Delayering the organisation
in a radically open way
The University of Hertfordshire Agile Programme
Alan Combes – Head of Improvement and Planning
The case for change
`The current structure has worked well and as a university we
are achieving great things. This change is about ensuring the
University stays ahead of the game and is able to adapt and
move with agility as demands from students and changes to
the sector become apparent.’
`The aim of the change is to reduce complexity and improve
the effectiveness and agility of the organisation’
Quintin McKellar,
Vice Chancellor, July 2011
Initial Feasibility –
analysing faculty
roles, processes and
activities
Devolve to
Schools or
Centralise?
Overall aims of the Programme
• Consolidate emerging Strategic Business Unit model
establish consistent roles in each management team
• Devolve responsibility/governance where possible
• Reduce organisational/process/decision complexity
enabling more decision making at a local level
• Enhance strategic focus and leadership
Delivering a more focussed, clearly led and agile
organisation
How?
The Approach to change…
1. The VC addressed the community immediately with key principles:
 We believe this is right, we want staff involved in developing the solutions
 The key driver is agility and effectiveness not cost reduction
 Roles and reporting lines may change but no-one will be at risk of redundancy
 The Programme will be cost and headcount neutral
 There will be no new SBUs
 Both operational management and governance needs will be met
2. Team/project oriented within an overarching programme of works
 Dedicated programme management group established
3. Opportunities for process and operational improvement will be maximised
4. Very regular and consistent communications
Programme Management – APMG / IPO
Champion - VC
Infrastructure: IT-Systems / Estates
People
Communications and Involvement
Finance
Work
streams
Impact
Assessment
Work stream 1 Work stream 2 Work stream 3 Work stream 4 Work stream 5 Work stream 6 Work stream 7 Work stream 8
Finalisation of
Top Level
Organisation
Technicians
Review
Procurement
Centralisation
Health Schools
Reorg
Faculty
Academic
Roles
Governance
(Committees
and Policy)
Faculty Admin
Reorganisation
PVC /
HOS/AHOS
Leader Leader Leader Leader Leader Leader Leader Leader
Work stream
Project Team
Work stream
Project Team
Work stream
Project Team
Work stream
Project Team
Work stream
Project Team
Work stream
Project Team
Work stream
Project Team
Work stream
Project Team
HR Business
Partner
HR Business
Partner
HR Business
Partner
HR Business
Partner
HR Business
Partner
HR Business
Partner
HR Business
Partner
HR Business
Partner
Facilitator Facilitator Facilitator Facilitator Facilitator Facilitator Facilitator Facilitator
RTU rep RTU rep RTU rep RTU rep RTU rep
Other
specialists
Other
specialists
Other
specialists
Other
specialists
Other
specialist
Other
specialists
Other
specialists
Other
specialists
Wider engagement activities and inclusion of volunteers
Management
Agile Programme
Timescales and phasing
Engagement and
Design
Review and formal
Consultation
Implementation
July 2011 September 2012
VC’s
announcement
Proposals published
Structures agreed
Organisation in place
January
2012
May
2012
1st Sept
2012
Autumn 2011
Feb - April
May - Sept Embedding
2013-14
Engagement statistics
• Programme Management Group = IPO head plus 5 senior staff
 Met weekly or fortnightly for the whole year
• More than 500 staff were directly affected
 by either organisational or role change
• 75 members of staff supported the core work streams
• More than 300 staff attended over 40 ‘involvement meetings’
 facilitated by the work streams
• More than 600 staff attended 40 `briefing meetings’
 chaired by line managers, supported by HR and attended by Trade Unions.
