Contract Management
D. Vasudevan
Agenda
• Contract and Contract Management
• Contract Management Life cycle
• Key Elements of Contract Management
• Issues involved in managing contracts
What is a Contract ?
• A contract is an agreement between two or more
people that is legally binding. A contract can be
verbal or written.
• The contract, in terms of enforceability, includes
an offer and an acceptance, has consideration
for the exchange, clearly sets out the terms of
the agreement without ambiguity and is signed
by the involved parties who have the proper
capacity to enter into the contract
Contract management
• Contract management is the process
which ensures all parties to a contract fully
meet their obligations, in order to satisfy
the operational objectives of the contract
and the strategic business goals of the
customer.
Why Contract management ?
• Risk is the chance of an event occurring that would cause
actual project circumstances to differ from those assumed
when forecasting project benefits and costs.
• Effective contract management incorporates identifying,
monitoring and managing all risks and opportunities over
the life of the project contract to achieve project objectives
and value for money outcomes.
• Risks not identified cannot be proactively managed.
They can be very damaging. Risks cannot be correctly
identified unless there are clear project objectives that
provide an unambiguous description of success for the
project.
Contract Management Lifecycle
• Procurement Stage
• Execution Stage
• Service Delivery Stage
• Closing Stage
Effective contract management must take account of and adapt to changing
circumstances and significant events through the project lifecycle.
Contract Management Issues
Procurement Stage
• Resourcing
• Planning & Development
• Developing Tools
• Integrate Management
aspects in the contract
• Key Performance
Indicators
• Defining Governance
Responsibilities
Execution Stage
• Managing Performance
• Managing Relationships
• Managing Changes
• Managing Contingencies
• Managing Documents
and records
• Executing Governance
Responsibilities
1 of 2
Contract Management Issues
Service Delivery
• Managing Performance
• Managing Relationship
• Managing Changes
• Managing Contingencies
• Managing Documents
and Records
• Delivering Governance
Responsibilities
Contract Closure
• Managing Compliance
• Maintaining Relationships
• Documenting Changes
• Regularizing Contingencies
• Saving Documents for
Asset Mangement
• Informing the Management
of the closure
2 of 2
Procurement Process
• The foundations for effective contract and
performance management are typically set during the
procurement planning process;
• a sound contractual basis for effective contract
management is incorporated in the contract;
• there is adequate knowledge transfer from the
procurement team to the contract management team;
• the contract management strategy for the project is in
place as soon as practical after the contract is
executed.
The relationship between contract
management and the procurement process
Contract Management Team
• Small team
• Skills need to cover
– Project Management
– Technical
– Financial
– Legal
• Authority to negotiate
Effective contract risk
management requires the
dedication of appropriate financial
resources and experienced
personnel to the establishment of
a contract risk management
strategy during the procurement
phase of the project and the
maintenance of that strategy
throughout the project lifecycle.
Ideal Contract
• Allocation of risk
• Service requirements
• Value for Money Mechanisms
• Procedures for contract management
Service Level
• The Contract should set out clearly the
expected performance and Quality
• Who is responsible for what needs to be
clear, both mutual and individual
• Flexibility especially in early stages of long
term contracts
• Enter into mutual Service Level
Agreements
Developing a contract
management strategy
Key Elements of effective
Contract Management
• Planning, Information Collection and Analysis
• Contract Administration
• Performance Reporting and Monitoring
• Relationship management, dispute resolution and issue
management
• Governance, probity and compliance
• Knowledge and Information management
• Change management
• Contingency Planning
• Ongoing Review
• Contract Management Training
Planning, Information Collection
and Analysis
• Contract management personnel understand the legislative, regulatory
and commercial context of the project.
• All the key risks of the project are identified and are updated as
necessary over time.
• The likelihood of each risk materialising, and its potential consequences
and impact on project objectives have been assessed.
• Possible controls and mitigations for each risk have been identified,
assessed and implemented.
• Interdependencies between risks are understood.
• Potential changes in the project’s risk profile over its lifecycle have been
considered, planned for and responded to.
• Good contract management is not reactive, but aims to anticipate
and respond to business needs of the future.
