Cut server migration times by
upgrading to Dell PowerEdge
MX from legacy Cisco UCS
Compared to moving to a new Cisco
UCS X-Series Modular System
The time has come to update your data center with new servers
and get all the benefits the latest technology can offer, but
significant migration questions remain. If the infrastructure
you have in place comprises older Cisco UCS servers running
virtual machines (VMs), you may assume migrating to the latest
Cisco UCS X-Series hardware would simplify the process. In our
tests in the Principled Technologies data center, we found that
wasn’t the case.
The modular Dell PowerEdge MX server platform offers an
attractive migration target that can simplify the server migration
process and save significant administrator time and effort
compared to moving to a new Cisco UCS X-Series Modular
System. By requiring 246 fewer administrator steps from initial
configuration through server migration for a three-node cluster,
choosing the Dell PowerEdge MX platform could help reduce
human error and potential troubleshooting time as you move
your new hardware into production. With PowerEdge MX,
administrators save time as well—2 hours and 21 minutes for
a three-node cluster—compared to moving to new Cisco UCS
hardware. That’s time that administrators can spend working on
new initiatives to further your business goals.
Cut total migration
time by 57.3%
for a three-node
cluster migration
Save 2 hours and
21 minutes
for a three-node
cluster migration
58.0% fewer
steps reduces the
chance for error
from configuration
through migration
Cut server migration times by upgrading to Dell PowerEdge MX from legacy Cisco UCS March 2023 (Revised)
A Principled Technologies report: Hands-on testing. Real-world results.
Migration considerations from old hardware to new
A common reason that organizations choose a specific vendor for new data center hardware is familiarity—they
expect that upgrading with hardware and software from the same vendor they already use will be a simpler
process than switching to a new vendor altogether. But IT managers charged with upgrade planning would
be remiss in forging ahead without considering what other platforms might bring to the table—or potential
downsides of sticking with their current vendor. For example, customers expecting a seamless integration from
older Cisco UCS hardware to the new Cisco UCS X-Series hardware may find themselves disappointed. Because
the new Cisco UCS X-Series we tested is cloud-managed, the migration of VMs on older servers to the new
platform takes significant time and effort. And if the rationale of easier vendor-specific migration is gone, it only
makes sense for administrators to examine what other virtualization platforms on the market can offer.
In our comparison of migrating VMs from an older three-node Cisco UCS cluster onto two new platforms,
we found that the Dell PowerEdge MX platform dramatically simplified the deployment process. As Figure 1
shows, it took 57.3 percent less time and 58.0 percent fewer steps to complete cluster migration onto the Dell
PowerEdge MX platform compared to moving to the new Cisco UCS X-Series platform.
Figure 1: Total time and steps to migrate the VMs on a legacy Cisco UCS cluster to both new platforms, including initial configuration,
server profile configuration and deployment, and migration. Less time and fewer steps are better. Source: Principled Technologies.
By reducing the time it takes to upgrade your data center infrastructure, the Dell PowerEdge MX platform can
ensure your organization starts reaping the benefits of your new investment sooner. Plus, the faster migration
process can give admins back precious time that they could spend tuning applications for optimal performance
or focusing on other IT initiatives. Reducing the number of steps administrators must follow also minimizes the
chance that an errant click derails the migration process, which could save even more administrator time.
1h 45m 12s
178 steps
4h 6m 53s
424 steps
Total time and steps to complete migration
Dell PowerEdge MX
Cisco UCS X-Series
57.3% less time
58.0% fewer steps
to complete a
cluster migration
Cut server migration times by upgrading to Dell PowerEdge MX from legacy Cisco UCS March 2023 (Revised) | 2
How we tested
In the Principled Technologies data center, we set up an older Cisco UCS infrastructure, consisting of three
servers in a chassis running six VMs. We then captured the time and steps it took to complete initial server
configuration, server profile configuration and deployment, and server migration of this older hardware to
two new platforms:
• Dell PowerEdge MX7000 • Cisco UCS X-Series X9508
To learn more about the systems we migrated and the step-by-step details of our testing, read the
science behind the report.
