are preparing to fail  –  Benjamin Franklin Process Improvement Optimise -GB D M A I C
Process Improvement Project Team Who are the experts?  - who does the day to day activities? Who is going to project manage this work? What are the lines of responsibility and communication? Optimise -GB D M A I C
Process Improvement Stakeholder Identification! What external stakeholders are there? Optimise -GB D M A I C
Measure -  Phase 1 (Workshop event) Review the objectives, add to them Document current process Identify key issues Process Improvement Optimise -GB D M A I C
Process map the activities Process Improvement Measure – Phase 1 Who, which department The what Ensure you record the tools / systems used and products / artefacts utilised / created Optimise -GB D M A I C Customer Operations Finance Give order to sales desk Take goods from shelf Produce / print invoice Box goods / Invoice
Spaghetti Diagram (illustration view of process map) Customer Operations Credit Control Phone in order Deliver goods and invoice Pay invoice Requests an invoice to be raised Process Improvement Measure – Phase 1 Optimise -GB D M A I C
Review the business process for each activity but more importantly as a whole from a  customer’s perspective  Review the spaghetti diagrams and add to the issues log Categorise them as High and Low Impact (notice there is no medium to remove confusion and limits being subjective) Process Improvement Measure – Phase 1 D M A I C
Measure -  Phase 2 (Data collection event – not a workshop event) You will need computer based information. If you do not have data capture points then move onto the Improve Phase. Do not guess or assume these statistics Identify costs of each activity and on the whole Create capability / control charts per activity Identify process and waiting times Identify defects / failures of demand / errors Identify bottlenecks in the process Prioritise area of focus Process Improvement Optimise -GB D M A I C
Time focuses on how long a piece of work takes to complete. This also focuses on waiting time for others to complete their task. Cost of work including internal and external labour, purchased goods and overheads that are allocated. Process Improvement Measure – Phase 2 Optimise -GB D M A I C
Quality focus looks at the work itself to identify defects / errors and aims to eliminate them before reaching the end customer or the next person in the chain of events Capacity looks at the resources required to complete the job without bottle necks stopping work, such as waiting time on management approval or waiting on other departments to clear their backlog Process Improvement Measure – Phase 2 Optimise -GB D M A I C
Theory of Constraints (ToC) The Theory of Constraints aims to identify and eliminate constraints so that bottle necks do not appear by following 5 steps: 1 – Identify the constraint 2 – Exploit the constraint to maximise production benefit  3 – Subordinate everything else – eliminate non value added work 4 – Elevate the constraint by increasing resources to handle more work 5 – Start again from point 1 to review all other constraints Process Improvement Measure – Phase 2 Optimise -GB D M A I C
Theory of Constraints (ToC) Each completed unit is passed onto the next person / department in the line Can you see where the bottle necks are? Do you ever wait on others to compete their work so you can start yours? Dept A units  Dept B units  Dept C units Dept D units Week 1    10  5  6  6 Week 2  8  11  3  9 Week 3   8  14  4  8  Week 4    8  16  5  9 Department B is the bottle neck in the process. They have more work coming in than they have going out. This causes a delay in the entire process. Add resources or improve efficiency in Department B  Process Improvement Measure – Phase 2 Optimise -GB D M A I C
Control  / Capability Charts Use software to plot the time taken for one process to understand if there is consistency between activities and workers  Process Improvement Measure – Phase 2 Optimise -GB D M A I C
Use statistics to verify the data from the control / capability charts Mean (Average) = 14.5 Days Median (Middle number)  = 15 Days Standard deviation = 2.26 The standard deviation is still greater than 2 but this at least provides a better sample. Therefore the average (baseline) of 14.5 can be assumed for larger samples. Process Improvement Measure – Phase 2 Optimise -GB D M A I C
