Planning & Scheduling
Presentation
Presented by
Mark Michael – BDM/Sales Manager
Nov 2015
Company Overview
– BPD Zenith is a global full service provider of Maximo Asset Management solutions
– Head Office in Carlisle (UK) with Offices in Aberdeen (UK), Houston (USA), Calgary
(Canada), Melbourne (Australia) and New Zealand
• Currently over 90 staff
• Are an Award wining IBM Maximo
Premier Business Partner
• Only Gold Accredited Partner in the Oil
& Gas industry
• Offer Maximo on premise and
MaxiCloud off premise solutions and
support options
• Are driving business platforms for future
smarter operations within our Clients
Recent Awards
2015 IBM Awards
• Beacon Award for innovation –
Manifest Solution – awarded
March 2015
• Global Business Partner of the
Year for Asset Management –
Awarded October 2015
Interconnect 2015
Insights 2015
Maximo - Product Offering Extension
• Maximo Customisations
– Email listener for PO & PR
– Authorisations split by value and OPEX or CAPEX
– Manifest solution
• Maximo Implementation Framework
– Complete documentation pack
• Extension of BI packs in Cognos
– AM Focus
– Master data and process compliance
• Maxicloud – Fully Managed solution
– Suites business of all sizes.
– Removes the support and hardware burden.
– Upgrades and patches included.
– Rapid instal – can be done within 4 weeks for industry solutions
Why Schedule?
• Increase Productivity
– Reduce Waste - Clients typically see ~10% increase in
trades utilisation after implementation by eliminate
cherry picking – ROI in months
– More time to deal with Backlog
• Better labour requirement forecasting
– Reduction in contractor numbers
– Identify conflicting jobs requiring the same resources
Why Schedule?
• Consistent process
• Reduce paper
• Changes In org structure
• Too may WO’s for any
person to make sense of
• Remove inefficiencies
• Understand the dynamic
nature when changes are
made.
• Help the organisation
move towards less reactive
maintenance
Asset Management Journey
How to Schedule
1. Identify available time
– Understand Trade availability
2. Prioritise
– Most critical/essential 1st
3. Look at work grouped by
– Site
– Location
– Supervisor
– Work type
– Status
4. Allow for contingency
– Reduce this over time
5. Its an iterative process.
Scheduling Product Options
• Maximo Scheduler
• Solufy “Akwire” Scheduler
• CiM Scheduling
Common functions
• Graphical Scheduling
• Graphical Assignment
• Dispatching
Product Comparison
Maximo Scheduler
• Embedded into Maximo
• In the same screen
• Only need to buy licenses for the
Planners/Schedulers
• Optimisation tool
• SQL builder/Asset/location
availability
• May need additional server power
• Some technical items to deal with
(simple installation (half day),
– Java versions to be checked to view
charts, likely increase memory of your
Database and Application servers,
some minor tweaks –Xmx1024m,
Update statistics, clear browser cache,
etc)
Akwire Solution
• Client Server architecture
• Utilise your local system resources,
so very quick to process data
• Easy to install
• Available on V6, V7, V7.5 and V7.6
• Works on all common browsers
• Easier calendar changes – ctrl V
Data Requirements
• Minimum is
– Just need WO’s – default values set at 1hr for each WO if not present
• To use full functionality you will need:-
– Calendars
– Shifts
– Crafts
– Labour (with Calendars/Shifts applied)
– Properly populated Job Plans
– Properly populated PM records
– Work Orders
Depending on functionality you utilize
– Costs
– GIS info
– Special tools
• Any other the Scheduling products will show your data visually – warts and all !!
• Our advice – spend some time cleaning up your data prior to putting scheduling in place, or
better still, keep it up to date regularly.
Maximo Scheduler Applications
Maximo Scheduler Roadmap
Major changes
1.New name
2.New Graphical Engine
3.Focus on useability
enhancements – ie over
40 click reductions
Maximo Scheduler Applications
Maximo Scheduler
• Create Schedules
1. How many records you want to view – it
can’t be everything
2. Add a Shift & Calendar
3. Create Queries using GUI
1. APPR WO’s
2. Craft
3. etc
Maximo Scheduler
• Ghantt chart view
Moving Records
1. Drag to a new date
2. Right click on work
record
3. Adjust dates in table
4. Group work
If outside constraints then
dashed line appears
Maximo Scheduler
• Graphical Assignment
Colours change
dependent on job
status
Schedule Cost
Budget Adherence
• Commited estimated Total
• Saved estimated Total
• Actual total
Dispatcher
• Understand
your dynamic
work day
Optimisation
• Compare Scenarios
Performance Enhancements
• Further information
– Tune the database
– Performance best practice
– iFixes
More Information
• Recent Webinar Series
• Maximo Scheduler Webinar Recording: Part 1
https://ibm.biz/BdHz3v
• Maximo Scheduler Webinar Recording: Part 2
https://ibm.biz/BdHfCj
• Maximo Scheduler Webinar Recording: Part 3 – due 20th Nov
• Scheduler Wiki
Mark Michael
Sales & BDM Manager
Mark.Michael@bpdzenith.com
0410 524 641
Akwire vScheduler
• Functionally Rich including:
– One Click Assignment
– Multi-Assigment
– Mass Move / Realignment
– Add more in here

