Page 1 of 6
Ahmed Afifi Mahmoud Rezk
Mechanical and Piping construction engineer
Address : El_berka - Abu-Homs - El Behera - Egypt
Phone : (002) 045 2530571
Mobile : (002) 012 27725171– 011 20241119
Email : Ah.Afifi17@gmail.com
: Pet_Eng_Ahmed_Afifi@yahoo.com
Postal code: 22738
Personal Data
 Date of Birth: March17, 1986
 Place of Birth : El_Behera , Egypt
 Marital-status: Married
 Military status: Finished
 Nationality : Egyptian
 Religion : Moslem
 6 years of experience as mechanical, piping engineer for projects related to Oil & Gas, Petrochemicals,
Water and Steels of esteemed organizations like Enppi/TOYO, Petrojet, Johnson Controls Co.
 Good knowledge of Construction, Lifting , Maintenance ,Testing, Pre- Commissioning and Commissioning
Related to Piping & Static Equipment, Mechanical Structures ,Vessels ,Tanks, Overhead cranes, Hoists,
Load Cell and Truck Scale Calibration …etc.
 Able to work in a team, Team leadership, work under pressure and perform effectively.
 Quick to grasp new concepts and ideas, with ability of development and creativity.
Education
 University: Suez Canal University.
o Faculty: Faculty of Petroleum and Mining Engineering.
o Department: Refining and petrochemical engineering department.
o General grade: Good July 2010
o Project grade : Excellent
 Graduation project: "Refining process" (Catalytic Reforming Process).
Practical Experience
 Summer Training in 2008 & 2009 : in Nubaria Power Station III Project .
 Summer Training in 2007 : in Khalda El_salam Petroleum Company .
 Summer Training in 2006 : in Nubaria Refining Sugar Company .
Profile
Page 2 of 6
Work Experience
As Mechanical construction engineer (Equipment - Static- Rot)
(Main Contractor JV)
From September 2015 - Up till now
OWNER : ETHYDCO
MAIN CONTRACTOR : ENPPI/TOYO
SUB-CONTRACTOR : PETROJET
Project : EGYPTIAN POLYETHYLENE PROJECT
PROJECT DESCRIPTION:
- A Polyethylene Plant produces a total capacity of 400,000 T/Y divided into Linear
Low Density Polyethylene (LLDPE) and High Density Polyethylene (HDPE) through
two trains of 200,000T/Y each using polymer grade of Ethylene as feedstock using
NIVATION License.
As piping construction engineer (Sub-contractor)
From Jun 2014 - September 2015
OWNER : ETHYDCO
MAIN CONTRACTOR : ENPPI/TOYO
SUB-CONTRACTOR : PETROJET
Project : EGYPTIAN ETHYLENE PROJECT
As Piping and Mechanical construction engineer (Sub-contractor)
From Feb 2012 –Jun 2014
MAIN CONTRACTOR : Johnson Controls (Egypt) Limited Formerly Known as York Air
Conditioning & Refrigeration Ltd.
SUB-CONTRACTOR : United Group for Engineering and Contracting.
Projects
o Sabah- Foods : Distillate Water networks – Install chiller room - HVAC System.
o NAPCO for Medical in 10th
of Ramadan City Egypt : HVAC System.
o Multi Care for Medical in Cairo : Firefighting systems- Plumbing network- Drinking water network.
o Kraft – Foods in Borg El_Arab : Distillate Water networks – Install chiller room - HVAC System.
o Kraft – Foods in 10th
of Ramadan City Egypt: Distillate Water networks– HVAC System.
o Egyptian German Porcelain-Alex (Fathi Mahmoud): Firefighting systems.
o "Pharco B" Pharmaceutical in Borg El_Arab : Distillate Water networks.
o Amriya Pharm Ind. : Firefighting systems.
o Arab Company Gelatinous : Distillate Water networks.
o Hilton Alexandria Corniche : Distillate Water networks - Install chiller room - HVAC System.
o LE MERIDIEN PYRAMIDS : Distillate Water networks – Install chiller room - HVAC System.