Prioritisation of focus: Process time If your focus is on process time, a Pareto chart will help to prioritise your improvement focus. In this case Taking goods from Shelves” and Boxing goods and invoice” seems to take the longest time. Process Improvement Measure – Phase 2 Optimise -GB Process Time Take goods from shelf 30 Package goods and invoice 15 Take order 10 Produce Invoice 10 D M A I C
Prioritisation of focus: Quality If your focus is on quality a Pareto chart will help to prioritise your improvement focus. In this case “Taking goods from shelves” and “Taking orders” has the larges defects. Process Improvement Measure – Phase 2 Optimise -GB Process Defects Take goods from shelf 5% Take order 5% Package goods and invoice 4% Produce Invoice 1% D M A I C
Process maps review Identify more to the issues log Process Improvement Measure – Phase 2 What are the costs, defect rates, process / waiting  times per activity? What are the costs, defect rates, process / waiting  times from cradle to grave for the entire process? What would your customers think to this? Optimise -GB D M A I C
Review the business process for each activity but more importantly as a whole from the  customer perspective  Review the time, cost and defect statistics  Review the resourcing and efficiency of the business process Categorise them as High and Low Impact (notice there is no medium to remove confusion and limits being subjective) Process Improvement Measure – Phase 2 D M A I C
Process Improvement Analyse the problem (Workshop event) From the process map Identify non-value added work Look at ways to automate work Identify process wastes Add items to issues log Finally Analyse the root cause analysis  Optimise -GB D M A I C
Question each activity Is it needed? Does it add value? Can the activity be removed? Reduce time of each activity wherever possible through systems development Process Improvement Optimise -GB Value Added Non-value Added Value enabled Process Take order Take goods from shelf Produce and print invoice Box goods / invoice D M A I C
Process Improvement Use Cause and Effect Trees to get the root cause of the problem Optimise -GB D M A I C Take goods from shelf Writing on form mis-read Writing of poor quality Person was in a rush Writing was smudged Felt tips are used Too much workload Person is carless Paper is greasy No pens in the office No other supplies Lack of training
Identify  Process Waste  Process Improvement Optimise -GB Waste category Office examples 1. Overproducing Printing / working on paperwork before it is needed 2. Inventory Filed in boxes, office supplies, batch processing 3. Waiting System downtime, managers approval, information from others 4. Extra processing Re-entering data, extra copies, excessive reports, budget process, scanning 5. Correction Data entry, design, invoice errors 6. Excess motion Walking to and from printers, other offices, filing 7. Transportation Excessive email attachments, multiple hand offs, approvals, postal services, internal post 8. Under utilised people Limited employee authority, excessive management control D M A I C
Add the issues to the issues log.  Review the entire issues log Categorise issues as High and Low Impact Process Improvement D M A I C
Process Improvement Improve (Workshop event) Obtain the issues that have a high impact Brainstorm solutions  Evaluate the solutions Pick the top 3 items to work on (There will always be a top 3 action list until all the big impact solutions have been implemented) Optimise -GB D M A I C
Generating solutions:  Good practice Shout out as many ideas as possible Do not discuss ideas at this stage Questions should only be asked for clarification purposes Everyone should suggest an idea No judgements or criticisms should be made Do not talk over others Process Improvement Optimise- GB D M A I C
Identify the solutions Solution 1 Use post it notes and put the solutions on a blank wall Solution 2 Solution 3 Solution 4 Solution 5 Solution 6 Solution 7 Solution 8 Solution 9 Solution  10 Solution 11 Solution 12 Solution 13 Solution 14 Solution 15 Solution  16 Solution 17 Solution 18 Process Improvement Optimise- GB D M A I C