• Over 200 written consultation responses were received,
 summarised WITH RESPONSES and published openly
Impact of the change
• Substantially flatter structure
 entire layer of faculty meetings, reviews and double checks removed
• Improved line of sight - Deans of Schools to the Deputy Vice Chancellor
 leading to substantially communications and decision making
• Improved autonomy and accountability for Deans of School
 managing technical staff, school based administration teams
 a greater sense of ‘my school’ and improved pastoral care for every student
• Introduction of Strategic PVCs linked to specific named roles present in all management teams
• Establishment of maximum spans of control requiring PLs to take on line management
• Improved and more consistent job descriptions
Managed in an Open
Engaged Planning Process
Strategic Plan
Expressed in our
Organisational Structure
PVCStudentExperience,PVCBusinessEnterprise
PVCResearch,PVCInternational
PVCRegionalandCulturalAffairs
UH Embedded Strategy
Professional SBUs – services and advice
Academic SBUs*
1. Business School
2. Education
3. Law
4. Humanities
5. Engineering & Technology
6. Computer Science
7. Physics, Astronomy and
Maths
8. Creative Arts
9. Life and Medical Sciences
10. Health and Social Work
DVC / OVC 5 Year Targets
Traffic Light Report
2 x per year
Measured in KPIs and
Targets
October/November
• Look back at previous year
• Performance review
May / June
• Late mid year
• Commentary based
LeadingonStrategic
Goals
Management / Leadership
Oversight / Balance
Annual Planning
Round
Parallel, Integrated
Capital Investment
Process
Transparent
Overhead Allocation
Feb: Planning Conference
• Context, constraints
April: Submissions
May: 1-1 Planning Meetings
• For all business units
• Focus on goals and aspirations
• Resulting in Budget and Capital
investment
PVCs
* Management roles aligned to PVCs
Clear budget position
Dean of School
Associate Dean
Learning &
Teaching / Student
Experience
School
Administration Manager
Associate Dean
Research
Associate
Dean
Academic Quality
Associate Dean
Business
Innovation
Associate Dean
International and
Recruitment
TBC
Head of Screen
Head of Visual Arts Head of Design Head of Music Academic Group
Leader Postgraduate
Technical and
Resources Manager
School Typical
Structure
Profs/Subject Group Leaders
Feedback – good and bad…
• Of 468 staff affected - one official grievance registered by a group of 5 staff
• Clearly some staff found the change very challenging
• Genuine effort to encourage staff to participate and influence the change
• Workstreams effective - but some inconsistency in approach
• Temprorary Transition resources required - not sufficiently considered
• Aggressive timescale and ‘big bang’ change created strain alongside business as usual
• Equally – not knowing the outcome for six months created tension
• More time needed for implementation – has led to a number of post Agile challenges
• Accept that the change isn’t finished when the Programme ends
Key Success Factors…
• A project oriented approach
• Sub-dividing the task into manageable pieces
• Active – very present Programme management
 providing an effective focus for leadership, governance , decision making and communication
• Provision of clear leadership briefs for each stage
• IPO Facilitators and HR Business Partners for each project
 encouraging dialogue and consistency
• A heavy emphasis on communications and dialogue
We didn’t achieve all of these!!
Next steps
• Embedding the change through:
o Understanding the new roles
o Defining and refining the processes
o Developing staff
• Internal (IPO) Process Review of the Agile process
• SUMS-led B independent review of benefits/outcome
• Admitting something could have gone better
Any questions or observations?