Page 3 of 6
Duties (Per Project)
I- ENPPI Polyethylene Project
1- Supervision and follow up of the installation, Lifting and maintenance of stationary
equipment (vessels, towers, Heat -exchangers, skids.. etc.).
2- Studying the vendor drawings and preparing drawings for fabrication.
3- Supervising the contractor and giving technical support so they can do the job
according to project specifications and standards.
4- Preparation and checking all equipment’s which ready to install (inspection, packing
list, Material Issue Voucher (MIV), accessories…etc.).
5- Distribute required daily activities on contractor engineers, Mechanical Supervisors,
workers foremen and technicians and determine the priorities and daily/weekly
targets for them.
6- Facilitate all job requirements for workers to do their work (Man lift, Forklift,
Cranes, Welding Machines, Hand Tools.. etc).
7- Supervision and follow up of the installation, Lifting and maintenance in
accordance of project mechanical DWG of the following :
 Overhead cranes, Hoists and chain blocks.
 Load Cell for Vessels, Silos and purge bin.
 Internal parts, mish for trays and grating for purification vessels.
 Hydraulic snubbers for product chamber.
 Sanitary tank.
 Agitator pump.
 Air volume skid.
 Catalyst feeder.
 Cylinder roller machine.
 ICA buffer tank.
 Loading arm.
 Chemical skid.
 Maxi-conveyor.
 Pelleting water tank.
 Plower machine.
 Product chamber.
 Dock leveler.
 Truck
8- Supervision and follow up of the load test and Calibration in accordance of project
specifications and standards of the following :
 Overhead cranes, Hoists and chain blocks with 3rd party SGS and the Owner.
 Load Cell for Vessels, Silos and purge bin with their Vendor and the Owner.
 Truck Scale with their Vendor and the Owner.
 Additive Lifts (Elevators) with 3rd party SGS and the Owner.
Page 4 of 6
9- Monitoring the daily construction work activities of contractor and updating
Progress Reports.
10- Making visual inspection for equipment’s and Preparing punch lists.
11- Supervision and follow up the boxing up operation for vessels after clear all punches.
12- Supervision and follow up the leak test operation for vessels after boxing up for all
manholes and nozzle’s.
13- Supervision and follow up the alignment for vessels, tanks and steel structure for
hoists.
14- Supervision and follow up the alignment and balarezm for pumps and compressors.
15- Supervision and follow up the failing of cold box and MS tanks by perlite, dryers
vessels by catalyst and silos by resin.
16- Assisting the pre-commissioning team in clearing all remaining punch items of
equipment’s to obtain Mechanical Completion (MC) by the owner.
17- On systems phase, I start a preliminary punch list then make a walkthrough with the
client rep. to make the official punch list.
18- Once the punch list is made, I distribute it among all disciplines and push them to
finish their punch items.
19- After all punch items are cleared by each discipline, I gather all documents to
complete the system dossier.
20- Excellent knowledge in the development and usage of HSE cases, risk identification
and mitigation techniques.
II- PETROJET Ethylene Project
1- Responsible for supervising an entire area including full study of all piping works and
preparing all relevant documentation (Isometric Drawing, Layout and P&IDs, Plot
Plans, 3D Model, Supports Details.. etc.).
2- Responsible for supervising the Piping erection, Lifting operations and pipe supports
installation in accordance with DWG.
3- Preparation of the team works and guides them to do what’s required according to
project’s specifications and standards.
4- Preparation all material requirements (piping Spools, piping fittings, piping
supports…etc.).
5- Distribute required daily activities on piping foremen, welding foremen, welders and
technicians, and determine the priorities and daily/weekly targets for them.
6- Facilitate all job requirements for workers to do their work (Man lift, Forklift, Cranes,
Welding Machines, Hand Tools.. etc).