...Group the solutions to identify duplications Group the post it notes in an affinity diagram to identify common themes Six Sigma  Theme 3 Solution 12 Solution 18 Theme 2 Theme 1 Optimise- GB Solution 1 Solution 2 Solution 3 Solution 4 Solution 5 Solution 7 Solution 8 Solution 9 Solution  10 Solution 11 Solution 13 Solution 14 Solution 15 Solution  16 Solution 17 D M A I C
Evaluate solution Process Improvement Optimise- GB D M A I C Easy to  Implement Big Impact Hard to  implement Small Impact Solution 1 Solution 3 Solution 6 Solution 7 Solution 8 Solution 9 Solution 2 Implement Now Possible Kill Implement Later
Formularise the top 3 solutions Solution 1 Who? What? When? Where? How? Why? Process Improvement Optimise- GB D M A I C
Use mistake  / error proofing to prevent future problems Process Improvement Optimise -GB Use colour and clear help guides for users Use system interfaces to prevent manual working Use drop down lists instead of free text fields Use colourful pictures to show the expected end result D M A I C
Produce an A2/3  project charter to describe what the project is about and what it is to deliver (ex1) Process Improvement Optimise -GB D M A I C
Six Sigma  Control (Business as usual management reviews) Project manage business process improvement activities  Ensure control reports, policy documents, training manuals and schedules are in place to ensure control Optimise -GB D M A I C
Use capability / control charts to notify issues immediately Six Sigma  Unacceptable time to input invoice – managers to immediately address issue System to send email upon work falling outside tolerance levels Optimise -GB D M A I C
Control  – Training manuals: Each process maps should be accompanied by the following documents Six Sigma  Process map of who does what Procedure of how to carry out activity clearly numbered with screen shots What is expected, policies behind work, rules and regulations that apply Examples of what the finished output should look like: example being forms Check list for the activities to confirm completion and sign as authorisation Optimise -GB D M A I C Process map How to guide Policy info Specimen Checklist
Control – staff training: Ensure that  every user  involved in the business process has been given training. Use tests to ensure understanding and ensure  employees sign  to acknowledge that training has been given Do not  allow access to systems or allow person to work in process if they have not been trained Six Sigma  Optimise -GB D M A I C
For other solutions Contact  Simon Misiewicz through  Web:  www.optimise-gb.com Email:  [email_address]  or Optimise- GB

More Related Content

PDF
Business Process Improvement (BPI 7) Process Training Module
PDF
Business Process Management Training 1
PPTX
BPM (Business Process Management) Introduction
PPTX
Business Process Management
PPT
Lean And Six Sigma
PDF
Business Process Management 101 Training
PPTX
You Say Process Excellence, She Says Operational Excellence, I Say Performanc...
PDF
Lean Six Sigma Green Belt roadmap poster
Business Process Improvement (BPI 7) Process Training Module
Business Process Management Training 1
BPM (Business Process Management) Introduction
Business Process Management
Lean And Six Sigma
Business Process Management 101 Training
You Say Process Excellence, She Says Operational Excellence, I Say Performanc...
Lean Six Sigma Green Belt roadmap poster

What's hot (20)

PDF
Business Process Management Training | By ex-Deloitte & McKinsey Consultants
PPT
090 Process Mapping
PPTX
Business Process Playbook - An introduction
PPTX
Business process mapping
PPTX
Business process improvement (special report) presentation
PDF
How to achieve Operational Excellence?
PPTX
Lean six sigma Yellow Belt Complete training
PDF
Process mapping with flowcharts
PDF
The HR Business Partner
PPT
Business process management
PPTX
Intro of KPI
PPTX
Process improvement
PPT
Process Mapping For Systems Improvement
PPTX
The project management process groups a case study
PPT
Introduction to Business Process Analysis and Redesign
PPT
Framework for a business process management competency centre
PPTX
Six Sigma Yellow Belt
PDF
Clarity First: Process & Performance
PDF
Value Stream Mapping in Non-Manufacturing Environments
Business Process Management Training | By ex-Deloitte & McKinsey Consultants
090 Process Mapping
Business Process Playbook - An introduction
Business process mapping
Business process improvement (special report) presentation
How to achieve Operational Excellence?
