EMBANKMENT DAM
DESIGN OF HYDRAULIC STRUCTURE
MODULE 1
LECTURE 2 ON 10 45
1/8/2014

prepared by V.H.KHOKHANI, ASSISTANT
PROFESSOR, DIET.

1
COMPONENTS OF EARTHEN
DAM
The main components of an earth dam
are as follows :
1. Impervious core
2. Pervious shell
3. Filter
4. Rock toe
5. U/S slope protection
6. D/S slope protection
7. Cutoff
1/8/2014

prepared by V.H.KHOKHANI, ASSISTANT
PROFESSOR, DIET.

2
1/8/2014

prepared by V.H.KHOKHANI, ASSISTANT
PROFESSOR, DIET.

3
Impervious core :
The impervious core at the centre
checks seepage through the dam. It
is constructed of clay, silt, silty
clay or clayey silt. At the top of top
width of impervious core should
not be less than 3 m and its
height should be 1 m more
than the maximum water level
in the reservoir.
1/8/2014

prepared by V.H.KHOKHANI, ASSISTANT
PROFESSOR, DIET.

4
Pervious shell :
The pervious shell gives stability to the
dam. It consists of sand, gravel or a
mixture of these materials.
The upstream pervious zone provides
free drainage during sudden
drawdown. The down stream
pervious zone acts as a drain to
control the phreatic line.
1/8/2014

prepared by V.H.KHOKHANI, ASSISTANT
PROFESSOR, DIET.

5
FILTER Filter zones are invariably
provided in all earth dams.
They are constructed of pervious
materials. Provision of filter
zones at d/s side serves the

1/8/2014

prepared by V.H.KHOKHANI, ASSISTANT
PROFESSOR, DIET.

6
following functions :
 to drain off the water seeping
through earth dam safely.
To reduce the pore water pressure
in the downstream portion of the
dam.
 To keep the phreatic line within the
body of the dam.
To check the piping by checking
migration of the particles.
1/8/2014

prepared by V.H.KHOKHANI, ASSISTANT
PROFESSOR, DIET.

7
Usually following types of
filters are provided :
(1) Toe filter
(2) Horizontal drainage filter
(blanket)
(3) Chimney drains

1/8/2014

prepared by V.H.KHOKHANI, ASSISTANT
PROFESSOR, DIET.

8
Filter criteria :
Generally, a multilayered filter is
provided in which each Subsequent
layer becomes increasingly coarser
than the previous one. Such a
filter is sometimes known as
inverted filter or reverse filter.

1/8/2014

prepared by V.H.KHOKHANI, ASSISTANT
PROFESSOR, DIET.

9
The soil to be protected is
known as base material.
 Basic requirements of filter material
are :
(i) The filter material should be
sufficiently fine and properly graded
so that the voids of the filter are small
enough to prevent base material
particles from penetrating and
clogging the filter.
1/8/2014

prepared by V.H.KHOKHANI, ASSISTANT
PROFESSOR, DIET.

10
• (ii) The filter material should be
sufficiently coarse and
pervious compared to the base
material so that the incoming
water is rapidly removed without
any appreciable build up of
seepage forces within the filter.

1/8/2014

prepared by V.H.KHOKHANI, ASSISTANT
PROFESSOR, DIET.

11
(iii) The filter material should be
coarse enough not to be carried
away through the drainage pipe
openings.
(iv) The filter layer should be
sufficiently thick to provide a
good distribution of all particle
size throughout the filter and to
be able to carry the seepage
discharge.
1/8/2014

prepared by V.H.KHOKHANI, ASSISTANT
PROFESSOR, DIET.

12
The Filter material should satisfy the
following two criteria.

1/8/2014

prepared by V.H.KHOKHANI, ASSISTANT
PROFESSOR, DIET.

13
Rock toe :
At the d/s end of an earth dam a rock
toe is provided by arranging 15 to 20 cm
size stones. The height of rock toe is
usually kept 30 to 40% of the reservoir
head.“
Rock toe keeps the phreatic line well
within the section and also facilitates
drainage.
It also prevent failure of d/s of the dam
due to piping or sloughing.
1/8/2014

prepared by V.H.KHOKHANI, ASSISTANT
PROFESSOR, DIET.