About the Dell PowerEdge MX server platform
Dell calls the PowerEdge MX a “modular, 7U integrated solution designed for enterprise data center
density with easy deployment, management, and maximum longevity” and says its no midplane design
and scalable fabric architecture allow it to support new processor
technologies, storage types, and connectivity options.1
Learn more
at https://www.dell.com/en-us/dt/servers/modular-infrastructure/
poweredge-mx/index.htm#tab0=0&tab1=0&accordion0.
Save time on initial server configuration
with Dell PowerEdge MX
Initial platform configuration tasks are where the Dell PowerEdge MX platform showed the most significant
reduction in time and steps compared to the Cisco UCS X-Series platform. As Figure 2 shows, the PowerEdge
MX platform cut administrator time by over two hours and reduced steps by 84.8 percent compared to the
Cisco UCS X-Series.
Total time and steps to complete initial configuration tasks
Dell PowerEdge MX 30 steps
198 steps
Cisco UCS X-Series
0h 25m 00s
2h 37m 57s
Figure 2: Time and steps it took to complete initial configuration tasks for both platforms.
Lower numbers are better. Source: Principled Technologies.
One of the reasons the initial configuration tasks for the Cisco UCS X-Series platform took so much longer to
complete is that it shipped with a firmware version that Intersight does not support. This required us to upload
and update the firmware just to continue the setup process. We also had to enroll in Cisco Intersight and
configure domain and chassis templates. This was a lengthy process with room for user error that could further
hinder the deployment process. In contrast, the Dell PowerEdge MX platform required only a brief initial setup
and chassis configuration.
84.1% less time
84.8% fewer steps
to complete initial
configuration
Cut server migration times by upgrading to Dell PowerEdge MX from legacy Cisco UCS March 2023 (Revised) | 3
Save time on server profile configuration/deployment with Dell PowerEdge MX
Server profile configuration/deployment for the three-node cluster was also simpler using the Dell PowerEdge
MX platform. As Figure 3 shows, it took 29 minutes, 45 seconds and 49 steps to complete these tasks using the
PowerEdge MX solution, while the Cisco UCS X-Series platform required 124 steps to complete the same tasks.
Figure 3: Time and steps it took to complete server profile configuration and deployment tasks for both platforms.
Lower numbers are better. Source: Principled Technologies.
While the profile deployment processes were similar in time and steps, the server template creation process was
significantly easier for the Dell PowerEdge MX platform. With the Cisco platform, creating the server profile took
115 steps, while Dell server template creation took only 31 steps and saved over 10 minutes.
Save time on server migration with Dell PowerEdge MX
While most of the time and steps savings for the migration process came over the setup and configuration
tasks we have already covered, the actual cluster migration was also short and simple with the Dell PowerEdge
MX platform, taking 11.5 percent less time and three fewer steps than the Cisco UCS X-Series platform
(see Figure 4).
Figure 4: Time and steps it took to complete server migration tasks for both platforms.
Lower numbers are better. Source: Principled Technologies.
Total time and steps to complete server profile configuration and deployment tasks
Dell PowerEdge MX
Cisco UCS X-Series
49 steps
124 steps
29m 45s
31m 53s
Total time and steps to complete server migration tasks
Dell PowerEdge MX
Cisco UCS X-Series
50m 27s
57m 03s
99 steps
102 steps
6.6% less time
60.4% fewer steps
to complete server
profile configuration and
deployment tasks
11.5% less time
2.9% fewer steps
to complete server
migration tasks
Cut server migration times by upgrading to Dell PowerEdge MX from legacy Cisco UCS March 2023 (Revised) | 4
Conclusion
If your organization currently runs VMs on a legacy
Cisco UCS cluster, we found that migrating to a new
Dell PowerEdge MX platform can save significant
administrator time and steps compared to moving to
new Cisco UCS X-Series hardware. By cutting total
migration preparation and time by 57.3 percent and
reducing administrator steps by over 200 clicks, the Dell
PowerEdge MX platform can simplify the entire upgrade
process. With the Dell PowerEdge MX platform, your
business can attain the performance benefits of your
new hardware faster, reduce the chance of user error,
and ensure that administrators can move onto strategic
tasks in less time.
