Create a New Work Order
Corrective Maintenance
Created by: Tony Bertram-Maxadmin-CHS
From the Start Center, click on New Work
Order icon in the Quick Insert application
The application open’s with a Work Order number
already inserted into the box. Type in a short
description of the work to be performed
Click on the Long Description box to enter
a full text edit of the work to be performed
or a full explanation of the work needed to
be done
2. Enter only information that can
help the worker know what possible
tools and materials he/she may
need to carry to the work as an
initial evaluation of what is to be
done
1. Provide as
much info as
possible
3. Click OK when finished entering description
Click on the detailed menu
arrow by Location
WAPPR
On any detailed menu, select the option
that you want to search by. Click on Select
Value
1. The Select Value box
opens and from here we
either use the browse
next/previous page arrows
2. Or type in a location and
press enter on the keyboard
1. Select from the list or
browse using next/previous
page
2. Select TK-91
Select Menu arrow Asset
1. Select Value icon
1. Only the first 500
assets can be found
using the browse
next page arrows
2. Type in a description i.e.. TANK
TANK
Use the next page
arrow to scroll
through assets
Select the Asset
number
Select Classification menu arrow and Go
To Classifications
Type in the item to classify
If this is the item you wanted to
classify the WO to select return with
value, if not click on List and do
another item search
1. Select Work Type
Select code for Work Type
Select GL Account search icon
Type in a description or use
the next page scroll arrows
Select the Zone that the work
is being performed for
Select the appropriate
charge to
Select the account
Select OK
Type in the department, Zone/Facility and
Unit/Bldg. Select the search icon for
Failure Class
Select the Failure Class of
the Asset, use scroll next
or type in a description
Select Code once found
Enter the Maintenance Planner’s
Name
1. Check the boxes as appropriate for
the WO to track
2. Select Menu for Job
Plan and select Go To
Job Plans
Select All Records or select Bookmarks
All records displayed
Choose the plan that is appropriate
If this is a plan you want to use for the work, select return with value
Select Menu for Safety
Plan
Select Go To
Safety Plans
Click on the search, then all records
If the plan you want to use is here select it.
If not, you can create a safety plan in the
Plans Tab on the Work Order
Once selected, the plan info
will show and select return with
value to place the plan on the
work order
Select Priority code,
Priority Justification and
Risk Assessment
Use select
value
Select Target Start Date
Set the Target Start
Date, for training set
to September 1st
at
08:00
Use the next
month arrow
and set time to
08:00
Now do the same for the Target
Finish. Maximo requires these to
be set before the WO can be
saved
Set month to
September using
the next month
arrow
Set time to
4:30 PM
1. Set the duration of
work, the time in
hours to complete the
task
2. If this wo is from
a service request
enter the request
number
3. Select if wo can
be interrupted
Select who
report the work
1. Click select value
2. This select value
screen will appear.
Select the person
who reported the
work
1. Select menu
2. Select Value
Identifies for whom this work
order has been created. For
example, if someone did not have
access to a computer, another
user could create the work order
on behalf of that person.
Select
Supervisor
Select the
Supervisor
Select
Lead/Craft
Select Value
Type in
persons name
or scroll menu
to next page
Create a new work order in Ibm Maximo
Select
Value
Create a new work order in Ibm Maximo
Create a new work order in Ibm Maximo
Click on the Plans Tab
One task has already been inserted from the Plans
that were selected on the work order screen. If
another task needs to be created, click on the new
row button and input the required information.
