PREFACE
In huge infrastructure facilities and projects, such as power plants, unfortunately it is not always possible to
prevent poor installation quality. Discovering poor quality at a late stage can add an exponential increase
to the costs, with dreadful consequences for the client and the development of the whole plant. To the the
contrary, by using the Supply Chain risk mitigation methods enabling good surveillance for quality, there is a
chance to discover poor quality early thus allowing for immediate solution.
https://www.statsengineering.com
CONTROLLING THE POWER PLANT AND INFRASTRUCTURE PROJECTS SUPPLY CHAIN
A project is a set of activities with a defined start point and a defined end state, which pursues a defined goal and uses a defined set of
resources with a common goal for which we try to control costs, resource usage, completion time, and quality of the output.
Supply Chain Management in power industry is a critical activity for the success of the project and the industry required supply chain
practitioners with diverse knowledge not only on the business side but on also on the technical side enable them to procure the right tools
and services at competitive price and quality with minimum risk exposure.
The understanding and practicing of supply chain management (SCM) has become an essential prerequisite for staying competitive in the
global race and for enhancing profitability.
Defining Project
https://www.statsengineering.com
Proportions of Projects that encounter Cost & Time Control
Proportion of Projects Time overrun Cost Overrun
> 90% 2.9% 4.4%
60 - 90% 1.5% 7.4%
40 - 60% 8.8% 11.8%
10 - 40% 48.5% 35.3%
< 10% 38.2% 41.2%
Reference; Cost & Time Control of Construction Projects by Yakubu Adisa Olawale
Construction management and Economics
Why the Need for Supply Chain Management
Survey conducted on 250 construction projects in UK
https://www.statsengineering.com
Controlling the Power Plant and infrastructure projects supply chain
CONTROLLING THE POWER PLANT AND INFRASTRUCTURE PROJECTS SUPPLY CHAIN
Supply chain is NOT a CHAIN of businesses
BUT A NETWORK of businesses & relationships
That offers the opportunity to capture the full potential of intra and inter-company integration and management to organize – people,
activities, information and resources involved in moving a product at the right quantities, right locations and at right time when linking them
from supplier to end-user satisfying the service level requirements. In other words it is management to efficiently integrate all resources.
https://www.statsengineering.com
CONTROLLING THE POWER PLANT AND INFRASTRUCTURE PROJECTS SUPPLY CHAIN
Power plants have:
1. Complex structures.
2. Involve large amounts of capital.
3. long-running construction period.
4. Multivendor supply chain.
5. Complex procedures and activities and equipment integration.
For example: A coal fired power plant of the 700 MW class consists of approximately 9000 activities
and 18000 logic links to determine the critical path and to identify schedule changes and subsequent
impacts.
(www.energy.siemens.com/hq/...power-plants/1_Successful_Complementation.)
https://www.statsengineering.com
POWER PLANT CONSTRUCTION SUPPLY CHAIN
A CRITICAL PHASE.
The construction phase is identified as a critical phase in power projects supply chain where
many unforeseen factors occur.( Article - Supply Chain Risk Management in power industry-
Vienna University of technology) Failure to manage project risks leads to significant
problems for the project and a project risk management in the supply chain in the
construction stage of power plant projects should be conducted to achieve and support:
 Shorter construction periods.
 Mitigate uncertainty factors and considerably high risks.
 Prevent time delays and cost overruns .
 Deliver quality.
https://www.statsengineering.com
BENEFITS OF SUPPLY CHAIN IN CONSTRUCTING A POWER PLANT
Supply chain has immense benefits to the adding value while minimizing total cost of project. Some of the benefits are listed below:
 Decrease in inventory cost by more accurate estimation and scheduling construction
