DELAYS IN VERILOG
Delays in Verilog
Presented BY:
Jitu Mistry
At eiTRA centre
Why delays and timing so important ?
 They allow a degree of realism to be incorporated into
the modeling process.
 The time taken for changes to propagate through a
module may lead to race conditions in other modules.
 Some designs, such as high speed microprocessors, may
have very tight timing requirements that must be met.
7/30/2013
2
Types of Delays.
 Depending on the design approach,
 Gate-level Modeling
 Dataflow Modeling
 Behavioral Modeling
7/19/2013
3
Gate level modelling
 Propagation delay :
through the gate, and the time taken for the output to actually
change state, according to input.
 Gate level modelling delay described below as:-
 Rise
 Fall Min/Typ/Max values
 Turn-off
7/19/2013
4
The rise delay is associated with a gate output transition
to a 1 from another value(0,x,z).
Format: operation #( Rise_Val, fall_Val ) a1( out, i1, i2);
Ex: and #(1 , 0 ) a1(out ,i1,i2);
//Rise=1, Fall=0, Turn-Off=0
7/19/2013
5
Rise delay
7/19/2013
6
 buf #(2,0) (out,in);
Fall delay
The fall delay is associated with a gate output transition to
‘0’ from another state ‘1’
Format: operation #( Rise_Val, fall_Val ) a1( out, i1, i2);
Ex:-> and #(0 , 1 ) a1(out ,i1,i2);
// Rise=0 Fall=1 Turn-Off=0
7/19/2013
7
7/19/2013
8
buf #(0,2) (out,in);
buf #(2,3) (out,in);
The turn-off delay is associated with a gate output transition to the high
impedance value(z) from another value(0,1,x).
If the value changes to x, the minimum of three delay is considered.
Rise Delay 0,x,z -> 1
Fall Delay 1,x,z -> 0
Turn-Off Delay 0,1,x -> z
Number Of Delays Specified delays
1 Rise, fall and turn-off times of
equal length
2 Rise and fall times
3 Rise, fall and turn off
7/19/2013
9
Turn-off delay
 For each type of delay, there are three values, min,typ
and max can be specified.
 Any one value can be chosen at the start of the simulation
Because of IC fabrication process variations.
Ex:
And #( 2:3:4, 3:4:5, 4:5:6) a ( out, i1, i2 );
7/19/2013
10
Min, typ or max values
 In Verilog delays can be introduced with
#'num'
as in the examples below, where # is a special character
to introduce delay, and 'num' is the number of ticks
simulator should delay current statement execution.
 #1 a = b // Delay by 1, i.e. execute after 1 tick unit
7/19/2013
11
#'num'
 We can provide num value of different way by variable
or/and parameter
 Parameter delata= 10;
#delta out = in1& in2
Note: # There is no way we could synthesize delays, but
of course we can add delay to particular signals by
adding buffers.
7/19/2013
12
#'num'
#5 y = x + z; // line will execute after 5 unit delay
And
Y = #5 x + z; // assignment to y after the 5 unit delay
7/19/2013
13
#'num'
Dataflow Modelling
 As dataflow modelling use the concept of signals or values
 The delays are associated with the Net (e.g. a Wire)
along which the value is transmitted
 Delays values control the time between the change in a
right hand side operand and when the new value is
assigned to the left hand side.
#5 a = b; means a    b
7/19/2013
14
Dataflow Modelling
 Since values can be assigned to a net in a number of ways,
there are corresponding methods of specifying the
appropriate delays.
1. Regular Assignment Delay
2. Net Declaration Delay
3. Implicit Continuous Assignment
7/19/2013
15
Regular Assignment Delay
 To assign a delay in continuous assignment the delay