7- Performing necessary modifications on site.
8- Excellent knowledge in the development and usage of HSE cases, risk identification and
mitigation techniques.
9- Reporting any problems back to designers to get the appropriate solutions.
10- Arranging with management in case the area requires more manpower to achieve daily
targets based on the open work front.
Page 5 of 6
11- Making productivity daily reports to analyze manpower performances.
12- Monitoring the daily work activities of contractor and updating Progress Reports.
13- Distribute the test packages among piping foremen according to priorities.
14- Following up with and clearing pre-hydro test punch lists (bunch A) to introduce to
ready for hydro test (RHT) .
15- Following up with and clearing the bunch B and to introduce to ready for Reinstatement.
16- Reinstatement for test packages after finishing commissioning activities then making the
walkthrough with the client on piping systems.
17- Finally, closing out all systems punch items.
III- United Group’s All Projects:
1- Responsible for studying the electro-mechanical projects including full study of
tender and drawings.
2- Follow up of the pre-fabrication and erection of all type of piping operations and
pipe supports in accordance of project specifications.
3- Follow up of Installation, Lifting, Erecting ,Commissioning and Maintenance of
the following :
 Chillers – Pumps - Cooling towers - Air handling units.
 Pump room for Fire Fighting system.
 Expansion tanks - Condensate tanks - Blow down tanks.
 Heat exchangers - Air ducts in all sizes.
4- Responsible for supervising the Mechanical works for (Plumbing – HVAC - Fire
Fighting).
5- It provides thermal insulation for all kind of pipes, ducts, tanks and heat exchangers.
6- Air balance, water balance and hydro test for HVAC systems.
7- Preparing the shop drawing, Submittal materials, contracts, cost estimation and cash
flow plan.
8- Responsible for supervising the contractor and giving technical support so they can
do the job according to project specifications.
9- Arranging with management in case the site requires more manpower to achieve
daily targets based on the open work front.
10- Preparation of the team works and guides them to do what’s required according to
project’s specifications and standards.
11- Preparation all material requirements (pipes, fittings, steel structure…etc.).
12- Facilitate all job requirements for workers to do their work (Man lift, Forklift,
Cranes, trucks, Welding Machines, Hand Tools.. etc).
13- Distribute required daily activities on piping foremen, mechanical foremen, welding
foremen, welders and technicians, and determine the priorities and daily/weekly
targets for them.
14- Making the daily report with photo evidence and keeping track performance and
productivity.
Page 6 of 6
15- Performing necessary modifications on site.
16- Reporting any problems back to consultant to get the appropriate solutions.
17- Follow-up implementation of Safety instructions on site.
Courses & Certificates
 Fundamental of Petroleum Industry Simulation Calculation "Hysys" .
 International Computer driving License (ICDL) Syllabus 4.
 Summer Training (16/7/2009)to (30/7/2009) in Alameria for petroleum refining company.
 Summer Training (1/7/2009) to (15/7/2009) in Alexandria for petroleum refining company.
 Summer Training (1/7/2008) to (29/7/2008) in Alameria for petroleum refining company.
Skills
Computer Skills:
 Professional with using windows (All versions).
 Excellent with using Microsoft Office (Word – Excel -Power point and Access).
 Designing programs (Auto cad, Hysys , Photo shop).
Languages:
 Arabic: Mother tongue.
 English: Very good (Writing and Reading) ‫؛‬ good (speaking and listening).
