SlideShare a Scribd company logo
Critical First Well Process: High
Temperature Wells in Gulf of Thailand
Block I – December 2013
Kody Chandler
Halliburton Baroid
Gulf of Mexico
Ekkadit Siriwachirawat
Halliburton Baroid
Thailand
2
At Halliburton, solving customer challenges is second only to keeping everyone
safe and healthy. You can find more safety tips at www.halliburton.com/HSE.
• Plan the Trip
• Prepare Vehicle
• Prepare Yourself
Winter Driving
3
Objectives
• Analyze the Critical First Well (CFW)
Process.
• Interpret information provided in
CFW Checklists.
• Explain the role of the GTFA.
• Describe the CFW process.
- Technical Mainstay
- Role in DDSQ
4
Customer: Chevron Thailand Exploration
Platform: SBWA (South Baanphot Alpha)
1st Batch: 5 Wells
Rig name: Key Gibraltar
Project Overview
5
Overview of Technical and
Black Book Processes
6
Estimated BHT 425o F.
Issues getting logs to bottom.
No previous logging data.
Barite sag, especially in static conditions.
Identify the Challenge
7
Solution Creation
“This was probably the most-tested fluid
Baroid has ever launched,”
JJ Miller,
Global Technical Services Manager for
Baroid
HalNews 9/30/2013
8
Solution Creation “Doing Our Homework”
System Performance
Review
Evaluate
POP
System
Customization
System Rationalization
ValidationData Analysis
9
Solution Creation “Doing Our Homework”
System Performance
Review
Evaluate
POP
System
Customization
System Rationalization
ValidationData Analysis
 Offset well data from SBWA-10,19, 14 and 02
 Lessons Learned Log from SBWA project in 2011
10
Solution Creation “Doing Our Homework”
System Performance
Review
Evaluate
POP
System
Customization
System Rationalization
ValidationData Analysis
 Fluid Risk Assessment
– Mud Engineers unfamiliar with Chevron GoT operation
– Consumption of chemicals more than expected
– Contamination with CO2
– Lost Circulation
11
Solution Creation “Doing Our Homework”
System Performance
Review
Evaluate
POP
System
Customization
System Rationalization
ValidationData Analysis
 Opportunity to introduce “new products” to the customer
– PERFORMUL
– BENTONE 38
12
Solution Creation “Doing Our Homework”
System Performance
Review
Evaluate
POP
System
Customization
System Rationalization
ValidationData Analysis
 Lab work flow: Bangkok  Kuala Lumpur  Jarkata 
Pune  Houston
 Lab Testing new HT ENVIROMUL formulation
– PERFORMUL 7.5 ppb
– BENTONE 38 2.0 ppb
13
Solution Creation “Doing Our Homework”
System Performance
Review
Evaluate
POP
System
Customization
System Rationalization
ValidationData Analysis
14
Solution Creation “Doing Our Homework”
System Performance
Review
Evaluate
POP
System
Customization
System Rationalization
ValidationData Analysis
 Ops Leader & Country Manager confirm all
potential solutions can be effectively delivered
to customer.
15
Overview of Technical and
Black Book Processes
16
CFW Process Map
 Criteria for
determining a CFW
 Process-driven
 Sets us apart from
our competitors
17
Baroid was relegated to
servicing a few rigs
working on low-
temperature wells.
Unsuccessful HT Well project in 2011.
August
September
October
November
December
Baroid was called upon
to enhance this fluid for
HT wells,.
Radioactive Source got
stuck in the well bore and
was irretrievable.
Baroid’s service was
reduced from 8 rigs to 2
rigs.
The wellbores were not
log-able because of the
fluid’s gelation.
18
 Encompassing
design
 Consistency
 GTFA
CFW Checklist
19
GTFA Support
20
Overview of Technical and
Black Book Processes
21
Present the Value
Avg. Cost
$750K USD /
Well, approx.
$3.8M
“Zero” NPT
and
Recordable
Incidents
5 Wells
Completed -
72,767 ft in 77
days
22
 Success in getting logs to bottom
 Consistent mud weight, especially during
periods without circulation – No barite sag
Key Performance Indicators
23
 Customer focused
 Excellence in delivery
– Quality
– Consistency
 Delivering on our word
CFW Process and DDSQ
24
 HalNews 9/30/2013 “Lab testing brings HT success in the Gulf of Thailand”.
 SBWA Pre-Spud Meeting May 5th, 2013
 SBWA Risk management planning.
 Asia Pacific Share point : Technical and Black Book Process Page
 Baroid Critical First Well Support : Chevron SWBA 2nd Pass Debrief and
Lessons Learned Report on18 June 2013 report by Robert Bertrand
(GTFA)
 Shell Safety Alert : September 2013.
 Critical Well Process PM-GL-HAL-HMS-702
 Critical Well Execution Process Criteria ST-GL-HAL-HMS-702
 Personal Interview: Chip Miller, Vice President
 Personal Interview: Toby Dixon, Global Ops Manager
 Personal Interview: Dennis Lynch, PASQ and HSE Manager
 High Temperature OBM fluids for Chevron Lab Test Report in Pune, India
23rd March 2012
Reference
25
Thank you. Questions?