Lean six sigma Yellow Belt Complete training
Process mapping with flowcharts
The HR Business Partner
Business process management
Intro of KPI
Process improvement
Process Mapping For Systems Improvement
The project management process groups a case study
Introduction to Business Process Analysis and Redesign
Framework for a business process management competency centre
Six Sigma Yellow Belt
Clarity First: Process & Performance
Value Stream Mapping in Non-Manufacturing Environments
Ad

Viewers also liked (20)

PDF
5 Minutes to Process Improvement Success
PDF
Lean Process Improvement Techniques
PPTX
Lean Manufacturing PowerPoint Presentation Sample
PDF
Business Process
PPT
What is BPM?
PPTX
Continuous improvement presentation 2014
PPTX
Continuous process improvement
PPT
Introduction to BPM, Business Process Management, BPM
PPT
Fundamentals of Project Management
PPT
The Power of Business Process Improvement
PDF
Business process design powerpoint presentation slides ppt templates
PDF
Introduction to Business Process Management
PDF
BPM (Business Process Management), CRM and Cross-Functional Enterprise-Level ...
PDF
Customer Journey Mapping and CX Research
PDF
Utilize Process Improvement Methodologies to Improve Finance and Accounting ...
PPTX
BUSINESS PROCESS REVIEW-
PDF
2015 Upload Campaigns Calendar - SlideShare
PDF
TD PM Process Map rev1 07.02.09
PPTX
What to Upload to SlideShare
DOCX
HR Systems & Process Improvement Manager - Job Description - FINAL
5 Minutes to Process Improvement Success
Lean Process Improvement Techniques
Lean Manufacturing PowerPoint Presentation Sample
Business Process
What is BPM?
Continuous improvement presentation 2014
Continuous process improvement
Introduction to BPM, Business Process Management, BPM
Fundamentals of Project Management
The Power of Business Process Improvement
Business process design powerpoint presentation slides ppt templates
Introduction to Business Process Management
BPM (Business Process Management), CRM and Cross-Functional Enterprise-Level ...
Customer Journey Mapping and CX Research
Utilize Process Improvement Methodologies to Improve Finance and Accounting ...
BUSINESS PROCESS REVIEW-
2015 Upload Campaigns Calendar - SlideShare
TD PM Process Map rev1 07.02.09
What to Upload to SlideShare
HR Systems & Process Improvement Manager - Job Description - FINAL
Ad

Similar to Business Process Improvement - Doing the right things effectively and efficiently (20)

PPTX
M1 Refresher Training Master Final Version non client linkedin
PDF
Optimizing Legal Service Delivery
PPT
Lean Thinking Baljit
PDF
Yellow belt process improvement training and certification module
PPT
Process mapping
PPT
Lean, Six Sigma, ToC using DMAIC - Measure phase
PPT
Lean, Six Sigma, ToC using DMAIC project management
PPTX
Continuous process improvement (4)
PPT
12 -improving_operations
PDF
Introduction to Lean Six Sigma in Government
PDF
Using the DMAIC Process for SEO Projects
PPTX
You_Exec_-_Process_Improvement_Free.pptx
PPTX
Unleashing the power of your people for improvement
PDF
Lean vs six sigma -jk
PPTX
PDF
ITIL® endlich Agile
PDF
Using the DMAIC Process for SEO Projects
PPT
Business Process Improvement
PPTX
Leadership, Business Process Improvement, & Process Mapping!
M1 Refresher Training Master Final Version non client linkedin
Optimizing Legal Service Delivery
Lean Thinking Baljit
Yellow belt process improvement training and certification module
Process mapping
Lean, Six Sigma, ToC using DMAIC - Measure phase
Lean, Six Sigma, ToC using DMAIC project management
Continuous process improvement (4)
12 -improving_operations
Introduction to Lean Six Sigma in Government
Using the DMAIC Process for SEO Projects
You_Exec_-_Process_Improvement_Free.pptx
Unleashing the power of your people for improvement
Lean vs six sigma -jk
ITIL® endlich Agile
Using the DMAIC Process for SEO Projects
Business Process Improvement
Leadership, Business Process Improvement, & Process Mapping!