1. Dell PowerEdge MX, accessed February 5, 2023,
https://www.dell.com/en-us/dt/servers/mod-
ular-infrastructure/poweredge-mx/index.ht-
m#tab0=0&tab1=0&accordion0.
Principled Technologies is a registered trademark of Principled Technologies, Inc.
All other product names are the trademarks of their respective owners.
For additional information, review the science behind this report.
Principled
Technologies®
Facts matter.®
Principled
Technologies®
Facts matter.®
This project was commissioned by Dell Technologies.
Read the science behind this report at https://facts.pt/Dar4Pyd
Cut server migration times by upgrading to Dell PowerEdge MX from legacy Cisco UCS March 2023 (Revised) | 5

More Related Content

PDF
Save IT admin time with the Dell EMC PowerEdge MX platform and OpenManage En...
PDF
Cut server migration times by upgrading to Dell PowerEdge MX from legacy Cisc...
PDF
A Dell PowerEdge MX environment using OpenManage Enterprise and OpenManage En...
PDF
Migrate VMs faster with a new Dell EMC PowerEdge MX solution - Summary
PDF
Dell EMC PowerEdge MX streamlined routine tasks including deployment, firmwar...
PDF
Simplifying server provisioning with Cisco UCS Director
PDF
Reducing deployment time with Dell Chassis Management Controller
PDF
Migrate VMs faster with a new Dell EMC PowerEdge MX solution
Save IT admin time with the Dell EMC PowerEdge MX platform and OpenManage En...
Cut server migration times by upgrading to Dell PowerEdge MX from legacy Cisc...
A Dell PowerEdge MX environment using OpenManage Enterprise and OpenManage En...
Migrate VMs faster with a new Dell EMC PowerEdge MX solution - Summary
Dell EMC PowerEdge MX streamlined routine tasks including deployment, firmwar...
Simplifying server provisioning with Cisco UCS Director
Reducing deployment time with Dell Chassis Management Controller
Migrate VMs faster with a new Dell EMC PowerEdge MX solution

Similar to Cut server migration times by upgrading to Dell PowerEdge MX from legacy Cisco UCS (20)

PDF
Manage infrastructure and deploy services with ease using Dell Active System ...
PDF
Handle 19.7% more SQL Server work and support 25% more VMs with new Dell Powe...
PDF
Dell PowerEdge VRTX and M-series compute nodes configuration study
PDF
Ensure greater uptime and boost VMware vSAN cluster performance with the Del...
PDF
Power edge mx7000_sds_performance_1018
PDF
More efficient service deployment with Dell Active System Manager
PDF
Faster and more efficient Flex System management with Lenovo XClarity Adminis...
PDF
3 key wins: Dell EMC PowerEdge MX with OpenManage Enterprise over Cisco UCS a...
PDF
Reap better SQL Server OLTP performance with next-generation Dell EMC PowerEd...
PDF
Migrate server identities and data access 34 percent faster with Cisco UCS an...
PDF
Save IT admin time with the Dell EMC PowerEdge MX platform and OpenManage En...
PDF
Microsoft System Center virtual environment comparison: Dell PowerEdge server...
PDF
Reduce complexity and save money with Dell Engineered Solutions for VMware EV...
PDF
Oracle PeopleSoft on Cisco Unified Computing System and EMC VNX Storage
 
PDF
Cisco UCS blades deploy 77 percent faster with 67 percent fewer steps than H...
PDF
Reduce hands-on deployment times to near zero* with iDRAC9 automation
PDF
The evolution of Dell EMC PowerEdge server systems management - Infographic
PDF
VMware Horizon with F5 BIG-IP vs. Citrix XenDesktop with Citrix NetScaler
PDF
Simplifying systems management with Dell OpenManage on 13G Dell PowerEdge ser...
