Flood,  Flood Control Cell,  Flood Forecasting
Total dams under flood monitoring 193 Major Medium Minor Total North Gujarat Central Gujarat South Gujarat Kachchh Saurashtra Total 193 Gated: Ungated:
Occurrence of flood: Heavy and wide spread rain persists in the contributing catchment area of the river system. (Quantity and duration of rainfall) Flash floods in smaller river basins occur due to concentrated spells of heavy rain/ cloud bursts in short periods When carrying capacity of river channel is insufficient Wetness of the underlying surface at the time of rainfall Course of monsoon system causing rain and the direction of river flow.
Floods due to breaches: Failure of structures/ embankments of reservoirs and rivers/ operational mistakes Breaches in the embankment Sudden release of water from the dam Failure of reservoirs
Floods due to meteorological situation : Tropical storms and depressions Active monsoon situation Break monsoon situation
Effect of Flood Any flood occurred due to either release from the dam or natural river flow causes loss of life,  damage to the properties,  damage to standing crops,  polluting drinking water sources,  disruption to road/ rail transportation system and communication system.
Flood Management Therefore it is important to evolve flood management technique so as to minimise loss of lives and property on account of release of water from the dam and also to store the flood water in the reservoir.  Two types of measures  Structural measure Non-structural measures [A] Structural measures: Protection works Flood embankments [B] Non-structural measures Flood forecasting Flood warning Flood plain zoning
Among the above measures, the non-structural measures particularly flood forecast is more important The need of hydrological forecasts is more and more felt and reliable forecast service becomes a necessity both for a means of flood damage reduction and reservoir regulations. The need of flood forecasting
Flood forecasting system can be effectively evolved by  Setting up improved/ computerised flood control cell Setting up effective instrumentation for observation of hydrological and hydro-meteorological data. Setting up of effective communication system for transferring data even under most adverse conditions. The data to be transmitted and processed  Rainfall, weather forecast, river gauges, reservoir  level and releases through gates.
Decisions to be taken at flood cell : Computation of inflow forecasts to reservoirs Decide releases from the dams Issue Flood warnings for down stream localities
Flood cell shall maintain the following basic data Information: List of project under monitoring with its detail Basin map of each project. Flood memorandum:- keep ready the chapters related to your dam. Data of history of past flood. Area - capacity table. Weather forecast Equipments: Wireless set - Its link periodical checking. Mobile. Computer - Xerox  / Fax machine. Internet facility. Detail of rainfall / river gauge station in the C.A.
(Contd…) Telephone/ mobile Nos of of related authority e.g. Revenue authority i.e. collector, D.D.O., Mamlatdar Police M. L. A. Vilage Sarpanch, Talati
Duties of flood operator : Sitting in the chair of operation of flood, the followings are to be kept in mined. (i) P W L (ii) Present storage. (iii) Any warning from IMD, CWC or from other  authority for rainfall, flood etc. (iv) Rule level of the particular day. (v) Cushion available in the dam w.r.t. rule level & F  R L. (vi) Present inflow / outflow.
For effectively reservoir operation, the operation of flood shall keep the following details in mind. Fully acquivant with the basin. Size, type, extent. General slope, vegetation cover. Rainfall station. Distance from the dam site. Representation catchments area. Communication of rainfall data to dam site, flood control cell. River gauging station: Correlate the gauge level and its river discharge. Details of upstream dam (if any) w.r.f. its storages, max. release capacity, travel time of flood from U/S dam to our dam site, arrangement of communication of release of flood. Travel time of flood upto dam site.
Unexpected situations A  very difficult situation arises when the official responsible for formulation of forecast is handicapped because of: Non availability of all the desired data/ information, and Deviation from the defined boundary conditions. Breach in flood embankments of river Rain of very high intensity at location in between the base and the forecasting stations. Unexpected regulation of control structures.
During very severe floods communications may fail and the only information available at the dam may be reservoir water level and the rate of rise. Unexpected situations
Present flood forecasting system : For inter-state rivers CWC is responsible for making observation and issue of forecasts for reservoir regulation and important cities. For rivers of the state Focal officers/ officers in charge of the dam decides the quantum of flood reaching the dam site at a particular point of time.
Action to be taken at the time of unexpected situation Decide the rate of rise of water level and period of filling cushion available in the reservoir. Decide the inflow rate Decide the period of filling cushion available in the reservoir Check the data of historical flood  Decide the release keeping in view the inflow rate, time to fill the flood cushion and historical flood.
Release of Water and flood warning : Safety of the reservoir Safe carrying capacity of river channel Keeping in view the inflow rate, water level in the reservoir, Rule levels, cushion available in the reservoir, storage position of d/s reservoir When the release of water from more then one reservoir in the same river, care shall be taken to restrict the flow within the banks, storage position of the d/s dam. The tidal position at the time of release of water. As far as possible release the water during ebb period. Avoid releasing flood during nights as far as possible. Manage the release of water in such a way that it can be avoided during Night. Warning of release water to the d/s area shall be well in advance following the guidelines laid in flood memorandum. As far as possible warning regarding quantum of flood water should be given comparing same amount of flood in past. Inform the concern Revenue, Police, MLA, Concerned village Sarpanch/ Talati, Railway authority , Highway authority etc.
Weather forecast: Issued by IMD Last 24 hr data Five day Rainfall forecast (Districtwise) Qualitative forecast for next 24 hrs showing the trend of storm movement and rain fall. Satellite image
Thank You