More from Simon Misiewicz (20)

PPT
Creative thinking template
PPT
Is starting a business right time for you
PPT
Raising finance for your business
PPT
Business user requirements for it development
PPT
Business process re-engineering and systems design - implementation
XLS
Optimise-GB's Lean Six Sigma's DMAIC & DMADV Programme imporvement plan Manag...
PPT
Communicating strategic missions, vision, project progress and celebrate succ...
PPT
Deliver training to suit varying learning styles
PPT
4 steps to formulating strategies from the boardroom through to every employee
PPT
Stakeholder engagement and management
PPT
Effective Communication for successful working and personal relationships
PPT
Strategic improvement through the balanced scorecard and programme management
DOC
Programme start up document - Optimised Programme Methodology
XLS
Staff appraisal document - template
DOCX
Be proactive
DOC
Optimised - Programme start up
DOC
Project End Report - Project Management template
DOC
Lessons learned Report - Project Management template
DOC
Highlight Report - Project Management template
DOC
Exceptions Report - Project Management template
Creative thinking template
Is starting a business right time for you
Raising finance for your business
Business user requirements for it development
Business process re-engineering and systems design - implementation
Optimise-GB's Lean Six Sigma's DMAIC & DMADV Programme imporvement plan Manag...
Communicating strategic missions, vision, project progress and celebrate succ...
Deliver training to suit varying learning styles
4 steps to formulating strategies from the boardroom through to every employee
Stakeholder engagement and management
Effective Communication for successful working and personal relationships
Strategic improvement through the balanced scorecard and programme management
Programme start up document - Optimised Programme Methodology
Staff appraisal document - template
Be proactive
Optimised - Programme start up
Project End Report - Project Management template
Lessons learned Report - Project Management template
Highlight Report - Project Management template
Exceptions Report - Project Management template

Recently uploaded (20)

PDF
Laughter Yoga Basic Learning Workshop Manual
PDF
20250805_A. Stotz All Weather Strategy - Performance review July 2025.pdf
PPTX
job Avenue by vinith.pptxvnbvnvnvbnvbnbmnbmbh
PDF
DOC-20250806-WA0002._20250806_112011_0000.pdf
PDF
Roadmap Map-digital Banking feature MB,IB,AB
DOCX
unit 2 cost accounting- Tender and Quotation & Reconciliation Statement
PDF
A Brief Introduction About Julia Allison
PPTX
ICG2025_ICG 6th steering committee 30-8-24.pptx
PDF
pdfcoffee.com-opt-b1plus-sb-answers.pdfvi
PDF
IFRS Notes in your pocket for study all the time
PPTX
New Microsoft PowerPoint Presentation - Copy.pptx
PDF
Unit 1 Cost Accounting - Cost sheet
PDF
Training And Development of Employee .pdf
PDF
MSPs in 10 Words - Created by US MSP Network
PDF
Nidhal Samdaie CV - International Business Consultant
PDF
Dr. Enrique Segura Ense Group - A Self-Made Entrepreneur And Executive
PPTX
Amazon (Business Studies) management studies
PDF
WRN_Investor_Presentation_August 2025.pdf
PDF
Types of control:Qualitative vs Quantitative
PDF
Elevate Cleaning Efficiency Using Tallfly Hair Remover Roller Factory Expertise
Laughter Yoga Basic Learning Workshop Manual
20250805_A. Stotz All Weather Strategy - Performance review July 2025.pdf
job Avenue by vinith.pptxvnbvnvnvbnvbnbmnbmbh
DOC-20250806-WA0002._20250806_112011_0000.pdf
Roadmap Map-digital Banking feature MB,IB,AB
unit 2 cost accounting- Tender and Quotation & Reconciliation Statement
A Brief Introduction About Julia Allison
ICG2025_ICG 6th steering committee 30-8-24.pptx
pdfcoffee.com-opt-b1plus-sb-answers.pdfvi
IFRS Notes in your pocket for study all the time
New Microsoft PowerPoint Presentation - Copy.pptx
Unit 1 Cost Accounting - Cost sheet
Training And Development of Employee .pdf
MSPs in 10 Words - Created by US MSP Network
Nidhal Samdaie CV - International Business Consultant
Dr. Enrique Segura Ense Group - A Self-Made Entrepreneur And Executive
Amazon (Business Studies) management studies
WRN_Investor_Presentation_August 2025.pdf
Types of control:Qualitative vs Quantitative
