SlideShare a Scribd company logo
The Coating Solution Forum presents:
The Importance of Corrosion Prevention —
Presented by:
REINFORCING OUR NATION’S
INFRASTRUCTURE.
TOPLINE FACTS
& FIGURES
02
How Stark is the Reality?
610,749
1Total number of U.S.
bridges
50 Years
2Average designed bridge
lifespan
43 Years
3Current average age
of bridges
65 Years
4Average age of “structurally
deficient”* bridges
1,500 Miles…
that’s how far the structurally
deficient bridges in America would
run if lined up, end to end!5
* Structurally deficient means there are elements of the bridge that are
considered a “significant defect”, requiring monitoring and/or repair.
03
Estimated cost to replace
“structurally deficient”
bridges
Estimated cost
to recoat
How Great is the Cost?
$500 Million
7
$3.79 Billion
6
04
How Attainable is a Qualified Solution?
The solution is
within reach
via…
Pragmatic
dialogue and
qualified
expertise.
Without a map,
any road will
get you there..
05
THE CORROSIVE
PROBLEM
06
What is Corrosion?
The physical properties of metal
are constantly in flux.
This “disintegration” occurs through
unintentional or electrochemical
activity that starts on the metal’s
surface, as part of its natural
behavior.
07
Causes of Corrosion
Water / moisture (humidity)
Acids
Bases
Salts
Oils
Within these bridge, highway and
overpass applications, the metallic
form will continually corrode due
to a variety of factors:
8
9
Assessment Selection and Engineering
Corrosion Prevention
Some of the common coatings used on bridges: Ultra-High
Solids (Plural Component) Coatings, High Performance Alkyds,
Alkyd Esters and Acrylics, Epoxy Esters, Pre-Catalyzed Epoxies,
Moisture Cured Urethanes, VOC Compliant Coatings, Powder
Coatings, Metalizing, Vinyls, Radiation Cured Coatings,
Sacrificial Coatings.
Technological advancements in the formulation of coatings,
the expertise necessary to choose the appropriate coating
solution for each infrastructure asset, the proper inspection
by certified coatings inspectors and the proper surface
preparation and application by certified coatings applicators,
has increased the professionalism of the industry and
elongated the expected performance life-cycles.
10
ECONOMIC
REALITIES
11
It is an age-old problem… too great the number of
initiatives, too few the funding resources.
However, if we only focus on the short-term economics,
we may lose sight of the ”long-view” savings.
The Cost of Public Safety
12
A Deeper Look at the Numbers
A leveraged bridge, overpass and
highway infrastructure has a direct,
negative effect on the U.S. economy
of more than $500 billion per year…
that’s about $1,500 per citizen!
8
13
Funding Snapshot
Of that total commitment, $13.4 billion (42.2%) was
dedicated towards items such as road reconstruction /
resurfacing, bridge replacement and bridge repairs. 10
Prior to the Highway Bill of 2011, $31.8 billion in federal
dollars was committed for new projects – approximately
126,000 miles of highway and over 4,500 bridges. 9
The Department of Transportation currently estimates
highways and bridges face a “backlog” of investment
needs to the tune of $808.2 billion, including $479.1
billion in critical repair work. 11
14
QUALIFICATIONS
15
Stringent Training Program
enacted in 2004.
Training Modules: Environmental Safety
and Health; Process Control; Materials;
Surface Preparation; and Coating
Application.
What is the “NACE 13/SSPC ACS-1 Standard?”
16
The CIP and PCS Programs
The Protective Coatings Specialist Program (PCS)
- introduction to coatings and linings used to
control corrosion… defines and examines
common coatings, addressing when, how and
why they should be used.
NACE Coating Inspector Program (CIP) - for over
30 years, the “gold standard” for inspections in
the protective coatings industry.
17
US Navy’s Naval Facilities department
(NAVFAC) did a cost-benefit analysis
regarding the use of certified or non-
certified contractors on coatings
projects.
The results showed that utilizing
certified contractors and trained
personnel has proven an overwhelming
“cost-benefit” success.12
Independent Cost-Benefit Analysis
18
Location
Contractor
Certification
Contract Award
Final Contract Cost
Material
$/Sq Foot
NFESC Support
Total
Time
San Diego, CA
YES
$ 320 K
$ 320 K
$ 30 K
$ 17.50
$ 40 K
$ 390 K
2 months
Pensacola, FL
None
$ 320 K
$ 600 K
$ 30 K
$ 31.50
$ 240 K
$ 870 K
5 months
The NACE 13/SSPC ACS-1
Standard was firmly in place
to execute the massive Capitol
Dome Restoration Project.
Case Study
19
American workforce, well versed
in the up-to-date techniques
and equipment to truly make
a difference in fighting corrosion.
The Coating Application Specialist
20
TAKEAWAYS
21
Preservation Through Mitigation
We can expand
expected lifetimes of
these structures up to13
100 Years!
22
Responsible Economics
30%
Through proper
mitigation, costs
can be reduced
by as much as14
23
Harnessing the expertise
of those trained to handle
these types of projects brings
about the culmination of
The Coating Solution.
Certified Personnel
24
25
Proper Assessment & Selection
+ Qualified Applicators & Contractors
+ Certified Inspectors
The Coating Solution
Quality Job=
The Coating Solution Forum presents:
The Importance of Corrosion Prevention —
Presented by:
REINFORCING OUR NATION’S
INFRASTRUCTURE.
THANK YOU
27
APPENDIX
28
29
1 NACE® International
2 Transportation for America
3 Transportation for America
4 Transportation for America
5 Transportation for America
6 The United States Corrosion Study / NACE® International
7 The United States Corrosion Study / NACE® International
8 NACE® International
9 NACE® International
10 NACE® International
11 NACE® International
12 NAVFAC (Naval Facilities Engineering Command)
13 NACE® International
14 NACE® International
Appendix