PDF
MT23 Benefits of Modular Computing from Data Center to Branch Office
Manage infrastructure and deploy services with ease using Dell Active System ...
Handle 19.7% more SQL Server work and support 25% more VMs with new Dell Powe...
Dell PowerEdge VRTX and M-series compute nodes configuration study
Ensure greater uptime and boost VMware vSAN cluster performance with the Del...
Power edge mx7000_sds_performance_1018
More efficient service deployment with Dell Active System Manager
Faster and more efficient Flex System management with Lenovo XClarity Adminis...
3 key wins: Dell EMC PowerEdge MX with OpenManage Enterprise over Cisco UCS a...
Reap better SQL Server OLTP performance with next-generation Dell EMC PowerEd...
Migrate server identities and data access 34 percent faster with Cisco UCS an...
Save IT admin time with the Dell EMC PowerEdge MX platform and OpenManage En...
Microsoft System Center virtual environment comparison: Dell PowerEdge server...
Reduce complexity and save money with Dell Engineered Solutions for VMware EV...
Oracle PeopleSoft on Cisco Unified Computing System and EMC VNX Storage
 
Cisco UCS blades deploy 77 percent faster with 67 percent fewer steps than H...
Reduce hands-on deployment times to near zero* with iDRAC9 automation
The evolution of Dell EMC PowerEdge server systems management - Infographic
VMware Horizon with F5 BIG-IP vs. Citrix XenDesktop with Citrix NetScaler
Simplifying systems management with Dell OpenManage on 13G Dell PowerEdge ser...
MT23 Benefits of Modular Computing from Data Center to Branch Office
Ad

More from Principled Technologies (20)

PDF
Unlocking hybrid cloud efficiency: Dell AX System for Azure Local with PowerFlex
PDF
Energize your business strategy with the new Dell Pro 14 Plus
PDF
Unlock faster data-driven business decisions with Azure Databricks - Infographic
PDF
Supercharge AI performance and enhance productivity with the HP EliteBook X G...
PDF
Supercharge AI performance and enhance productivity with the HP EliteBook X G...
PDF
Equal time, equal tools: Measuring PC deployment time in multi-vendor environ...
PDF
Modernizing your data center with Dell and AMD
PDF
Dell Pro 14 Plus: Be better prepared for what’s coming
PDF
Security features in Dell, HP, and Lenovo PC systems: A research-based compar...
PDF
Make GenAI investments go further with the Dell AI Factory - Infographic
PDF
Make GenAI investments go further with the Dell AI Factory
PDF
Unlock faster insights with Azure Databricks
PDF
Speed up your transactions and save with new Dell PowerEdge R7725 servers pow...
PDF
The case for on-premises AI
PDF
Dell PowerEdge server cooling: Choose the cooling options that match the need...
PDF
Speed up your transactions and save with new Dell PowerEdge R7725 servers pow...
PDF
Propel your business into the future by refreshing with new one-socket Dell P...
PDF
Propel your business into the future by refreshing with new one-socket Dell P...
PDF
Unlock flexibility, security, and scalability by migrating MySQL databases to...
PDF
Migrate your PostgreSQL databases to Microsoft Azure for plug‑and‑play simpli...
Unlocking hybrid cloud efficiency: Dell AX System for Azure Local with PowerFlex
Energize your business strategy with the new Dell Pro 14 Plus
Unlock faster data-driven business decisions with Azure Databricks - Infographic
Supercharge AI performance and enhance productivity with the HP EliteBook X G...
Supercharge AI performance and enhance productivity with the HP EliteBook X G...
Equal time, equal tools: Measuring PC deployment time in multi-vendor environ...
Modernizing your data center with Dell and AMD
Dell Pro 14 Plus: Be better prepared for what’s coming
Security features in Dell, HP, and Lenovo PC systems: A research-based compar...