More Related Content

PPT
Sanitized Knowledge Transfer Deliverable:Rapid Process Change Tutorial
PPTX
Core Values Of Knowledge Transfers
PPTX
Kaizen Masaakiimai 090701152003 Phpapp01
PPT
May 09 -Cable curriculum delivery 2009 v1
PDF
ELEC 2017 2.1 d. gawlik - hoshin kanri strategy development
PPTX
Building a ppmo from scratch
PPTX
Ppmo presentation building bridges conference
PDF
Understanding why people behave as they do to improve change delivery, Enabli...
Sanitized Knowledge Transfer Deliverable:Rapid Process Change Tutorial
Core Values Of Knowledge Transfers
Kaizen Masaakiimai 090701152003 Phpapp01
May 09 -Cable curriculum delivery 2009 v1
ELEC 2017 2.1 d. gawlik - hoshin kanri strategy development
Building a ppmo from scratch
Ppmo presentation building bridges conference
Understanding why people behave as they do to improve change delivery, Enabli...

What's hot (20)

PPTX
Governing the Chaos
PDF
PDF
Knowledge transfer success factors
PDF
ELEC2017 3.2 w. knol - learning lean in manufacturing sm es
PPTX
Nw admission and enrollment process 11-28-16
PPT
Connected Congregations: Adaptive Leadership Webinar
PDF
Elec2017 3.1 p. zubin - a lean success story in an international, non-manuf...
PPTX
Thomas Blumer - Knowledge Transfer in M&A
PDF
Let My Patients Flow-Streamlining the OR Suite
PPTX
Ce new student orientation 11-28-16
PPT
Presentation Strategy Team
PPT
Presentation Strategy Team
PDF
Prosci Webinar: The Holistic Approach to Change Management - Insights and Inn...
PDF
Building_a_flexibility_strategy
PDF
Leadership: Responding to complexity webinar
PPT
Quality control circle presentation
PPTX
Build Your NGO: Monitoring & Evaluation
PDF
ELEC2017 2.1 p. anhede - learning lean according to the view of the product...
PPT
ASAE Presentation: Managing Enterprise Projects
Governing the Chaos
Knowledge transfer success factors
ELEC2017 3.2 w. knol - learning lean in manufacturing sm es
Nw admission and enrollment process 11-28-16
Connected Congregations: Adaptive Leadership Webinar
Elec2017 3.1 p. zubin - a lean success story in an international, non-manuf...
Thomas Blumer - Knowledge Transfer in M&A
Let My Patients Flow-Streamlining the OR Suite
Ce new student orientation 11-28-16
Presentation Strategy Team
Presentation Strategy Team
Prosci Webinar: The Holistic Approach to Change Management - Insights and Inn...
Building_a_flexibility_strategy
Leadership: Responding to complexity webinar
Quality control circle presentation
Build Your NGO: Monitoring & Evaluation
ELEC2017 2.1 p. anhede - learning lean according to the view of the product...
ASAE Presentation: Managing Enterprise Projects
Ad

Viewers also liked (8)

PPT
Delayering & Outsourcing
PPT
Organisational Structure
PPT
HRM - Delayering
PPS
A Case For Restructuring An Organization
PPT
Organisational Structures
PDF
Hr project study of recruitment & selection process in aviva life insurance
PPTX
Organisational structure
PPT
HRM - Organisational Structure
Delayering & Outsourcing
Organisational Structure
HRM - Delayering
A Case For Restructuring An Organization
Organisational Structures
Hr project study of recruitment & selection process in aviva life insurance
Organisational structure
HRM - Organisational Structure
Ad

Similar to MCHE Open Forum 2013 - Hertfordshire's Delayering the Organisation Programme (20)

PDF
Pem zhipeng xie engg 5812 change management presentation
PDF
Juliet Maynard, Business Change Project Management in Public Sector Environme...
PDF
PMO's and the CxO webinar, 6 June 2023
PDF
diagnostic report for uc berkeley - bain
PDF
Building Change Capability - Jess Annison and Jan Jayes
PPTX
111: From generalist to specialist
PPTX
UCISA Major Project Governance Assessment Toolkit
PPTX
UCISA Major Project Governance Assessment Toolkit
DOCX
Dhananjay_S
PDF
Change management in a project environment- donna unitt
PPT
Research Restructure within HE - Morag Easton
PPTX
Portfolio management Challenges and Implementation
PPT
SAP Organization Change Management
PPTX
UNIT II.pptx Organizing in Principles of Management
PPTX
Piloting Major Business Change: Worktribe Research Management at the Universi...
PPTX
Project Management Fundamentals based on the PMBOK Guide
PDF
Prosci ECM Boot Camp Ino Webinar May 2016
PPTX
Whitepaper: Portfolio Management 101: Moving from ‘Just’ Project Management t...
PPT
Advanced project management ppts
PDF
Elec2017 3.1 f. hermkens - the role of middle management in implementing le...
Pem zhipeng xie engg 5812 change management presentation
Juliet Maynard, Business Change Project Management in Public Sector Environme...
PMO's and the CxO webinar, 6 June 2023
diagnostic report for uc berkeley - bain
Building Change Capability - Jess Annison and Jan Jayes
111: From generalist to specialist
UCISA Major Project Governance Assessment Toolkit
UCISA Major Project Governance Assessment Toolkit
Dhananjay_S
Change management in a project environment- donna unitt
Research Restructure within HE - Morag Easton
Portfolio management Challenges and Implementation
SAP Organization Change Management
UNIT II.pptx Organizing in Principles of Management
Piloting Major Business Change: Worktribe Research Management at the Universi...
Project Management Fundamentals based on the PMBOK Guide
Prosci ECM Boot Camp Ino Webinar May 2016
Whitepaper: Portfolio Management 101: Moving from ‘Just’ Project Management t...
Advanced project management ppts
Elec2017 3.1 f. hermkens - the role of middle management in implementing le...