value is specified after the keyword assign.
 This is used to introduce a delay onto a net that has
already been declared.
 e.g. wire out;
assign #10 out = in1 & in2;
7/19/2013
16
Any change in values of in1 or in2
will result in the 10 time unit before
Recomputaion
Inertial delay
Net Declaration Delay
 The Delay to be attributed to a Net can be associated
when the Net is declared.
 e.g.
// net delays
wire #10 out;
assign out = in1 & in2;
// the same effect as the following, generally
preferable
wire out;
assign #10 out = in1 & in2;
7/19/2013
17
assign #10 out = in1 & in2;
assign #10 out = in1 & in2;
Implicit Continuous Assignment
 Since a net can be implicitly assigned a value at its
declaration, it is possible to introduce a delay then, before that
assignment takes place.
 E.g.
wire #10 out = in1 & in2;
// same as
wire out;
assign #10 out = in1 & in2;
7/19/2013
20
Inertial delay
 Inertial delay is a measure of the elapsed time during
which a signal must persist at an input of a device in order
for a change to appear at an output.
 A pulse of duration less than the inertial delay does not
contain enough energy to cause the device to switch.
7/19/2013
21
Transport delay
 It is like ideal conductors; that is, they may be modeled as
having no resistance.
 In that case the waveform at the output is delayed but
otherwise matches the waveform at the input.
 Transport delay can also be useful when modeling
behavioral elements where the delay from input to output
is of interest, but there is no visibility into the behavior of
delays internal to the device
7/19/2013
22
DELAYS IN BEHAVIOURAL MODELLING
7/19/2013
23
There are following method
 Delay-based timing control
Regular
Intra- assignment
Zero delay
REGULAR DELAY CONTROL
 Regular delay control is used when a non –zero
delay is specified to the left of a procedural
assignment
 This is sometimes also referred to as inter-
assignment delay control
 Example:#10 q = x+y;
 It simply waits for the appropriate number of
timesteps before executing the command.
7/19/2013
24
INTRA ASSIGNMENT DELAY
 Instead of specifying delay control to the left of tha
assignment, it is possible to assign a delay to the
right of the assignment operator.
 Example: q = #10 x+y;
 With this kind of delay ,the value of x+y is stored
at the time that the assignment is executed, but this
value is not assigned to q until after the delay
period.
7/19/2013
25
7/19/201326
Delays in verilog
ZERO DELAY
 Zero delay is a method to ensure that a statement
is executed last,after all other statements in that
simulation time are execcuted.
 This is to to elminate race arround conditions.
 However if there are multiple zero delay
statements,the order between them is
nondeterministic.
 EX:#0 x=1
7/19/2013
28
SEQENTIAL BLOCKS
 The keywords begin and end are used to group
statements into seqential blocks.
 A statement is executed only after its preceeding
statement completes execution.
7/19/2013
29
7/19/201330
PARALLEL BLOCKS
 Parallel blocks, specified by keywords fork and
join,provide intresting simulation features.
 Statements in a parallel block are executed
concurrently.
 Ordering of statements is controlled by delay or
event control assigned to each statement.
7/19/2013
31
7/19/201332
Setup and Holdtime
 Very important in sequential logic.
 $setup(data_line, clk_line, limit);
 $hold(clk_line, data_line, limit);
7/19/2013
33
Thank you
7/19/2013
34
?