Information
Collection and
Analysis
Information Sources
• the business case for the
project
• project risk analysis conducted
by the procurement team for
the purpose of developing the
contractual allocation of project
risk between the parties
• the project contract documents
• associated financial, structural
and organisational details
• interviews with the procurement
team and their advisers
• existing risk management tools
within the organisation
Contract Administration
• Contract administration requires an understanding of the legal
documentation for the project and also:
– the commercial intent of the parties
– the operating, industry and community issues associated with service provision
– the legislative and regulatory context in which the project operates
• It is the best practice to prepare a comprehensive Contract
Administration Manual that enables the Project Director to
understand the key contract provisions and the environment in
which the contract must be administered, which will specify:
– What needs to be done, by whom and when ?
– How will employer’s role be performed ?
– What are the ramifications of any non-performance or default by
either party and how these should be addressed ?
Performance Reporting and
Monitoring
• Performance measures lie at the heart of performance management and
it is important that performance measures are linked to strategic
objectives, or to desired outcomes.
• The employer understands the contractor’s internal operating
environment, such as its cash flows. It is through this understanding that
the employer can derive an awareness of the private party’s strengths
and weaknesses, including financial performance.
• The Employer monitors ‘soft’ indicators of the management quality of
contractor looking for weaknesses or trends that may provide an early
indication of trouble ahead.
• The employer regularly reviews the quality of the service as measured
against the KPIs and output specifications.
• Having assessed the data collected through these monitoring activities,
the employer takes appropriate action to mitigate or control any risks that
are materialising, and to maximise value for money from the project.
Performance
Monitoring
• The stepped approach to
performance reporting:
Step 1: Understanding the
business
• Strategic and Project level
requirements
• Cash flows, Project costs and debts
• Risks
Step 2: Analyse the underlying
quality of the project
• Financial Health
• Management Quality
• Service Performance
Step 3: Reporting requirements
• Internal MIS
• Senior Management
• Government and Parliament
Relationship Management, Dispute
Resolution and Issue management
• It is imperative to maintain a strong relationship between the employer
and the contractor. Good relationship management enables the parties
to anticipate risk events more effectively and deal with those risks that
do materialise.
• Good communication and a strong relationship are essential,
especially if issues arise which go to the heart of the contract’s
operation.
• It is also important to recognise that disputes and service delivery
issues most likely will arise and will need to be appropriately managed.
• If the parties have strong dispute and issue management principles
and procedures in place, these will help minimise damage to the
relationship and assist the parties to achieve success in the project.
Relationship Management
• Establishing relationship management structures
– Senior Management Support; Peer to Peer communication; separation
of roles; Defined roles and responsibilities; escalation paths
• Understanding one another
– Objectives and expectations; future plan and directions; concerns about
wider relationship; Opinion surveys
• Establishing and using communication channels
– Formal and informal contact points; horizontal and vertical
communications; documenting verbal communication
• Relationship management and succession planning
• Monitoring the Relationship
Governance, Probity & Compliance
• It is the duty of the employer in ensuring appropriate
governance, probity and compliance practices are
established within the organisation and in its interactions
with the contractors and any other government
stakeholders.
• This assists the employer to comply with relevant laws,
regulations, and government policy.
Knowledge and Information
Management
• Employer’s ability to successfully manage a contract can
depend upon the Project Director having an effective
knowledge and information management strategy tailored
to the project’s needs.
• In a well-managed project, the Project Director ensures
the information collected in relation to a project is
maintained, periodically reviewed, and organised for easy
retrieval and access. These practices assist the employer
to comply with:
– record-keeping obligations
– disclosure obligations, such as those under RTI act
– intellectual property laws and confidentiality obligations
Change Management
• During the lifecycle of any project, it is likely that a
number of changes will occur, requiring proper
management.
• Changes may be contemplated at the time of
procurement and provided for in the contract, or not
contemplated during procurement but seen as
desirable or necessary alterations to services or the
contract.
• In either case, change events are both a source of risk
and a potential opportunity to extract additional
benefits from the project.
Change Management
• Good change management processes incorporate
the following features:
– Appropriate protocols are in place to manage change
– Appropriate staff have the authority to request and authorise changes
– Potential changes are assessed thoroughly by suitably experienced
personnel, having consulted with all relevant stakeholders
– Changes are appropriately prioritised and their implementation is
properly resourced
– The implementation of changes is controlled and tested
– Changes are appropriately documented
– Changes do not compromise value for money outcomes
Contingency Planning
• It may not be possible to fully transfer responsibility for the risk of service
delivery failure to the contractor.
• If the contractor fails to deliver services according to the requirements of
the contract, the employer, and possibly government as a whole, may
retain accountability, and potentially face adverse reaction from end
users and third parties.