14
u/s slope protection :
The u/s slope should be protected against
the wave action and the d/s slope should
be protected against rain.
The following measures are taken to protect
the slope.
(1) Rock riprap
(2) Concrete pavement
(3) Steel facing
(4) Bituminous pavement
(5) Precast concrete blocks
1/8/2014

prepared by V.H.KHOKHANI, ASSISTANT
PROFESSOR, DIET.

15
1/8/2014

prepared by V.H.KHOKHANI, ASSISTANT
PROFESSOR, DIET.

16
Cut off :
Cut off is required to
(1) reduce loss of stored water
through foundation and
abutments
(2) Prevent sub surface erosion
by piping.
1/8/2014

prepared by V.H.KHOKHANI, ASSISTANT
PROFESSOR, DIET.

17
• As per IS : 8826-1978
recommendations :
(1) The alignment of the cut off
trench should be fixed in such
a way that its center line
should be within the u/s base
of the impervious core and it
should be keyed into rock.
1/8/2014

prepared by V.H.KHOKHANI, ASSISTANT
PROFESSOR, DIET.

18
(2) The bottom width of cutoff
trench may be fixed taking
following factors into
considerations :
• Provide sufficient working space
to carry curtain grouting.
• Provide sufficient working space
for compaction equipment.
• Provide safety against piping.
1/8/2014

prepared by V.H.KHOKHANI, ASSISTANT
PROFESSOR, DIET.

19
Cutoff may be provided in the
following ways :
• by providing concrete cutoff wall
• by providing cutoff trench filled
with impervious material
• by driving sheet pile
• by curtain grouting
1/8/2014

prepared by V.H.KHOKHANI, ASSISTANT
PROFESSOR, DIET.

20

More Related Content

PPTX
Embankment lecture 3
PDF
Control Seepage Thought Earth Dams
PPTX
PPTX
Embankment lecture 1
PPTX
Stress distribution of the soil
PPTX
River training method
PPT
Rule level & gate operation
Embankment lecture 3
Control Seepage Thought Earth Dams
Embankment lecture 1
Stress distribution of the soil
River training method
Rule level & gate operation

What's hot (20)

PPTX
Gravity dam
PPTX
Tube wells and their design
PPTX
energy dissipator in hydraulic structure
PPTX
types of dam
PPTX
Design consideration Of Earth Dams
PPTX
Flood routing
PPTX
Arch and Buttress Dams
PPT
Reservoir sedimentation
PPTX
Reservoir Planning
PPT
SOIL EXPLORATION
PPTX
Types of Forces Acting on Gravity Dam
PPT
Spillway
PPTX
Reservoir Planning
PPTX
Reservoir capacity, Reservoir sedimentation and control
PPTX
PDF
Irrigation
PPTX
presentation : cross drainage work
PPTX
Irrigation Channels
Gravity dam
Tube wells and their design
energy dissipator in hydraulic structure
types of dam
Design consideration Of Earth Dams
Flood routing
Arch and Buttress Dams
Reservoir sedimentation
Reservoir Planning
SOIL EXPLORATION
Types of Forces Acting on Gravity Dam
Spillway
Reservoir Planning
Reservoir capacity, Reservoir sedimentation and control
Irrigation
presentation : cross drainage work
Irrigation Channels
Ad

Viewers also liked (20)

PPTX
Earthen Dams
PPTX
Ppt of design of dams
PPTX
Gravity dam
PPS
DAMS AND IT'S TYPES . . .
PPTX
Chapter 7 dams and reservoirs
PDF
Embankment
PPTX
design of gravity dam
PDF
Consolidation nec
PPTX
PPTX
PPTX
Design of Hydraulic Structures
PDF
Pavements PPT
PDF
Stability analysis of earth dam by geostudio software
PDF
Modes of Dam Faliures
PPTX
Bangladesh flood 1998
PPT
Embankment dam civil 5 th sem upload
PDF
Seepage through earthen made dams
PPTX
PDF
Unit4 kvv
Earthen Dams
Ppt of design of dams
Gravity dam
DAMS AND IT'S TYPES . . .
Chapter 7 dams and reservoirs
Embankment
design of gravity dam
Consolidation nec
Design of Hydraulic Structures
Pavements PPT
Stability analysis of earth dam by geostudio software
Modes of Dam Faliures
Bangladesh flood 1998
Embankment dam civil 5 th sem upload
Seepage through earthen made dams
Unit4 kvv
Ad