More Related Content

PPT
WHSG Engineering Forum 08.07.2010
PDF
Ncm services data sheet overview - e doc
PPT
PAINTING SURFACES de Beaufort
PPT
Aircraft Painting What You Should Know
PPT
Welesgard. Oil n gas coating application
PPT
Marine Corrosion Protection
PDF
Weld Improvement Example in Offshore Oil & Gas
PDF
Fundamentals of metallic corrosion
WHSG Engineering Forum 08.07.2010
Ncm services data sheet overview - e doc
PAINTING SURFACES de Beaufort
Aircraft Painting What You Should Know
Welesgard. Oil n gas coating application
Marine Corrosion Protection
Weld Improvement Example in Offshore Oil & Gas
Fundamentals of metallic corrosion

Viewers also liked (13)

PDF
Oil & Gas technical training courses
PDF
1 Corrosion Control In Oil And Gas Industry
PPTX
Protective coating
PPTX
Protection of metals from corrosion
PDF
SURFACE ENGINEERING AND COATING PROCESSES 2
PPTX
Types of corrosions
PPTX
Surface Treatment
PPTX
CHAPTER 2 in HUMANITIES (PRELIM)
PPT
Agr Field Operations Pipeline Inspection
PPT
coating defects
PPTX
Surface treatment an overview
PPTX
Corrosion.ppt
PPTX
5S: A Workplace Organization Method
Oil & Gas technical training courses
1 Corrosion Control In Oil And Gas Industry
Protective coating
Protection of metals from corrosion
SURFACE ENGINEERING AND COATING PROCESSES 2
Types of corrosions
Surface Treatment
CHAPTER 2 in HUMANITIES (PRELIM)
Agr Field Operations Pipeline Inspection
coating defects
Surface treatment an overview
Corrosion.ppt
5S: A Workplace Organization Method
Ad

Similar to Coating Solution Forum Presentation V6 (20)

PPTX
The Coating Solution - Energy Infrastructure
PPTX
Coating Solution Water Presentation
PPTX
Coating solution forum water
PDF
Cost Benefit Analysis of Mobile Barriers MBT-1
PDF
Finpro market opportunity bridges usa
PDF
CEMATRIX Corporation (TSXV: CVX) Management Presentation
PDF
Cematrix Investor Presentation
PPT
Nuprecon - Presentation I gave at Camp Dresser McKee
PDF
Cematrix Presentation May 2021
PDF
Modern technology and robotics for bridge inspections
PDF
Cematrix December 2021 Company Presentation
PDF
Opportunities In Environmental Engineering & Environmental Services Post COVI...
PPT
Coasts and Marine Structures- Industry Experts Key Topic Discussion
PDF
Detailed appraisal-of-the-offshore-wind-industry-in-china
PDF
CIB Publication 405
PDF
The Construction Manager-General Contractor method for consctruction of trans...
PPTX
Improved Jacketing Repair System For Steel H Beams
PDF
Undergraduate Senior Design Brief - Climate Change Impact Assesment - Infrast...
PDF
Concept topology- Architectural Build Design.pdf
PDF
State senate transpo hearings 11 13-13 backgroundpaper
The Coating Solution - Energy Infrastructure
Coating Solution Water Presentation
Coating solution forum water
Cost Benefit Analysis of Mobile Barriers MBT-1
Finpro market opportunity bridges usa
CEMATRIX Corporation (TSXV: CVX) Management Presentation
Cematrix Investor Presentation
Nuprecon - Presentation I gave at Camp Dresser McKee
Cematrix Presentation May 2021
Modern technology and robotics for bridge inspections
Cematrix December 2021 Company Presentation
Opportunities In Environmental Engineering & Environmental Services Post COVI...
Coasts and Marine Structures- Industry Experts Key Topic Discussion
Detailed appraisal-of-the-offshore-wind-industry-in-china
CIB Publication 405
The Construction Manager-General Contractor method for consctruction of trans...
Improved Jacketing Repair System For Steel H Beams
Undergraduate Senior Design Brief - Climate Change Impact Assesment - Infrast...
Concept topology- Architectural Build Design.pdf
State senate transpo hearings 11 13-13 backgroundpaper
Ad