More Related Content

PDF
Maximo Scheduler 7.5.1
PPTX
Planning and Scheduling in Maximo: Best Practices and Coming Enhancements
PPTX
Maximo training - Getting Started
PPS
Maximo overview
PPT
ibm_maximo
PPTX
Maximo Training - Inventory Management
PPTX
Maximo 7.6 Features
PDF
Maximo integration to other systems by Bashar Mahasen
Maximo Scheduler 7.5.1
Planning and Scheduling in Maximo: Best Practices and Coming Enhancements
Maximo training - Getting Started
Maximo overview
ibm_maximo
Maximo Training - Inventory Management
Maximo 7.6 Features
Maximo integration to other systems by Bashar Mahasen

What's hot (20)

PDF
Maximo Roadmap - September 2019
PPTX
Maximo Training - Introduction
PPTX
Maximo Training - Work Management
PDF
IBM Maximo Asset Management Training - Asset and Work Management for Chang Sh...
PPT
Create a new work order in Ibm Maximo
PPT
Failure Codes in IBM Maximo Asset Management
PPT
Classifications in IBM Maximo Asset Management
PPTX
Maximo Training - Asset Management
PPT
Maximo 7.5 New Features
PDF
IBM Maximo Product Roadmap 2016
PPT
IBM Maximo for Utilities
PPT
Meters in IBM Maximo Asset Management
PPTX
Why upgrade to maximo v7.6
PPTX
PPT
Attachments in IBM Maximo Asset Management
PDF
SAP PM Master Data Training Guide
PPTX
Sap plant maintenance
PDF
IBM Maximo AM-USER.pdf
PDF
Why Solutions Fail and the Business Value of Solution Architecture
PDF
Using IBM MAXIMO Safety Plans
Maximo Roadmap - September 2019
Maximo Training - Introduction
Maximo Training - Work Management
IBM Maximo Asset Management Training - Asset and Work Management for Chang Sh...
Create a new work order in Ibm Maximo
Failure Codes in IBM Maximo Asset Management
Classifications in IBM Maximo Asset Management
Maximo Training - Asset Management
Maximo 7.5 New Features
IBM Maximo Product Roadmap 2016
IBM Maximo for Utilities
Meters in IBM Maximo Asset Management
Why upgrade to maximo v7.6
Attachments in IBM Maximo Asset Management
SAP PM Master Data Training Guide
Sap plant maintenance
IBM Maximo AM-USER.pdf
Why Solutions Fail and the Business Value of Solution Architecture
Using IBM MAXIMO Safety Plans
Ad

Viewers also liked (7)

PDF
Northstar Bluescope Steel Maximo BIRT Case Study
PPTX
SysAid Presentation V.7
PPTX
Maximo/Tririga product update/roadmap
PPTX
Agile Delivery
PDF
Maximo and a roadmap for your IoT journey
PPT
Maximo differentiators
PPT
The NEW Way to Win Friends & Influence People (social media in events)
Northstar Bluescope Steel Maximo BIRT Case Study
SysAid Presentation V.7
Maximo/Tririga product update/roadmap
Agile Delivery
Maximo and a roadmap for your IoT journey
Maximo differentiators
The NEW Way to Win Friends & Influence People (social media in events)
Ad

Similar to Maximo Planning & Scheduling - BPD Zenith Presentation (20)