References are furnished upon request

More Related Content

PDF
CV.Eslam-ELSNOSY.update
PDF
Mostafa omar el beh 2015 cv
DOCX
CV- Ho Xuan Minh Huu
DOC
CV_Truong Van Thanh_Operation Geologist Consultant 2015
PDF
Luc CV
PDF
Salakidis Savvas
DOCX
Projects CV January 2016
CV.Eslam-ELSNOSY.update
Mostafa omar el beh 2015 cv
CV- Ho Xuan Minh Huu
CV_Truong Van Thanh_Operation Geologist Consultant 2015
Luc CV
Salakidis Savvas
Projects CV January 2016

What's hot (18)

DOCX
Ejike's CV
DOCX
Ahmed Mahran
DOCX
Hisham.cv
PDF
Nivaldo Curcio CV Feb 2015
DOC
CURRICULUM VITAE 22_07_2016 (1)
PDF
MEP Manager CV)
PDF
Cv mechanical supervisor
DOCX
Islam Kamel - Resume
DOCX
Regidor A. Manalo Sub-Agent (Corporate C.V)
PDF
Saw Qualification1
DOC
e. mahmoud gaber c.v 8-2015
DOCX
Tom van wyk c.v.
DOC
METHOD STATEMENT
DOC
CURRICULUM VITAE 15112015
PDF
mohammad fathi cv2017
DOC
Mohamed Abu El enin CV-CM
DOCX
PDF
Project mechanical engineer c.v
Ejike's CV
Ahmed Mahran
Hisham.cv
Nivaldo Curcio CV Feb 2015
CURRICULUM VITAE 22_07_2016 (1)
MEP Manager CV)
Cv mechanical supervisor
Islam Kamel - Resume
Regidor A. Manalo Sub-Agent (Corporate C.V)
Saw Qualification1
e. mahmoud gaber c.v 8-2015
Tom van wyk c.v.
METHOD STATEMENT
CURRICULUM VITAE 15112015
mohammad fathi cv2017
Mohamed Abu El enin CV-CM
Project mechanical engineer c.v
Ad

Viewers also liked (20)

PDF
M.adel_CV
PPTX
SAGE Profile 3
DOC
Eng mostafa magdy cv
PDF
instrument supervisor
PDF
Mohamed Abo El Fotouh Mohamed(1)
PDF
Enppi Old Letter (Project Engineer)
PDF
My Updated CV
PDF
R.R CV
PDF
Mostafa_El-Iskandarani_CV_FINAL (1)
PDF
PDF
ENP-EI-T-16-0001 - ARAMCO Replor Resume (Islam abd elrhman )
PDF
PERSONAL INFORMATION
DOC
ibrahim cv10a
DOC
safety Cv
PDF
PDF
Ahmed - Process commissioing
DOC
Reda CV Uptated (June 2015)
PDF
Chemical Engineering Career Divergence
PDF
Mohammed Abdelazeem Resume
M.adel_CV
SAGE Profile 3
Eng mostafa magdy cv
instrument supervisor
Mohamed Abo El Fotouh Mohamed(1)
Enppi Old Letter (Project Engineer)
My Updated CV
R.R CV
Mostafa_El-Iskandarani_CV_FINAL (1)
ENP-EI-T-16-0001 - ARAMCO Replor Resume (Islam abd elrhman )
PERSONAL INFORMATION
ibrahim cv10a
safety Cv
Ahmed - Process commissioing
Reda CV Uptated (June 2015)
Chemical Engineering Career Divergence
Mohammed Abdelazeem Resume
Ad

Similar to Eng Ahmed Afifi final CV (20)

DOC
my_cv_WP
DOC
Hassan Essa CV (20)
DOCX
Leo Doc (CV)A(Mechanical Supervisor)
DOC
PIPING SUPERVISOR RESUME
DOCX
Resume for Mechanical Engineer (1)
DOCX
Manish Ray - CV
DOCX
Project Engineer 3
PDF
CV_for_Mohamed_Hashim1
DOCX
Mohamed El Hadi ADJABI 2016
PDF
Piping supervisor Cv.mohamad anwar malik
PDF
CV@JOMY NEW
DOC
Construction Engineer(Oil&GasResume
DOCX
(Ahmed Kamal Mohamed)
DOC
Allen Schmitgen pushkar resume'
DOC
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
DOCX
Piping Welding Engineer
DOCX
Waseem CV
DOC
Project Engineer
DOC
CV Dodo NEW
PDF
Sobhy C V 2015 Rev Q S
my_cv_WP
Hassan Essa CV (20)
Leo Doc (CV)A(Mechanical Supervisor)
PIPING SUPERVISOR RESUME
Resume for Mechanical Engineer (1)
Manish Ray - CV
Project Engineer 3
CV_for_Mohamed_Hashim1
Mohamed El Hadi ADJABI 2016
Piping supervisor Cv.mohamad anwar malik
CV@JOMY NEW
Construction Engineer(Oil&GasResume
(Ahmed Kamal Mohamed)
Allen Schmitgen pushkar resume'
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
Piping Welding Engineer
Waseem CV
Project Engineer
CV Dodo NEW
Sobhy C V 2015 Rev Q S

Eng Ahmed Afifi final CV