More Related Content

PPT
DNV GL Asset Life Extension (ALE) Projects Showcase
PPT
Ldi Venture In Shell
PDF
December 10, 2013 Analyst Site Visit
PDF
E&C Profilep123
PPT
Design notes5
PDF
Shivang raval 2018
PPT
Using Six Sigma to reduce ATF pipeline transfer losses
PDF
The Digital Oilfield - Collaborative Working at Global Scale
DNV GL Asset Life Extension (ALE) Projects Showcase
Ldi Venture In Shell
December 10, 2013 Analyst Site Visit
E&C Profilep123
Design notes5
Shivang raval 2018
Using Six Sigma to reduce ATF pipeline transfer losses
The Digital Oilfield - Collaborative Working at Global Scale

What's hot (18)

PPTX
Essential Prerequisites for Maximizing Success from Big Data
PPTX
Technical Prospects of Floating LNG
PPTX
Cu-Boil Pot Upgrade - Closeout Presentation Rev2a
PPTX
Measuring Land Drilling Performance
PDF
underground_4-page_12142015_LR
PPSX
Time cost-control
PPTX
Completion Decision Making with Cross Discipline Integration
PPT
Automation of the Drilling System: What has been done, what is being done, an...
PDF
Petrotech Presenttaion- Punj Lloyd
PDF
Giignl cthb 5.0.web_
PPTX
The Value and the Danger of Complex Reservoir Simulations
PPSX
PPTX
A performance-based approach for developing upstream professionals - Salam Sa...
PDF
Prestea underground presentation final
PPTX
Vulnerability and Management of Water Injectors - Kazeem Lawal
PPTX
Luis Romualdez_CRC_Oxy
PDF
Highbank Resources 43-101 Technical Report
DOC
Christopher A Pruett Resume
Essential Prerequisites for Maximizing Success from Big Data
Technical Prospects of Floating LNG
Cu-Boil Pot Upgrade - Closeout Presentation Rev2a
Measuring Land Drilling Performance
underground_4-page_12142015_LR
Time cost-control
Completion Decision Making with Cross Discipline Integration
Automation of the Drilling System: What has been done, what is being done, an...
Petrotech Presenttaion- Punj Lloyd
Giignl cthb 5.0.web_
The Value and the Danger of Complex Reservoir Simulations
A performance-based approach for developing upstream professionals - Salam Sa...
Prestea underground presentation final
Vulnerability and Management of Water Injectors - Kazeem Lawal
Luis Romualdez_CRC_Oxy
Highbank Resources 43-101 Technical Report
Christopher A Pruett Resume
Ad

Viewers also liked (6)

PPT
Oil Base Muds
PDF
Challenges Drill Fluids
PPTX
Non damaging drilling fluids for oil and gas
PPTX
Presentation-Halliburton
PPTX
Drilling fluids
PPTX
Drilling Mud Laboratory
Oil Base Muds
Challenges Drill Fluids
Non damaging drilling fluids for oil and gas
Presentation-Halliburton
Drilling fluids
Drilling Mud Laboratory
Ad

Similar to Final presentation Rev3 (20)