PDF
Informs 2016 Solving Planning and Scheduling Problems with CPLEX
PDF
Pagerinkite užsakymų įvykdymą laiku naudodami šiuolaikinius gamybos planavimo...
PDF
Paranda ettevõtte tulemusi targa tootmise planeerimise ja operatiivjuhtimisega
PDF
MaxiCloud for oil and gas
PPTX
Fast track RTC Innovate India 2013
PPTX
Integrated Planning Using Enterprise Planning & Budgeting Cloud Service (EPBC...
PDF
Business Analytics as a Service
PDF
EPBCS - A New Approach to Planning Implementations
PPTX
Best practice for_agile_ds_projects
PDF
British American Tobacco GP Upgrade
PPTX
AVATA Webinar: Solutions to Common Demantra & ASCP Challenges
PPTX
Motorola Advaced Project Portfolio Management
PPTX
AVATA Webinar: Upgrading ASCP - The New Face of ASCP is Here! www.avata.com
PDF
Bulletproof Your QAD ERP to Cloud | JK Tech Webinar
PDF
Primavera roadmap 2012/2013
PDF
Simplifying SAP Plant Maintenance
PDF
5174 oracleascp
PPT
LG Inform Learning Day
PPT
Integrating primavera p6 with oracle erp which technology path is right for...
PDF
Webinar - Integrating InEight Hard Dollar and Oracle Primavera P6
Informs 2016 Solving Planning and Scheduling Problems with CPLEX
Pagerinkite užsakymų įvykdymą laiku naudodami šiuolaikinius gamybos planavimo...
Paranda ettevõtte tulemusi targa tootmise planeerimise ja operatiivjuhtimisega
MaxiCloud for oil and gas
Fast track RTC Innovate India 2013
Integrated Planning Using Enterprise Planning & Budgeting Cloud Service (EPBC...
Business Analytics as a Service
EPBCS - A New Approach to Planning Implementations
Best practice for_agile_ds_projects
British American Tobacco GP Upgrade
AVATA Webinar: Solutions to Common Demantra & ASCP Challenges
Motorola Advaced Project Portfolio Management
AVATA Webinar: Upgrading ASCP - The New Face of ASCP is Here! www.avata.com
Bulletproof Your QAD ERP to Cloud | JK Tech Webinar
Primavera roadmap 2012/2013
Simplifying SAP Plant Maintenance
5174 oracleascp
LG Inform Learning Day
Integrating primavera p6 with oracle erp which technology path is right for...
Webinar - Integrating InEight Hard Dollar and Oracle Primavera P6

More from Helen Fisher (20)

PDF
Maximo - Management of Change (MOC) Implementation Best Practices
PDF
MaxTECH Technical Training - Maximo Custom Audit Solution
PPTX
MaxTECH Technical Training Presentation from MaximoWorld 2018
PDF
Canadian Maximo User Group Technical Training - Maximo Reporting 201
PPTX
Watson IoT at Think 2018
PPT
IBM Maximo and ISO 55000
PDF
BPD Zenith AMUG Presentation 2017
PPTX
Maximo 7.6.0.8
PPT
IBM Maximo for utilities T&D
PPTX
Maximo mobile work management in the hospitality industry
PPT
Maximo Oil and Gas 7.6.1 HSE: Incident Management overview
PPT
Maximo Oil and Gas 7.6.1 HSE: Drilling and Completion Run Log overview
PPT
Maximo Oil and Gas 7.6.1 HSE Reports
PPTX
Maximo Oil and Gas 7.6.1 HSE: Overview
PPT
Maximo Oil and Gas 7.6.1 HSE: Change Module options
PPT
Maximo Oil and Gas 7.6.1 HSE: Change Module Overview
PPT
Maximo Oil and Gas 7.6.1 HSE: Standard Actions & Standard Action Groups overview
PPT
Maximo Oil and Gas 7.6.1 HSE: Work Orders Job Plans Overview
PPT
Maximo Oil and Gas 7.6.1 HSE: Solutions Overview
PPT
Maximo Oil and Gas 7.6.1 HSE: Risk Assessment Risk Matrix Overview
Maximo - Management of Change (MOC) Implementation Best Practices
MaxTECH Technical Training - Maximo Custom Audit Solution
MaxTECH Technical Training Presentation from MaximoWorld 2018
Canadian Maximo User Group Technical Training - Maximo Reporting 201
Watson IoT at Think 2018
IBM Maximo and ISO 55000
BPD Zenith AMUG Presentation 2017
Maximo 7.6.0.8
IBM Maximo for utilities T&D
Maximo mobile work management in the hospitality industry
Maximo Oil and Gas 7.6.1 HSE: Incident Management overview
Maximo Oil and Gas 7.6.1 HSE: Drilling and Completion Run Log overview
Maximo Oil and Gas 7.6.1 HSE Reports
Maximo Oil and Gas 7.6.1 HSE: Overview
Maximo Oil and Gas 7.6.1 HSE: Change Module options
Maximo Oil and Gas 7.6.1 HSE: Change Module Overview
Maximo Oil and Gas 7.6.1 HSE: Standard Actions & Standard Action Groups overview
Maximo Oil and Gas 7.6.1 HSE: Work Orders Job Plans Overview
Maximo Oil and Gas 7.6.1 HSE: Solutions Overview
Maximo Oil and Gas 7.6.1 HSE: Risk Assessment Risk Matrix Overview