Elevate Cleaning Efficiency Using Tallfly Hair Remover Roller Factory Expertise

Business Process Improvement - Doing the right things effectively and efficiently

  • 1. Using Systems Thinking, Lean, Six Sigma and Theory of Constraints (ToC) Business process improvement - Doing the right things, effectively and efficiently - First stage of significant improvement Optimise -GB
  • 2. Knowledge base Lean: is centred around creating more value with less work by removing waste and increasing efficiencies in business processes. Six Sigma: seeks to improve the quality of process outputs by identifying and removing the causes of defects (errors) Optimise -GB
  • 3. Knowledge base Theory of Constraints (TOC ) ...seeks to identify bottlenecks / constraints and restructure the rest of the organisation around it to eliminate it and improve process flow Systems thinking ...views "problems" as parts of an overall system, rather than reacting to specific part through the context of relationships with each other. Systems thinking focuses on cyclical rather than linear cause and effect. Optimise -GB
  • 4. Six Sigma Process Improvement methodology Optimise -GB
  • 5. Define the objectives What do customers want from you? What are their issues? What are the issues you wish to address? What are the Critical To Quality aspects of your business? What are the milestones? What are the key objectives to be achieved? By failing to prepare you are preparing to fail – Benjamin Franklin Process Improvement Optimise -GB D M A I C
  • 6. Process Improvement Project Team Who are the experts? - who does the day to day activities? Who is going to project manage this work? What are the lines of responsibility and communication? Optimise -GB D M A I C
  • 7. Process Improvement Stakeholder Identification! What external stakeholders are there? Optimise -GB D M A I C
  • 8. Measure - Phase 1 (Workshop event) Review the objectives, add to them Document current process Identify key issues Process Improvement Optimise -GB D M A I C
  • 9. Process map the activities Process Improvement Measure – Phase 1 Who, which department The what Ensure you record the tools / systems used and products / artefacts utilised / created Optimise -GB D M A I C Customer Operations Finance Give order to sales desk Take goods from shelf Produce / print invoice Box goods / Invoice
  • 10. Spaghetti Diagram (illustration view of process map) Customer Operations Credit Control Phone in order Deliver goods and invoice Pay invoice Requests an invoice to be raised Process Improvement Measure – Phase 1 Optimise -GB D M A I C
  • 11. Review the business process for each activity but more importantly as a whole from a customer’s perspective Review the spaghetti diagrams and add to the issues log Categorise them as High and Low Impact (notice there is no medium to remove confusion and limits being subjective) Process Improvement Measure – Phase 1 D M A I C
  • 12. Measure - Phase 2 (Data collection event – not a workshop event) You will need computer based information. If you do not have data capture points then move onto the Improve Phase. Do not guess or assume these statistics Identify costs of each activity and on the whole Create capability / control charts per activity Identify process and waiting times Identify defects / failures of demand / errors Identify bottlenecks in the process Prioritise area of focus Process Improvement Optimise -GB D M A I C
  • 13. Time focuses on how long a piece of work takes to complete. This also focuses on waiting time for others to complete their task. Cost of work including internal and external labour, purchased goods and overheads that are allocated. Process Improvement Measure – Phase 2 Optimise -GB D M A I C
  • 14. Quality focus looks at the work itself to identify defects / errors and aims to eliminate them before reaching the end customer or the next person in the chain of events Capacity looks at the resources required to complete the job without bottle necks stopping work, such as waiting time on management approval or waiting on other departments to clear their backlog Process Improvement Measure – Phase 2 Optimise -GB D M A I C