More Related Content

PPTX
types of flood & flood mitigation/management techniques - damages
PPTX
Flood frequency analyses
PPTX
Flood management
PDF
L 2 sources and water supply schemes
PPTX
Flood management m4
PPTX
Landslides with case studies Presentation by Anand Swaroop Jaichandran
PPTX
PPTX
ROLE OF SOCIAL MEDIA IN DISASTER MANAGEMENT
types of flood & flood mitigation/management techniques - damages
Flood frequency analyses
Flood management
L 2 sources and water supply schemes
Flood management m4
Landslides with case studies Presentation by Anand Swaroop Jaichandran
ROLE OF SOCIAL MEDIA IN DISASTER MANAGEMENT

What's hot (20)

PPTX
Flood - Mitigation & Management
PDF
Floods in India
PDF
river training work
PPTX
Uttrakhand disaster
PPTX
2. glof
PPTX
Disaster mitigation - land slide
PPTX
PPTX
Floods causes & impacts
PPTX
Flood control
PPTX
Presentation on flood
PDF
Flood risk assessment: Introduction and examples.
PPTX
Flood ppt
PPTX
Floods management
PPTX
Designing a landfill
PPT
FLOOD MANAGEMENT
PDF
Floods as natural hazards
PPTX
Flood presentation with more media
PPTX
Rain water harvesting ppt
PPT
Sewerage network
PPTX
Water management techniques
Flood - Mitigation & Management
Floods in India
river training work
Uttrakhand disaster
2. glof
Disaster mitigation - land slide
Floods causes & impacts
Flood control
Presentation on flood
Flood risk assessment: Introduction and examples.
Flood ppt
Floods management
Designing a landfill
FLOOD MANAGEMENT
Floods as natural hazards
Flood presentation with more media
Rain water harvesting ppt
Sewerage network
Water management techniques
Ad

Viewers also liked (12)

PPTX
FLOOD PREVENTION, MITIGATION AND PREPAREDNESS
PPT
Presentation FLOOD-WISE at UNECE
PDF
ASSESSMENT OF FLOOD MITIGATION STRATEGIES FOR THE CITY OF KALONA, IA
PPTX
Flood Mitigation Strategy for the Milwaukee 30th Street Corridor Redevelopmen...
PPTX
Disaster management and mitigation
PPT
L6 Causes Of Flooding
PPT
PPTX
Flood routing
PPTX
Runoff & Flood Frequency Analysis
PPTX
Flood forecasting presentation final
PDF
SMART Seminar Series: "Geosocial intelligence: assisting flood mitigation"
FLOOD PREVENTION, MITIGATION AND PREPAREDNESS
Presentation FLOOD-WISE at UNECE
ASSESSMENT OF FLOOD MITIGATION STRATEGIES FOR THE CITY OF KALONA, IA
Flood Mitigation Strategy for the Milwaukee 30th Street Corridor Redevelopmen...
Disaster management and mitigation
L6 Causes Of Flooding
Flood routing
Runoff & Flood Frequency Analysis
Flood forecasting presentation final
SMART Seminar Series: "Geosocial intelligence: assisting flood mitigation"
Ad

Similar to Gujarat flood presentation (20)