1. Type in a
description of the task
Repair crack in Coil
2. Click on the long description box and enter
a more detailed description of the work
Click OK when finished
Enter estimated duration of work
Select any
value for
inspector,
MP, MV and
date that is
needed
Select Value
Use the next page arrows to scroll or
type in a persons name and press
enter on keyboard
Click on the persons name to add them to the task
Click on the Labor Tab
1. One Craft has already been added from the Plan selected for the work order
2. To Add another Labor, click on new row and select the required information
Use the select menu arrows to select the right info
Select Craft
Once all information is entered, select the Materials Tab
Create a new work order in Ibm Maximo
Here a circuit Breaker Lockout kit has already been
selected, to add other materials select new row
A new row has already been
opened, use the select
menus to find and enter the
materials needed
Recommend select go to item master
Several ways to search for materials, simplest is
to type in a description on the item and press
enter
Gloves
Below is the search results, click on an item to open it’s location
Once you have verified that this is the material or
item you wanted, click on return with value
Fill in Quantity and
Storeroom
Go To Storerooms
Select the arrow by search and select all records
Tip: Once you find a storeroom that you will use
frequently, bookmark it for future use
Select the storeroom
Click return
with value
1. If a select person is to be issued the
materials, check direct issue and Issue to
2. Click on Services Tab
1. Clicking on Select Standard Services will open this
window, usually not used in work order creation
3. Click the Tools Tab
2. Click cancel
Click on New Row to add tools needed
1. Select the task that the tool is needed for
Select which task the tool is for
Select Value
Select the tool that is required
1. You may also want to use the Go To Tools option
2. The Tools record opens and from here select search and all
records to see a list of available tools
1. In this training presentation there is only the one tool listed, in
the production environment there should be more
2. Click on the tool to
open the tool description
3. Once you have
verified that this is the
correct tool needed for
the work, click on
return with value
1. Check the quantity and enter how many of this tool will be
needed. Some require more than one of the same tool
2. For some tools you may needed to track
the hours that the tool is in use. This
would be for tools requiring maintenance
on an hour meter and Maximo will track
this items hours and keep the record up-
to-date
3. If more tools
are needed for
this task or
another task,
click on new
row to search
for the tools
Click on the related records tab
1. Select any related work orders or tickets that are
associated with this work
2. Click on Actuals Tab
3. Click on Safety Plan
Tab
1. The actuals tab is used for keeping track of the
actual resources that were used for this work. Labor
hours, Materials, Services (could have required any
outside contractor that was not initially planned for)
and Tools
2. When completing the work order, be sure to fill
in the information here so that Maximo can track
the cost of this work
Click New Row under Hazards and Precautions
1. Select any Hazard, Hazardous Materials and Lock Out/Tag
Out that may be related to the work assignment. Use the tabs to
move through the Safety Plan
2. Click on select menu
Select Value
Select the Hazard
For training there is only the one hazard listed, in
production there are more to choose from
Click on the Hazardous Materials Tab
To add a hazardous material click on new row
1. Use the select menus to add a hazardous
material to the work order and describe each.
2. Search for
the type of
hazard
Once all hazardous materials have been identified, click on the
Lock Out/Tag Out Tab
Lock Out and Tag Out of equipment is not just a requirement, it is the core value of any
safety program. Click on new row to add requirements for this work.
Here we list hazard that requires lock out or tag out and we use the select menu arrows to
select the hazards
1. You use the same method to select the values as
before, do this for each hazard
2. List the Tag Outs for the Hazard above, click new row
Just as before use the select value arrows to select
the values for tagging out items
After selecting all Hazards, Tag Outs and Lock Outs, Click on the Log Tab
1. Here we list notes for the work that
is being done, notes maybe to notify
others of some problem, a record that
needs to be completed, a tool
requirement that may not be in the
system or any other note that may be
of interest to future work on this
equipment
Click on the Communications Tab
1. You use the Create Communication action to send messages about a
record via e-mail. When you create a communication, you can use a
communication template created in the Communication Templates
application, or you can create a free-form communication.
You can view any inbound or outbound communications associated with
a record in the Communications Log on the Log tab.
For more information about communication templates, refer to the
Communication Templates in help.
2. Click Failure
Reporting Tab
1. You use the Failure Reporting tab to record and view asset and location problems,
causes, and remedies. This data enables you to identify trends and isolate probable
causes of breakdowns. You can enter remarks in the Remarks box that will aid in future
resolutions of problems associated with the root cause of this failure
2. To change the failure code you must first delete the failure code from the work order
page and then select a new code here.