  • 1. Page 1 of 6 Ahmed Afifi Mahmoud Rezk Mechanical and Piping construction engineer Address : El_berka - Abu-Homs - El Behera - Egypt Phone : (002) 045 2530571 Mobile : (002) 012 27725171– 011 20241119 Email : Ah.Afifi17@gmail.com : Pet_Eng_Ahmed_Afifi@yahoo.com Postal code: 22738 Personal Data  Date of Birth: March17, 1986  Place of Birth : El_Behera , Egypt  Marital-status: Married  Military status: Finished  Nationality : Egyptian  Religion : Moslem  6 years of experience as mechanical, piping engineer for projects related to Oil & Gas, Petrochemicals, Water and Steels of esteemed organizations like Enppi/TOYO, Petrojet, Johnson Controls Co.  Good knowledge of Construction, Lifting , Maintenance ,Testing, Pre- Commissioning and Commissioning Related to Piping & Static Equipment, Mechanical Structures ,Vessels ,Tanks, Overhead cranes, Hoists, Load Cell and Truck Scale Calibration …etc.  Able to work in a team, Team leadership, work under pressure and perform effectively.  Quick to grasp new concepts and ideas, with ability of development and creativity. Education  University: Suez Canal University. o Faculty: Faculty of Petroleum and Mining Engineering. o Department: Refining and petrochemical engineering department. o General grade: Good July 2010 o Project grade : Excellent  Graduation project: "Refining process" (Catalytic Reforming Process). Practical Experience  Summer Training in 2008 & 2009 : in Nubaria Power Station III Project .  Summer Training in 2007 : in Khalda El_salam Petroleum Company .  Summer Training in 2006 : in Nubaria Refining Sugar Company . Profile
  • 2. Page 2 of 6 Work Experience As Mechanical construction engineer (Equipment - Static- Rot) (Main Contractor JV) From September 2015 - Up till now OWNER : ETHYDCO MAIN CONTRACTOR : ENPPI/TOYO SUB-CONTRACTOR : PETROJET Project : EGYPTIAN POLYETHYLENE PROJECT PROJECT DESCRIPTION: - A Polyethylene Plant produces a total capacity of 400,000 T/Y divided into Linear Low Density Polyethylene (LLDPE) and High Density Polyethylene (HDPE) through two trains of 200,000T/Y each using polymer grade of Ethylene as feedstock using NIVATION License. As piping construction engineer (Sub-contractor) From Jun 2014 - September 2015 OWNER : ETHYDCO MAIN CONTRACTOR : ENPPI/TOYO SUB-CONTRACTOR : PETROJET Project : EGYPTIAN ETHYLENE PROJECT As Piping and Mechanical construction engineer (Sub-contractor) From Feb 2012 –Jun 2014 MAIN CONTRACTOR : Johnson Controls (Egypt) Limited Formerly Known as York Air Conditioning & Refrigeration Ltd. SUB-CONTRACTOR : United Group for Engineering and Contracting. Projects o Sabah- Foods : Distillate Water networks – Install chiller room - HVAC System. o NAPCO for Medical in 10th of Ramadan City Egypt : HVAC System. o Multi Care for Medical in Cairo : Firefighting systems- Plumbing network- Drinking water network. o Kraft – Foods in Borg El_Arab : Distillate Water networks – Install chiller room - HVAC System. o Kraft – Foods in 10th of Ramadan City Egypt: Distillate Water networks– HVAC System. o Egyptian German Porcelain-Alex (Fathi Mahmoud): Firefighting systems. o "Pharco B" Pharmaceutical in Borg El_Arab : Distillate Water networks. o Amriya Pharm Ind. : Firefighting systems. o Arab Company Gelatinous : Distillate Water networks. o Hilton Alexandria Corniche : Distillate Water networks - Install chiller room - HVAC System. o LE MERIDIEN PYRAMIDS : Distillate Water networks – Install chiller room - HVAC System.