Make GenAI investments go further with the Dell AI Factory - Infographic
Make GenAI investments go further with the Dell AI Factory
Unlock faster insights with Azure Databricks
Speed up your transactions and save with new Dell PowerEdge R7725 servers pow...
The case for on-premises AI
Dell PowerEdge server cooling: Choose the cooling options that match the need...
Speed up your transactions and save with new Dell PowerEdge R7725 servers pow...
Propel your business into the future by refreshing with new one-socket Dell P...
Propel your business into the future by refreshing with new one-socket Dell P...
Unlock flexibility, security, and scalability by migrating MySQL databases to...
Migrate your PostgreSQL databases to Microsoft Azure for plug‑and‑play simpli...
Ad

Recently uploaded (20)

PDF
Two-dimensional Klein-Gordon and Sine-Gordon numerical solutions based on dee...
PDF
NewMind AI Weekly Chronicles – August ’25 Week III
PPTX
Chapter 5: Probability Theory and Statistics
PDF
Taming the Chaos: How to Turn Unstructured Data into Decisions
PDF
Flame analysis and combustion estimation using large language and vision assi...
PPT
Geologic Time for studying geology for geologist
PPT
What is a Computer? Input Devices /output devices
PDF
CloudStack 4.21: First Look Webinar slides
PPTX
The various Industrial Revolutions .pptx
PPTX
Configure Apache Mutual Authentication
PDF
Five Habits of High-Impact Board Members
PDF
Getting started with AI Agents and Multi-Agent Systems
PPT
Galois Field Theory of Risk: A Perspective, Protocol, and Mathematical Backgr...
PPTX
Microsoft Excel 365/2024 Beginner's training
PPTX
Modernising the Digital Integration Hub
PDF
Consumable AI The What, Why & How for Small Teams.pdf
PDF
Enhancing emotion recognition model for a student engagement use case through...
PDF
Developing a website for English-speaking practice to English as a foreign la...
PDF
ENT215_Completing-a-large-scale-migration-and-modernization-with-AWS.pdf
PPTX
AI IN MARKETING- PRESENTED BY ANWAR KABIR 1st June 2025.pptx
Two-dimensional Klein-Gordon and Sine-Gordon numerical solutions based on dee...
NewMind AI Weekly Chronicles – August ’25 Week III
Chapter 5: Probability Theory and Statistics
Taming the Chaos: How to Turn Unstructured Data into Decisions
Flame analysis and combustion estimation using large language and vision assi...
Geologic Time for studying geology for geologist
What is a Computer? Input Devices /output devices
CloudStack 4.21: First Look Webinar slides
The various Industrial Revolutions .pptx
Configure Apache Mutual Authentication
Five Habits of High-Impact Board Members
Getting started with AI Agents and Multi-Agent Systems
Galois Field Theory of Risk: A Perspective, Protocol, and Mathematical Backgr...
Microsoft Excel 365/2024 Beginner's training
Modernising the Digital Integration Hub
Consumable AI The What, Why & How for Small Teams.pdf
Enhancing emotion recognition model for a student engagement use case through...
Developing a website for English-speaking practice to English as a foreign la...
ENT215_Completing-a-large-scale-migration-and-modernization-with-AWS.pdf
AI IN MARKETING- PRESENTED BY ANWAR KABIR 1st June 2025.pptx

Cut server migration times by upgrading to Dell PowerEdge MX from legacy Cisco UCS

  • 1. Cut server migration times by upgrading to Dell PowerEdge MX from legacy Cisco UCS Compared to moving to a new Cisco UCS X-Series Modular System The time has come to update your data center with new servers and get all the benefits the latest technology can offer, but significant migration questions remain. If the infrastructure you have in place comprises older Cisco UCS servers running virtual machines (VMs), you may assume migrating to the latest Cisco UCS X-Series hardware would simplify the process. In our tests in the Principled Technologies data center, we found that wasn’t the case. The modular Dell PowerEdge MX server platform offers an attractive migration target that can simplify the server migration process and save significant administrator time and effort compared to moving to a new Cisco UCS X-Series Modular System. By requiring 246 fewer administrator steps from initial configuration through server migration for a three-node cluster, choosing the Dell PowerEdge MX platform could help reduce human error and potential troubleshooting time as you move your new hardware into production. With PowerEdge MX, administrators save time as well—2 hours and 21 minutes for a three-node cluster—compared to moving to new Cisco UCS hardware. That’s time that administrators can spend working on new initiatives to further your business goals. Cut total migration time by 57.3% for a three-node cluster migration Save 2 hours and 21 minutes for a three-node cluster migration 58.0% fewer steps reduces the chance for error from configuration through migration Cut server migration times by upgrading to Dell PowerEdge MX from legacy Cisco UCS March 2023 (Revised) A Principled Technologies report: Hands-on testing. Real-world results.