  • 15. Theory of Constraints (ToC) The Theory of Constraints aims to identify and eliminate constraints so that bottle necks do not appear by following 5 steps: 1 – Identify the constraint 2 – Exploit the constraint to maximise production benefit 3 – Subordinate everything else – eliminate non value added work 4 – Elevate the constraint by increasing resources to handle more work 5 – Start again from point 1 to review all other constraints Process Improvement Measure – Phase 2 Optimise -GB D M A I C
  • 16. Theory of Constraints (ToC) Each completed unit is passed onto the next person / department in the line Can you see where the bottle necks are? Do you ever wait on others to compete their work so you can start yours? Dept A units Dept B units Dept C units Dept D units Week 1 10 5 6 6 Week 2 8 11 3 9 Week 3 8 14 4 8 Week 4 8 16 5 9 Department B is the bottle neck in the process. They have more work coming in than they have going out. This causes a delay in the entire process. Add resources or improve efficiency in Department B Process Improvement Measure – Phase 2 Optimise -GB D M A I C
  • 17. Control / Capability Charts Use software to plot the time taken for one process to understand if there is consistency between activities and workers Process Improvement Measure – Phase 2 Optimise -GB D M A I C
  • 18. Use statistics to verify the data from the control / capability charts Mean (Average) = 14.5 Days Median (Middle number) = 15 Days Standard deviation = 2.26 The standard deviation is still greater than 2 but this at least provides a better sample. Therefore the average (baseline) of 14.5 can be assumed for larger samples. Process Improvement Measure – Phase 2 Optimise -GB D M A I C
  • 19. Prioritisation of focus: Process time If your focus is on process time, a Pareto chart will help to prioritise your improvement focus. In this case Taking goods from Shelves” and Boxing goods and invoice” seems to take the longest time. Process Improvement Measure – Phase 2 Optimise -GB Process Time Take goods from shelf 30 Package goods and invoice 15 Take order 10 Produce Invoice 10 D M A I C
  • 20. Prioritisation of focus: Quality If your focus is on quality a Pareto chart will help to prioritise your improvement focus. In this case “Taking goods from shelves” and “Taking orders” has the larges defects. Process Improvement Measure – Phase 2 Optimise -GB Process Defects Take goods from shelf 5% Take order 5% Package goods and invoice 4% Produce Invoice 1% D M A I C
  • 21. Process maps review Identify more to the issues log Process Improvement Measure – Phase 2 What are the costs, defect rates, process / waiting times per activity? What are the costs, defect rates, process / waiting times from cradle to grave for the entire process? What would your customers think to this? Optimise -GB D M A I C
  • 22. Review the business process for each activity but more importantly as a whole from the customer perspective Review the time, cost and defect statistics Review the resourcing and efficiency of the business process Categorise them as High and Low Impact (notice there is no medium to remove confusion and limits being subjective) Process Improvement Measure – Phase 2 D M A I C
  • 23. Process Improvement Analyse the problem (Workshop event) From the process map Identify non-value added work Look at ways to automate work Identify process wastes Add items to issues log Finally Analyse the root cause analysis Optimise -GB D M A I C
  • 24. Question each activity Is it needed? Does it add value? Can the activity be removed? Reduce time of each activity wherever possible through systems development Process Improvement Optimise -GB Value Added Non-value Added Value enabled Process Take order Take goods from shelf Produce and print invoice Box goods / invoice D M A I C
  • 25. Process Improvement Use Cause and Effect Trees to get the root cause of the problem Optimise -GB D M A I C Take goods from shelf Writing on form mis-read Writing of poor quality Person was in a rush Writing was smudged Felt tips are used Too much workload Person is carless Paper is greasy No pens in the office No other supplies Lack of training