• In addition, the contractor’s obligation to provide services may be
suspended through the operation of force majeure provisions. If so, the
employer may be compelled or subjected to strong pressure to ensure
that the public or other third parties are not inconvenienced by a
disruption to the supply of those services.
• Effective contingency planning is that the employer can react to
unplanned events and control the impact of these events on service
delivery value for money outcomes.
Ongoing Review
• Contract management processes must change and adapt
throughout the lifecycle of a contract, and therefore should
be reviewed on an ongoing basis to ensure that
management is sufficiently informed of current and
emerging risks and issues.
• In addition to regular reviews, the impact of the following
events should be considered as and when they occur:
– divergence between each party’s expectations and actual project outcomes
– changes in the project itself through change events, contingency events, or
as a result of the project moving from one stage to another in its lifecycle
– changes in the external environment in which the project operates.
Contract Management Training
• For contract management to be effective, Project Directors
need not only a strong knowledge of the basics, but also a
detailed practical understanding of commercial and legal
dimensions of contract management. The training will meet
this second need.
• As this practical understanding is vital to the success of the
Project Director, and the contract management team, in
implementing effective contract management practices, the
training will be mandatory for employer’s personnel
involved in the management of projects.
Thanks …
dvasudevan@outlook.com

More Related Content

PPT
Contract management.ppt
PPTX
Contract management
PPTX
Overview to contract management
PPT
Effective Contract Management
PPTX
3 Step Contract Management System
PPTX
Procurement- Contract Management
PPTX
Contract management
Contract management.ppt
Contract management
Overview to contract management
Effective Contract Management
3 Step Contract Management System
Procurement- Contract Management
Contract management

What's hot (20)

PDF
contract management, stages of contract management
PPTX
contract administration PPT
PPTX
Contract Management
PPTX
Construction contract
PPTX
CONTRACT ADMINISTRATION- Presentation dated 22.11.16
PPT
Contract Management
PDF
Procurement in construction
PPTX
Chapter_2-Procurement and Contract management.pptx
PDF
Contract negotiation
PPTX
Procurement management
PDF
Project procuremenet contract in ethiopia
PPTX
Tendering Bidding & Award of Contract Final Draft
PPTX
PPTX
Procurement management
PPTX
Tendering process, Bid Evaluation & Award Process
PDF
Introduction to contract management
PPT
Contract management sys
PPT
L8_PROJECT CONTRACT Management.ppt
contract management, stages of contract management
contract administration PPT
Contract Management
Construction contract
CONTRACT ADMINISTRATION- Presentation dated 22.11.16
Contract Management
Procurement in construction
Chapter_2-Procurement and Contract management.pptx
Contract negotiation
Procurement management
Project procuremenet contract in ethiopia
Tendering Bidding & Award of Contract Final Draft
Procurement management
Tendering process, Bid Evaluation & Award Process
Introduction to contract management
Contract management sys
L8_PROJECT CONTRACT Management.ppt
Ad

Similar to Contract management general (20)

PPTX
chapter 6 of human resource management (6).pptx
PDF
Ahmed Faheem Resume 17-04-2016
PPTX
Week 2- Lecture 2.hbhbjbjbjbjbjbjvjvjvjvjv
PDF
Post Award Contract Management for IT Suppliers v1.0 20200701
DOCX
Contracting Process Paper CPMGT_302.docx
PDF
Topic 6 - Project Integration Management.pdf
PPTX
Facility management
DOCX
Contracting process paper cpmgt302september 21, 2015
PDF
Project Stakeholders’ Role for its Success or Failure
PPT
Lecture 2
PPTX
Manage Your Organization's Contract Risks Final
PDF
Amr hassan
PDF
0.Commercial Management slides _Lvl3.pdf
PPTX
Managing the Consulting Engagement
PPTX
Online PMP Training Material for PMP Exam - Integration Management Knowledge ...