More from Association of University Administrators (20)

PDF
The 2017 AUA Study Tour of Switzerland and Germany
PDF
Global Trends in Study Abroad: Student Engagement in International Experience
PDF
International Student Mobility Trends: Can National Policies Support (or Obst...
PDF
Go International@ Stand Out. Is the UK Making its Mark on Mobility
PDF
Co-designing space that works for everyone
PPTX
"So What Do You Do?" - Building an External Reputation
PDF
The 5 lessons learnt through a critical investigation of professional develop...
PPTX
Enhancing public speaking skills using improvisation techniques
PPTX
Cross departmental effectiveness to improve the student experience: a case study
PPTX
Creating an Engaged and Effective Technical Team
PPTX
Celebrating 15 Years of the AUA PgCert
PDF
Beyond Brexit – Post EU Scenarios for Higher Education
PPTX
Strathclyde’s Distinctive Approach to Enhancing Students’ Experience
PPTX
Find Your Presenting Style
PPTX
Becoming an AUA Accredited Member or Fellow
PPTX
Building an External Reputation
PPTX
UCAS Presentation - Clare Marchant ARC 2017
PDF
Hot topics: ARC Assessment & Quality Practitioner Group Updates
The 2017 AUA Study Tour of Switzerland and Germany
Global Trends in Study Abroad: Student Engagement in International Experience
International Student Mobility Trends: Can National Policies Support (or Obst...
Go International@ Stand Out. Is the UK Making its Mark on Mobility
Co-designing space that works for everyone
"So What Do You Do?" - Building an External Reputation
The 5 lessons learnt through a critical investigation of professional develop...
Enhancing public speaking skills using improvisation techniques
Cross departmental effectiveness to improve the student experience: a case study
Creating an Engaged and Effective Technical Team
Celebrating 15 Years of the AUA PgCert
Beyond Brexit – Post EU Scenarios for Higher Education
Strathclyde’s Distinctive Approach to Enhancing Students’ Experience
Find Your Presenting Style
Becoming an AUA Accredited Member or Fellow
Building an External Reputation
UCAS Presentation - Clare Marchant ARC 2017
Hot topics: ARC Assessment & Quality Practitioner Group Updates

Recently uploaded (20)