More Related Content

PDF
Overview of digital design with Verilog HDL
PDF
Verilog lab manual (ECAD and VLSI Lab)
PDF
VHDL course
PPTX
Verilog operators
PDF
Basics of Digital Design and Verilog
PDF
Basic concepts in Verilog HDL
PPTX
Verilog Test Bench
PPTX
Verilog
Overview of digital design with Verilog HDL
Verilog lab manual (ECAD and VLSI Lab)
VHDL course
Verilog operators
Basics of Digital Design and Verilog
Basic concepts in Verilog HDL
Verilog Test Bench
Verilog

What's hot (20)

PPT
Switch level modeling
PPT
Verilog tutorial
PDF
Verilog coding of demux 8 x1
PPTX
Verilog Tutorial - Verilog HDL Tutorial with Examples
PPTX
Modules and ports in Verilog HDL
PDF
Logic Synthesis
PDF
Verilog tutorial
PPTX
Verilog presentation final
PPTX
Verilog HDL
PPT
PPT
Verilog Tasks and functions
PPT
VHDL-PRESENTATION.ppt
PDF
Actel fpga
PPTX
PDF
verilog code for logic gates
PDF
VERILOG CODE FOR Adder
PPTX
Xilinx 4000 series
PPT
Multipliers in VLSI
PPTX
dual-port RAM (DPRAM)
PDF
Verilog full adder in dataflow & gate level modelling style.
Switch level modeling
Verilog tutorial
Verilog coding of demux 8 x1
Verilog Tutorial - Verilog HDL Tutorial with Examples
Modules and ports in Verilog HDL
Logic Synthesis
Verilog tutorial
Verilog presentation final
Verilog HDL
Verilog Tasks and functions
VHDL-PRESENTATION.ppt
Actel fpga
verilog code for logic gates
VERILOG CODE FOR Adder
Xilinx 4000 series
Multipliers in VLSI
dual-port RAM (DPRAM)
Verilog full adder in dataflow & gate level modelling style.
Ad

Similar to Delays in verilog (20)

PPT
Advanced modeling techniques
PDF
Concepts of Behavioral modelling in Verilog HDL
PPT
Behavioral modeling
PPT
Assic 9th Lecture
PPT
Unit 4 - Features of Verilog HDL (1).ppt
PPTX
behavioralmodeling and Timing Control - P04.pptx
PPT
VHDLhshdhdbbdbdbdbdbdbdbbdbrbrbrbfbfbbfb_PPT.ppt
PPT
Fpga 07-port-rules-gate-delay-data-flow-carry-look-ahead-adder
PPTX
System design using HDL - Module 2
PPTX
HDL_verilog_unit_2_part-2_gatelevel.pptx
DOCX
Unit i
PDF
Notes: Verilog Part 4- Behavioural Modelling
PPTX
Domine specification section on VLSI.pptx
PPTX
Introduction to Verilog & code coverage
PPTX
Model simulation VHDL
PDF
Verilog HDL - 3
PPTX
PTC(procedure timing control) in verilog hdl language.pptx
PPTX
Model simulation VHDL
PDF
RTL Coding Basics in verilog hardware language
PPT
07_Digital timing_&_Pipelining.ppt
Advanced modeling techniques
Concepts of Behavioral modelling in Verilog HDL
Behavioral modeling
Assic 9th Lecture
Unit 4 - Features of Verilog HDL (1).ppt
behavioralmodeling and Timing Control - P04.pptx
VHDLhshdhdbbdbdbdbdbdbdbbdbrbrbrbfbfbbfb_PPT.ppt
Fpga 07-port-rules-gate-delay-data-flow-carry-look-ahead-adder
System design using HDL - Module 2
HDL_verilog_unit_2_part-2_gatelevel.pptx
Unit i
Notes: Verilog Part 4- Behavioural Modelling
Domine specification section on VLSI.pptx
Introduction to Verilog & code coverage
Model simulation VHDL
Verilog HDL - 3
PTC(procedure timing control) in verilog hdl language.pptx
Model simulation VHDL
RTL Coding Basics in verilog hardware language
07_Digital timing_&_Pipelining.ppt
Ad

Recently uploaded (20)