PPTX
4. Project Delivery System and Meeting.pptx
DOC
KD VM.doc 150716
PPTX
LN I - PPT.pptx
DOC
Richard Chiou - Resume (12-22-15)
PDF
L7_PROJECT PROCUREMENT Management.pdf
chapter 6 of human resource management (6).pptx
Ahmed Faheem Resume 17-04-2016
Week 2- Lecture 2.hbhbjbjbjbjbjbjvjvjvjvjv
Post Award Contract Management for IT Suppliers v1.0 20200701
Contracting Process Paper CPMGT_302.docx
Topic 6 - Project Integration Management.pdf
Facility management
Contracting process paper cpmgt302september 21, 2015
Project Stakeholders’ Role for its Success or Failure
Lecture 2
Manage Your Organization's Contract Risks Final
Amr hassan
0.Commercial Management slides _Lvl3.pdf
Managing the Consulting Engagement
Online PMP Training Material for PMP Exam - Integration Management Knowledge ...
4. Project Delivery System and Meeting.pptx
KD VM.doc 150716
LN I - PPT.pptx
Richard Chiou - Resume (12-22-15)
L7_PROJECT PROCUREMENT Management.pdf
Ad

Recently uploaded (20)

PDF
Budora Case Study: Building Trust in Canada’s Online Cannabis Market
PPT
chap9.New Product Development product lifecycle.ppt
PPTX
ENTREPRENEURSHIP..PPT.pptx..1234567891011
PDF
Decision trees for high uncertainty decisions
PDF
Meme Coin Empire- Launch, Scale & Earn $500K-Month_3.pdf
PDF
AI Cloud Sprawl Is Real—Here’s How CXOs Can Regain Control Before It Costs Mi...
PPTX
Daily stand up meeting on the various business
PPTX
_From Idea to Revenue How First-Time Founders Are Monetizing Faster in 2025.pptx
PDF
Why Has Vertical Farming Recently Become More Economical.pdf
PPT
Chap8. Product & Service Strategy and branding
PPTX
Peerless Plumbing Company-Fort Worth.pptx
PPTX
ELS-07 Lifeskills ToT PPt-Adama (ABE).pptx
PDF
Pollitrace pitch deck- Ai powered multiple species
PDF
Driving Innovation & Growth, Scalable Startup IT Services That Deliver Result...
PDF
Investment Risk Assessment Brief: Zacharia Ali and Associated Entities
PPTX
Process-and-Ethics-in-Research-1.potatoi
PPTX
TimeBee vs. Toggl: Which Time Tracking Tool is Best for You?
PDF
Chapter 3 - Business environment - Final.pdf
PDF
Business Risk Assessment and Due Diligence Report: Zacharia Ali and Associate...
PDF
Chapter 1 - Introduction to management.pdf
Budora Case Study: Building Trust in Canada’s Online Cannabis Market
chap9.New Product Development product lifecycle.ppt
ENTREPRENEURSHIP..PPT.pptx..1234567891011
Decision trees for high uncertainty decisions
Meme Coin Empire- Launch, Scale & Earn $500K-Month_3.pdf
AI Cloud Sprawl Is Real—Here’s How CXOs Can Regain Control Before It Costs Mi...
Daily stand up meeting on the various business
_From Idea to Revenue How First-Time Founders Are Monetizing Faster in 2025.pptx
Why Has Vertical Farming Recently Become More Economical.pdf
Chap8. Product & Service Strategy and branding
Peerless Plumbing Company-Fort Worth.pptx
ELS-07 Lifeskills ToT PPt-Adama (ABE).pptx
Pollitrace pitch deck- Ai powered multiple species
Driving Innovation & Growth, Scalable Startup IT Services That Deliver Result...
Investment Risk Assessment Brief: Zacharia Ali and Associated Entities
Process-and-Ethics-in-Research-1.potatoi
TimeBee vs. Toggl: Which Time Tracking Tool is Best for You?
Chapter 3 - Business environment - Final.pdf
Business Risk Assessment and Due Diligence Report: Zacharia Ali and Associate...
Chapter 1 - Introduction to management.pdf

Contract management general

  • 2. Agenda • Contract and Contract Management • Contract Management Life cycle • Key Elements of Contract Management • Issues involved in managing contracts
  • 3. What is a Contract ? • A contract is an agreement between two or more people that is legally binding. A contract can be verbal or written. • The contract, in terms of enforceability, includes an offer and an acceptance, has consideration for the exchange, clearly sets out the terms of the agreement without ambiguity and is signed by the involved parties who have the proper capacity to enter into the contract
  • 4. Contract management • Contract management is the process which ensures all parties to a contract fully meet their obligations, in order to satisfy the operational objectives of the contract and the strategic business goals of the customer.