  • 3. Page 3 of 6 Duties (Per Project) I- ENPPI Polyethylene Project 1- Supervision and follow up of the installation, Lifting and maintenance of stationary equipment (vessels, towers, Heat -exchangers, skids.. etc.). 2- Studying the vendor drawings and preparing drawings for fabrication. 3- Supervising the contractor and giving technical support so they can do the job according to project specifications and standards. 4- Preparation and checking all equipment’s which ready to install (inspection, packing list, Material Issue Voucher (MIV), accessories…etc.). 5- Distribute required daily activities on contractor engineers, Mechanical Supervisors, workers foremen and technicians and determine the priorities and daily/weekly targets for them. 6- Facilitate all job requirements for workers to do their work (Man lift, Forklift, Cranes, Welding Machines, Hand Tools.. etc). 7- Supervision and follow up of the installation, Lifting and maintenance in accordance of project mechanical DWG of the following :  Overhead cranes, Hoists and chain blocks.  Load Cell for Vessels, Silos and purge bin.  Internal parts, mish for trays and grating for purification vessels.  Hydraulic snubbers for product chamber.  Sanitary tank.  Agitator pump.  Air volume skid.  Catalyst feeder.  Cylinder roller machine.  ICA buffer tank.  Loading arm.  Chemical skid.  Maxi-conveyor.  Pelleting water tank.  Plower machine.  Product chamber.  Dock leveler.  Truck 8- Supervision and follow up of the load test and Calibration in accordance of project specifications and standards of the following :  Overhead cranes, Hoists and chain blocks with 3rd party SGS and the Owner.  Load Cell for Vessels, Silos and purge bin with their Vendor and the Owner.  Truck Scale with their Vendor and the Owner.  Additive Lifts (Elevators) with 3rd party SGS and the Owner.
  • 4. Page 4 of 6 9- Monitoring the daily construction work activities of contractor and updating Progress Reports. 10- Making visual inspection for equipment’s and Preparing punch lists. 11- Supervision and follow up the boxing up operation for vessels after clear all punches. 12- Supervision and follow up the leak test operation for vessels after boxing up for all manholes and nozzle’s. 13- Supervision and follow up the alignment for vessels, tanks and steel structure for hoists. 14- Supervision and follow up the alignment and balarezm for pumps and compressors. 15- Supervision and follow up the failing of cold box and MS tanks by perlite, dryers vessels by catalyst and silos by resin. 16- Assisting the pre-commissioning team in clearing all remaining punch items of equipment’s to obtain Mechanical Completion (MC) by the owner. 17- On systems phase, I start a preliminary punch list then make a walkthrough with the client rep. to make the official punch list. 18- Once the punch list is made, I distribute it among all disciplines and push them to finish their punch items. 19- After all punch items are cleared by each discipline, I gather all documents to complete the system dossier. 20- Excellent knowledge in the development and usage of HSE cases, risk identification and mitigation techniques. II- PETROJET Ethylene Project 1- Responsible for supervising an entire area including full study of all piping works and preparing all relevant documentation (Isometric Drawing, Layout and P&IDs, Plot Plans, 3D Model, Supports Details.. etc.). 2- Responsible for supervising the Piping erection, Lifting operations and pipe supports installation in accordance with DWG. 3- Preparation of the team works and guides them to do what’s required according to project’s specifications and standards. 4- Preparation all material requirements (piping Spools, piping fittings, piping supports…etc.). 5- Distribute required daily activities on piping foremen, welding foremen, welders and technicians, and determine the priorities and daily/weekly targets for them. 6- Facilitate all job requirements for workers to do their work (Man lift, Forklift, Cranes, Welding Machines, Hand Tools.. etc). 7- Performing necessary modifications on site. 8- Excellent knowledge in the development and usage of HSE cases, risk identification and mitigation techniques. 9- Reporting any problems back to designers to get the appropriate solutions. 10- Arranging with management in case the area requires more manpower to achieve daily targets based on the open work front.
