A
Datum
7.0 m
5.0 m
•
Example 1):
For the system shown in Fig., find
1. Flow rate per meter length of sheet pile, if k = 1*10-4
m/sec
2. The FS against piping, L=1.5m
3. The effective stress at point A, if void ratio equal
to 0.57 and specific gravity is 2.68.
Solution:
1)
d
f
N
N
Hkq =
/sec/mm10*273.2
11
5
*5*10*1q 344- −
==
2)
ex
cr
i
i
FS = , 07.1
57.01
168.2
e1
1G
i s
cr =
+
−
=
+
−
=
L
Δh
iex = , 455.0
11
5
N
H
h
d
===∆
303.0
1.5
0.455
iex ==
531.3
0.303
1.07
FS ==
3) hp = ht - he
1.5880.455*7.55ht =−= m
he = -7.0 m
hp = 1.588 – (-7.0) = 8.588 m
uA = 8.588 * 9.81 = 84.248 kN/m2
3
w
s
sat kN/m307.20
57.01
81.9*)]57.0*1(68.2[
γ
e1
seG
γ =
+
+
+
+
==
kPa142.1497*20.307σt ==
kPa57.90184.248-142.149σ ==′
Example 2):
The dam and flow net shown below, the dam is 120m long and has two sheet piles.
Datum is at the impervious layer. Required the
1. Quantity of the seepage loss under the dam, k = 20*10-4
cm/sec
2. Factor of safety against boiling.
3. Uplift pressure at point A & F.
Solution:
1)
d
f
N
N
Hkq =
/secm10*308.8120*
10.4
3
*12*10*20q 33-6-
==
2)
ex
cr
i
i
FS =
L
Δh
iex = , 154.1
4.10
12
N
H
h
d
===∆
136.0
8.5
1.154
iex ==
353.7
0.136
1.00
FS ==
3) point A
hp = ht - he
37.9611.154*3.542ht =−= m
he = 28.0 m
hp = 37.961 – 28.0 = 9.961 m
uA = 9.961 * 9.81 = 97.717 kN/m2
point F
34.0371.154*6.942ht =−= m
he = 28.0 m
hp = 34.037 – 28.0 = 6.037 m
uF = 6.037 * 9.81 = 59.223 kN/m2
Example 3):
For the flow net shown in Figure.
(a) How high would water rise if a piezometer
is placed at (i) A (ii) B (iii) C?
(b) If k = 0.01mm/s, determine the seepage loss
of the dam in (m3
/day/m).
Solution:
(a) point A
m7.5
12
10
*310Δh*lineialequipotentofNo.H =−=− above the ground
surface
point B
m5.833
12
10
*510Δh*lineialequipotentofNo.H =−=−
point C
point A and point C locate at the same equipotential lines so the high of water is
same as in point A and equal to 7.5 m above the ground surface.
(b)
d
f
N
N
Hkq =
/day/mm6.3
12
5
*10*24)*60*(60*10*1q 35-
==
Example 4):
A sheet piling with its corresponding flow net
is shown:
a) Estimate the flow rate in m3
/day.
b) For the element A with L = 1.5 m calculate
the average velocity and the effective stress.
c) Determine the magnitude of the effective stress
at the base and at the right hand side of the sheet pile.
d) Calculate the factor of safety against the piping (quick condition)
k = 0.02 mm/sec and γsat = 20 kN/m3
.
Solution: a)
d
f
N
N
Hkq =
/day/mm356.2
11
5
*3*24)*60*(60*10*2q 35-
==
b) ikv = ,
L
Δh
i = , 273.0
11
3
N
H
h
d
===∆
182.0
1.5
0.273
i ==
1.5m
mm/hr13.104
mm/sec10*3.640.182*0.02v 4-
=
==
m5.318
11
3
*2.51.5)(4.5hp =−+=
uA = 5.318 * 9.81 = 52.17 kN/m2
kPa104.71520*4.59.81*1.5σt =+=
kPa52.54552.17-104.715σ ==′
c)
m4.364
11
3
*66hp =−=
uA = 4.364 * 9.81 = 42.811 kN/m2
kPa0620*3σt ==
kPa.1897142.811-06σ ==′
d)
ex
cr
i
i
FS = , 039.1
81.9
81.920
γ
γ
i
w
cr =
−
=
′
=
L
Δh
iex = , L = 0.6 by scale
455.0
0.6
0.273
iex ==
284.2
0.455
1.039
FS ==
Example 5): For the system shown below compute the
1. Flow rate, (k = 1.1 m/day) and
2. Pore pressure at point B.
Solution: 1)
d
f
N
N
Hkq =
length/day/mm733.0
12
4
*8)-(10*1.1q 3
==
2)