3. After going through each step in creating this work order and proving the
information required for the system to track the progress, labor, materials and cost,
clickk on the Save icon to save the work order.
The record has now been saved, if you have approval authority,
approve the work
1. Click on the select arrow
2. Click on Approved
Approving the work on any section of the work order
will also approve the task created for the work
1. All work info entered and approved.
The work is now pending scheduling by
the work scheduler.
At any point in
creating a work order
and you get stuck on
something, looking for

More Related Content

PPTX
Maximo Training - Work Management
PPTX
Maximo training - Getting Started
PPTX
Planning and Scheduling in Maximo: Best Practices and Coming Enhancements
PPT
Meters in IBM Maximo Asset Management
PDF
IBM Maximo Asset Management Training - Asset and Work Management for Chang Sh...
PDF
Maximo Scheduler 7.5.1
PPT
Failure Codes in IBM Maximo Asset Management
PPTX
Maximo 7.6 Features
Maximo Training - Work Management
Maximo training - Getting Started
Planning and Scheduling in Maximo: Best Practices and Coming Enhancements
Meters in IBM Maximo Asset Management
IBM Maximo Asset Management Training - Asset and Work Management for Chang Sh...
Maximo Scheduler 7.5.1
Failure Codes in IBM Maximo Asset Management
Maximo 7.6 Features

What's hot (20)

PPT
Classifications in IBM Maximo Asset Management
PPTX
Why upgrade to maximo v7.6
PPTX
Maximo Training - Asset Management
PPT
ibm_maximo
PPTX
Maximo Training - Inventory Management
PPTX
Maximo Planning & Scheduling - BPD Zenith Presentation
PPTX
IBM Maximo Tips & Tricks
PPTX
Maximo Training - Introduction
PPS
Maximo overview
PDF
Sap pm test scripts
PPTX
IBM Roadmap Maximo 2018
PPT
Domains in IBM Maximo Asset Management
PDF
Asset Management for Rail,Metro and Monorail
PPTX
jshaw-projetech--understanding-maximo-inventory.pptx
PPT
IBM Maximo for Utilities
PDF
IBM Maximo Asset Management
PPTX
Generic Maximo Business Processes
PPT
Attachments in IBM Maximo Asset Management
PDF
Maximo Roadmap - September 2019
PDF
Maximo integration to other systems by Bashar Mahasen
Classifications in IBM Maximo Asset Management
Why upgrade to maximo v7.6
Maximo Training - Asset Management
ibm_maximo
Maximo Training - Inventory Management
Maximo Planning & Scheduling - BPD Zenith Presentation
IBM Maximo Tips & Tricks
Maximo Training - Introduction
Maximo overview
Sap pm test scripts
IBM Roadmap Maximo 2018
Domains in IBM Maximo Asset Management
Asset Management for Rail,Metro and Monorail
jshaw-projetech--understanding-maximo-inventory.pptx
IBM Maximo for Utilities
IBM Maximo Asset Management
Generic Maximo Business Processes
Attachments in IBM Maximo Asset Management
Maximo Roadmap - September 2019
Maximo integration to other systems by Bashar Mahasen
Ad

Similar to Create a new work order in Ibm Maximo (20)

PDF
Work Order Basics
PPT
03 - SAP PM WorkOrder Presentation_EN.ppt
PPTX
PDF
Work Order Level 1
PDF
W02 - Overview of Work Order Creation
PPT
Maximo Oil and Gas 7.6.1 HSE: Work Orders Job Plans Overview
PDF
Maintenance Work Order
PDF
W05 - Work Order Routing
PPT
Maintenance Work Orders.ppt
DOC
Closing Work Orders
PDF
30632830 plant-maintenance-basics-course
PDF
W09 - Work Order Management Tools
DOCX
Quick Check Lists for Tasks (ana holiday cover 2014)
PDF
Wo Print Mgr
ZIP
New work order system
PPT
Workcenter in Odoo Manufacturing
PPT
Planning & Route Sheet.ppt
PDF
Simplifying the work order business processes at marin municipal water distri...