Recently uploaded (20)

PPTX
cloud_computing_Infrastucture_as_cloud_p
PDF
Hybrid model detection and classification of lung cancer
PDF
ENT215_Completing-a-large-scale-migration-and-modernization-with-AWS.pdf
PDF
A comparative study of natural language inference in Swahili using monolingua...
PPTX
Programs and apps: productivity, graphics, security and other tools
PPTX
Group 1 Presentation -Planning and Decision Making .pptx
PDF
August Patch Tuesday
PPTX
KOM of Painting work and Equipment Insulation REV00 update 25-dec.pptx
PDF
Mushroom cultivation and it's methods.pdf
PDF
Agricultural_Statistics_at_a_Glance_2022_0.pdf
PPTX
Digital-Transformation-Roadmap-for-Companies.pptx
PPTX
SOPHOS-XG Firewall Administrator PPT.pptx
PDF
A comparative analysis of optical character recognition models for extracting...
PDF
Profit Center Accounting in SAP S/4HANA, S4F28 Col11
PDF
7 ChatGPT Prompts to Help You Define Your Ideal Customer Profile.pdf
PDF
Unlocking AI with Model Context Protocol (MCP)
PPTX
OMC Textile Division Presentation 2021.pptx
PDF
Encapsulation theory and applications.pdf
PDF
Zenith AI: Advanced Artificial Intelligence
PPTX
1. Introduction to Computer Programming.pptx
cloud_computing_Infrastucture_as_cloud_p
Hybrid model detection and classification of lung cancer
ENT215_Completing-a-large-scale-migration-and-modernization-with-AWS.pdf
A comparative study of natural language inference in Swahili using monolingua...
Programs and apps: productivity, graphics, security and other tools
Group 1 Presentation -Planning and Decision Making .pptx
August Patch Tuesday
KOM of Painting work and Equipment Insulation REV00 update 25-dec.pptx
Mushroom cultivation and it's methods.pdf
Agricultural_Statistics_at_a_Glance_2022_0.pdf
Digital-Transformation-Roadmap-for-Companies.pptx
SOPHOS-XG Firewall Administrator PPT.pptx
A comparative analysis of optical character recognition models for extracting...
Profit Center Accounting in SAP S/4HANA, S4F28 Col11
7 ChatGPT Prompts to Help You Define Your Ideal Customer Profile.pdf
Unlocking AI with Model Context Protocol (MCP)
OMC Textile Division Presentation 2021.pptx
Encapsulation theory and applications.pdf
Zenith AI: Advanced Artificial Intelligence
1. Introduction to Computer Programming.pptx