execution to match it,
 Reduce the overall construction cost by streamlining the flow of supplies to the
execution process and by improving information flow between the agencies,
 Improve client’s satisfaction by offering better qualities, timely completion of projects and
minimizing the costs,
 Reduce the replenishment time of the supplies at the construction sites,
 Helps in accurate forecasting of change orders and making available actual estimation
information to all levels, Helps in standardizing of construction processes by
implementing quality assurance plan,
https://www.statsengineering.com
Sample of a System of Multiplier Supplier – Integrated Supply Chain Systems
CLIENT FEED & DESIGN ENGINEERING
PROCUREMENT
(VENDORS
LOGISTIC
OPERATION COMMISSIONING
PROJECT
COMPLETION
SITE
SUBCONTRACTORS
/SUPPLIERS
MAIN CONTRACTOR
Source: Supply Chain Improvement in Construction Industry- National technical University of Athens-Greece.
https://www.statsengineering.com
Supply Chain Risks
0
1
2
3
4
5
6
Rating of Concern on a scale of 1-10 (10 Indicating greatest Concern)
Reference: Managing Risk in the Global Supply Chain faculty - University of Tennessee
https://www.statsengineering.com
Supply Chain Risks Mitigation
0
1
2
3
4
5
6
7
8
Preference on a scale of 1-10 (10 Being Most Preferred )
Reference: Managing Risk in the Global Supply Chain faculty - University of Tennessee
https://www.statsengineering.com
Supply Chain Risks- Influencing factor when constructing a Power Plant
0
1
2
3
4
5
6
Right Contractors &
Subcontractors
Strong QA/QC
Strong Supplier Visibility & Due
Diligence
Expediting &
Inprocess
Inspection
Best Practice for
Shipping, Clearing &
Packaging - Pre
Shipment Inspection
PreShipment
Inspection
Purchase Insurance
Rating of Concern on a scale of 1-10)
Quality
RiskofSupplierFailure
Design
Consideration
MeetingClient
Expectation
Wrong
Specificationfor
Manufacturing
TransitLossduetoPoor
Packaging/Accidents
Customs
Political
Instability
R
I
S
K
S
https://www.statsengineering.com
TRADITIONAL COST AND HIDDEN COST OF POOR QUALITY( COPQ)
Hidden COPQ: The costs
incurred to deal with these
chronic problems
https://www.statsengineering.com
Traditional Cost
Hidden Cost
Quality and Supply Chain Management advantages
Source: Effectiveness of quality in Supply Chain management- Noida International University-India.
https://www.statsengineering.com
SUPPLY CHAIN RISK MITIGATION MEASURES- PROCUREMENT AND
CONSTRUCTION
1. Selection of Right Vendors and Suppliers.
2. Continuous Quality Surveillance System at site.
3. Listing Inhibitive and Mitigation Measures.
4. Understanding Critical Path for time Analysis and management.
5. Understanding importance of Criticality Index for reliability
https://www.statsengineering.com
Factory Evaluation – Vendor Assessment Procurement
VMT- Verification of Manufacturers testing Product Quality
In-process and Factory Acceptance Testing Product Conformance as per purchase specification.
Pre- Shipment Inspections Shipping of lesser quality material to the site.
Receipt Inspections by the means of enterprise part tracking system Receiving wrong or lesser quality material /substitute material
SQR pre-shipment and site QA/QC program guidelines and checklists Non Conventional and sub standard loading and unloading practices
SQR Guidelines for Marking and Packaging for shipping equipments Non Standard Packaging and Damage in transit
SQR Guideline for preservation and checklist for conformance of activity Non Standard preservation of critical equipments on site
SQR site QA/QC program and site material handling guidelines and checklists Defective or Non Standard methods of material handling on site.
SAT, after installation, Verification of performance as per PTC and relevant
standards after commissioning.
Commissioning of Power Plant/Infra Projects
Addressing Supply chain High Impact factors for quality-Solutions to the key
issues from SQR
https://www.statsengineering.com
Professional Services
To address following issues
Thank
you
CONTROLLING THE POWER PLANT
AND INFRASTRUCTURE PROJECTS
SUPPLY CHAIN
https://www.statsengineering.com