PDF
Flood Report
PPTX
Flash flood
PPTX
Hydrological Observation, Network Establishment of sites.pptx
PDF
Smart monitoring system of Najran dam
PDF
SWaRMA_IRBM_Module2_#6, Flood management in Nepal, Dilip Gautam
PPTX
L7 hydrograph
PDF
Boletin tecnico informativo n. 61 EFECTO DE LAS LLUVIAS EN LAS COMUNIDADES. E...
PPTX
Floods in Pakistan
PPTX
Hydrology unit 1 4th year.pptx ppt noted
PPTX
chapter-4- Water Carriage Sanitation System
PPTX
Key faced notes of geography for student
PPTX
Flood control by Dr Sandeep Yadav
PPTX
Flood & drought management
PPTX
4_HYDROLOGY.pptx fdfjyf6r6 uyguydtdhtytdys
 
PDF
What You Need to Know About NOAA Atlas 14, Gregory Waller - National Oceanic ...
DOCX
© Copyright 2004; VVimaging, Inc. All Rights Res.docx
PPTX
L5 - ESTIMATION OF SEWAGE.pptx
PPTX
Session 4: Establishment of Community-Based Flood Early Warning System (CBFEWS)
PDF
C-039.pdf
Flood Report
Flash flood
Hydrological Observation, Network Establishment of sites.pptx
Smart monitoring system of Najran dam
SWaRMA_IRBM_Module2_#6, Flood management in Nepal, Dilip Gautam
L7 hydrograph
Boletin tecnico informativo n. 61 EFECTO DE LAS LLUVIAS EN LAS COMUNIDADES. E...
Floods in Pakistan
Hydrology unit 1 4th year.pptx ppt noted
chapter-4- Water Carriage Sanitation System
Key faced notes of geography for student
Flood control by Dr Sandeep Yadav
Flood & drought management
4_HYDROLOGY.pptx fdfjyf6r6 uyguydtdhtytdys
 
What You Need to Know About NOAA Atlas 14, Gregory Waller - National Oceanic ...
© Copyright 2004; VVimaging, Inc. All Rights Res.docx
L5 - ESTIMATION OF SEWAGE.pptx
Session 4: Establishment of Community-Based Flood Early Warning System (CBFEWS)
C-039.pdf

More from Tushar Dholakia (20)

PDF
Iirs rstechnologypdf
PDF
Iirs overview -Remote sensing and GIS application in Water Resources Management
PDF
Iirs lecure notes for Remote sensing –An Overview of Decision Maker
PDF
Iirs lecturers & gis for regional planning
PDF
Iirs lecture space inputs to disaster management in india
PDF
Operational Remote sensing Applications
PDF
Iirs Institutions-Geospatial services in India
PDF
Iirs Artificial Naural network based Urban growth Modeling
PDF
Iirs district plan1
PDF
Iirs remote sensing data policy (RSDP)
PDF
Iirs Role of Remote sensing and GIS in Ground water studies
PDF
Iirs gps dmc 2010
PDF
Iirs - Overview of GIS
PDF
Iirs Remote sensing and GIS application in Agricultur- Indian Experience
PDF
Iirs Remote sensing application in Urban Planning
PDF
Iirs- Opensources software solutions and Data services for Domain
PDF
effective use of consultant
PDF
Nashik photos
PDF
LARGE SCALE INSTALLATION OF SUBSURFACE DRAINAGE SYSTEM
PDF
Panam Project Presentation
Iirs rstechnologypdf
Iirs overview -Remote sensing and GIS application in Water Resources Management
Iirs lecure notes for Remote sensing –An Overview of Decision Maker
Iirs lecturers & gis for regional planning
Iirs lecture space inputs to disaster management in india
Operational Remote sensing Applications
Iirs Institutions-Geospatial services in India
Iirs Artificial Naural network based Urban growth Modeling
Iirs district plan1
Iirs remote sensing data policy (RSDP)
Iirs Role of Remote sensing and GIS in Ground water studies
Iirs gps dmc 2010
Iirs - Overview of GIS
Iirs Remote sensing and GIS application in Agricultur- Indian Experience
Iirs Remote sensing application in Urban Planning
Iirs- Opensources software solutions and Data services for Domain
effective use of consultant
Nashik photos
LARGE SCALE INSTALLATION OF SUBSURFACE DRAINAGE SYSTEM
Panam Project Presentation