hp = (2+3+3.5) – 10 (2/12) = 6.833 m
uB = 6.833*9.81 = 67.035 kN/m2
Example 6):
Given the flow net shown for a sheet Pile cutoff wall. Required the effective stress at
point A and compute the seepage quantity based on k = 4*10-2
cm/sec.
Solution:
Pressure head at A
(13.5+1+2) – 10 (13.5/11) = 4.2m
uA = 4.2*9.81 = 41.2 kN/m2
kPa51.479.81*118.85*2σt =+=
kPa31.641.2-51.47σ ==′
Since 0,σ >′ point A is not "quick" but 6.31 kN/m2
is not large enough to be very
confidence - inspiring.
d
f
N
N
Hkq =
widthwallof/day/mm9.173)24*60*60(*
11
4.1
*13.5*
100
1
*2-10*4q 3
==
Example 7): For the concrete dam shown find the uplift pressure at base of the dam.
Solution:
hp = ht - he
For point 1:
0.270.267*144ht =−= m
he = – 1.80 m
hp = 0.27 – (–1.80) = 2.07 m
u1 = 2.07 * 9.81 = 20.307 kN/m2
For point 7.5:
2.00.267*7.54ht =−= m
he = – 2.40 m
hp = 2.0 – (–2.40) = 4.40 m
u7.5 = 4.40 * 9.81 = 43.164 kN/m2
Example 8):
A river bed consists of a layer of sand 8.25m thick overlying impermeable rock; the
depth of water is 2.50 m. A long cofferdam 5.50m wide is formed by driving two lines
of sheet piling to a depth of 6.00m below the level of the river bed and excavation to a
depth of 2.00m below bed level is carried out within the cofferdam. The water level
within the cofferdam is kept at excavation level by pumping. If the flow of water into
the cofferdam is 0.25m3
/h per unit length, what is the coefficient of permeability of the
sand? What is the hydraulic gradient immediately below the excavated surface?
Solution:
The section and flow net appear in the above Figure. In the flow net there are 6.0 flow
channels and 10 equipotential drops.
The total head loss is 4.50 m. The coefficient of permeability is given by
d
f
N
N
Hkq =
cm/sec10*57.2m/h0926.0k
10
6
*4.5*k0.25 3−
==⇒=
The distance between the last two equipotentials is measured as 0.9 m. The required
hydraulic gradient is given by
L
Δh
iex = , 45.0
10
5.4
N
H
h
d
===∆
5.0
0.9
0.45
iex ==
Example 9):
The flow net for seepage of water around a single row of sheet piles driven into a
permeable layer is shown in figure below. Calculate the quantity of seepage loss and
factor of safety against downstream heave, given that k = 2.6*10-5
m/sec and γsat = 17.7
kN/m3
. (Note: thickness of permeable layer T = 18 m)
Solution:
d
f
N
N
Hkq =
/sec/mm10*473.1
6
4
*1.5)-(10*10*2.6q
34
5
−
−
=
=
)H(HγC
γD
FS
21wo
−
′
=
D/T = 18/6 = 0.33, from table by interpolation Co = 0.357
59.1
1.5)9.81(10*0.357
9.81)-(17.7*6
FS =
−
=
Example 10):
A concrete dam has a base length of 8m and retains 5m of water. The water level on
the down stream side is at the ground level. Under the dam there exists an 8m thick
layer of anistropic permeable soil with the k values shown in Figure (a). Calculate the
flow rate under the dam in lit/day/m.
Solution:
horizontal scale =
x
z
k
k * vertical scale
= 625.0
10*2.56
10*1
5-
5-
= * vertical scale
Therefore, the length of the transformed base is
8*0.625 = 5m
The dam section must be redrawn according to the new scale, and then the flow nets can
be drawn as shown in Figure (b).
8
4
*5*10*56.2*10*1
N
N
Hkkq 55
d
f
vx
−−
==
3456sec//10*4 35
== −
mm lit/day/m