  • 2. Migration considerations from old hardware to new A common reason that organizations choose a specific vendor for new data center hardware is familiarity—they expect that upgrading with hardware and software from the same vendor they already use will be a simpler process than switching to a new vendor altogether. But IT managers charged with upgrade planning would be remiss in forging ahead without considering what other platforms might bring to the table—or potential downsides of sticking with their current vendor. For example, customers expecting a seamless integration from older Cisco UCS hardware to the new Cisco UCS X-Series hardware may find themselves disappointed. Because the new Cisco UCS X-Series we tested is cloud-managed, the migration of VMs on older servers to the new platform takes significant time and effort. And if the rationale of easier vendor-specific migration is gone, it only makes sense for administrators to examine what other virtualization platforms on the market can offer. In our comparison of migrating VMs from an older three-node Cisco UCS cluster onto two new platforms, we found that the Dell PowerEdge MX platform dramatically simplified the deployment process. As Figure 1 shows, it took 57.3 percent less time and 58.0 percent fewer steps to complete cluster migration onto the Dell PowerEdge MX platform compared to moving to the new Cisco UCS X-Series platform. Figure 1: Total time and steps to migrate the VMs on a legacy Cisco UCS cluster to both new platforms, including initial configuration, server profile configuration and deployment, and migration. Less time and fewer steps are better. Source: Principled Technologies. By reducing the time it takes to upgrade your data center infrastructure, the Dell PowerEdge MX platform can ensure your organization starts reaping the benefits of your new investment sooner. Plus, the faster migration process can give admins back precious time that they could spend tuning applications for optimal performance or focusing on other IT initiatives. Reducing the number of steps administrators must follow also minimizes the chance that an errant click derails the migration process, which could save even more administrator time. 1h 45m 12s 178 steps 4h 6m 53s 424 steps Total time and steps to complete migration Dell PowerEdge MX Cisco UCS X-Series 57.3% less time 58.0% fewer steps to complete a cluster migration Cut server migration times by upgrading to Dell PowerEdge MX from legacy Cisco UCS March 2023 (Revised) | 2
  • 3. How we tested In the Principled Technologies data center, we set up an older Cisco UCS infrastructure, consisting of three servers in a chassis running six VMs. We then captured the time and steps it took to complete initial server configuration, server profile configuration and deployment, and server migration of this older hardware to two new platforms: • Dell PowerEdge MX7000 • Cisco UCS X-Series X9508 To learn more about the systems we migrated and the step-by-step details of our testing, read the science behind the report. About the Dell PowerEdge MX server platform Dell calls the PowerEdge MX a “modular, 7U integrated solution designed for enterprise data center density with easy deployment, management, and maximum longevity” and says its no midplane design and scalable fabric architecture allow it to support new processor technologies, storage types, and connectivity options.1 Learn more at https://www.dell.com/en-us/dt/servers/modular-infrastructure/ poweredge-mx/index.htm#tab0=0&tab1=0&accordion0. Save time on initial server configuration with Dell PowerEdge MX Initial platform configuration tasks are where the Dell PowerEdge MX platform showed the most significant reduction in time and steps compared to the Cisco UCS X-Series platform. As Figure 2 shows, the PowerEdge MX platform cut administrator time by over two hours and reduced steps by 84.8 percent compared to the Cisco UCS X-Series. Total time and steps to complete initial configuration tasks Dell PowerEdge MX 30 steps 198 steps Cisco UCS X-Series 0h 25m 00s 2h 37m 57s Figure 2: Time and steps it took to complete initial configuration tasks for