  • 5. Why Contract management ? • Risk is the chance of an event occurring that would cause actual project circumstances to differ from those assumed when forecasting project benefits and costs. • Effective contract management incorporates identifying, monitoring and managing all risks and opportunities over the life of the project contract to achieve project objectives and value for money outcomes. • Risks not identified cannot be proactively managed. They can be very damaging. Risks cannot be correctly identified unless there are clear project objectives that provide an unambiguous description of success for the project.
  • 6. Contract Management Lifecycle • Procurement Stage • Execution Stage • Service Delivery Stage • Closing Stage Effective contract management must take account of and adapt to changing circumstances and significant events through the project lifecycle.
  • 7. Contract Management Issues Procurement Stage • Resourcing • Planning & Development • Developing Tools • Integrate Management aspects in the contract • Key Performance Indicators • Defining Governance Responsibilities Execution Stage • Managing Performance • Managing Relationships • Managing Changes • Managing Contingencies • Managing Documents and records • Executing Governance Responsibilities 1 of 2
  • 8. Contract Management Issues Service Delivery • Managing Performance • Managing Relationship • Managing Changes • Managing Contingencies • Managing Documents and Records • Delivering Governance Responsibilities Contract Closure • Managing Compliance • Maintaining Relationships • Documenting Changes • Regularizing Contingencies • Saving Documents for Asset Mangement • Informing the Management of the closure 2 of 2
  • 9. Procurement Process • The foundations for effective contract and performance management are typically set during the procurement planning process; • a sound contractual basis for effective contract management is incorporated in the contract; • there is adequate knowledge transfer from the procurement team to the contract management team; • the contract management strategy for the project is in place as soon as practical after the contract is executed.
  • 10. The relationship between contract management and the procurement process
  • 11. Contract Management Team • Small team • Skills need to cover – Project Management – Technical – Financial – Legal • Authority to negotiate Effective contract risk management requires the dedication of appropriate financial resources and experienced personnel to the establishment of a contract risk management strategy during the procurement phase of the project and the maintenance of that strategy throughout the project lifecycle.
  • 12. Ideal Contract • Allocation of risk • Service requirements • Value for Money Mechanisms • Procedures for contract management
  • 13. Service Level • The Contract should set out clearly the expected performance and Quality • Who is responsible for what needs to be clear, both mutual and individual • Flexibility especially in early stages of long term contracts • Enter into mutual Service Level Agreements
  • 15. Key Elements of effective Contract Management • Planning, Information Collection and Analysis • Contract Administration • Performance Reporting and Monitoring • Relationship management, dispute resolution and issue management • Governance, probity and compliance • Knowledge and Information management • Change management • Contingency Planning • Ongoing Review • Contract Management Training
  • 16. Planning, Information Collection and Analysis • Contract management personnel understand the legislative, regulatory and commercial context of the project. • All the key risks of the project are identified and are updated as necessary over time. • The likelihood of each risk materialising, and its potential consequences and impact on project objectives have been assessed. • Possible controls and mitigations for each risk have been identified, assessed and implemented. • Interdependencies between risks are understood. • Potential changes in the project’s risk profile over its lifecycle have been considered, planned for and responded to. • Good contract management is not reactive, but aims to anticipate and respond to business needs of the future.
  • 17. Information Collection and Analysis Information Sources • the business case for the project • project risk analysis conducted by the procurement team for the purpose of developing the contractual allocation of project risk between the parties • the project contract documents • associated financial, structural and organisational details • interviews with the procurement team and their advisers • existing risk management tools within the organisation
  • 18. Contract Administration • Contract administration requires an understanding of the legal documentation for the project and also: – the commercial intent of the parties – the operating, industry and community issues associated with service provision – the legislative and regulatory context in which the project operates • It is the best practice to prepare a comprehensive Contract Administration Manual that enables the Project Director to understand the key contract provisions and the environment in which the contract must be administered, which will specify: – What needs to be done, by whom and when ? – How will employer’s role be performed ? – What are the ramifications of any non-performance or default by either party and how these should be addressed ?
  • 19. Performance Reporting and Monitoring • Performance measures lie at the heart of performance management and it is important that performance measures are linked to strategic objectives, or to desired outcomes. • The employer understands the contractor’s internal operating environment, such as its cash flows. It is through this understanding that the employer can derive an awareness of the private party’s strengths and weaknesses, including financial performance. • The Employer monitors ‘soft’ indicators of the management quality of contractor looking for weaknesses or trends that may provide an early indication of trouble ahead. • The employer regularly reviews the quality of the service as measured against the KPIs and output specifications. • Having assessed the data collected through these monitoring activities, the employer takes appropriate action to mitigate or control any risks that are materialising, and to maximise value for money from the project.