More Related Content

PDF
Flow nets
DOC
Examples on effective stress
PDF
300 solved-problems
DOC
Examples on total consolidation
PDF
4 permeability and seepage
PDF
300 solved problems in geotechnical engineering
PPSX
Geotechnical Engineering-I [Lec #27: Flow Nets]
PPSX
Geotechnical Engineering-I [Lec #23: Soil Permeability]
Flow nets
Examples on effective stress
300 solved-problems
Examples on total consolidation
4 permeability and seepage
300 solved problems in geotechnical engineering
Geotechnical Engineering-I [Lec #27: Flow Nets]
Geotechnical Engineering-I [Lec #23: Soil Permeability]

What's hot (20)

PPSX
Geotechnical Engineering-I [Lec #21: Consolidation Problems]
PDF
Chapter 6 concrete dam engineering with examples
PDF
Problems on bearing capacity of soil
PDF
Lecture 7 strap footing
PPTX
_lateral_earth_pressure_(foundation engineering)
PDF
Lecture 2 bearing capacity
PPSX
Geotechnical Engineering-II [Lec #23: Rankine Earth Pressure Theory]
PDF
Load carrying capacity of piles
PDF
Bearing capacity of shallow foundations by abhishek sharma
PDF
Lecture 7 stress distribution in soil
PPSX
Geotechnical Engineering-II [Lec #7A: Boussinesq Method]
PPTX
Numerical problem bearing capacity terzaghi , group pile capacity (usefulsear...
PDF
Problems on piles and deep footing
PDF
Homework 1 (solution )
PPTX
Geotech2.pptx
PDF
Prestressed Concrete Design
PPSX
Geotechnical Engineering-II [Lec #3: Direct Shear Test)
PDF
Design for flexure and shear (rectangular & square section)
PDF
Lecture 3 foundation settlement
PDF
Flexural design of beam...PRC-I
Geotechnical Engineering-I [Lec #21: Consolidation Problems]
Chapter 6 concrete dam engineering with examples
Problems on bearing capacity of soil
Lecture 7 strap footing
_lateral_earth_pressure_(foundation engineering)
Lecture 2 bearing capacity
Geotechnical Engineering-II [Lec #23: Rankine Earth Pressure Theory]
Load carrying capacity of piles
Bearing capacity of shallow foundations by abhishek sharma
Lecture 7 stress distribution in soil
Geotechnical Engineering-II [Lec #7A: Boussinesq Method]
Numerical problem bearing capacity terzaghi , group pile capacity (usefulsear...
Problems on piles and deep footing
Homework 1 (solution )
Geotech2.pptx
Prestressed Concrete Design
Geotechnical Engineering-II [Lec #3: Direct Shear Test)
Design for flexure and shear (rectangular & square section)
Lecture 3 foundation settlement
Flexural design of beam...PRC-I
Ad

Similar to Examples on seepage (20)

PPT
Drainage Engineering (Flow Nets)
PDF
Geotechnical Engineering-I [Lec #27A: Flow Calculation From Flow Nets]
PDF
Unit4 kvv
PDF
Seepage new(2)
PDF
SoilMech_Ch10_Flow_Nets-1.pdf
PDF
04_ex_flow_net_seepage_GDS.pdf (1).pdf
DOC
Faculty of Engineering (2011. 2012) - Solver.doc
PDF
120715 - LMAJdS paper - HydroVision 2012 presentation - 14 pages
PDF
17. seepage through anisotropic soil (1)
PDF
17. seepage through anisotropic soil
PPTX
Unit 2 FLOW NET CONSTRUCTION for Civil Engineering
PDF
ce_382_chapter_8_seepage_1442_r.pdf
PPT
Faculty of Engineering (2012-2013) - Solver.ppt
PPTX
Flow net in anisotropic soils
PPTX
Soil Mechanics UII Soil Water and Flow.pptx
PDF
AJMS_405_22.pdf
PDF
Hydraulics Notes 2_ One Slide on a page.pdf
DOC
soil mechanics and its behaviour andPermeability in Stratified Soil Layers
PDF
Principles of groundwater flow
Drainage Engineering (Flow Nets)
Geotechnical Engineering-I [Lec #27A: Flow Calculation From Flow Nets]
Unit4 kvv
Seepage new(2)
SoilMech_Ch10_Flow_Nets-1.pdf
04_ex_flow_net_seepage_GDS.pdf (1).pdf
Faculty of Engineering (2011. 2012) - Solver.doc
120715 - LMAJdS paper - HydroVision 2012 presentation - 14 pages
17. seepage through anisotropic soil (1)
17. seepage through anisotropic soil
Unit 2 FLOW NET CONSTRUCTION for Civil Engineering
ce_382_chapter_8_seepage_1442_r.pdf
Faculty of Engineering (2012-2013) - Solver.ppt
Flow net in anisotropic soils
Soil Mechanics UII Soil Water and Flow.pptx
AJMS_405_22.pdf
Hydraulics Notes 2_ One Slide on a page.pdf
soil mechanics and its behaviour andPermeability in Stratified Soil Layers
Principles of groundwater flow
Ad