Recently uploaded (20)

PDF
distributed database system" (DDBS) is often used to refer to both the distri...
PDF
III.4.1.2_The_Space_Environment.p pdffdf
PDF
Design Guidelines and solutions for Plastics parts
PPTX
6ME3A-Unit-II-Sensors and Actuators_Handouts.pptx
PDF
Artificial Superintelligence (ASI) Alliance Vision Paper.pdf
PDF
Visual Aids for Exploratory Data Analysis.pdf
PPTX
Fundamentals of safety and accident prevention -final (1).pptx
PDF
A SYSTEMATIC REVIEW OF APPLICATIONS IN FRAUD DETECTION
PPTX
Software Engineering and software moduleing
PPTX
AUTOMOTIVE ENGINE MANAGEMENT (MECHATRONICS).pptx
PPTX
ASME PCC-02 TRAINING -DESKTOP-NLE5HNP.pptx
PDF
Soil Improvement Techniques Note - Rabbi
PPTX
Management Information system : MIS-e-Business Systems.pptx
PDF
null (2) bgfbg bfgb bfgb fbfg bfbgf b.pdf
PPTX
Fundamentals of Mechanical Engineering.pptx
PDF
Exploratory_Data_Analysis_Fundamentals.pdf
PDF
737-MAX_SRG.pdf student reference guides
PPTX
Sorting and Hashing in Data Structures with Algorithms, Techniques, Implement...
PDF
BIO-INSPIRED ARCHITECTURE FOR PARSIMONIOUS CONVERSATIONAL INTELLIGENCE : THE ...
PDF
August -2025_Top10 Read_Articles_ijait.pdf
distributed database system" (DDBS) is often used to refer to both the distri...
III.4.1.2_The_Space_Environment.p pdffdf
Design Guidelines and solutions for Plastics parts
6ME3A-Unit-II-Sensors and Actuators_Handouts.pptx
Artificial Superintelligence (ASI) Alliance Vision Paper.pdf
Visual Aids for Exploratory Data Analysis.pdf
Fundamentals of safety and accident prevention -final (1).pptx
A SYSTEMATIC REVIEW OF APPLICATIONS IN FRAUD DETECTION
Software Engineering and software moduleing
AUTOMOTIVE ENGINE MANAGEMENT (MECHATRONICS).pptx
ASME PCC-02 TRAINING -DESKTOP-NLE5HNP.pptx
Soil Improvement Techniques Note - Rabbi
Management Information system : MIS-e-Business Systems.pptx
null (2) bgfbg bfgb bfgb fbfg bfbgf b.pdf
Fundamentals of Mechanical Engineering.pptx
Exploratory_Data_Analysis_Fundamentals.pdf
737-MAX_SRG.pdf student reference guides
Sorting and Hashing in Data Structures with Algorithms, Techniques, Implement...
BIO-INSPIRED ARCHITECTURE FOR PARSIMONIOUS CONVERSATIONAL INTELLIGENCE : THE ...
August -2025_Top10 Read_Articles_ijait.pdf