PDF
Pre independence Education in Inndia.pdf
PPTX
BOWEL ELIMINATION FACTORS AFFECTING AND TYPES
PDF
Microbial disease of the cardiovascular and lymphatic systems
PPTX
master seminar digital applications in india
PDF
Anesthesia in Laparoscopic Surgery in India
PDF
O5-L3 Freight Transport Ops (International) V1.pdf
PPTX
Final Presentation General Medicine 03-08-2024.pptx
PDF
Abdominal Access Techniques with Prof. Dr. R K Mishra
PPTX
The Healthy Child – Unit II | Child Health Nursing I | B.Sc Nursing 5th Semester
PDF
RMMM.pdf make it easy to upload and study
PDF
Business Ethics Teaching Materials for college
PDF
Basic Mud Logging Guide for educational purpose
PPTX
PPH.pptx obstetrics and gynecology in nursing
PDF
Classroom Observation Tools for Teachers
PDF
ANTIBIOTICS.pptx.pdf………………… xxxxxxxxxxxxx
PDF
Insiders guide to clinical Medicine.pdf
PPTX
Pharma ospi slides which help in ospi learning
PDF
Module 4: Burden of Disease Tutorial Slides S2 2025
PDF
Complications of Minimal Access Surgery at WLH
PDF
BÀI TẬP BỔ TRỢ 4 KỸ NĂNG TIẾNG ANH 9 GLOBAL SUCCESS - CẢ NĂM - BÁM SÁT FORM Đ...
Pre independence Education in Inndia.pdf
BOWEL ELIMINATION FACTORS AFFECTING AND TYPES
Microbial disease of the cardiovascular and lymphatic systems
master seminar digital applications in india
Anesthesia in Laparoscopic Surgery in India
O5-L3 Freight Transport Ops (International) V1.pdf
Final Presentation General Medicine 03-08-2024.pptx
Abdominal Access Techniques with Prof. Dr. R K Mishra
The Healthy Child – Unit II | Child Health Nursing I | B.Sc Nursing 5th Semester
RMMM.pdf make it easy to upload and study
Business Ethics Teaching Materials for college
Basic Mud Logging Guide for educational purpose
PPH.pptx obstetrics and gynecology in nursing
Classroom Observation Tools for Teachers
ANTIBIOTICS.pptx.pdf………………… xxxxxxxxxxxxx
Insiders guide to clinical Medicine.pdf
Pharma ospi slides which help in ospi learning
Module 4: Burden of Disease Tutorial Slides S2 2025
Complications of Minimal Access Surgery at WLH
BÀI TẬP BỔ TRỢ 4 KỸ NĂNG TIẾNG ANH 9 GLOBAL SUCCESS - CẢ NĂM - BÁM SÁT FORM Đ...