More from Malika khalil (15)

PDF
Spot speed studies.ppt .mylan nejyar
PDF
Design of two way slabs(d.d.m.)
PDF
Twri3 a5
DOCX
Ch.1 fluid dynamic
PDF
Chap 26 isometric drawing
PDF
Simple formulas excel
PDF
Cash flow using excel
DOC
Examples on stress distribution
DOC
Examples on soil classification
PDF
1 reinforced concrete lectures-t-beam2
PDF
4 pages from matlab an introduction with app.-2
PDF
Design of column trail and error example
PDF
Design of one way slab exampe
PPT
Phase relations soil analysis
PPT
Lec 4 solids environment
Spot speed studies.ppt .mylan nejyar
Design of two way slabs(d.d.m.)
Twri3 a5
Ch.1 fluid dynamic
Chap 26 isometric drawing
Simple formulas excel
Cash flow using excel
Examples on stress distribution
Examples on soil classification
1 reinforced concrete lectures-t-beam2
4 pages from matlab an introduction with app.-2
Design of column trail and error example
Design of one way slab exampe
Phase relations soil analysis
Lec 4 solids environment

Recently uploaded (20)

PDF
SM_6th-Sem__Cse_Internet-of-Things.pdf IOT
PPTX
UNIT-1 - COAL BASED THERMAL POWER PLANTS
PPTX
IOT PPTs Week 10 Lecture Material.pptx of NPTEL Smart Cities contd
PPTX
OOP with Java - Java Introduction (Basics)
PPTX
Geodesy 1.pptx...............................................
PPT
Project quality management in manufacturing
PDF
July 2025 - Top 10 Read Articles in International Journal of Software Enginee...
DOCX
573137875-Attendance-Management-System-original
PPTX
Sustainable Sites - Green Building Construction
PPTX
MET 305 2019 SCHEME MODULE 2 COMPLETE.pptx
PDF
Embodied AI: Ushering in the Next Era of Intelligent Systems
PPTX
Internet of Things (IOT) - A guide to understanding
PPTX
web development for engineering and engineering
PDF
Operating System & Kernel Study Guide-1 - converted.pdf
PDF
Mohammad Mahdi Farshadian CV - Prospective PhD Student 2026
PPTX
KTU 2019 -S7-MCN 401 MODULE 2-VINAY.pptx
PPTX
additive manufacturing of ss316l using mig welding
PPTX
Welding lecture in detail for understanding
PDF
Model Code of Practice - Construction Work - 21102022 .pdf
PPTX
Foundation to blockchain - A guide to Blockchain Tech
SM_6th-Sem__Cse_Internet-of-Things.pdf IOT
UNIT-1 - COAL BASED THERMAL POWER PLANTS
IOT PPTs Week 10 Lecture Material.pptx of NPTEL Smart Cities contd
OOP with Java - Java Introduction (Basics)
Geodesy 1.pptx...............................................
Project quality management in manufacturing
July 2025 - Top 10 Read Articles in International Journal of Software Enginee...
573137875-Attendance-Management-System-original
Sustainable Sites - Green Building Construction
MET 305 2019 SCHEME MODULE 2 COMPLETE.pptx
Embodied AI: Ushering in the Next Era of Intelligent Systems
Internet of Things (IOT) - A guide to understanding
web development for engineering and engineering
Operating System & Kernel Study Guide-1 - converted.pdf
Mohammad Mahdi Farshadian CV - Prospective PhD Student 2026
KTU 2019 -S7-MCN 401 MODULE 2-VINAY.pptx
additive manufacturing of ss316l using mig welding
Welding lecture in detail for understanding
Model Code of Practice - Construction Work - 21102022 .pdf
Foundation to blockchain - A guide to Blockchain Tech