Coating Solution Forum Presentation V6

  • 1. The Coating Solution Forum presents: The Importance of Corrosion Prevention — Presented by: REINFORCING OUR NATION’S INFRASTRUCTURE.
  • 3. How Stark is the Reality? 610,749 1Total number of U.S. bridges 50 Years 2Average designed bridge lifespan 43 Years 3Current average age of bridges 65 Years 4Average age of “structurally deficient”* bridges 1,500 Miles… that’s how far the structurally deficient bridges in America would run if lined up, end to end!5 * Structurally deficient means there are elements of the bridge that are considered a “significant defect”, requiring monitoring and/or repair. 03
  • 4. Estimated cost to replace “structurally deficient” bridges Estimated cost to recoat How Great is the Cost? $500 Million 7 $3.79 Billion 6 04
  • 5. How Attainable is a Qualified Solution? The solution is within reach via… Pragmatic dialogue and qualified expertise. Without a map, any road will get you there.. 05
  • 7. What is Corrosion? The physical properties of metal are constantly in flux. This “disintegration” occurs through unintentional or electrochemical activity that starts on the metal’s surface, as part of its natural behavior. 07
  • 8. Causes of Corrosion Water / moisture (humidity) Acids Bases Salts Oils Within these bridge, highway and overpass applications, the metallic form will continually corrode due to a variety of factors: 8
  • 10. Corrosion Prevention Some of the common coatings used on bridges: Ultra-High Solids (Plural Component) Coatings, High Performance Alkyds, Alkyd Esters and Acrylics, Epoxy Esters, Pre-Catalyzed Epoxies, Moisture Cured Urethanes, VOC Compliant Coatings, Powder Coatings, Metalizing, Vinyls, Radiation Cured Coatings, Sacrificial Coatings. Technological advancements in the formulation of coatings, the expertise necessary to choose the appropriate coating solution for each infrastructure asset, the proper inspection by certified coatings inspectors and the proper surface preparation and application by certified coatings applicators, has increased the professionalism of the industry and elongated the expected performance life-cycles. 10
  • 12. It is an age-old problem… too great the number of initiatives, too few the funding resources. However, if we only focus on the short-term economics, we may lose sight of the ”long-view” savings. The Cost of Public Safety 12
  • 13. A Deeper Look at the Numbers A leveraged bridge, overpass and highway infrastructure has a direct, negative effect on the U.S. economy of more than $500 billion per year… that’s about $1,500 per citizen! 8 13
  • 14. Funding Snapshot Of that total commitment, $13.4 billion (42.2%) was dedicated towards items such as road reconstruction / resurfacing, bridge replacement and bridge repairs. 10 Prior to the Highway Bill of 2011, $31.8 billion in federal dollars was committed for new projects – approximately 126,000 miles of highway and over 4,500 bridges. 9 The Department of Transportation currently estimates highways and bridges face a “backlog” of investment needs to the tune of $808.2 billion, including $479.1 billion in critical repair work. 11 14
  • 16. Stringent Training Program enacted in 2004. Training Modules: Environmental Safety and Health; Process Control; Materials; Surface Preparation; and Coating Application. What is the “NACE 13/SSPC ACS-1 Standard?” 16
  • 17. The CIP and PCS Programs The Protective Coatings Specialist Program (PCS) - introduction to coatings and linings used to control corrosion… defines and examines common coatings, addressing when, how and why they should be used. NACE Coating Inspector Program (CIP) - for over 30 years, the “gold standard” for inspections in the protective coatings industry. 17
  • 18. US Navy’s Naval Facilities department (NAVFAC) did a cost-benefit analysis regarding the use of certified or non- certified contractors on coatings projects. The results showed that utilizing certified contractors and trained personnel has proven an overwhelming “cost-benefit” success.12 Independent Cost-Benefit Analysis 18 Location Contractor Certification Contract Award Final Contract Cost Material $/Sq Foot NFESC Support Total Time San Diego, CA YES $ 320 K $ 320 K $ 30 K $ 17.50 $ 40 K $ 390 K 2 months Pensacola, FL None $ 320 K $ 600 K $ 30 K $ 31.50 $ 240 K $ 870 K 5 months
  • 19. The NACE 13/SSPC ACS-1 Standard was firmly in place to execute the massive Capitol Dome Restoration Project. Case Study 19
  • 20. American workforce, well versed in the up-to-date techniques and equipment to truly make a difference in fighting corrosion. The Coating Application Specialist 20
  • 22. Preservation Through Mitigation We can expand expected lifetimes of these structures up to13 100 Years! 22
  • 23. Responsible Economics 30% Through proper mitigation, costs can be reduced by as much as14 23
  • 24. Harnessing the expertise of those trained to handle these types of projects brings about the culmination of The Coating Solution. Certified Personnel 24
  • 25. 25 Proper Assessment & Selection + Qualified Applicators & Contractors + Certified Inspectors The Coating Solution Quality Job=
  • 26. The Coating Solution Forum presents: The Importance of Corrosion Prevention — Presented by: REINFORCING OUR NATION’S INFRASTRUCTURE.
  • 29. 29 1 NACE® International 2 Transportation for America 3 Transportation for America 4 Transportation for America 5 Transportation for America 6 The United States Corrosion Study / NACE® International 7 The United States Corrosion Study / NACE® International 8 NACE® International 9 NACE® International 10 NACE® International 11 NACE® International 12 NAVFAC (Naval Facilities Engineering Command) 13 NACE® International 14 NACE® International Appendix