SlideShare a Scribd company logo
Etwinning project : THE GARDENS OF MATHS

Activity 1 : from September 2011 to the Autumn holidays (05/09/11 - 21/10/11)
1) Creation of a Powerpoint presentation
From the photo of the whole class we’ll create areas to associate each pupil to his photo
(beware : size 640x480) and a text to introduce himself in English typed by each pupil.
Each student must do this himself.
2) Study the vocabulary linked to the symmetry in English (axial and central)
3) Logo's contest
In September, we ask volonteers among our pupils. We ask them to do a handmade logo
(not using the computer). Then we scan and upload their works on the twinspace. We ask
our pupils to vote for their favourite logo in each partner country (Polish pupils vote for a
French, a Czech and a Spanish logo; and so on ...).
We publish the winner of each country on the twinspace , inside the gallery (with a little
gift for all).



Activity 2 : November 2011 – Christmas holidays (03/11/11 - 16/12/11)
1) Researches about “ French gardens”:
a) Definition of what a “French garden” looks like.
b) Each partner chooses one or several examples of “ French gardens” in his own country.
Group work: each group writes a description in English of these gardens with photos to
illustrate his description.
2) Creation of Powerpoint presentation in groups.

Activity 3 : Christmas cards (to be sent by the 12/12/11)

Activity 4 : January 2012 – Winter holidays (03/01/12 - 24/02/12)
1) Creation de « transparent gifs » the students learn how to turn a gif picture
transparent.
2) Use of Geogebra : The students learn to build the symmetrical picture using central or
axial symmetry.

Activity 5 : March 2012 – Easter holidays (12/03/12 - 20/04/12)
1) Easter cards (to be sent by the 02/04/12)
2) Each pupil must create freely a « French garden » using Geogebra.
THE GARDENS OF MATHS
             Planning activities for School year 2011 – 2012

           SETPTEMBER 2011                                                                       OCTOBER    2011
Mo          5    12     19            26                                   Mo                      3        10     17    24
Tu          6    13     20            27                                   Tu                      4        11     18    25
We          7    14     21            28                                   We                      5        12     19    26
Th    1     8    15     22            29                                   Th                      6        13     20    27
Fr    2     9    16     23            30                                   Fr                      7        14     21    28
Sa    3    10    17     24                                                 Sa                1     8        15     22    29
Su    4    11    18     25                                                 Su                2     9        16     23    30
           W 1     W 2    W 3         W4                                                 W4        W5       W6     W7    W8
            NOVEMBER 2011                                                                        DECEMBER 2011
Mo   31     7    14     21            28                                   Mo                       5     12       19    26
Tu    1     8    15     22            29                                   Tu                       6     13       20    27
We   2      9    16     23            30                                   We                       7     14       21    28
Th   3     10    17     24                                                 Th                1      8     15       22    29
Fr   4     11    18     25                                                 Fr                2      9     16       23    30
Sa   5     12    19     26                                                 Sa                3     10     17       24    31
Su   6     13    20     27                                                 Su                4     11     18       25
     W9    W10     W11    W12       W13                                                 W13       W14      W15     W16   W17
             JANUARY 2012                                                                        FEBRUARY   2012
Mo          2     9     16            23        30                         Mo                       6       13     20    27
Tu          3     10    17            24        31                         Tu                       7       14     21    28
We          4     11    18            25                                   We                1      8       15     22    29
Th          5     12    19            26                                   Th                2      9       16     23
Fr          6     13    20            27                                   Fr                3     10       17     24
Sa          7     14    21            28                                   Sa                4     11       18     25
Su    1     8     15    22            29                                   Su                5     12       19     26
     W17   W18     W19    W20       W21      W22                                        W22       W23      W24     W25   W26
                MARCH 2012                                                                        APRIL 2012
Mo          5       12     19         26                                   Mo                      2      9        16
Tu          6       13     20         27                                   Tu                      3      10       17
We          7       14     21         28                                   We                      4      11       18
Th    1     8       15     22         29                                   Th                      5      12       19
Fr    2     9       16     23         30                                   Fr                      6      13       20
Sa    3    10       17     24         31                                   Sa                      7      14       21
Su    4    11       18     25                                              Su                1     8      15       22
     W26   W27     W28    W29       W30                                                 W30       W31      W32     W33
                                                          ACTIVITY 3 & 4
                                ACTIVITY 1