Examples on seepage

  • 1. A Datum 7.0 m 5.0 m • Example 1): For the system shown in Fig., find 1. Flow rate per meter length of sheet pile, if k = 1*10-4 m/sec 2. The FS against piping, L=1.5m 3. The effective stress at point A, if void ratio equal to 0.57 and specific gravity is 2.68. Solution: 1) d f N N Hkq = /sec/mm10*273.2 11 5 *5*10*1q 344- − == 2) ex cr i i FS = , 07.1 57.01 168.2 e1 1G i s cr = + − = + − = L Δh iex = , 455.0 11 5 N H h d ===∆ 303.0 1.5 0.455 iex == 531.3 0.303 1.07 FS == 3) hp = ht - he 1.5880.455*7.55ht =−= m he = -7.0 m hp = 1.588 – (-7.0) = 8.588 m uA = 8.588 * 9.81 = 84.248 kN/m2 3 w s sat kN/m307.20 57.01 81.9*)]57.0*1(68.2[ γ e1 seG γ = + + + + == kPa142.1497*20.307σt == kPa57.90184.248-142.149σ ==′ Example 2): The dam and flow net shown below, the dam is 120m long and has two sheet piles. Datum is at the impervious layer. Required the 1. Quantity of the seepage loss under the dam, k = 20*10-4 cm/sec 2. Factor of safety against boiling. 3. Uplift pressure at point A & F.
  • 2. Solution: 1) d f N N Hkq = /secm10*308.8120* 10.4 3 *12*10*20q 33-6- == 2) ex cr i i FS = L Δh iex = , 154.1 4.10 12 N H h d ===∆ 136.0 8.5 1.154 iex == 353.7 0.136 1.00 FS == 3) point A hp = ht - he 37.9611.154*3.542ht =−= m he = 28.0 m hp = 37.961 – 28.0 = 9.961 m uA = 9.961 * 9.81 = 97.717 kN/m2 point F 34.0371.154*6.942ht =−= m he = 28.0 m hp = 34.037 – 28.0 = 6.037 m uF = 6.037 * 9.81 = 59.223 kN/m2
  • 3. Example 3): For the flow net shown in Figure. (a) How high would water rise if a piezometer is placed at (i) A (ii) B (iii) C? (b) If k = 0.01mm/s, determine the seepage loss of the dam in (m3 /day/m). Solution: (a) point A m7.5 12 10 *310Δh*lineialequipotentofNo.H =−=− above the ground surface point B m5.833 12 10 *510Δh*lineialequipotentofNo.H =−=− point C point A and point C locate at the same equipotential lines so the high of water is same as in point A and equal to 7.5 m above the ground surface. (b) d f N N Hkq = /day/mm6.3 12 5 *10*24)*60*(60*10*1q 35- == Example 4): A sheet piling with its corresponding flow net is shown: a) Estimate the flow rate in m3 /day. b) For the element A with L = 1.5 m calculate the average velocity and the effective stress. c) Determine the magnitude of the effective stress at the base and at the right hand side of the sheet pile. d) Calculate the factor of safety against the piping (quick condition) k = 0.02 mm/sec and γsat = 20 kN/m3 . Solution: a) d f N N Hkq = /day/mm356.2 11 5 *3*24)*60*(60*10*2q 35- == b) ikv = , L Δh i = , 273.0 11 3 N H h d ===∆ 182.0 1.5 0.273 i ==
  • 4. 1.5m mm/hr13.104 mm/sec10*3.640.182*0.02v 4- = == m5.318 11 3 *2.51.5)(4.5hp =−+= uA = 5.318 * 9.81 = 52.17 kN/m2 kPa104.71520*4.59.81*1.5σt =+= kPa52.54552.17-104.715σ ==′ c) m4.364 11 3 *66hp =−= uA = 4.364 * 9.81 = 42.811 kN/m2 kPa0620*3σt == kPa.1897142.811-06σ ==′ d) ex cr i i FS = , 039.1 81.9 81.920 γ γ i w cr = − = ′ = L Δh iex = , L = 0.6 by scale 455.0 0.6 0.273 iex == 284.2 0.455 1.039 FS == Example 5): For the system shown below compute the 1. Flow rate, (k = 1.1 m/day) and 2. Pore pressure at point B. Solution: 1) d f N N Hkq = length/day/mm733.0 12 4 *8)-(10*1.1q 3 == 2) hp = (2+3+3.5) – 10 (2/12) = 6.833 m uB = 6.833*9.81 = 67.035 kN/m2 Example 6):