PPTX
Unit 4 Computer Architecture Multicore Processor.pptx
PDF
Skin Care and Cosmetic Ingredients Dictionary ( PDFDrive ).pdf
PDF
MBA _Common_ 2nd year Syllabus _2021-22_.pdf
PDF
Hazard Identification & Risk Assessment .pdf
PDF
Race Reva University – Shaping Future Leaders in Artificial Intelligence
PDF
Empowerment Technology for Senior High School Guide
PDF
CISA (Certified Information Systems Auditor) Domain-Wise Summary.pdf
PDF
Journal of Dental Science - UDMY (2021).pdf
PDF
Myanmar Dental Journal, The Journal of the Myanmar Dental Association (2013).pdf
PPTX
Introduction to pro and eukaryotes and differences.pptx
PDF
BP 505 T. PHARMACEUTICAL JURISPRUDENCE (UNIT 1).pdf
PPTX
DRUGS USED FOR HORMONAL DISORDER, SUPPLIMENTATION, CONTRACEPTION, & MEDICAL T...
PDF
Environmental Education MCQ BD2EE - Share Source.pdf
PDF
1.3 FINAL REVISED K-10 PE and Health CG 2023 Grades 4-10 (1).pdf
PDF
LIFE & LIVING TRILOGY- PART (1) WHO ARE WE.pdf
PDF
Journal of Dental Science - UDMY (2022).pdf
PDF
Literature_Review_methods_ BRACU_MKT426 course material
PPTX
Share_Module_2_Power_conflict_and_negotiation.pptx
PDF
semiconductor packaging in vlsi design fab
PPTX
Education and Perspectives of Education.pptx
Unit 4 Computer Architecture Multicore Processor.pptx
Skin Care and Cosmetic Ingredients Dictionary ( PDFDrive ).pdf
MBA _Common_ 2nd year Syllabus _2021-22_.pdf
Hazard Identification & Risk Assessment .pdf
Race Reva University – Shaping Future Leaders in Artificial Intelligence
Empowerment Technology for Senior High School Guide
CISA (Certified Information Systems Auditor) Domain-Wise Summary.pdf
Journal of Dental Science - UDMY (2021).pdf
Myanmar Dental Journal, The Journal of the Myanmar Dental Association (2013).pdf
Introduction to pro and eukaryotes and differences.pptx
BP 505 T. PHARMACEUTICAL JURISPRUDENCE (UNIT 1).pdf
DRUGS USED FOR HORMONAL DISORDER, SUPPLIMENTATION, CONTRACEPTION, & MEDICAL T...
Environmental Education MCQ BD2EE - Share Source.pdf
1.3 FINAL REVISED K-10 PE and Health CG 2023 Grades 4-10 (1).pdf
LIFE & LIVING TRILOGY- PART (1) WHO ARE WE.pdf
Journal of Dental Science - UDMY (2022).pdf
Literature_Review_methods_ BRACU_MKT426 course material
Share_Module_2_Power_conflict_and_negotiation.pptx
semiconductor packaging in vlsi design fab
Education and Perspectives of Education.pptx