                                             ACTIVITY 2




                                                                                ACTIVITY 5

More Related Content

PDF
The Garden Of Maths Schedule
PDF
2012 2013 school year
XLS
2012 calendar
PDF
CommCalendar2010
PDF
Msz Zw228 H04
PPT
Simple present - Yes no questions
PDF
S'cool Agenda 2007/2008
The Garden Of Maths Schedule
2012 2013 school year
2012 calendar
CommCalendar2010
Msz Zw228 H04
Simple present - Yes no questions
S'cool Agenda 2007/2008

What's hot (20)

XLS
2011 calendar
PDF
2012 calendar
PDF
PacBlue Printing Calendar 2011
DOC
Kalender 2012
PDF
Gorham school calendar
PDF
2011 2012 --d18_8x11calendar_2
PPT
5 sec mult and div
PDF
Atlanta calendar2011
PDF
Ecisd calendar 2012 2013
PDF
Calendarr12
DOC
Test Calendar 2013
DOCX
January 2012
PDF
Academic year-2010-2011 CIT-U
DOC
Calendar2
XLS
2013 calendar
PDF
Year 2012 calendar – australia
DOC
Public holidays 2013
PDF
2011-2012 calendar
PPSX
Library Advent Calendar
PDF
KPMG IFRS Training Program 2013
2011 calendar
2012 calendar
PacBlue Printing Calendar 2011
Kalender 2012
Gorham school calendar
2011 2012 --d18_8x11calendar_2
5 sec mult and div
Atlanta calendar2011
Ecisd calendar 2012 2013
Calendarr12
Test Calendar 2013
January 2012
Academic year-2010-2011 CIT-U
Calendar2
2013 calendar
Year 2012 calendar – australia
Public holidays 2013
2011-2012 calendar
Library Advent Calendar
KPMG IFRS Training Program 2013
Ad

Viewers also liked (6)

DOCX
Resume - Santa Moya
DOCX
Activity sheet how do you learn best
DOCX
3. parte criptozoologia
PDF
Multithreaded Algorithms
PPTX
redes sociales
PDF
Avaluació protagonistes de la història
Resume - Santa Moya
Activity sheet how do you learn best
3. parte criptozoologia
Multithreaded Algorithms
redes sociales
Avaluació protagonistes de la història
Ad

Similar to Description Schedule eTwinning Project (20)

PDF
Calendar eTwinning Project
PDF
Calendar eTwinning Project Around the circle/around the wheel project
PDF
Kalender Training SATUNAMA 2012
PPSX
Calendar 2011 - Tân Mão Lunar calendar - tibet landscape
XLS
2010 Calendar 161
XLS
2009 Calendar 275
XLS
Calendario de actividades 2010
XLS
Calendario De Actividades 2010
XLS
Calendario De Actividades 2010
XLS
Calendario de actividades 2010
XLS
Calendario de actividades 2010
PPTX
Calendar 2011 planner powerpoint presentation templates
PDF
Calendário 2011 em semanas (iso)
PDF
How to make create calendar 2011 planner powerpoint presentation slides and p...
PDF
Calendar 2011 planner powerpoint presentation templates.
PDF
Calendar 2011 planner powerpoint ppt templates.
PDF
Calendar 2011 planner powerpoint ppt slides.
PDF
Calendar 2011 planner powerpoint presentation slides.
Calendar eTwinning Project
Calendar eTwinning Project Around the circle/around the wheel project
Kalender Training SATUNAMA 2012
Calendar 2011 - Tân Mão Lunar calendar - tibet landscape
2010 Calendar 161
2009 Calendar 275
Calendario de actividades 2010
Calendario De Actividades 2010
Calendario De Actividades 2010
Calendario de actividades 2010
Calendario de actividades 2010
Calendar 2011 planner powerpoint presentation templates
Calendário 2011 em semanas (iso)
How to make create calendar 2011 planner powerpoint presentation slides and p...
Calendar 2011 planner powerpoint presentation templates.
Calendar 2011 planner powerpoint ppt templates.
Calendar 2011 planner powerpoint ppt slides.
Calendar 2011 planner powerpoint presentation slides.