PDF
Automan - Material Resource Planning (MRP)
DOCX
Eam Activity Association Template
Work Order Basics
03 - SAP PM WorkOrder Presentation_EN.ppt
Work Order Level 1
W02 - Overview of Work Order Creation
Maximo Oil and Gas 7.6.1 HSE: Work Orders Job Plans Overview
Maintenance Work Order
W05 - Work Order Routing
Maintenance Work Orders.ppt
Closing Work Orders
30632830 plant-maintenance-basics-course
W09 - Work Order Management Tools
Quick Check Lists for Tasks (ana holiday cover 2014)
Wo Print Mgr
New work order system
Workcenter in Odoo Manufacturing
Planning & Route Sheet.ppt
Simplifying the work order business processes at marin municipal water distri...
Automan - Material Resource Planning (MRP)
Eam Activity Association Template
Ad

Recently uploaded (20)

PDF
Unit 1 Cost Accounting - Cost sheet
PPTX
The Marketing Journey - Tracey Phillips - Marketing Matters 7-2025.pptx
PDF
Reconciliation AND MEMORANDUM RECONCILATION
PDF
kom-180-proposal-for-a-directive-amending-directive-2014-45-eu-and-directive-...
PDF
DOC-20250806-WA0002._20250806_112011_0000.pdf
PPTX
HR Introduction Slide (1).pptx on hr intro
PPTX
New Microsoft PowerPoint Presentation - Copy.pptx
PPTX
Principles of Marketing, Industrial, Consumers,
PPTX
Probability Distribution, binomial distribution, poisson distribution
PDF
Chapter 5_Foreign Exchange Market in .pdf
PDF
Power and position in leadershipDOC-20250808-WA0011..pdf
DOCX
unit 2 cost accounting- Tender and Quotation & Reconciliation Statement
PDF
Ôn tập tiếng anh trong kinh doanh nâng cao
PDF
Stem Cell Market Report | Trends, Growth & Forecast 2025-2034
PDF
IFRS Notes in your pocket for study all the time
PPT
Data mining for business intelligence ch04 sharda
PDF
Business model innovation report 2022.pdf
DOCX
Euro SEO Services 1st 3 General Updates.docx
PDF
Katrina Stoneking: Shaking Up the Alcohol Beverage Industry
PPTX
Lecture (1)-Introduction.pptx business communication
Unit 1 Cost Accounting - Cost sheet
The Marketing Journey - Tracey Phillips - Marketing Matters 7-2025.pptx
Reconciliation AND MEMORANDUM RECONCILATION
kom-180-proposal-for-a-directive-amending-directive-2014-45-eu-and-directive-...
DOC-20250806-WA0002._20250806_112011_0000.pdf
HR Introduction Slide (1).pptx on hr intro
New Microsoft PowerPoint Presentation - Copy.pptx
Principles of Marketing, Industrial, Consumers,
Probability Distribution, binomial distribution, poisson distribution
Chapter 5_Foreign Exchange Market in .pdf
Power and position in leadershipDOC-20250808-WA0011..pdf
unit 2 cost accounting- Tender and Quotation & Reconciliation Statement
Ôn tập tiếng anh trong kinh doanh nâng cao
Stem Cell Market Report | Trends, Growth & Forecast 2025-2034
IFRS Notes in your pocket for study all the time
Data mining for business intelligence ch04 sharda
Business model innovation report 2022.pdf
Euro SEO Services 1st 3 General Updates.docx
Katrina Stoneking: Shaking Up the Alcohol Beverage Industry
Lecture (1)-Introduction.pptx business communication

Create a new work order in Ibm Maximo

  • 1. Create a New Work Order Corrective Maintenance Created by: Tony Bertram-Maxadmin-CHS
  • 2. From the Start Center, click on New Work Order icon in the Quick Insert application
  • 3. The application open’s with a Work Order number already inserted into the box. Type in a short description of the work to be performed