  • 20. Performance Monitoring • The stepped approach to performance reporting: Step 1: Understanding the business • Strategic and Project level requirements • Cash flows, Project costs and debts • Risks Step 2: Analyse the underlying quality of the project • Financial Health • Management Quality • Service Performance Step 3: Reporting requirements • Internal MIS • Senior Management • Government and Parliament
  • 21. Relationship Management, Dispute Resolution and Issue management • It is imperative to maintain a strong relationship between the employer and the contractor. Good relationship management enables the parties to anticipate risk events more effectively and deal with those risks that do materialise. • Good communication and a strong relationship are essential, especially if issues arise which go to the heart of the contract’s operation. • It is also important to recognise that disputes and service delivery issues most likely will arise and will need to be appropriately managed. • If the parties have strong dispute and issue management principles and procedures in place, these will help minimise damage to the relationship and assist the parties to achieve success in the project.
  • 22. Relationship Management • Establishing relationship management structures – Senior Management Support; Peer to Peer communication; separation of roles; Defined roles and responsibilities; escalation paths • Understanding one another – Objectives and expectations; future plan and directions; concerns about wider relationship; Opinion surveys • Establishing and using communication channels – Formal and informal contact points; horizontal and vertical communications; documenting verbal communication • Relationship management and succession planning • Monitoring the Relationship
  • 23. Governance, Probity & Compliance • It is the duty of the employer in ensuring appropriate governance, probity and compliance practices are established within the organisation and in its interactions with the contractors and any other government stakeholders. • This assists the employer to comply with relevant laws, regulations, and government policy.
  • 24. Knowledge and Information Management • Employer’s ability to successfully manage a contract can depend upon the Project Director having an effective knowledge and information management strategy tailored to the project’s needs. • In a well-managed project, the Project Director ensures the information collected in relation to a project is maintained, periodically reviewed, and organised for easy retrieval and access. These practices assist the employer to comply with: – record-keeping obligations – disclosure obligations, such as those under RTI act – intellectual property laws and confidentiality obligations
  • 25. Change Management • During the lifecycle of any project, it is likely that a number of changes will occur, requiring proper management. • Changes may be contemplated at the time of procurement and provided for in the contract, or not contemplated during procurement but seen as desirable or necessary alterations to services or the contract. • In either case, change events are both a source of risk and a potential opportunity to extract additional benefits from the project.
  • 26. Change Management • Good change management processes incorporate the following features: – Appropriate protocols are in place to manage change – Appropriate staff have the authority to request and authorise changes – Potential changes are assessed thoroughly by suitably experienced personnel, having consulted with all relevant stakeholders – Changes are appropriately prioritised and their implementation is properly resourced – The implementation of changes is controlled and tested – Changes are appropriately documented – Changes do not compromise value for money outcomes
  • 27. Contingency Planning • It may not be possible to fully transfer responsibility for the risk of service delivery failure to the contractor. • If the contractor fails to deliver services according to the requirements of the contract, the employer, and possibly government as a whole, may retain accountability, and potentially face adverse reaction from end users and third parties. • In addition, the contractor’s obligation to provide services may be suspended through the operation of force majeure provisions. If so, the employer may be compelled or subjected to strong pressure to ensure that the public or other third parties are not inconvenienced by a disruption to the supply of those services. • Effective contingency planning is that the employer can react to unplanned events and control the impact of these events on service delivery value for money outcomes.
  • 28. Ongoing Review • Contract management processes must change and adapt throughout the lifecycle of a contract, and therefore should be reviewed on an ongoing basis to ensure that management is sufficiently informed of current and emerging risks and issues. • In addition to regular reviews, the impact of the following events should be considered as and when they occur: – divergence between each party’s expectations and actual project outcomes – changes in the project itself through change events, contingency events, or as a result of the project moving from one stage to another in its lifecycle – changes in the external environment in which the project operates.
  • 29. Contract Management Training • For contract management to be effective, Project Directors need not only a strong knowledge of the basics, but also a detailed practical understanding of commercial and legal dimensions of contract management. The training will meet this second need. • As this practical understanding is vital to the success of the Project Director, and the contract management team, in implementing effective contract management practices, the training will be mandatory for employer’s personnel involved in the management of projects.