PDF
“Achieving Mine to Market Throughput” – Iluka South West Operations – Case...
PDF
Water Infrastructure Projects in Brazil 2012
PDF
BMO Capital Markets 2014 Global Metals & Mining Conference
PPTX
Gabriel India Limited_ProjectPresentation
PPTX
2021 Is the floating LNG moment?
PDF
Design and Rating of Packed Distillation Columns
PDF
Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012
PPT
Design notes5
PDF
CD 2016 March - Advisian Showcase
PDF
part 1 .pdf.pdf
PDF
Selection of Internals for Distillation Columns
PDF
Chato liquid acquisition strategies for exploration missions current status 2010
DOC
5.ve volume 1_ve_burton
PDF
2011-08-18 AEM Technical Update
PDF
OCS TRAINING - HPHT DRILLING DESIGN AND OPERATION 5 DAYS - PUBLIC TRAINING.pdf
DOCX
Curriculum vitae_Bhupat Kanani
DOCX
Curriculum vitae Bhupat Kanani
PDF
IPTC 16192 Manuscript
PPT
Accelerating the deployment of technology to business opportunities-chevron T...
PPT
Presentation On Warehousing
“Achieving Mine to Market Throughput” – Iluka South West Operations – Case...
Water Infrastructure Projects in Brazil 2012
BMO Capital Markets 2014 Global Metals & Mining Conference
Gabriel India Limited_ProjectPresentation
2021 Is the floating LNG moment?
Design and Rating of Packed Distillation Columns
Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012
Design notes5
CD 2016 March - Advisian Showcase
part 1 .pdf.pdf
Selection of Internals for Distillation Columns
Chato liquid acquisition strategies for exploration missions current status 2010
5.ve volume 1_ve_burton
2011-08-18 AEM Technical Update
OCS TRAINING - HPHT DRILLING DESIGN AND OPERATION 5 DAYS - PUBLIC TRAINING.pdf
Curriculum vitae_Bhupat Kanani
Curriculum vitae Bhupat Kanani
IPTC 16192 Manuscript
Accelerating the deployment of technology to business opportunities-chevron T...
Presentation On Warehousing

More from Ekkadit S. (7)

PDF
TOEIC
PDF
transcript
PDF
TOEIC
PDF
Ecoscope Level 2 cert.
PDF
MWD level 2 cert.
PDF
LWD level 1 cert.
PDF
CV_Ekkadit Siriwachirawat_6AUG2016_Ref
TOEIC
transcript
TOEIC
Ecoscope Level 2 cert.
MWD level 2 cert.
LWD level 1 cert.
CV_Ekkadit Siriwachirawat_6AUG2016_Ref