  • 4. Click on the Long Description box to enter a full text edit of the work to be performed or a full explanation of the work needed to be done
  • 5. 2. Enter only information that can help the worker know what possible tools and materials he/she may need to carry to the work as an initial evaluation of what is to be done 1. Provide as much info as possible 3. Click OK when finished entering description
  • 6. Click on the detailed menu arrow by Location WAPPR
  • 7. On any detailed menu, select the option that you want to search by. Click on Select Value
  • 8. 1. The Select Value box opens and from here we either use the browse next/previous page arrows 2. Or type in a location and press enter on the keyboard
  • 9. 1. Select from the list or browse using next/previous page 2. Select TK-91
  • 12. 1. Only the first 500 assets can be found using the browse next page arrows 2. Type in a description i.e.. TANK TANK
  • 13. Use the next page arrow to scroll through assets
  • 15. Select Classification menu arrow and Go To Classifications
  • 16. Type in the item to classify
  • 17. If this is the item you wanted to classify the WO to select return with value, if not click on List and do another item search
  • 19. Select code for Work Type
  • 20. Select GL Account search icon
  • 21. Type in a description or use the next page scroll arrows
  • 22. Select the Zone that the work is being performed for
  • 26. Type in the department, Zone/Facility and Unit/Bldg. Select the search icon for Failure Class
  • 27. Select the Failure Class of the Asset, use scroll next or type in a description
  • 29. Enter the Maintenance Planner’s Name
  • 30. 1. Check the boxes as appropriate for the WO to track 2. Select Menu for Job Plan and select Go To Job Plans
  • 31. Select All Records or select Bookmarks All records displayed Choose the plan that is appropriate
  • 32. If this is a plan you want to use for the work, select return with value
  • 33. Select Menu for Safety Plan
  • 35. Click on the search, then all records
  • 36. If the plan you want to use is here select it. If not, you can create a safety plan in the Plans Tab on the Work Order Once selected, the plan info will show and select return with value to place the plan on the work order
  • 37. Select Priority code, Priority Justification and Risk Assessment Use select value
  • 39. Set the Target Start Date, for training set to September 1st at 08:00 Use the next month arrow and set time to 08:00
  • 40. Now do the same for the Target Finish. Maximo requires these to be set before the WO can be saved
  • 41. Set month to September using the next month arrow Set time to 4:30 PM
  • 42. 1. Set the duration of work, the time in hours to complete the task 2. If this wo is from a service request enter the request number 3. Select if wo can be interrupted
  • 44. 1. Click select value 2. This select value screen will appear. Select the person who reported the work
  • 45. 1. Select menu 2. Select Value
  • 46. Identifies for whom this work order has been created. For example, if someone did not have access to a computer, another user could create the work order on behalf of that person.
  • 51. Type in persons name or scroll menu to next page
  • 56. Click on the Plans Tab
  • 57. One task has already been inserted from the Plans that were selected on the work order screen. If another task needs to be created, click on the new row button and input the required information.