  • 5. Page 5 of 6 11- Making productivity daily reports to analyze manpower performances. 12- Monitoring the daily work activities of contractor and updating Progress Reports. 13- Distribute the test packages among piping foremen according to priorities. 14- Following up with and clearing pre-hydro test punch lists (bunch A) to introduce to ready for hydro test (RHT) . 15- Following up with and clearing the bunch B and to introduce to ready for Reinstatement. 16- Reinstatement for test packages after finishing commissioning activities then making the walkthrough with the client on piping systems. 17- Finally, closing out all systems punch items. III- United Group’s All Projects: 1- Responsible for studying the electro-mechanical projects including full study of tender and drawings. 2- Follow up of the pre-fabrication and erection of all type of piping operations and pipe supports in accordance of project specifications. 3- Follow up of Installation, Lifting, Erecting ,Commissioning and Maintenance of the following :  Chillers – Pumps - Cooling towers - Air handling units.  Pump room for Fire Fighting system.  Expansion tanks - Condensate tanks - Blow down tanks.  Heat exchangers - Air ducts in all sizes. 4- Responsible for supervising the Mechanical works for (Plumbing – HVAC - Fire Fighting). 5- It provides thermal insulation for all kind of pipes, ducts, tanks and heat exchangers. 6- Air balance, water balance and hydro test for HVAC systems. 7- Preparing the shop drawing, Submittal materials, contracts, cost estimation and cash flow plan. 8- Responsible for supervising the contractor and giving technical support so they can do the job according to project specifications. 9- Arranging with management in case the site requires more manpower to achieve daily targets based on the open work front. 10- Preparation of the team works and guides them to do what’s required according to project’s specifications and standards. 11- Preparation all material requirements (pipes, fittings, steel structure…etc.). 12- Facilitate all job requirements for workers to do their work (Man lift, Forklift, Cranes, trucks, Welding Machines, Hand Tools.. etc). 13- Distribute required daily activities on piping foremen, mechanical foremen, welding foremen, welders and technicians, and determine the priorities and daily/weekly targets for them. 14- Making the daily report with photo evidence and keeping track performance and productivity.
  • 6. Page 6 of 6 15- Performing necessary modifications on site. 16- Reporting any problems back to consultant to get the appropriate solutions. 17- Follow-up implementation of Safety instructions on site. Courses & Certificates  Fundamental of Petroleum Industry Simulation Calculation "Hysys" .  International Computer driving License (ICDL) Syllabus 4.  Summer Training (16/7/2009)to (30/7/2009) in Alameria for petroleum refining company.  Summer Training (1/7/2009) to (15/7/2009) in Alexandria for petroleum refining company.  Summer Training (1/7/2008) to (29/7/2008) in Alameria for petroleum refining company. Skills Computer Skills:  Professional with using windows (All versions).  Excellent with using Microsoft Office (Word – Excel -Power point and Access).  Designing programs (Auto cad, Hysys , Photo shop). Languages:  Arabic: Mother tongue.  English: Very good (Writing and Reading) ‫؛‬ good (speaking and listening). References are furnished upon request