Final presentation Rev3

  • 1. Critical First Well Process: High Temperature Wells in Gulf of Thailand Block I – December 2013 Kody Chandler Halliburton Baroid Gulf of Mexico Ekkadit Siriwachirawat Halliburton Baroid Thailand
  • 2. 2 At Halliburton, solving customer challenges is second only to keeping everyone safe and healthy. You can find more safety tips at www.halliburton.com/HSE. • Plan the Trip • Prepare Vehicle • Prepare Yourself Winter Driving
  • 3. 3 Objectives • Analyze the Critical First Well (CFW) Process. • Interpret information provided in CFW Checklists. • Explain the role of the GTFA. • Describe the CFW process. - Technical Mainstay - Role in DDSQ
  • 4. 4 Customer: Chevron Thailand Exploration Platform: SBWA (South Baanphot Alpha) 1st Batch: 5 Wells Rig name: Key Gibraltar Project Overview
  • 5. 5 Overview of Technical and Black Book Processes
  • 6. 6 Estimated BHT 425o F. Issues getting logs to bottom. No previous logging data. Barite sag, especially in static conditions. Identify the Challenge
  • 7. 7 Solution Creation “This was probably the most-tested fluid Baroid has ever launched,” JJ Miller, Global Technical Services Manager for Baroid HalNews 9/30/2013
  • 8. 8 Solution Creation “Doing Our Homework” System Performance Review Evaluate POP System Customization System Rationalization ValidationData Analysis
  • 9. 9 Solution Creation “Doing Our Homework” System Performance Review Evaluate POP System Customization System Rationalization ValidationData Analysis  Offset well data from SBWA-10,19, 14 and 02  Lessons Learned Log from SBWA project in 2011
  • 10. 10 Solution Creation “Doing Our Homework” System Performance Review Evaluate POP System Customization System Rationalization ValidationData Analysis  Fluid Risk Assessment – Mud Engineers unfamiliar with Chevron GoT operation – Consumption of chemicals more than expected – Contamination with CO2 – Lost Circulation
  • 11. 11 Solution Creation “Doing Our Homework” System Performance Review Evaluate POP System Customization System Rationalization ValidationData Analysis  Opportunity to introduce “new products” to the customer – PERFORMUL – BENTONE 38
  • 12. 12 Solution Creation “Doing Our Homework” System Performance Review Evaluate POP System Customization System Rationalization ValidationData Analysis  Lab work flow: Bangkok  Kuala Lumpur  Jarkata  Pune  Houston  Lab Testing new HT ENVIROMUL formulation – PERFORMUL 7.5 ppb – BENTONE 38 2.0 ppb
  • 13. 13 Solution Creation “Doing Our Homework” System Performance Review Evaluate POP System Customization System Rationalization ValidationData Analysis
  • 14. 14 Solution Creation “Doing Our Homework” System Performance Review Evaluate POP System Customization System Rationalization ValidationData Analysis  Ops Leader & Country Manager confirm all potential solutions can be effectively delivered to customer.
  • 15. 15 Overview of Technical and Black Book Processes
  • 16. 16 CFW Process Map  Criteria for determining a CFW  Process-driven  Sets us apart from our competitors
  • 17. 17 Baroid was relegated to servicing a few rigs working on low- temperature wells. Unsuccessful HT Well project in 2011. August September October November December Baroid was called upon to enhance this fluid for HT wells,. Radioactive Source got stuck in the well bore and was irretrievable. Baroid’s service was reduced from 8 rigs to 2 rigs. The wellbores were not log-able because of the fluid’s gelation.
  • 20. 20 Overview of Technical and Black Book Processes
  • 21. 21 Present the Value Avg. Cost $750K USD / Well, approx. $3.8M “Zero” NPT and Recordable Incidents 5 Wells Completed - 72,767 ft in 77 days
  • 22. 22  Success in getting logs to bottom  Consistent mud weight, especially during periods without circulation – No barite sag Key Performance Indicators
  • 23. 23  Customer focused  Excellence in delivery – Quality – Consistency  Delivering on our word CFW Process and DDSQ
  • 24. 24  HalNews 9/30/2013 “Lab testing brings HT success in the Gulf of Thailand”.  SBWA Pre-Spud Meeting May 5th, 2013  SBWA Risk management planning.  Asia Pacific Share point : Technical and Black Book Process Page  Baroid Critical First Well Support : Chevron SWBA 2nd Pass Debrief and Lessons Learned Report on18 June 2013 report by Robert Bertrand (GTFA)  Shell Safety Alert : September 2013.  Critical Well Process PM-GL-HAL-HMS-702  Critical Well Execution Process Criteria ST-GL-HAL-HMS-702  Personal Interview: Chip Miller, Vice President  Personal Interview: Toby Dixon, Global Ops Manager  Personal Interview: Dennis Lynch, PASQ and HSE Manager  High Temperature OBM fluids for Chevron Lab Test Report in Pune, India 23rd March 2012 Reference

Editor's Notes

  • #2: Together
  • #3: Men
  • #4: Both - What we expect you to learn from this presentation.
  • #5: Men
  • #6: Kody
  • #7: Both
  • #8: Kody
  • #9: Kody introduce SC process
  • #10: Kody - Details of formulation of mud.
  • #11: Men - Details of formulation of mud.
  • #12: Men - Details of formulation of mud.
  • #13: Kody - Details of formulation of mud.
  • #14: Kody - Details of formulation of mud.
  • #15: Kody - Details of formulation of mud.
  • #16: Kody
  • #17: Kody - Whole process increases our success rate
  • #18: Both - Lost business to competitor because of their formulation. Baroid given a second chance to earn back the business and deliver on our word.
  • #19: Kody - Finding the need behind the need. GTFA details: FP2, run 70-75% of mud systems, reservoir drilling and completion fluids experience, knowledge of BSS, responsible for their own recap. GTFA on the frontline ensuring we are meeting customer’s needs and educating the customer and our personnel
  • #20: Kody - Only 6 currently worldwide – 3 supervised over the first 3 wells in Thailand: Randall Adamson, Robert Bertrand, Bob DeWolfe.
  • #21: Kody
  • #22: Men
  • #23: Men
  • #24: Kody - Quality of steak at the consistency of McDonald’s.