  • 58. 1. Type in a description of the task Repair crack in Coil 2. Click on the long description box and enter a more detailed description of the work
  • 59. Click OK when finished
  • 61. Select any value for inspector, MP, MV and date that is needed
  • 63. Use the next page arrows to scroll or type in a persons name and press enter on keyboard
  • 64. Click on the persons name to add them to the task
  • 65. Click on the Labor Tab
  • 66. 1. One Craft has already been added from the Plan selected for the work order 2. To Add another Labor, click on new row and select the required information
  • 67. Use the select menu arrows to select the right info
  • 69. Once all information is entered, select the Materials Tab
  • 71. Here a circuit Breaker Lockout kit has already been selected, to add other materials select new row A new row has already been opened, use the select menus to find and enter the materials needed
  • 72. Recommend select go to item master
  • 73. Several ways to search for materials, simplest is to type in a description on the item and press enter Gloves Below is the search results, click on an item to open it’s location
  • 74. Once you have verified that this is the material or item you wanted, click on return with value
  • 75. Fill in Quantity and Storeroom
  • 77. Select the arrow by search and select all records Tip: Once you find a storeroom that you will use frequently, bookmark it for future use
  • 80. 1. If a select person is to be issued the materials, check direct issue and Issue to 2. Click on Services Tab
  • 81. 1. Clicking on Select Standard Services will open this window, usually not used in work order creation 3. Click the Tools Tab 2. Click cancel
  • 82. Click on New Row to add tools needed
  • 83. 1. Select the task that the tool is needed for
  • 84. Select which task the tool is for
  • 86. Select the tool that is required
  • 87. 1. You may also want to use the Go To Tools option 2. The Tools record opens and from here select search and all records to see a list of available tools
  • 88. 1. In this training presentation there is only the one tool listed, in the production environment there should be more 2. Click on the tool to open the tool description 3. Once you have verified that this is the correct tool needed for the work, click on return with value
  • 89. 1. Check the quantity and enter how many of this tool will be needed. Some require more than one of the same tool 2. For some tools you may needed to track the hours that the tool is in use. This would be for tools requiring maintenance on an hour meter and Maximo will track this items hours and keep the record up- to-date 3. If more tools are needed for this task or another task, click on new row to search for the tools
  • 90. Click on the related records tab
  • 91. 1. Select any related work orders or tickets that are associated with this work 2. Click on Actuals Tab
  • 92. 3. Click on Safety Plan Tab 1. The actuals tab is used for keeping track of the actual resources that were used for this work. Labor hours, Materials, Services (could have required any outside contractor that was not initially planned for) and Tools 2. When completing the work order, be sure to fill in the information here so that Maximo can track the cost of this work
  • 93. Click New Row under Hazards and Precautions
  • 94. 1. Select any Hazard, Hazardous Materials and Lock Out/Tag Out that may be related to the work assignment. Use the tabs to move through the Safety Plan 2. Click on select menu
  • 96. Select the Hazard For training there is only the one hazard listed, in production there are more to choose from
  • 97. Click on the Hazardous Materials Tab
  • 98. To add a hazardous material click on new row 1. Use the select menus to add a hazardous material to the work order and describe each. 2. Search for the type of hazard
  • 99. Once all hazardous materials have been identified, click on the Lock Out/Tag Out Tab Lock Out and Tag Out of equipment is not just a requirement, it is the core value of any safety program. Click on new row to add requirements for this work.
  • 100. Here we list hazard that requires lock out or tag out and we use the select menu arrows to select the hazards
  • 101. 1. You use the same method to select the values as before, do this for each hazard 2. List the Tag Outs for the Hazard above, click new row
  • 102. Just as before use the select value arrows to select the values for tagging out items
  • 103. After selecting all Hazards, Tag Outs and Lock Outs, Click on the Log Tab
  • 104. 1. Here we list notes for the work that is being done, notes maybe to notify others of some problem, a record that needs to be completed, a tool requirement that may not be in the system or any other note that may be of interest to future work on this equipment
  • 105. Click on the Communications Tab
  • 106. 1. You use the Create Communication action to send messages about a record via e-mail. When you create a communication, you can use a communication template created in the Communication Templates application, or you can create a free-form communication. You can view any inbound or outbound communications associated with a record in the Communications Log on the Log tab. For more information about communication templates, refer to the Communication Templates in help. 2. Click Failure Reporting Tab
  • 107. 1. You use the Failure Reporting tab to record and view asset and location problems, causes, and remedies. This data enables you to identify trends and isolate probable causes of breakdowns. You can enter remarks in the Remarks box that will aid in future resolutions of problems associated with the root cause of this failure 2. To change the failure code you must first delete the failure code from the work order page and then select a new code here. 3. After going through each step in creating this work order and proving the information required for the system to track the progress, labor, materials and cost, clickk on the Save icon to save the work order.
  • 108. The record has now been saved, if you have approval authority, approve the work
  • 109. 1. Click on the select arrow 2. Click on Approved
  • 110. Approving the work on any section of the work order will also approve the task created for the work
  • 111. 1. All work info entered and approved. The work is now pending scheduling by the work scheduler. At any point in creating a work order and you get stuck on something, looking for