MCHE Open Forum 2013 - Hertfordshire's Delayering the Organisation Programme

  • 1. Delayering the organisation in a radically open way The University of Hertfordshire Agile Programme Alan Combes – Head of Improvement and Planning
  • 2. The case for change `The current structure has worked well and as a university we are achieving great things. This change is about ensuring the University stays ahead of the game and is able to adapt and move with agility as demands from students and changes to the sector become apparent.’ `The aim of the change is to reduce complexity and improve the effectiveness and agility of the organisation’ Quintin McKellar, Vice Chancellor, July 2011
  • 3. Initial Feasibility – analysing faculty roles, processes and activities
  • 5. Overall aims of the Programme • Consolidate emerging Strategic Business Unit model establish consistent roles in each management team • Devolve responsibility/governance where possible • Reduce organisational/process/decision complexity enabling more decision making at a local level • Enhance strategic focus and leadership Delivering a more focussed, clearly led and agile organisation
  • 7. The Approach to change… 1. The VC addressed the community immediately with key principles:  We believe this is right, we want staff involved in developing the solutions  The key driver is agility and effectiveness not cost reduction  Roles and reporting lines may change but no-one will be at risk of redundancy  The Programme will be cost and headcount neutral  There will be no new SBUs  Both operational management and governance needs will be met 2. Team/project oriented within an overarching programme of works  Dedicated programme management group established 3. Opportunities for process and operational improvement will be maximised 4. Very regular and consistent communications
  • 8. Programme Management – APMG / IPO Champion - VC Infrastructure: IT-Systems / Estates People Communications and Involvement Finance Work streams Impact Assessment Work stream 1 Work stream 2 Work stream 3 Work stream 4 Work stream 5 Work stream 6 Work stream 7 Work stream 8 Finalisation of Top Level Organisation Technicians Review Procurement Centralisation Health Schools Reorg Faculty Academic Roles Governance (Committees and Policy) Faculty Admin Reorganisation PVC / HOS/AHOS Leader Leader Leader Leader Leader Leader Leader Leader Work stream Project Team Work stream Project Team Work stream Project Team Work stream Project Team Work stream Project Team Work stream Project Team Work stream Project Team Work stream Project Team HR Business Partner HR Business Partner HR Business Partner HR Business Partner HR Business Partner HR Business Partner HR Business Partner HR Business Partner Facilitator Facilitator Facilitator Facilitator Facilitator Facilitator Facilitator Facilitator RTU rep RTU rep RTU rep RTU rep RTU rep Other specialists Other specialists Other specialists Other specialists Other specialist Other specialists Other specialists Other specialists Wider engagement activities and inclusion of volunteers Management Agile Programme
  • 9. Timescales and phasing Engagement and Design Review and formal Consultation Implementation July 2011 September 2012 VC’s announcement Proposals published Structures agreed Organisation in place January 2012 May 2012 1st Sept 2012 Autumn 2011 Feb - April May - Sept Embedding 2013-14
  • 10. Engagement statistics • Programme Management Group = IPO head plus 5 senior staff  Met weekly or fortnightly for the whole year • More than 500 staff were directly affected  by either organisational or role change • 75 members of staff supported the core work streams • More than 300 staff attended over 40 ‘involvement meetings’  facilitated by the work streams • More than 600 staff attended 40 `briefing meetings’  chaired by line managers, supported by HR and attended by Trade Unions. • Over 200 written consultation responses were received,  summarised WITH RESPONSES and published openly
  • 11. Impact of the change • Substantially flatter structure  entire layer of faculty meetings, reviews and double checks removed • Improved line of sight - Deans of Schools to the Deputy Vice Chancellor  leading to substantially communications and decision making • Improved autonomy and accountability for Deans of School  managing technical staff, school based administration teams  a greater sense of ‘my school’ and improved pastoral care for every student • Introduction of Strategic PVCs linked to specific named roles present in all management teams • Establishment of maximum spans of control requiring PLs to take on line management • Improved and more consistent job descriptions
  • 12. Managed in an Open Engaged Planning Process Strategic Plan Expressed in our Organisational Structure PVCStudentExperience,PVCBusinessEnterprise PVCResearch,PVCInternational PVCRegionalandCulturalAffairs UH Embedded Strategy Professional SBUs – services and advice Academic SBUs* 1. Business School 2. Education 3. Law 4. Humanities 5. Engineering & Technology 6. Computer Science 7. Physics, Astronomy and Maths 8. Creative Arts 9. Life and Medical Sciences 10. Health and Social Work DVC / OVC 5 Year Targets Traffic Light Report 2 x per year Measured in KPIs and Targets October/November • Look back at previous year • Performance review May / June • Late mid year • Commentary based LeadingonStrategic Goals Management / Leadership Oversight / Balance Annual Planning Round Parallel, Integrated Capital Investment Process Transparent Overhead Allocation Feb: Planning Conference • Context, constraints April: Submissions May: 1-1 Planning Meetings • For all business units • Focus on goals and aspirations • Resulting in Budget and Capital investment PVCs * Management roles aligned to PVCs Clear budget position
  • 13. Dean of School Associate Dean Learning & Teaching / Student Experience School Administration Manager Associate Dean Research Associate Dean Academic Quality Associate Dean Business Innovation Associate Dean International and Recruitment TBC Head of Screen Head of Visual Arts Head of Design Head of Music Academic Group Leader Postgraduate Technical and Resources Manager School Typical Structure Profs/Subject Group Leaders
  • 14. Feedback – good and bad… • Of 468 staff affected - one official grievance registered by a group of 5 staff • Clearly some staff found the change very challenging • Genuine effort to encourage staff to participate and influence the change • Workstreams effective - but some inconsistency in approach • Temprorary Transition resources required - not sufficiently considered • Aggressive timescale and ‘big bang’ change created strain alongside business as usual • Equally – not knowing the outcome for six months created tension • More time needed for implementation – has led to a number of post Agile challenges • Accept that the change isn’t finished when the Programme ends
  • 15. Key Success Factors… • A project oriented approach • Sub-dividing the task into manageable pieces • Active – very present Programme management  providing an effective focus for leadership, governance , decision making and communication • Provision of clear leadership briefs for each stage • IPO Facilitators and HR Business Partners for each project  encouraging dialogue and consistency • A heavy emphasis on communications and dialogue We didn’t achieve all of these!!
  • 16. Next steps • Embedding the change through: o Understanding the new roles o Defining and refining the processes o Developing staff • Internal (IPO) Process Review of the Agile process • SUMS-led B independent review of benefits/outcome • Admitting something could have gone better
  • 17. Any questions or observations?