More Related Content

PDF
Prdz_resume_march16
PDF
HOCH,_Randall_E_2
PDF
Cost Engineering for Turn Arounds
PDF
Samir Patil 16 YRs EXP
PDF
shaunDSmithResume_NR
DOCX
Resume (updated 060515) for Evelyn Maes
PDF
Allen Schmitgen Resume' #12
PPTX
LinkedIn2017
Prdz_resume_march16
HOCH,_Randall_E_2
Cost Engineering for Turn Arounds
Samir Patil 16 YRs EXP
shaunDSmithResume_NR
Resume (updated 060515) for Evelyn Maes
Allen Schmitgen Resume' #12
LinkedIn2017

Similar to Controlling quality supply chain issues for infrastructure projects (20)

PDF
IRJET- Review on Risk Assessment of Supply Chain Management in Constructi...
DOCX
Nilesh More_Project Manager
DOCX
MUKUL PATEL 21042016
PDF
Investigation of Supply Chain Management in Construction Companies
PDF
Quality management at construction projects: Case study of a stormwater netwo...
PDF
Quality management at construction projects: Case study of a stormwater netwo...
PPTX
Chapter 2 - Develop an End-to-end Process Architecture
PPTX
Ch 2 develop an end-to-end process architecture
PPTX
Total Cost Management - Synergy between Cost Estimating and Project Controls
PDF
Quality Control in Infrastructure Development
DOCX
JAYANT KUMAR
PDF
Petrotech Presenttaion- Punj Lloyd
PDF
Midstream Automation, Instrumentation & Control Congress 2015
PDF
IRJET- Construction Quality Management on Site
PPTX
Project Collaboration on Infrastructure Megaprojects - Webinar, June 3, 2015
PDF
Offshore Wind Energy: Improving Project Development and Supply Chain Processe...
PDF
Operational Efficiency Based on Innovative Automation, Industry Expertise, En...
PDF
Aquaculture Facility Rehabilitation - Presentation 04-29-2013
PDF
Choudhary Divyang Resume
PDF
EPC_Enterprise_Systems_Deck
IRJET- Review on Risk Assessment of Supply Chain Management in Constructi...
Nilesh More_Project Manager
MUKUL PATEL 21042016
Investigation of Supply Chain Management in Construction Companies
Quality management at construction projects: Case study of a stormwater netwo...
Quality management at construction projects: Case study of a stormwater netwo...
Chapter 2 - Develop an End-to-end Process Architecture
Ch 2 develop an end-to-end process architecture
Total Cost Management - Synergy between Cost Estimating and Project Controls
Quality Control in Infrastructure Development
JAYANT KUMAR
Petrotech Presenttaion- Punj Lloyd
Midstream Automation, Instrumentation & Control Congress 2015
IRJET- Construction Quality Management on Site
Project Collaboration on Infrastructure Megaprojects - Webinar, June 3, 2015
Offshore Wind Energy: Improving Project Development and Supply Chain Processe...
Operational Efficiency Based on Innovative Automation, Industry Expertise, En...
Aquaculture Facility Rehabilitation - Presentation 04-29-2013
Choudhary Divyang Resume
EPC_Enterprise_Systems_Deck
Ad

More from Aniruddha Kulkarni (8)

PDF
Hazardous area module- Zones, Method of Determination of Hazardous area Radiu...
PDF
Make Profits - Evaluate your Construction Projects
PDF
Evaluation and Rating program for Construction Quality and Task Completion
PDF
Hazardous areas series( Module1 of 18) - What is hazardous area and explosio...
PDF
Critical path presentation for timely project completion
PPSX
Electrical safety training based on osha 1910 standards sw
PPSX
Electrical testing equipment clamp meters- Usage, operations and Safety
PDF
Testing inspection and certification industry
Hazardous area module- Zones, Method of Determination of Hazardous area Radiu...
Make Profits - Evaluate your Construction Projects
Evaluation and Rating program for Construction Quality and Task Completion
Hazardous areas series( Module1 of 18) - What is hazardous area and explosio...
Critical path presentation for timely project completion
Electrical safety training based on osha 1910 standards sw
Electrical testing equipment clamp meters- Usage, operations and Safety
Testing inspection and certification industry
Ad

Recently uploaded (20)

PDF
composite construction of structures.pdf
PDF
R24 SURVEYING LAB MANUAL for civil enggi
PDF
Digital Logic Computer Design lecture notes
PPTX
CARTOGRAPHY AND GEOINFORMATION VISUALIZATION chapter1 NPTE (2).pptx
PPTX
web development for engineering and engineering
PPTX
IOT PPTs Week 10 Lecture Material.pptx of NPTEL Smart Cities contd
PPTX
MET 305 2019 SCHEME MODULE 2 COMPLETE.pptx
PDF
PPT on Performance Review to get promotions
DOCX
573137875-Attendance-Management-System-original
PPTX
Welding lecture in detail for understanding
PPTX
FINAL REVIEW FOR COPD DIANOSIS FOR PULMONARY DISEASE.pptx
PPTX
CH1 Production IntroductoryConcepts.pptx
PDF
The CXO Playbook 2025 – Future-Ready Strategies for C-Suite Leaders Cerebrai...
PPTX
Geodesy 1.pptx...............................................
PDF
SM_6th-Sem__Cse_Internet-of-Things.pdf IOT
PDF
Evaluating the Democratization of the Turkish Armed Forces from a Normative P...
PDF
Automation-in-Manufacturing-Chapter-Introduction.pdf
PPTX
CYBER-CRIMES AND SECURITY A guide to understanding
PDF
Enhancing Cyber Defense Against Zero-Day Attacks using Ensemble Neural Networks
PDF
Embodied AI: Ushering in the Next Era of Intelligent Systems
composite construction of structures.pdf
R24 SURVEYING LAB MANUAL for civil enggi
Digital Logic Computer Design lecture notes
CARTOGRAPHY AND GEOINFORMATION VISUALIZATION chapter1 NPTE (2).pptx
web development for engineering and engineering
IOT PPTs Week 10 Lecture Material.pptx of NPTEL Smart Cities contd
MET 305 2019 SCHEME MODULE 2 COMPLETE.pptx
PPT on Performance Review to get promotions
573137875-Attendance-Management-System-original
Welding lecture in detail for understanding
FINAL REVIEW FOR COPD DIANOSIS FOR PULMONARY DISEASE.pptx
CH1 Production IntroductoryConcepts.pptx
The CXO Playbook 2025 – Future-Ready Strategies for C-Suite Leaders Cerebrai...
Geodesy 1.pptx...............................................
SM_6th-Sem__Cse_Internet-of-Things.pdf IOT
Evaluating the Democratization of the Turkish Armed Forces from a Normative P...
Automation-in-Manufacturing-Chapter-Introduction.pdf
CYBER-CRIMES AND SECURITY A guide to understanding
Enhancing Cyber Defense Against Zero-Day Attacks using Ensemble Neural Networks
Embodied AI: Ushering in the Next Era of Intelligent Systems