Recently uploaded (20)

PPTX
Chinmaya Tiranga Azadi Quiz (Class 7-8 )
PDF
Indian roads congress 037 - 2012 Flexible pavement
PDF
RTP_AR_KS1_Tutor's Guide_English [FOR REPRODUCTION].pdf
PDF
Complications of Minimal Access Surgery at WLH
PDF
Supply Chain Operations Speaking Notes -ICLT Program
PDF
IGGE1 Understanding the Self1234567891011
PDF
advance database management system book.pdf
PDF
What if we spent less time fighting change, and more time building what’s rig...
PDF
Black Hat USA 2025 - Micro ICS Summit - ICS/OT Threat Landscape
PPTX
UV-Visible spectroscopy..pptx UV-Visible Spectroscopy – Electronic Transition...
PPTX
Unit 4 Skeletal System.ppt.pptxopresentatiom
PPTX
Introduction to Building Materials
PPTX
Radiologic_Anatomy_of_the_Brachial_plexus [final].pptx
PDF
Classroom Observation Tools for Teachers
PDF
Chinmaya Tiranga quiz Grand Finale.pdf
PPTX
A powerpoint presentation on the Revised K-10 Science Shaping Paper
PDF
A GUIDE TO GENETICS FOR UNDERGRADUATE MEDICAL STUDENTS
PDF
OBE - B.A.(HON'S) IN INTERIOR ARCHITECTURE -Ar.MOHIUDDIN.pdf
PPTX
Lesson notes of climatology university.
PPTX
CHAPTER IV. MAN AND BIOSPHERE AND ITS TOTALITY.pptx
Chinmaya Tiranga Azadi Quiz (Class 7-8 )
Indian roads congress 037 - 2012 Flexible pavement
RTP_AR_KS1_Tutor's Guide_English [FOR REPRODUCTION].pdf
Complications of Minimal Access Surgery at WLH
Supply Chain Operations Speaking Notes -ICLT Program
IGGE1 Understanding the Self1234567891011
advance database management system book.pdf
What if we spent less time fighting change, and more time building what’s rig...
Black Hat USA 2025 - Micro ICS Summit - ICS/OT Threat Landscape
UV-Visible spectroscopy..pptx UV-Visible Spectroscopy – Electronic Transition...
Unit 4 Skeletal System.ppt.pptxopresentatiom
Introduction to Building Materials
Radiologic_Anatomy_of_the_Brachial_plexus [final].pptx
Classroom Observation Tools for Teachers
Chinmaya Tiranga quiz Grand Finale.pdf
A powerpoint presentation on the Revised K-10 Science Shaping Paper
A GUIDE TO GENETICS FOR UNDERGRADUATE MEDICAL STUDENTS
OBE - B.A.(HON'S) IN INTERIOR ARCHITECTURE -Ar.MOHIUDDIN.pdf
Lesson notes of climatology university.
CHAPTER IV. MAN AND BIOSPHERE AND ITS TOTALITY.pptx