Similar to Embankment lecture 2 (20)

PPTX
Case studies of failures of earthen dams
PPTX
EARTHERN DAM
PPTX
Control Of SEEPAGE THROUGH EMBANKMENTS
PPTX
Earthen dam
PPTX
Earthen dam
PPTX
Seepage in Earth Dams.
PPTX
Design of earth dam at gorukallu
PPTX
4. Construction and design criteria Earthen Dams.pptx
PPTX
4UB21CV005 PPT.pptx.....................
PPTX
Embankment dam by sitaram saini
PPTX
SK SARFARAJUDDIN 34701322040 [CE(PE)701C].pptx
PDF
Know_your_Dam__failuers_R.K.G_termes related to dams
PPT
Types of earth dams
PDF
lecturenote_1219301080Chapter 2 Embankment Dam-1 (1).pdf
PDF
lecturenote_1219301080Chapter 2 Embankment Dam-1 (3).pdf
PDF
lecturenote_1219301080Chapter 2 Embankment Dam-1 (2).pdf
PPTX
Gravity dams galleries
PPTX
Concrete dam lecture 1
PDF
Irrigation assignmen tby hemant
Case studies of failures of earthen dams
EARTHERN DAM
Control Of SEEPAGE THROUGH EMBANKMENTS
Earthen dam
Earthen dam
Seepage in Earth Dams.
Design of earth dam at gorukallu
4. Construction and design criteria Earthen Dams.pptx
4UB21CV005 PPT.pptx.....................
Embankment dam by sitaram saini
SK SARFARAJUDDIN 34701322040 [CE(PE)701C].pptx
Know_your_Dam__failuers_R.K.G_termes related to dams
Types of earth dams
lecturenote_1219301080Chapter 2 Embankment Dam-1 (1).pdf
lecturenote_1219301080Chapter 2 Embankment Dam-1 (3).pdf
lecturenote_1219301080Chapter 2 Embankment Dam-1 (2).pdf
Gravity dams galleries
Concrete dam lecture 1
Irrigation assignmen tby hemant

More from Vidhi Khokhani (20)

PPTX
2. w index and 5 index
PPTX
Drop structure lecture 4
PPTX
Drop structure lecture 3
PPTX
Drop structure lecture 2
PPTX
Drop structure lecture 1
PPT
ogee design
PPTX
Dam outlet works lecture 2
PPTX
Dam outlet works lecture 3
PPTX
Dam outlet works lecture 1
PPTX
Concrete dam lecture 2
PPTX
Concrete dam lecture 4
PPTX
Concrete dam lecture 11
PDF
check basin , furrow and border strip method
PDF
Embankment lecture 12
PDF
Embankment lecture 7
PPT
Lecture 1-aerial photogrammetry
PPTX
Embankment lecture 4
PPTX
irrigation water management
PPTX
Design of Hydraulic Structure
DOCX
Irrigation water management
2. w index and 5 index
Drop structure lecture 4
Drop structure lecture 3
Drop structure lecture 2
Drop structure lecture 1
ogee design
Dam outlet works lecture 2
Dam outlet works lecture 3
Dam outlet works lecture 1
Concrete dam lecture 2
Concrete dam lecture 4
Concrete dam lecture 11
check basin , furrow and border strip method
Embankment lecture 12
Embankment lecture 7
Lecture 1-aerial photogrammetry
Embankment lecture 4
irrigation water management
Design of Hydraulic Structure
Irrigation water management

Recently uploaded (20)