More from Gosia Garkowska (20)

PPTX
C1 How to work on Twinspace
PPTX
C6 task template - origami contest
PPTX
C6 task Origami Kusudama contest
PPTX
Science IST tools Warsaw October 2018
PDF
Leo STEAM konkurs na logo
PPTX
Science Maths Ict Tools
PDF
Comenius project Why Maths - a success story
PDF
PZO Gimnazjum
PDF
PZO Gimnazjum
PDF
PZO Gimnazjum
PDF
Równania trygonometryczne
PDF
Równania trygonometryczne
PDF
Maths and Economy
PDF
Maths and Chemistry chapter
PDF
Maths and Astronomy Comenius Why Maths
PDF
Maths in Nature and Biology
PDF
Maths in Art and Architecture Why Maths? Comenius project
PDF
Educational Game Trivia Persuit questions
PDF
Maths and nature Comenius Why Maths
PDF
About our Comenius project Why Maths?
C1 How to work on Twinspace
C6 task template - origami contest
C6 task Origami Kusudama contest
Science IST tools Warsaw October 2018
Leo STEAM konkurs na logo
Science Maths Ict Tools
Comenius project Why Maths - a success story
PZO Gimnazjum
PZO Gimnazjum
PZO Gimnazjum
Równania trygonometryczne
Równania trygonometryczne
Maths and Economy
Maths and Chemistry chapter
Maths and Astronomy Comenius Why Maths
Maths in Nature and Biology
Maths in Art and Architecture Why Maths? Comenius project
Educational Game Trivia Persuit questions
Maths and nature Comenius Why Maths
About our Comenius project Why Maths?

Recently uploaded (20)

PDF
2.FourierTransform-ShortQuestionswithAnswers.pdf
PPTX
Lesson notes of climatology university.
PDF
Weekly quiz Compilation Jan -July 25.pdf
PDF
LDMMIA Reiki Yoga Finals Review Spring Summer
PDF
Paper A Mock Exam 9_ Attempt review.pdf.
PDF
A systematic review of self-coping strategies used by university students to ...
PPTX
Cell Types and Its function , kingdom of life
PDF
Trump Administration's workforce development strategy
PDF
Practical Manual AGRO-233 Principles and Practices of Natural Farming
PDF
ChatGPT for Dummies - Pam Baker Ccesa007.pdf
PPTX
1st Inaugural Professorial Lecture held on 19th February 2020 (Governance and...
PPTX
Final Presentation General Medicine 03-08-2024.pptx
PDF
Chapter 2 Heredity, Prenatal Development, and Birth.pdf
PPTX
Radiologic_Anatomy_of_the_Brachial_plexus [final].pptx
PDF
Microbial disease of the cardiovascular and lymphatic systems
PPTX
UNIT III MENTAL HEALTH NURSING ASSESSMENT
PDF
What if we spent less time fighting change, and more time building what’s rig...
PPTX
202450812 BayCHI UCSC-SV 20250812 v17.pptx
PPTX
Introduction-to-Literarature-and-Literary-Studies-week-Prelim-coverage.pptx
PPTX
UV-Visible spectroscopy..pptx UV-Visible Spectroscopy – Electronic Transition...
2.FourierTransform-ShortQuestionswithAnswers.pdf
Lesson notes of climatology university.
Weekly quiz Compilation Jan -July 25.pdf
LDMMIA Reiki Yoga Finals Review Spring Summer
Paper A Mock Exam 9_ Attempt review.pdf.
A systematic review of self-coping strategies used by university students to ...
Cell Types and Its function , kingdom of life
Trump Administration's workforce development strategy
Practical Manual AGRO-233 Principles and Practices of Natural Farming
ChatGPT for Dummies - Pam Baker Ccesa007.pdf
1st Inaugural Professorial Lecture held on 19th February 2020 (Governance and...
Final Presentation General Medicine 03-08-2024.pptx
Chapter 2 Heredity, Prenatal Development, and Birth.pdf
Radiologic_Anatomy_of_the_Brachial_plexus [final].pptx
Microbial disease of the cardiovascular and lymphatic systems
UNIT III MENTAL HEALTH NURSING ASSESSMENT
What if we spent less time fighting change, and more time building what’s rig...
202450812 BayCHI UCSC-SV 20250812 v17.pptx
Introduction-to-Literarature-and-Literary-Studies-week-Prelim-coverage.pptx
UV-Visible spectroscopy..pptx UV-Visible Spectroscopy – Electronic Transition...