Maximo Planning & Scheduling - BPD Zenith Presentation

  • 1. 16/12/2015 BPD Zenith UK | Canada | USA | Australia | New Zealand Planning & Scheduling Presentation Presented by Mark Michael – BDM/Sales Manager Nov 2015
  • 2. Company Overview – BPD Zenith is a global full service provider of Maximo Asset Management solutions – Head Office in Carlisle (UK) with Offices in Aberdeen (UK), Houston (USA), Calgary (Canada), Melbourne (Australia) and New Zealand • Currently over 90 staff • Are an Award wining IBM Maximo Premier Business Partner • Only Gold Accredited Partner in the Oil & Gas industry • Offer Maximo on premise and MaxiCloud off premise solutions and support options • Are driving business platforms for future smarter operations within our Clients
  • 3. Recent Awards 2015 IBM Awards • Beacon Award for innovation – Manifest Solution – awarded March 2015 • Global Business Partner of the Year for Asset Management – Awarded October 2015 Interconnect 2015 Insights 2015
  • 4. Maximo - Product Offering Extension • Maximo Customisations – Email listener for PO & PR – Authorisations split by value and OPEX or CAPEX – Manifest solution • Maximo Implementation Framework – Complete documentation pack • Extension of BI packs in Cognos – AM Focus – Master data and process compliance • Maxicloud – Fully Managed solution – Suites business of all sizes. – Removes the support and hardware burden. – Upgrades and patches included. – Rapid instal – can be done within 4 weeks for industry solutions
  • 5. Why Schedule? • Increase Productivity – Reduce Waste - Clients typically see ~10% increase in trades utilisation after implementation by eliminate cherry picking – ROI in months – More time to deal with Backlog • Better labour requirement forecasting – Reduction in contractor numbers – Identify conflicting jobs requiring the same resources
  • 6. Why Schedule? • Consistent process • Reduce paper • Changes In org structure • Too may WO’s for any person to make sense of • Remove inefficiencies • Understand the dynamic nature when changes are made. • Help the organisation move towards less reactive maintenance
  • 8. How to Schedule 1. Identify available time – Understand Trade availability 2. Prioritise – Most critical/essential 1st 3. Look at work grouped by – Site – Location – Supervisor – Work type – Status 4. Allow for contingency – Reduce this over time 5. Its an iterative process.
  • 9. Scheduling Product Options • Maximo Scheduler • Solufy “Akwire” Scheduler • CiM Scheduling Common functions • Graphical Scheduling • Graphical Assignment • Dispatching
  • 10. Product Comparison Maximo Scheduler • Embedded into Maximo • In the same screen • Only need to buy licenses for the Planners/Schedulers • Optimisation tool • SQL builder/Asset/location availability • May need additional server power • Some technical items to deal with (simple installation (half day), – Java versions to be checked to view charts, likely increase memory of your Database and Application servers, some minor tweaks –Xmx1024m, Update statistics, clear browser cache, etc) Akwire Solution • Client Server architecture • Utilise your local system resources, so very quick to process data • Easy to install • Available on V6, V7, V7.5 and V7.6 • Works on all common browsers • Easier calendar changes – ctrl V
  • 11. Data Requirements • Minimum is – Just need WO’s – default values set at 1hr for each WO if not present • To use full functionality you will need:- – Calendars – Shifts – Crafts – Labour (with Calendars/Shifts applied) – Properly populated Job Plans – Properly populated PM records – Work Orders Depending on functionality you utilize – Costs – GIS info – Special tools • Any other the Scheduling products will show your data visually – warts and all !! • Our advice – spend some time cleaning up your data prior to putting scheduling in place, or better still, keep it up to date regularly.
  • 13. Maximo Scheduler Roadmap Major changes 1.New name 2.New Graphical Engine 3.Focus on useability enhancements – ie over 40 click reductions
  • 15. Maximo Scheduler • Create Schedules 1. How many records you want to view – it can’t be everything 2. Add a Shift & Calendar 3. Create Queries using GUI 1. APPR WO’s 2. Craft 3. etc
  • 16. Maximo Scheduler • Ghantt chart view Moving Records 1. Drag to a new date 2. Right click on work record 3. Adjust dates in table 4. Group work If outside constraints then dashed line appears
  • 17. Maximo Scheduler • Graphical Assignment Colours change dependent on job status
  • 18. Schedule Cost Budget Adherence • Commited estimated Total • Saved estimated Total • Actual total
  • 21. Performance Enhancements • Further information – Tune the database – Performance best practice – iFixes
  • 22. More Information • Recent Webinar Series • Maximo Scheduler Webinar Recording: Part 1 https://ibm.biz/BdHz3v • Maximo Scheduler Webinar Recording: Part 2 https://ibm.biz/BdHfCj • Maximo Scheduler Webinar Recording: Part 3 – due 20th Nov • Scheduler Wiki
  • 23. Mark Michael Sales & BDM Manager Mark.Michael@bpdzenith.com 0410 524 641
  • 24. Akwire vScheduler • Functionally Rich including: – One Click Assignment – Multi-Assigment – Mass Move / Realignment – Add more in here

Editor's Notes

  • #11: 1. Many organisations have a management drive to reduce the number of tools within an organisation
  • #14: It is important to note that Scheduler has come along way since early 2010. The new Graphical Engine in the latest Java technologies ensure better performance.
  • #20: The various colours represent different status of work
  • #23: Recent webinar series on scheduler