PDF
NewMind AI Monthly Chronicles - July 2025
PDF
Electronic commerce courselecture one. Pdf
PDF
Build a system with the filesystem maintained by OSTree @ COSCUP 2025
PDF
Building Integrated photovoltaic BIPV_UPV.pdf
PDF
Modernizing your data center with Dell and AMD
PPT
“AI and Expert System Decision Support & Business Intelligence Systems”
PPTX
Effective Security Operations Center (SOC) A Modern, Strategic, and Threat-In...
PDF
TokAI - TikTok AI Agent : The First AI Application That Analyzes 10,000+ Vira...
PPTX
Detection-First SIEM: Rule Types, Dashboards, and Threat-Informed Strategy
PDF
Review of recent advances in non-invasive hemoglobin estimation
PPTX
MYSQL Presentation for SQL database connectivity
PDF
Encapsulation theory and applications.pdf
PPTX
Understanding_Digital_Forensics_Presentation.pptx
PDF
Diabetes mellitus diagnosis method based random forest with bat algorithm
PDF
7 ChatGPT Prompts to Help You Define Your Ideal Customer Profile.pdf
DOCX
The AUB Centre for AI in Media Proposal.docx
PDF
Unlocking AI with Model Context Protocol (MCP)
PDF
Architecting across the Boundaries of two Complex Domains - Healthcare & Tech...
PDF
Chapter 3 Spatial Domain Image Processing.pdf
PPTX
Cloud computing and distributed systems.
NewMind AI Monthly Chronicles - July 2025
Electronic commerce courselecture one. Pdf
Build a system with the filesystem maintained by OSTree @ COSCUP 2025
Building Integrated photovoltaic BIPV_UPV.pdf
Modernizing your data center with Dell and AMD
“AI and Expert System Decision Support & Business Intelligence Systems”
Effective Security Operations Center (SOC) A Modern, Strategic, and Threat-In...
TokAI - TikTok AI Agent : The First AI Application That Analyzes 10,000+ Vira...
Detection-First SIEM: Rule Types, Dashboards, and Threat-Informed Strategy
Review of recent advances in non-invasive hemoglobin estimation
MYSQL Presentation for SQL database connectivity
Encapsulation theory and applications.pdf
Understanding_Digital_Forensics_Presentation.pptx
Diabetes mellitus diagnosis method based random forest with bat algorithm
7 ChatGPT Prompts to Help You Define Your Ideal Customer Profile.pdf
The AUB Centre for AI in Media Proposal.docx
Unlocking AI with Model Context Protocol (MCP)
Architecting across the Boundaries of two Complex Domains - Healthcare & Tech...
Chapter 3 Spatial Domain Image Processing.pdf
Cloud computing and distributed systems.