both platforms. Lower numbers are better. Source: Principled Technologies. One of the reasons the initial configuration tasks for the Cisco UCS X-Series platform took so much longer to complete is that it shipped with a firmware version that Intersight does not support. This required us to upload and update the firmware just to continue the setup process. We also had to enroll in Cisco Intersight and configure domain and chassis templates. This was a lengthy process with room for user error that could further hinder the deployment process. In contrast, the Dell PowerEdge MX platform required only a brief initial setup and chassis configuration. 84.1% less time 84.8% fewer steps to complete initial configuration Cut server migration times by upgrading to Dell PowerEdge MX from legacy Cisco UCS March 2023 (Revised) | 3
  • 4. Save time on server profile configuration/deployment with Dell PowerEdge MX Server profile configuration/deployment for the three-node cluster was also simpler using the Dell PowerEdge MX platform. As Figure 3 shows, it took 29 minutes, 45 seconds and 49 steps to complete these tasks using the PowerEdge MX solution, while the Cisco UCS X-Series platform required 124 steps to complete the same tasks. Figure 3: Time and steps it took to complete server profile configuration and deployment tasks for both platforms. Lower numbers are better. Source: Principled Technologies. While the profile deployment processes were similar in time and steps, the server template creation process was significantly easier for the Dell PowerEdge MX platform. With the Cisco platform, creating the server profile took 115 steps, while Dell server template creation took only 31 steps and saved over 10 minutes. Save time on server migration with Dell PowerEdge MX While most of the time and steps savings for the migration process came over the setup and configuration tasks we have already covered, the actual cluster migration was also short and simple with the Dell PowerEdge MX platform, taking 11.5 percent less time and three fewer steps than the Cisco UCS X-Series platform (see Figure 4). Figure 4: Time and steps it took to complete server migration tasks for both platforms. Lower numbers are better. Source: Principled Technologies. Total time and steps to complete server profile configuration and deployment tasks Dell PowerEdge MX Cisco UCS X-Series 49 steps 124 steps 29m 45s 31m 53s Total time and steps to complete server migration tasks Dell PowerEdge MX Cisco UCS X-Series 50m 27s 57m 03s 99 steps 102 steps 6.6% less time 60.4% fewer steps to complete server profile configuration and deployment tasks 11.5% less time 2.9% fewer steps to complete server migration tasks Cut server migration times by upgrading to Dell PowerEdge MX from legacy Cisco UCS March 2023 (Revised) | 4
  • 5. Conclusion If your organization currently runs VMs on a legacy Cisco UCS cluster, we found that migrating to a new Dell PowerEdge MX platform can save significant administrator time and steps compared to moving to new Cisco UCS X-Series hardware. By cutting total migration preparation and time by 57.3 percent and reducing administrator steps by over 200 clicks, the Dell PowerEdge MX platform can simplify the entire upgrade process. With the Dell PowerEdge MX platform, your business can attain the performance benefits of your new hardware faster, reduce the chance of user error, and ensure that administrators can move onto strategic tasks in less time. 1. Dell PowerEdge MX, accessed February 5, 2023, https://www.dell.com/en-us/dt/servers/mod- ular-infrastructure/poweredge-mx/index.ht- m#tab0=0&tab1=0&accordion0. Principled Technologies is a registered trademark of Principled Technologies, Inc. All other product names are the trademarks of their respective owners. For additional information, review the science behind this report. Principled Technologies® Facts matter.® Principled Technologies® Facts matter.® This project was commissioned by Dell Technologies. Read the science behind this report at https://facts.pt/Dar4Pyd Cut server migration times by upgrading to Dell PowerEdge MX from legacy Cisco UCS March 2023 (Revised) | 5