  • 5. Given the flow net shown for a sheet Pile cutoff wall. Required the effective stress at point A and compute the seepage quantity based on k = 4*10-2 cm/sec. Solution: Pressure head at A (13.5+1+2) – 10 (13.5/11) = 4.2m uA = 4.2*9.81 = 41.2 kN/m2 kPa51.479.81*118.85*2σt =+= kPa31.641.2-51.47σ ==′ Since 0,σ >′ point A is not "quick" but 6.31 kN/m2 is not large enough to be very confidence - inspiring. d f N N Hkq = widthwallof/day/mm9.173)24*60*60(* 11 4.1 *13.5* 100 1 *2-10*4q 3 == Example 7): For the concrete dam shown find the uplift pressure at base of the dam. Solution:
  • 6. hp = ht - he For point 1: 0.270.267*144ht =−= m he = – 1.80 m hp = 0.27 – (–1.80) = 2.07 m u1 = 2.07 * 9.81 = 20.307 kN/m2 For point 7.5: 2.00.267*7.54ht =−= m he = – 2.40 m hp = 2.0 – (–2.40) = 4.40 m u7.5 = 4.40 * 9.81 = 43.164 kN/m2 Example 8): A river bed consists of a layer of sand 8.25m thick overlying impermeable rock; the depth of water is 2.50 m. A long cofferdam 5.50m wide is formed by driving two lines of sheet piling to a depth of 6.00m below the level of the river bed and excavation to a depth of 2.00m below bed level is carried out within the cofferdam. The water level within the cofferdam is kept at excavation level by pumping. If the flow of water into the cofferdam is 0.25m3 /h per unit length, what is the coefficient of permeability of the sand? What is the hydraulic gradient immediately below the excavated surface? Solution: The section and flow net appear in the above Figure. In the flow net there are 6.0 flow channels and 10 equipotential drops. The total head loss is 4.50 m. The coefficient of permeability is given by d f N N Hkq = cm/sec10*57.2m/h0926.0k 10 6 *4.5*k0.25 3− ==⇒=
  • 7. The distance between the last two equipotentials is measured as 0.9 m. The required hydraulic gradient is given by L Δh iex = , 45.0 10 5.4 N H h d ===∆ 5.0 0.9 0.45 iex == Example 9): The flow net for seepage of water around a single row of sheet piles driven into a permeable layer is shown in figure below. Calculate the quantity of seepage loss and factor of safety against downstream heave, given that k = 2.6*10-5 m/sec and γsat = 17.7 kN/m3 . (Note: thickness of permeable layer T = 18 m) Solution: d f N N Hkq = /sec/mm10*473.1 6 4 *1.5)-(10*10*2.6q 34 5 − − = = )H(HγC γD FS 21wo − ′ = D/T = 18/6 = 0.33, from table by interpolation Co = 0.357 59.1 1.5)9.81(10*0.357 9.81)-(17.7*6 FS = − = Example 10): A concrete dam has a base length of 8m and retains 5m of water. The water level on the down stream side is at the ground level. Under the dam there exists an 8m thick layer of anistropic permeable soil with the k values shown in Figure (a). Calculate the flow rate under the dam in lit/day/m. Solution: horizontal scale = x z k k * vertical scale = 625.0 10*2.56 10*1 5- 5- = * vertical scale Therefore, the length of the transformed base is 8*0.625 = 5m The dam section must be redrawn according to the new scale, and then the flow nets can be drawn as shown in Figure (b).