Description Schedule eTwinning Project

  • 1. Etwinning project : THE GARDENS OF MATHS Activity 1 : from September 2011 to the Autumn holidays (05/09/11 - 21/10/11) 1) Creation of a Powerpoint presentation From the photo of the whole class we’ll create areas to associate each pupil to his photo (beware : size 640x480) and a text to introduce himself in English typed by each pupil. Each student must do this himself. 2) Study the vocabulary linked to the symmetry in English (axial and central) 3) Logo's contest In September, we ask volonteers among our pupils. We ask them to do a handmade logo (not using the computer). Then we scan and upload their works on the twinspace. We ask our pupils to vote for their favourite logo in each partner country (Polish pupils vote for a French, a Czech and a Spanish logo; and so on ...). We publish the winner of each country on the twinspace , inside the gallery (with a little gift for all). Activity 2 : November 2011 – Christmas holidays (03/11/11 - 16/12/11) 1) Researches about “ French gardens”: a) Definition of what a “French garden” looks like. b) Each partner chooses one or several examples of “ French gardens” in his own country. Group work: each group writes a description in English of these gardens with photos to illustrate his description. 2) Creation of Powerpoint presentation in groups. Activity 3 : Christmas cards (to be sent by the 12/12/11) Activity 4 : January 2012 – Winter holidays (03/01/12 - 24/02/12) 1) Creation de « transparent gifs » the students learn how to turn a gif picture transparent. 2) Use of Geogebra : The students learn to build the symmetrical picture using central or axial symmetry. Activity 5 : March 2012 – Easter holidays (12/03/12 - 20/04/12) 1) Easter cards (to be sent by the 02/04/12) 2) Each pupil must create freely a « French garden » using Geogebra.
  • 2. THE GARDENS OF MATHS Planning activities for School year 2011 – 2012 SETPTEMBER 2011 OCTOBER 2011 Mo 5 12 19 26 Mo 3 10 17 24 Tu 6 13 20 27 Tu 4 11 18 25 We 7 14 21 28 We 5 12 19 26 Th 1 8 15 22 29 Th 6 13 20 27 Fr 2 9 16 23 30 Fr 7 14 21 28 Sa 3 10 17 24 Sa 1 8 15 22 29 Su 4 11 18 25 Su 2 9 16 23 30 W 1 W 2 W 3 W4 W4 W5 W6 W7 W8 NOVEMBER 2011 DECEMBER 2011 Mo 31 7 14 21 28 Mo 5 12 19 26 Tu 1 8 15 22 29 Tu 6 13 20 27 We 2 9 16 23 30 We 7 14 21 28 Th 3 10 17 24 Th 1 8 15 22 29 Fr 4 11 18 25 Fr 2 9 16 23 30 Sa 5 12 19 26 Sa 3 10 17 24 31 Su 6 13 20 27 Su 4 11 18 25 W9 W10 W11 W12 W13 W13 W14 W15 W16 W17 JANUARY 2012 FEBRUARY 2012 Mo 2 9 16 23 30 Mo 6 13 20 27 Tu 3 10 17 24 31 Tu 7 14 21 28 We 4 11 18 25 We 1 8 15 22 29 Th 5 12 19 26 Th 2 9 16 23 Fr 6 13 20 27 Fr 3 10 17 24 Sa 7 14 21 28 Sa 4 11 18 25 Su 1 8 15 22 29 Su 5 12 19 26 W17 W18 W19 W20 W21 W22 W22 W23 W24 W25 W26 MARCH 2012 APRIL 2012 Mo 5 12 19 26 Mo 2 9 16 Tu 6 13 20 27 Tu 3 10 17 We 7 14 21 28 We 4 11 18 Th 1 8 15 22 29 Th 5 12 19 Fr 2 9 16 23 30 Fr 6 13 20 Sa 3 10 17 24 31 Sa 7 14 21 Su 4 11 18 25 Su 1 8 15 22 W26 W27 W28 W29 W30 W30 W31 W32 W33 ACTIVITY 3 & 4 ACTIVITY 1 ACTIVITY 2 ACTIVITY 5