Embankment lecture 2

  • 1. EMBANKMENT DAM DESIGN OF HYDRAULIC STRUCTURE MODULE 1 LECTURE 2 ON 10 45 1/8/2014 prepared by V.H.KHOKHANI, ASSISTANT PROFESSOR, DIET. 1
  • 2. COMPONENTS OF EARTHEN DAM The main components of an earth dam are as follows : 1. Impervious core 2. Pervious shell 3. Filter 4. Rock toe 5. U/S slope protection 6. D/S slope protection 7. Cutoff 1/8/2014 prepared by V.H.KHOKHANI, ASSISTANT PROFESSOR, DIET. 2
  • 3. 1/8/2014 prepared by V.H.KHOKHANI, ASSISTANT PROFESSOR, DIET. 3
  • 4. Impervious core : The impervious core at the centre checks seepage through the dam. It is constructed of clay, silt, silty clay or clayey silt. At the top of top width of impervious core should not be less than 3 m and its height should be 1 m more than the maximum water level in the reservoir. 1/8/2014 prepared by V.H.KHOKHANI, ASSISTANT PROFESSOR, DIET. 4
  • 5. Pervious shell : The pervious shell gives stability to the dam. It consists of sand, gravel or a mixture of these materials. The upstream pervious zone provides free drainage during sudden drawdown. The down stream pervious zone acts as a drain to control the phreatic line. 1/8/2014 prepared by V.H.KHOKHANI, ASSISTANT PROFESSOR, DIET. 5
  • 6. FILTER Filter zones are invariably provided in all earth dams. They are constructed of pervious materials. Provision of filter zones at d/s side serves the 1/8/2014 prepared by V.H.KHOKHANI, ASSISTANT PROFESSOR, DIET. 6
  • 7. following functions :  to drain off the water seeping through earth dam safely. To reduce the pore water pressure in the downstream portion of the dam.  To keep the phreatic line within the body of the dam. To check the piping by checking migration of the particles. 1/8/2014 prepared by V.H.KHOKHANI, ASSISTANT PROFESSOR, DIET. 7
  • 8. Usually following types of filters are provided : (1) Toe filter (2) Horizontal drainage filter (blanket) (3) Chimney drains 1/8/2014 prepared by V.H.KHOKHANI, ASSISTANT PROFESSOR, DIET. 8
  • 9. Filter criteria : Generally, a multilayered filter is provided in which each Subsequent layer becomes increasingly coarser than the previous one. Such a filter is sometimes known as inverted filter or reverse filter. 1/8/2014 prepared by V.H.KHOKHANI, ASSISTANT PROFESSOR, DIET. 9
  • 10. The soil to be protected is known as base material.  Basic requirements of filter material are : (i) The filter material should be sufficiently fine and properly graded so that the voids of the filter are small enough to prevent base material particles from penetrating and clogging the filter. 1/8/2014 prepared by V.H.KHOKHANI, ASSISTANT PROFESSOR, DIET. 10
  • 11. • (ii) The filter material should be sufficiently coarse and pervious compared to the base material so that the incoming water is rapidly removed without any appreciable build up of seepage forces within the filter. 1/8/2014 prepared by V.H.KHOKHANI, ASSISTANT PROFESSOR, DIET. 11
  • 12. (iii) The filter material should be coarse enough not to be carried away through the drainage pipe openings. (iv) The filter layer should be sufficiently thick to provide a good distribution of all particle size throughout the filter and to be able to carry the seepage discharge. 1/8/2014 prepared by V.H.KHOKHANI, ASSISTANT PROFESSOR, DIET. 12
  • 13. The Filter material should satisfy the following two criteria. 1/8/2014 prepared by V.H.KHOKHANI, ASSISTANT PROFESSOR, DIET. 13
  • 14. Rock toe : At the d/s end of an earth dam a rock toe is provided by arranging 15 to 20 cm size stones. The height of rock toe is usually kept 30 to 40% of the reservoir head.“ Rock toe keeps the phreatic line well within the section and also facilitates drainage. It also prevent failure of d/s of the dam due to piping or sloughing. 1/8/2014 prepared by V.H.KHOKHANI, ASSISTANT PROFESSOR, DIET. 14
  • 15. u/s slope protection : The u/s slope should be protected against the wave action and the d/s slope should be protected against rain. The following measures are taken to protect the slope. (1) Rock riprap (2) Concrete pavement (3) Steel facing (4) Bituminous pavement (5) Precast concrete blocks 1/8/2014 prepared by V.H.KHOKHANI, ASSISTANT PROFESSOR, DIET. 15
  • 16. 1/8/2014 prepared by V.H.KHOKHANI, ASSISTANT PROFESSOR, DIET. 16
  • 17. Cut off : Cut off is required to (1) reduce loss of stored water through foundation and abutments (2) Prevent sub surface erosion by piping. 1/8/2014 prepared by V.H.KHOKHANI, ASSISTANT PROFESSOR, DIET. 17
  • 18. • As per IS : 8826-1978 recommendations : (1) The alignment of the cut off trench should be fixed in such a way that its center line should be within the u/s base of the impervious core and it should be keyed into rock. 1/8/2014 prepared by V.H.KHOKHANI, ASSISTANT PROFESSOR, DIET. 18
  • 19. (2) The bottom width of cutoff trench may be fixed taking following factors into considerations : • Provide sufficient working space to carry curtain grouting. • Provide sufficient working space for compaction equipment. • Provide safety against piping. 1/8/2014 prepared by V.H.KHOKHANI, ASSISTANT PROFESSOR, DIET. 19
  • 20. Cutoff may be provided in the following ways : • by providing concrete cutoff wall • by providing cutoff trench filled with impervious material • by driving sheet pile • by curtain grouting 1/8/2014 prepared by V.H.KHOKHANI, ASSISTANT PROFESSOR, DIET. 20