Delays in verilog

  • 1. DELAYS IN VERILOG Delays in Verilog Presented BY: Jitu Mistry At eiTRA centre
  • 2. Why delays and timing so important ?  They allow a degree of realism to be incorporated into the modeling process.  The time taken for changes to propagate through a module may lead to race conditions in other modules.  Some designs, such as high speed microprocessors, may have very tight timing requirements that must be met. 7/30/2013 2
  • 3. Types of Delays.  Depending on the design approach,  Gate-level Modeling  Dataflow Modeling  Behavioral Modeling 7/19/2013 3
  • 4. Gate level modelling  Propagation delay : through the gate, and the time taken for the output to actually change state, according to input.  Gate level modelling delay described below as:-  Rise  Fall Min/Typ/Max values  Turn-off 7/19/2013 4
  • 5. The rise delay is associated with a gate output transition to a 1 from another value(0,x,z). Format: operation #( Rise_Val, fall_Val ) a1( out, i1, i2); Ex: and #(1 , 0 ) a1(out ,i1,i2); //Rise=1, Fall=0, Turn-Off=0 7/19/2013 5 Rise delay
  • 7. Fall delay The fall delay is associated with a gate output transition to ‘0’ from another state ‘1’ Format: operation #( Rise_Val, fall_Val ) a1( out, i1, i2); Ex:-> and #(0 , 1 ) a1(out ,i1,i2); // Rise=0 Fall=1 Turn-Off=0 7/19/2013 7
  • 9. The turn-off delay is associated with a gate output transition to the high impedance value(z) from another value(0,1,x). If the value changes to x, the minimum of three delay is considered. Rise Delay 0,x,z -> 1 Fall Delay 1,x,z -> 0 Turn-Off Delay 0,1,x -> z Number Of Delays Specified delays 1 Rise, fall and turn-off times of equal length 2 Rise and fall times 3 Rise, fall and turn off 7/19/2013 9 Turn-off delay
  • 10.  For each type of delay, there are three values, min,typ and max can be specified.  Any one value can be chosen at the start of the simulation Because of IC fabrication process variations. Ex: And #( 2:3:4, 3:4:5, 4:5:6) a ( out, i1, i2 ); 7/19/2013 10 Min, typ or max values
  • 11.  In Verilog delays can be introduced with #'num' as in the examples below, where # is a special character to introduce delay, and 'num' is the number of ticks simulator should delay current statement execution.  #1 a = b // Delay by 1, i.e. execute after 1 tick unit 7/19/2013 11 #'num'
  • 12.  We can provide num value of different way by variable or/and parameter  Parameter delata= 10; #delta out = in1& in2 Note: # There is no way we could synthesize delays, but of course we can add delay to particular signals by adding buffers. 7/19/2013 12 #'num'
  • 13. #5 y = x + z; // line will execute after 5 unit delay And Y = #5 x + z; // assignment to y after the 5 unit delay 7/19/2013 13 #'num'
  • 14. Dataflow Modelling  As dataflow modelling use the concept of signals or values  The delays are associated with the Net (e.g. a Wire) along which the value is transmitted  Delays values control the time between the change in a right hand side operand and when the new value is assigned to the left hand side. #5 a = b; means a    b 7/19/2013 14
  • 15. Dataflow Modelling  Since values can be assigned to a net in a number of ways, there are corresponding methods of specifying the appropriate delays. 1. Regular Assignment Delay 2. Net Declaration Delay 3. Implicit Continuous Assignment 7/19/2013 15
  • 16. Regular Assignment Delay  To assign a delay in continuous assignment the delay value is specified after the keyword assign.  This is used to introduce a delay onto a net that has already been declared.  e.g. wire out; assign #10 out = in1 & in2; 7/19/2013 16 Any change in values of in1 or in2 will result in the 10 time unit before Recomputaion Inertial delay
  • 17. Net Declaration Delay  The Delay to be attributed to a Net can be associated when the Net is declared.  e.g. // net delays wire #10 out; assign out = in1 & in2; // the same effect as the following, generally preferable wire out; assign #10 out = in1 & in2; 7/19/2013 17
  • 18. assign #10 out = in1 & in2;
  • 19. assign #10 out = in1 & in2;
  • 20. Implicit Continuous Assignment  Since a net can be implicitly assigned a value at its declaration, it is possible to introduce a delay then, before that assignment takes place.  E.g. wire #10 out = in1 & in2; // same as wire out; assign #10 out = in1 & in2; 7/19/2013 20
  • 21. Inertial delay  Inertial delay is a measure of the elapsed time during which a signal must persist at an input of a device in order for a change to appear at an output.  A pulse of duration less than the inertial delay does not contain enough energy to cause the device to switch. 7/19/2013 21
  • 22. Transport delay  It is like ideal conductors; that is, they may be modeled as having no resistance.  In that case the waveform at the output is delayed but otherwise matches the waveform at the input.  Transport delay can also be useful when modeling behavioral elements where the delay from input to output is of interest, but there is no visibility into the behavior of delays internal to the device 7/19/2013 22
  • 23. DELAYS IN BEHAVIOURAL MODELLING 7/19/2013 23 There are following method  Delay-based timing control Regular Intra- assignment Zero delay
  • 24. REGULAR DELAY CONTROL  Regular delay control is used when a non –zero delay is specified to the left of a procedural assignment  This is sometimes also referred to as inter- assignment delay control  Example:#10 q = x+y;  It simply waits for the appropriate number of timesteps before executing the command. 7/19/2013 24
  • 25. INTRA ASSIGNMENT DELAY  Instead of specifying delay control to the left of tha assignment, it is possible to assign a delay to the right of the assignment operator.  Example: q = #10 x+y;  With this kind of delay ,the value of x+y is stored at the time that the assignment is executed, but this value is not assigned to q until after the delay period. 7/19/2013 25
  • 28. ZERO DELAY  Zero delay is a method to ensure that a statement is executed last,after all other statements in that simulation time are execcuted.  This is to to elminate race arround conditions.  However if there are multiple zero delay statements,the order between them is nondeterministic.  EX:#0 x=1 7/19/2013 28
  • 29. SEQENTIAL BLOCKS  The keywords begin and end are used to group statements into seqential blocks.  A statement is executed only after its preceeding statement completes execution. 7/19/2013 29
  • 31. PARALLEL BLOCKS  Parallel blocks, specified by keywords fork and join,provide intresting simulation features.  Statements in a parallel block are executed concurrently.  Ordering of statements is controlled by delay or event control assigned to each statement. 7/19/2013 31
  • 33. Setup and Holdtime  Very important in sequential logic.  $setup(data_line, clk_line, limit);  $hold(clk_line, data_line, limit); 7/19/2013 33