  • 26. Identify Process Waste Process Improvement Optimise -GB Waste category Office examples 1. Overproducing Printing / working on paperwork before it is needed 2. Inventory Filed in boxes, office supplies, batch processing 3. Waiting System downtime, managers approval, information from others 4. Extra processing Re-entering data, extra copies, excessive reports, budget process, scanning 5. Correction Data entry, design, invoice errors 6. Excess motion Walking to and from printers, other offices, filing 7. Transportation Excessive email attachments, multiple hand offs, approvals, postal services, internal post 8. Under utilised people Limited employee authority, excessive management control D M A I C
  • 27. Add the issues to the issues log. Review the entire issues log Categorise issues as High and Low Impact Process Improvement D M A I C
  • 28. Process Improvement Improve (Workshop event) Obtain the issues that have a high impact Brainstorm solutions Evaluate the solutions Pick the top 3 items to work on (There will always be a top 3 action list until all the big impact solutions have been implemented) Optimise -GB D M A I C
  • 29. Generating solutions: Good practice Shout out as many ideas as possible Do not discuss ideas at this stage Questions should only be asked for clarification purposes Everyone should suggest an idea No judgements or criticisms should be made Do not talk over others Process Improvement Optimise- GB D M A I C
  • 30. Identify the solutions Solution 1 Use post it notes and put the solutions on a blank wall Solution 2 Solution 3 Solution 4 Solution 5 Solution 6 Solution 7 Solution 8 Solution 9 Solution 10 Solution 11 Solution 12 Solution 13 Solution 14 Solution 15 Solution 16 Solution 17 Solution 18 Process Improvement Optimise- GB D M A I C
  • 31. ...Group the solutions to identify duplications Group the post it notes in an affinity diagram to identify common themes Six Sigma Theme 3 Solution 12 Solution 18 Theme 2 Theme 1 Optimise- GB Solution 1 Solution 2 Solution 3 Solution 4 Solution 5 Solution 7 Solution 8 Solution 9 Solution 10 Solution 11 Solution 13 Solution 14 Solution 15 Solution 16 Solution 17 D M A I C
  • 32. Evaluate solution Process Improvement Optimise- GB D M A I C Easy to Implement Big Impact Hard to implement Small Impact Solution 1 Solution 3 Solution 6 Solution 7 Solution 8 Solution 9 Solution 2 Implement Now Possible Kill Implement Later
  • 33. Formularise the top 3 solutions Solution 1 Who? What? When? Where? How? Why? Process Improvement Optimise- GB D M A I C
  • 34. Use mistake / error proofing to prevent future problems Process Improvement Optimise -GB Use colour and clear help guides for users Use system interfaces to prevent manual working Use drop down lists instead of free text fields Use colourful pictures to show the expected end result D M A I C
  • 35. Produce an A2/3 project charter to describe what the project is about and what it is to deliver (ex1) Process Improvement Optimise -GB D M A I C
  • 36. Six Sigma Control (Business as usual management reviews) Project manage business process improvement activities Ensure control reports, policy documents, training manuals and schedules are in place to ensure control Optimise -GB D M A I C
  • 37. Use capability / control charts to notify issues immediately Six Sigma Unacceptable time to input invoice – managers to immediately address issue System to send email upon work falling outside tolerance levels Optimise -GB D M A I C
  • 38. Control – Training manuals: Each process maps should be accompanied by the following documents Six Sigma Process map of who does what Procedure of how to carry out activity clearly numbered with screen shots What is expected, policies behind work, rules and regulations that apply Examples of what the finished output should look like: example being forms Check list for the activities to confirm completion and sign as authorisation Optimise -GB D M A I C Process map How to guide Policy info Specimen Checklist
  • 39. Control – staff training: Ensure that every user involved in the business process has been given training. Use tests to ensure understanding and ensure employees sign to acknowledge that training has been given Do not allow access to systems or allow person to work in process if they have not been trained Six Sigma Optimise -GB D M A I C
  • 40. For other solutions Contact Simon Misiewicz through Web: www.optimise-gb.com Email: [email_address] or Optimise- GB