Controlling quality supply chain issues for infrastructure projects

  • 1. CONTROLLING THE POWER PLANT AND INFRASTRUCTURE PROJECTS SUPPLY CHAIN Key Issues to look for and how they can be solved https://www.statsengineering.com
  • 2. PREFACE In huge infrastructure facilities and projects, such as power plants, unfortunately it is not always possible to prevent poor installation quality. Discovering poor quality at a late stage can add an exponential increase to the costs, with dreadful consequences for the client and the development of the whole plant. To the the contrary, by using the Supply Chain risk mitigation methods enabling good surveillance for quality, there is a chance to discover poor quality early thus allowing for immediate solution. https://www.statsengineering.com
  • 3. CONTROLLING THE POWER PLANT AND INFRASTRUCTURE PROJECTS SUPPLY CHAIN A project is a set of activities with a defined start point and a defined end state, which pursues a defined goal and uses a defined set of resources with a common goal for which we try to control costs, resource usage, completion time, and quality of the output. Supply Chain Management in power industry is a critical activity for the success of the project and the industry required supply chain practitioners with diverse knowledge not only on the business side but on also on the technical side enable them to procure the right tools and services at competitive price and quality with minimum risk exposure. The understanding and practicing of supply chain management (SCM) has become an essential prerequisite for staying competitive in the global race and for enhancing profitability. Defining Project https://www.statsengineering.com
  • 4. Proportions of Projects that encounter Cost & Time Control Proportion of Projects Time overrun Cost Overrun > 90% 2.9% 4.4% 60 - 90% 1.5% 7.4% 40 - 60% 8.8% 11.8% 10 - 40% 48.5% 35.3% < 10% 38.2% 41.2% Reference; Cost & Time Control of Construction Projects by Yakubu Adisa Olawale Construction management and Economics Why the Need for Supply Chain Management Survey conducted on 250 construction projects in UK https://www.statsengineering.com Controlling the Power Plant and infrastructure projects supply chain
  • 5. CONTROLLING THE POWER PLANT AND INFRASTRUCTURE PROJECTS SUPPLY CHAIN Supply chain is NOT a CHAIN of businesses BUT A NETWORK of businesses & relationships That offers the opportunity to capture the full potential of intra and inter-company integration and management to organize – people, activities, information and resources involved in moving a product at the right quantities, right locations and at right time when linking them from supplier to end-user satisfying the service level requirements. In other words it is management to efficiently integrate all resources. https://www.statsengineering.com
  • 6. CONTROLLING THE POWER PLANT AND INFRASTRUCTURE PROJECTS SUPPLY CHAIN Power plants have: 1. Complex structures. 2. Involve large amounts of capital. 3. long-running construction period. 4. Multivendor supply chain. 5. Complex procedures and activities and equipment integration. For example: A coal fired power plant of the 700 MW class consists of approximately 9000 activities and 18000 logic links to determine the critical path and to identify schedule changes and subsequent impacts. (www.energy.siemens.com/hq/...power-plants/1_Successful_Complementation.) https://www.statsengineering.com
  • 7. POWER PLANT CONSTRUCTION SUPPLY CHAIN A CRITICAL PHASE. The construction phase is identified as a critical phase in power projects supply chain where many unforeseen factors occur.( Article - Supply Chain Risk Management in power industry- Vienna University of technology) Failure to manage project risks leads to significant problems for the project and a project risk management in the supply chain in the construction stage of power plant projects should be conducted to achieve and support:  Shorter construction periods.  Mitigate uncertainty factors and considerably high risks.  Prevent time delays and cost overruns .  Deliver quality. https://www.statsengineering.com