Gujarat flood presentation

  • 1. Flood, Flood Control Cell, Flood Forecasting
  • 2. Total dams under flood monitoring 193 Major Medium Minor Total North Gujarat Central Gujarat South Gujarat Kachchh Saurashtra Total 193 Gated: Ungated:
  • 3. Occurrence of flood: Heavy and wide spread rain persists in the contributing catchment area of the river system. (Quantity and duration of rainfall) Flash floods in smaller river basins occur due to concentrated spells of heavy rain/ cloud bursts in short periods When carrying capacity of river channel is insufficient Wetness of the underlying surface at the time of rainfall Course of monsoon system causing rain and the direction of river flow.
  • 4. Floods due to breaches: Failure of structures/ embankments of reservoirs and rivers/ operational mistakes Breaches in the embankment Sudden release of water from the dam Failure of reservoirs
  • 5. Floods due to meteorological situation : Tropical storms and depressions Active monsoon situation Break monsoon situation
  • 6. Effect of Flood Any flood occurred due to either release from the dam or natural river flow causes loss of life, damage to the properties, damage to standing crops, polluting drinking water sources, disruption to road/ rail transportation system and communication system.
  • 7. Flood Management Therefore it is important to evolve flood management technique so as to minimise loss of lives and property on account of release of water from the dam and also to store the flood water in the reservoir. Two types of measures Structural measure Non-structural measures [A] Structural measures: Protection works Flood embankments [B] Non-structural measures Flood forecasting Flood warning Flood plain zoning
  • 8. Among the above measures, the non-structural measures particularly flood forecast is more important The need of hydrological forecasts is more and more felt and reliable forecast service becomes a necessity both for a means of flood damage reduction and reservoir regulations. The need of flood forecasting
  • 9. Flood forecasting system can be effectively evolved by Setting up improved/ computerised flood control cell Setting up effective instrumentation for observation of hydrological and hydro-meteorological data. Setting up of effective communication system for transferring data even under most adverse conditions. The data to be transmitted and processed Rainfall, weather forecast, river gauges, reservoir level and releases through gates.
  • 10. Decisions to be taken at flood cell : Computation of inflow forecasts to reservoirs Decide releases from the dams Issue Flood warnings for down stream localities
  • 11. Flood cell shall maintain the following basic data Information: List of project under monitoring with its detail Basin map of each project. Flood memorandum:- keep ready the chapters related to your dam. Data of history of past flood. Area - capacity table. Weather forecast Equipments: Wireless set - Its link periodical checking. Mobile. Computer - Xerox / Fax machine. Internet facility. Detail of rainfall / river gauge station in the C.A.
  • 12. (Contd…) Telephone/ mobile Nos of of related authority e.g. Revenue authority i.e. collector, D.D.O., Mamlatdar Police M. L. A. Vilage Sarpanch, Talati
  • 13. Duties of flood operator : Sitting in the chair of operation of flood, the followings are to be kept in mined. (i) P W L (ii) Present storage. (iii) Any warning from IMD, CWC or from other authority for rainfall, flood etc. (iv) Rule level of the particular day. (v) Cushion available in the dam w.r.t. rule level & F R L. (vi) Present inflow / outflow.
  • 14. For effectively reservoir operation, the operation of flood shall keep the following details in mind. Fully acquivant with the basin. Size, type, extent. General slope, vegetation cover. Rainfall station. Distance from the dam site. Representation catchments area. Communication of rainfall data to dam site, flood control cell. River gauging station: Correlate the gauge level and its river discharge. Details of upstream dam (if any) w.r.f. its storages, max. release capacity, travel time of flood from U/S dam to our dam site, arrangement of communication of release of flood. Travel time of flood upto dam site.
  • 15. Unexpected situations A very difficult situation arises when the official responsible for formulation of forecast is handicapped because of: Non availability of all the desired data/ information, and Deviation from the defined boundary conditions. Breach in flood embankments of river Rain of very high intensity at location in between the base and the forecasting stations. Unexpected regulation of control structures.
  • 16. During very severe floods communications may fail and the only information available at the dam may be reservoir water level and the rate of rise. Unexpected situations
  • 17. Present flood forecasting system : For inter-state rivers CWC is responsible for making observation and issue of forecasts for reservoir regulation and important cities. For rivers of the state Focal officers/ officers in charge of the dam decides the quantum of flood reaching the dam site at a particular point of time.
  • 18. Action to be taken at the time of unexpected situation Decide the rate of rise of water level and period of filling cushion available in the reservoir. Decide the inflow rate Decide the period of filling cushion available in the reservoir Check the data of historical flood Decide the release keeping in view the inflow rate, time to fill the flood cushion and historical flood.
  • 19. Release of Water and flood warning : Safety of the reservoir Safe carrying capacity of river channel Keeping in view the inflow rate, water level in the reservoir, Rule levels, cushion available in the reservoir, storage position of d/s reservoir When the release of water from more then one reservoir in the same river, care shall be taken to restrict the flow within the banks, storage position of the d/s dam. The tidal position at the time of release of water. As far as possible release the water during ebb period. Avoid releasing flood during nights as far as possible. Manage the release of water in such a way that it can be avoided during Night. Warning of release water to the d/s area shall be well in advance following the guidelines laid in flood memorandum. As far as possible warning regarding quantum of flood water should be given comparing same amount of flood in past. Inform the concern Revenue, Police, MLA, Concerned village Sarpanch/ Talati, Railway authority , Highway authority etc.
  • 20. Weather forecast: Issued by IMD Last 24 hr data Five day Rainfall forecast (Districtwise) Qualitative forecast for next 24 hrs showing the trend of storm movement and rain fall. Satellite image