  • 8. BENEFITS OF SUPPLY CHAIN IN CONSTRUCTING A POWER PLANT Supply chain has immense benefits to the adding value while minimizing total cost of project. Some of the benefits are listed below:  Decrease in inventory cost by more accurate estimation and scheduling construction execution to match it,  Reduce the overall construction cost by streamlining the flow of supplies to the execution process and by improving information flow between the agencies,  Improve client’s satisfaction by offering better qualities, timely completion of projects and minimizing the costs,  Reduce the replenishment time of the supplies at the construction sites,  Helps in accurate forecasting of change orders and making available actual estimation information to all levels, Helps in standardizing of construction processes by implementing quality assurance plan, https://www.statsengineering.com
  • 9. Sample of a System of Multiplier Supplier – Integrated Supply Chain Systems CLIENT FEED & DESIGN ENGINEERING PROCUREMENT (VENDORS LOGISTIC OPERATION COMMISSIONING PROJECT COMPLETION SITE SUBCONTRACTORS /SUPPLIERS MAIN CONTRACTOR Source: Supply Chain Improvement in Construction Industry- National technical University of Athens-Greece. https://www.statsengineering.com
  • 10. Supply Chain Risks 0 1 2 3 4 5 6 Rating of Concern on a scale of 1-10 (10 Indicating greatest Concern) Reference: Managing Risk in the Global Supply Chain faculty - University of Tennessee https://www.statsengineering.com
  • 11. Supply Chain Risks Mitigation 0 1 2 3 4 5 6 7 8 Preference on a scale of 1-10 (10 Being Most Preferred ) Reference: Managing Risk in the Global Supply Chain faculty - University of Tennessee https://www.statsengineering.com
  • 12. Supply Chain Risks- Influencing factor when constructing a Power Plant 0 1 2 3 4 5 6 Right Contractors & Subcontractors Strong QA/QC Strong Supplier Visibility & Due Diligence Expediting & Inprocess Inspection Best Practice for Shipping, Clearing & Packaging - Pre Shipment Inspection PreShipment Inspection Purchase Insurance Rating of Concern on a scale of 1-10) Quality RiskofSupplierFailure Design Consideration MeetingClient Expectation Wrong Specificationfor Manufacturing TransitLossduetoPoor Packaging/Accidents Customs Political Instability R I S K S https://www.statsengineering.com
  • 13. TRADITIONAL COST AND HIDDEN COST OF POOR QUALITY( COPQ) Hidden COPQ: The costs incurred to deal with these chronic problems https://www.statsengineering.com Traditional Cost Hidden Cost
  • 14. Quality and Supply Chain Management advantages Source: Effectiveness of quality in Supply Chain management- Noida International University-India. https://www.statsengineering.com
  • 15. SUPPLY CHAIN RISK MITIGATION MEASURES- PROCUREMENT AND CONSTRUCTION 1. Selection of Right Vendors and Suppliers. 2. Continuous Quality Surveillance System at site. 3. Listing Inhibitive and Mitigation Measures. 4. Understanding Critical Path for time Analysis and management. 5. Understanding importance of Criticality Index for reliability https://www.statsengineering.com
  • 16. Factory Evaluation – Vendor Assessment Procurement VMT- Verification of Manufacturers testing Product Quality In-process and Factory Acceptance Testing Product Conformance as per purchase specification. Pre- Shipment Inspections Shipping of lesser quality material to the site. Receipt Inspections by the means of enterprise part tracking system Receiving wrong or lesser quality material /substitute material SQR pre-shipment and site QA/QC program guidelines and checklists Non Conventional and sub standard loading and unloading practices SQR Guidelines for Marking and Packaging for shipping equipments Non Standard Packaging and Damage in transit SQR Guideline for preservation and checklist for conformance of activity Non Standard preservation of critical equipments on site SQR site QA/QC program and site material handling guidelines and checklists Defective or Non Standard methods of material handling on site. SAT, after installation, Verification of performance as per PTC and relevant standards after commissioning. Commissioning of Power Plant/Infra Projects Addressing Supply chain High Impact factors for quality-Solutions to the key issues from SQR https://www.statsengineering.com Professional Services To address following issues
  • 17. Thank you CONTROLLING THE POWER PLANT AND INFRASTRUCTURE PROJECTS SUPPLY CHAIN https://www.statsengineering.com